DISCUSSION: Introduction
The purpose of this agenda item is to order the improvements for the 2017
Overlay Project if appropriate. The Public Hearing was held on March 13th,
2017. A motion to order the improvement failed on a 3-1 vote. A motion to
renew this item for consideration at a future City Council meeting when the
full City Council would be present was approved 4-0. Approval of the
resolution ordering the improvements requires a 4/5ths vote.
History
On November 28, 2016, the City Council ordered the preparation of a feasibility
study for the 2017 Street Improvements Project (Street Project #STR17-0000001).
The feasibility study was necessary because a portion of the funding for this project
is proposed to come from special assessments. State Statutes dictate that a
feasibility study can either be initiated by a petition of the affected property owners,
or at the direction of the City Council. This project was initiated at the direction of
the City Council.
Identification of the areas proposed for mill and overlay in 2017 are a result of the
City’s ongoing Pavement Management Program. The program was implemented to
maximize the useful life of the City’s streets.
Based on the Pavement Management Program data and field reviews by City staff,
the following streets were identified to be included in the 2017 Street Improvements:
Street From To
Kildeer Ln SE Crossandra St SE End
Mallard Way SE Crossandra St SE End
Wren Ct SE Crossandra St SE End
Parkview Circle SE Fish Point Rd SE End
Crossandra Circle SE Crossandra St SE End
Crossandra St SE Fish Point Rd SE- West
Side
Crosswalk
2
Crossandra St SE Victoria Curve SE Fish Point Rd SE
Cardinal Ridge Tr SE Crossandra St SE End
Cardinal Ridge Tr SE Crossandra St SE Fish Point Rd SE
Parkview Dr SE Cardinal Ridge Tr SE End
Parkview Dr SE Cardinal Ridge Tr SE Crossandra St SE
Oriole Pl SE Crossandra St SE End
Victoria Curve SE Fish Point Rd SE Parkview Dr SE
High Pointe Ct SE Fish Point Rd SE End
Overlook Circle SE Fish Point Rd SE End
Meadowview Ct SE Fish Point Rd SE End
Five Hawks Ave TH 13 Priorwood St SE
A map of the proposed project area is included in the Feasibility Report.
At the February 13, 2017 City Council meeting, the Council accepted the
feasibility study and scheduled the Public Hearing for March 13th, 2017.
Current Circumstances
The properties deemed to specially benefit from the improvements are
subject to assessment. Some properties do not directly about Five Hawks
Avenue SE but do receive their access to and from the transportation
system through this roadway and therefore should be assessed for this
special benefit.
Conclusion
The public hearing for this project was opened and closed on March 17,
2017.
City Staff is prepared to discuss each of the concerns presented at the
Public Hearing. If the Council deems the issues that have been brought up
need to be addressed in the project plans and specifications, direction
could be given to staff.
Completion of plans and specifications would be the next step. Once they
have been completed, they will be submitted to City Council for approval
and authorization to advertise for bids. The Council could decide not to
continue with the project upon receipt of the bids. A separate Assessment
Hearing can be scheduled at any time.
It is recommended to hold the assessment hearing in the fall so that
property owners can see the results of the project prior to the assessment
hearing. However, the proposed assessments have been established
according to the City’s 2017 Fee Schedule are not dependent upon the
actual construction costs nor will they cover the entire construction cost.
Therefore, the assessment hearing could be held prior to awarding the bid.
ISSUES: This will be the first pavement overlay project that will be completed under
the revised City Assessment Policy. The City Council approved
3
amendments to the Assessment Policy so that street reclamation and
street overlay projects would be assessed at their regular meeting on May
23, 2016.
It was concluded by the City Council that the use of assessments for
reclamation and overlay projects was appropriate and provides a funding
source that reduces the overall tax levy by distributing a portion of the
costs to the benefitting property owners.
Per the Assessment Policy, the assessment rate in 2017 for street overlay
projects is $1,200 for single family and $960 for multifamily (0.8 x $1,200).
Commercial and industrial parcels are assessed based on their Residential
Equivalent Density (RED). The assessment rate will be adjusted annually
with an escalator based on the Construction Cost Index (CCI). The
assessment period is over 5-years.
Based on the age of the City’s existing streets, the City is entering a time
period where more streets are in need of timely mill and overlay projects to
extend their useful lives. The previous method of funding these projects
put pressure on the tax levy. Utilizing special assessments brings greater
equity to the City’s funding of transportation improvements.
FINANCIAL
IMPACT:
The 2017 adopted Budget included the issuance of $300,000 in Revolving
Fund Bonds to partially finance the 2017 overlay project. Based on the
scope of the project, the bond amount will need to be increased slightly.
The remainder of the cost will be paid by the tax levy. Repayment of the
bonds will be provided by Special Assessments. The funding source and
the corresponding estimated amounts are shown below:
Ad Valorem $166,643
Assessments $350,357
Total $517,000
No other funding sources are currently available to assist with this project.
It is important to note that if the City Council were to reduce or eliminate
the assessments for this project at the assessment hearing, the only
alternative would be to increase the general tax levy to cover the project
budget shortfall.
ALTERNATIVES: 1. Approve a Resolution Ordering the 2017 Overlay Project, City
Project #STR17-000001 as proposed or with amendments.
2. Deny this item for a specific reason and provide staff with direction.
3. Table this item until some date in the future.
RECOMMENDED
MOTION:
A motion and a second for approval of Alternative #1. Approval of this
agenda item requires a 4/5ths vote.
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 17-___
ORDERING IMPROVEMENTS AND PREPARATION OF PLANS AND SPECIFICATIONS
FOR PROJECT # TRN17-000001
Motion By: Second By:
WHEREAS, The Prior Lake City Council on its own initiative has determined that it desires to
complete the Public Improvements for the 2017 Overlay Project; and
WHEREAS, On February 13, 2017; the City Council accepted the Feasibility Report and called
for a Public Hearing to be held for the 2017 Overlay Project which includes
bituminous surfacing and appurtenant work; and
WHEREAS, Ten days mailed notice and two weeks published notice of the hearing was given,
and the hearing was held on the 13th day of March, 2017, at which time all persons
desiring to be heard were given an opportunity to be heard thereon; and
WHEREAS, Since the project was initiated by the City Council it must be approved by 4/5ths
vote in accordance with Minnesota Statutes 429.031 Subdivision 1(f);
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. Such improvement is necessary, cost-effective, and feasibile as detailed in the feasibility
report.
3. The City Council by the required statutory 4/5ths vote does hereby order the project as
outlined in the feasibility study.
4. The Interim Public Works Director is hereby designated as the Engineer for these
improvements and is authorized to record engineering expenses in the Construction Fund
(#501-43500.00-55020-STR17-000001).
5. The Engineer shall prepare plans and specifications for the making of such improvements
for the 2017 Overlay Project.
6. The City Council authorizes the following preliminary funding sources and corresponding
transfers to the Construction Fund for the project:
Ad Valorem $166,643
Assessments $350,357
Total $517,000
2
Passed and adopted by the Prior Lake City Council this 10th day of April, 2017
VOTE Briggs McGuire Thompson Braid Burkart
Aye ☐ ☐ ☐ ☐ ☐
Nay ☐ ☐ ☐ ☐ ☐
Abstain ☐ ☐ ☐ ☐ ☐
Absent ☐ ☐ ☐ ☐ ☐