HomeMy WebLinkAboutDRIVEWAY PERMIT ittl:p
0
"EXHIBIT B"
• FOR CITY USE ONLY
DRIVEWAY PERMIT PERMIT# 03-Di(
DATE 7-30-02
APPLICANT NAME: Oa-r f CC l 1 '
OWNER NAME: /� -
PROPERTY ADDRESS: 3 I 4g4 5+ Scr 11
TO CONSTRUCT:, New 0 Replace 0 Widen
TYPE OF PROPERTY: �I'Residential 0 Commercial 0 Industrial
Proposed width of temporary or permanent driveway I (Please provide sketch on reverse side or on separate sheet)
Type of Material CAwtAtie
Is property within the Shoreland District? 0 YeskVo (If yes,applicant must submit impervious surface calculation)
i i 15 /S A lel
driveway is proposed off what roadway?
is driveway shared by another property owner? 0 Yes No (If yes,signature of all parties is required)
Estimated Start Date 1. 31.0)
iI
Estimated Completion Date . II. 6 b
SKETCH REQUIREMENTS
1. A driveway sketch is required as a part of this permit. The sketch can be drawn on page two of the permit or on a
separate sheet. The sketch does not need to be drawn to scale,however dimensions must be provided on sketch.
2. Driveway sketch should include proposed driveway, existing driveway(dashed line), driveway dimensions,property
lines, dimensions of driveway from property lines, building locations near driveway, arrow indicating north, surface
features near proposed driveway location(trees,hydrants,utilities,etc.).
3. If on a corner lot,the sketch should include dimensions to intersecting roadways.
CONDITIONS OF APPROVAL
1.
2.
3.
4.
No work under this application is to be started until application is approved and the permit is issued.
Where work on traveled roadway is necessary, traffic must be protected and flags, signs, safety cones and proper
barricades must be placed in accordance with safety procedures.
No foreign material such as dirt, gravel, or bituminous material shall be left or deposited on the road during the
construction of driveway.
Road must be swept clean after work is completed.
5. Prior to placement of concrete or bituminous surfacing,the applicant shall notify the Engineering Department at 952-
447-9830 that the work has been completed and is ready for final inspection.
6. No changes or alterations in entrances may be made at any time without written permission from the Engineering
Department.
-
13 z Qcg - m as 0D `' 4
3 2" coo 3, II
• m g.a m mf•o 70 a in C n g .O z Cc cn = a'5m3 o
•1 0 0 3•o m (tilt
� �mm ai =•o '.-.. z as am � "' r 3 � n m• n N C(O G -� Mm Q mm 8
m 3c3 cy, G �m 0a c�i3O 3 a
mfc
I
W.H
14 al m
al o
17
\ N 3 '
-8m =0 (8 •Z 7 m O•m O O
_ fp Om ca W, 0C 'op mm m
. , � � -- 5
'
3.
* ow D er1 mRa. m\ w C = ^o o5.
- O 0 ami Z =Sam r0 NNO
< v; ar O mom -' �o CO
Co < o.X' _ m mm go o N •,ate
o. m oma N alCO,� mN 0 m nj
a -i a
„�,r 0, m.0 @ -i ami �m m rn � CT) X
gy.3 Z crcm02 r,-co a m
'� 74
0.a °= O 'm Qg+ m 3 0 0
o -8 < S' St me * co
A 0 •••I _O m(Q O
o m N C1 n 7 "6 rt(Op O H
as m O.v 0_0 m O a 7 5i
n a
v � $ > W�omm 0
(�) \ to
mom - j m?n w
o a° aa)i ym �_. O
o a \m 5- m
3cm C \ • 9'yoo m
v
0 ID
1 Q m C 7-a 3
3
A
(Vi * N = O
G 0m- m
4 • =.aco
co N
7
5m
0 7
ma