HomeMy WebLinkAboutRPZ REPORT 8/15/2016 illimillill.171..
ETR O
Reduced Pressure Zone Backflow Preventer Valve & Double Check (DC)Assembly Valve
Rebuild & Test Report
1-\1)0AA4 59 1
0 AS k,
IAU la D k-v t k-t Y\ OAS D r 1 til ,;2- (,Y-e- 1: -"?"3-2._
1n)� V l S 9 --)(1.-- lA - I i( 4, 11 g2
Eav vi GAS14 v>n ti tiDD Y,.. C4C Wci51%,_
Test Yr. Check Valve#1 Check Valve#2 Differential Pressure Relief
1 2 3 4 Leaked ( ) Closed ( Leaked ( ) Closed (>( Did Not open( )
Overhauled )
Install ( ) Pressure : '1%2- Pressure : 7' Opened At: Z .S-
R
SR Cleaned Cleaned Cleaned
E Replaced Replaced Replaced
P Poppet Poppet Poppet
Spring Spring Spring
A 0 Ring 0 Ring 0 Ring
Rubber Seat Rubber Seat Rubber Seat
I
Other Repairs Other Repairs Other Repairs
R
S
Certification # 2 Shutoff Valve:
I hereby certify the foregoing data to be correct and that the device tested is Pass g
functioning within the limits of the standards. Fail ❑
Signature: `
/116F--
Date' g ilrilko Assembly Final Test
Performance:
COLE FORD BF066445 I GARY FORD BF058476 I ALAN FARR BF066481
Metro Plumbing I Metro Testing,LLC 9112 Davenport Street NE,Blaine,55449 612.221-5888 Pass
Plumbing Bond License:PC646918 Mechanical Bond Certificate ID:5054-MB Fail ❑
This report is for the purposes of recording only;Owner is responsible for safe operation and upkeep of scheduled maintenance.