HomeMy WebLinkAbout7A Overlay Public Hearing Presentation2017 Overlay Improvement Project March 13, 2017 Public Improvement Hearing Agenda •Project Objectives •Project Area •Existing Conditions •Proposed Improvements •Estimated Project Costs •Proposed Assessments •Special Assessment Process (MN Statutes Chapter 429) •Preliminary Project Schedule •Project Feedback •Next Steps Project Objectives To provide timely replacement of the existing pavement surface to maximize the life of the street. The overlay improvements will include: •Replacement of cracked or damaged curb and gutter •Milling and paving 1.5-inches of new bituminous •Restoration Project Area Project Area Cardinal Ridge Neighborhood Project Area Five Hawks Avenue SE Existing Conditions Existing pavement Overall Condition Index (OCI) ratings: •Cardinal Ridge Neighborhood ranges from 31.7 to 39.5 •Five Hawks Avenue SE is 27.5 The OCI is used as a guide to determine the type of project that is proposed. •0.0 to 45.0 Poor (Reclaim/Reconstruction) •45.1 to 65.0 Fair (Mill and Overlay) •65.1 to 100.0 Good (Preventative Maintenance) Existing Conditions Proposed Improvements Cardinal Ridge Neighborhood •Replace damaged or cracked curb and gutter •Edge mill to a depth of 1.5 inches and approximately 7 to 8 feet wide along curb line on both sides of the street •Pave 1.5 inches of new bituminous over the entire roadway width •Complete any restoration behind replaced curb and gutter that is needed Proposed Improvements Five Hawks Avenue SE •Replace damaged or cracked curb and gutter •Mill to a depth of 1.5 inches the full width of the street •Pave 1.5 inches of new bituminous over the entire roadway width •Complete any restoration behind replaced curb and gutter that is needed Estimated Project Costs Project Funding ITEM PROJECT TOTAL Ad Valorem (Property Taxes)$166,643 Assessments $350,357 Total $517,000 Proposed Assessments Assessment amounts are based on the City 2017 Fee Schedule per Residential Equivalent Density (RED): The fee per RED = $1,200 •Single Family (1.0 RED)=$1,200 •Townhouse (1.0 RED) =$1,200 •Condominium (0.8 RED) =$ 960 •Church/School (area÷2.5) =varies Assessment Period is 5 years Special Assessment Process Public Improvement Process for Special Assessment Projects •Order Feasibility Study •Accept Feasibility Study and Order Public Hearing •Hold Public Hearing and Order the Project •Approve Plans and Order Advertisement for Bids •Accept Bids and Award Construction Contract •Complete Construction •Hold Assessment Hearing and Adopt Assessment Roll •Certify Assessments to County Auditor Preliminary Project Schedule ACTIVITY DATE City Council Ordered Feasibility Study November 28, 2016 Accept Feasibility Report / Call for Public Hearing February 13, 2017 Conduct Public Hearing/Order Project March 13, 2017 Approve Plans and Specifications/Order Ad for Bids April 10, 2017 Open Bids May 2017 Accept Bids/Award Contract May 2017 Begin Construction June 2017 Complete Construction August 2017 Schedule Assessment Hearing October 2017 Conduct Assessment Hearing/Adopt Assessment Roll October 2017 Project Feedback City Project Email •2 emails received to date •Concern with holding Public Hearing during ISD 719 spring break •Concern with being assessed for overlay project Next Steps •City Council Initial Questions •Open Public Hearing •End Public Hearing •Answer Questions from the Public Hearing •City Council Discussion •Consider Approval of a Resolution Ordering the Project