Loading...
HomeMy WebLinkAboutRPZ REPORT 8/15/2016 illimillill.171.. ETR O Reduced Pressure Zone Backflow Preventer Valve & Double Check (DC)Assembly Valve Rebuild & Test Report 1-\1)0AA4 59 1 0 AS k, IAU la D k-v t k-t Y\ OAS D r 1 til ,;2- (,Y-e- 1: -"?"3-2._ 1n)� V l S 9 --)(1.-- lA - I i( 4, 11 g2 Eav vi GAS14 v>n ti tiDD Y,.. C4C Wci51%,_ Test Yr. Check Valve#1 Check Valve#2 Differential Pressure Relief 1 2 3 4 Leaked ( ) Closed ( Leaked ( ) Closed (>( Did Not open( ) Overhauled ) Install ( ) Pressure : '1%2- Pressure : 7' Opened At: Z .S- R SR Cleaned Cleaned Cleaned E Replaced Replaced Replaced P Poppet Poppet Poppet Spring Spring Spring A 0 Ring 0 Ring 0 Ring Rubber Seat Rubber Seat Rubber Seat I Other Repairs Other Repairs Other Repairs R S Certification # 2 Shutoff Valve: I hereby certify the foregoing data to be correct and that the device tested is Pass g functioning within the limits of the standards. Fail ❑ Signature: ` /116F-- Date' g ilrilko Assembly Final Test Performance: COLE FORD BF066445 I GARY FORD BF058476 I ALAN FARR BF066481 Metro Plumbing I Metro Testing,LLC 9112 Davenport Street NE,Blaine,55449 612.221-5888 Pass Plumbing Bond License:PC646918 Mechanical Bond Certificate ID:5054-MB Fail ❑ This report is for the purposes of recording only;Owner is responsible for safe operation and upkeep of scheduled maintenance.