HomeMy WebLinkAbout4A Trillium Cove Preplat PUD PC Report
Phone 952.447.9800 / Fax 952.447.4245 / www.cityofpriorlake.com
4646 Dakota Street SE
Prior Lake, MN 55372
PLANNING COMMISSION AGENDA REPORT
MEETING DATE: MAY 1, 2017
AGENDA #: 4A
PREPARED BY: JEFF MATZKE, PLANNER
PRESENTED BY: JEFF MATZKE
AGENDA ITEM:
AFTER CONDUCTING A PUBLIC HEARING, CONSIDER THE TRILLIUM
COVE PRELIMINARY PLAT AND PLANNED UNIT DEVELOPMENT PLAN
DISCUSSION: Introduction
Pulte Group, Inc., on behalf of the property owner, has applied for approval of
a Preliminary Plat and Planned Unit Development (PUD) Plan to be known as
Trillium Cove to be developed as a 207-lot, low density residential subdivision.
The subject site is located south of County Highway 42, west of Ferndale
Avenue, and north of Lower Prior Lake.
History
The City has received multiple land use applications for potential development
of the site over the last several years. In 2013 the City Council denied an
application for a preliminary plat on the east half of the site. In 2014 the Pulte
Group submitted a concept plan and preliminary plat to the City but ultimately
withdrew the application due to financial feasibility. More recently the Pulte
Group submitted a concept plan to the City in early 2017. The Planning
Commission and City Council provided feedback on the concept plan, and the
Pulte Group has since moved forward with this current Preliminary Plat and
PUD application.
Current Circumstances
The current proposal calls for a 207-lot single family subdivision and PUD on
the site with a mix of housing product types and lot sizes. The area
encompasses land with wooded areas to the north, a large significant wetland,
and open field areas in the south.
The following paragraphs outline the physical characteristics of the existing site,
the Comprehensive Plan and zoning designations, and a description of some of
the specifics of the site.
PHYSICAL SITE CHARACTERISTICS:
Total Site Area: The total development site area consists of approximately 92
acres which includes a large amount of what is known as the Shepard/Griffith
and Bolger properties.
Topography: This area has relatively level topography, with elevations ranging
from the 920’ MSL along the eastern property line near the City park land to
970’-980’ MSL at a few high points throughout the property.
Wetlands: Several small wetlands and one large high-quality wetland exist on
the proposed site. The developer proposes some impacts to the small wetlands
which will be evaluated under the regulations of the Wetland Conservation Act.
Access: The main access to the site is currently from a single gravel driveway
at County Hwy 42 that is identified as Meadowlawn Trail.
2030 Comprehensive Plan Designation: This property is designated for Low
Density Residential uses on the 2030 Comprehensive Plan Land Use Map.
Zoning: The site is presently zoned R-1, Low Density Residential.
PROPOSED PLAN
Phasing: The developer expects to complete this project in three phases,
beginning in 2017 and potentially ending in 2018 or 2019. The phasing plan
and the attached narrative identifies the 3 phases. A mixture of housing types
is proposed for construction in the first 2 phases.
Lots: The development plan calls for 207 lots to be constructed of single family
housing styles. The lot sizes range in size and product type including 90 multi-
story single family detached homes, 2) 52 one-story single family detached
homes, and 3) 65 3-story attached townhome units. Requested PUD
modifications to the typical lot minimum sizes and widths are as follows:
Min. Lot Area Min. Lot Width
Multi-Story
Single Family
7,559 sq. ft. proposed
(12,000 sq. ft. required)
60 feet proposed
(86 feet required)
One-Story
Single Family
7,559 sq. ft. proposed
(12,000 sq. ft. required)
55 feet proposed
(86 feet required)
Density: Density of the development is based on the net area of the site, which
is approximately 61 acres. There are a total of 207 units proposed, for an overall
density of approximately 3.4 units per acre. This is consistent with the density
in the R-1 district.
Building Setbacks: The developer requests PUD modifications to the building
setbacks as follows:
Townhome
Setbacks
Required
(R-1 Zoning)
Proposed
One-Story
Single Family
Required
(R-1 Zoning)
Proposed
Front 25’ 25’
Side 10’ 5’ / 10’
Rear 25’ 20’
Front (private
street)
25’ from back of
curb
20’
Front (from
public street)
25’ from ROW
line
20’
Side (between
buildings)
20’ 20’
* The developer does not propose modifications to the require typical R-1 building
setbacks for the multi-story single family lots
Parks / Trails: Parkland dedication is proposed mainly around the high-quality
wetland at the center of the development with some additional open space
adjacent to the current City Park (North Shore Park) along the eastern property
line as Outlot K. While Outlot K does include areas greater than the standard
10% maximum slope for useable active parkland, this area provides additional
open space adjacent to the existing public park/open space of North Shore Park
and nearby wetland. A network of public trails and sidewalks are proposed
throughout the site including connections to existing regional trails, a paved trail
around the large wetland, and a curvilinear sidewalk network as part of the site
design. A playground feature area is envisioned at the southwest corner of the
large wetland.
Tree Replacement: There are many significant trees on this site particularly in
the north half of the site. Due to the need to install street and public utility
connections throughout the ever-varying existing topography, it is difficult to
preserve many tree areas with the exception on the site perimeter and around
the large wetland. The developer has prepared an extensive landscape plan
which will incorporate over 860 trees (2,600 inches) of replacement on the
private lots, outlots, parkland, and street center islands.
Access/Street: The developer proposes a variety of local and collector streets.
These streets include the “missing link” of Carriage Hills Parkway which is an
important east-west collector that is proposed to be completed at one time with
the 2nd phase. It’s also important to note that the development plan shows only
one connection of Meadowlawn Trail into Carriage Hills Parkway as
recommended by City Staff. Meadowlawn Trail is an important connection
through the development from Carriage Hills to County Highway 42 with limited
driveway access points. Although City staff would recommend even fewer
driveway accesses, the plan shows turn-around potential for each driveway that
abuts this street (which acts as a minor collector). Moreover, the road appears
to properly align with the future full intersection at County Highway 42. A traffic
calming round-about is proposed at the intersection of Meadowlawn Trail and
Carriage Hills Parkway. Lastly, private streets are proposed for the townhome
area at the northeast corner of the development.
Sanitary Sewer / Water Mains: Sanitary sewer and watermain service will be
extended from multiple existing lines in the region. These include connections
to sanitary sewer lines under Carriage Hills Road, Ferndale Avenue, and County
Hwy 42 (via Rolling Oaks Circle). Watermain connections are proposed to
Carriage Hills Road, Ferndale Avenue, and multiple connections to County Hwy
42 (one connection via Rolling Oaks Circle).
Shoreland District/Impervious Surface: The maximum impervious surface
allowed in the Shoreland District is 30% of the lot area. Impervious surface
coverage is further limited to 25% of each tier area in a Shoreland District PUD.
The only area within the shoreland district (within 1000 feet of Prior Lake) is the
area at the southeast corner of the development just north of Carriage Hills
Parkway. This tier area will meet the shoreland district impervious surface
requirement.
Grading / Storm water: The site is very complex from a grading and storm
water perspective. The developer proposes to grade the entire site prior to the
construction of the first phase because of all the street, utility, and storm water
features which are ultimately planned. Multiple storm water basins are
proposed, and the City Staff has recommended increased regionalization of
storm water basins on the site.
Fees and Assessments: This development will be subject to the standard
development fees including park dedication and trunk street and utility service
charges. The developer has requested a waiver of the street oversize fee due
to the number of regional street improvements they are proposing to complete.
The City Council will ultimately need to evaluate whether this fee waiver is
justified given the proposed PUD benefits and regional improvements proposed
at the developer’s sole cost.
Conclusion
The Trillium Cove development, as proposed, is a very complex and unique
project. The developer and City Staff have met numerous times to discuss the
many aspects of the site. The developer has also hosted a neighborhood
meeting to present the development plan to nearby property owners. City Staff
believes the developer is identifying unique PUD benefits within the site
including the preservation of a high quality large wetland and creating a unique
natural public open space around this feature with an area for a park structure
in the future. Mixed used housing is also proposed for the site, and an
innovative residential development design that includes curvilinear streets,
varying building angles and setbacks, and a unique sense of place for future
residents.
In addition, the City is considering an option to coordinate reconstruction of
Rolling Oaks Circle street and utility improvements along with the developer’s
utility construction in the area. Although the status may change, at this time no
commitments have been made by the City Council to this effort and the
developer is planning to proceed without coordination of a City reconstruction
project.
As noted in the attached staff memorandums, the developer must refine the
plans to assure compliance with the Public Works Design Manual requirements
and City Zoning Ordinance; however, City Staff has discussed these comments
with the developer and feel they will not drastically alter the design of the
development plan or preliminary plat. Therefore, City Staff does advise the
Planning Commission to consider recommending approval of the Trillium Cove
Preliminary Plat and PUD Plan with the following conditions:
• The developer shall revise the plans according to the April 21, 2017 City
Engineering & Public Works Dept. Memorandum
• The developer shall revise the plans according to the April 24, 2017 City
Community & Economic Development Dept. Memorandum
• The developer shall obtain a grading permit from the City Engineering
Department prior to any grading or tree removal on the site.
• The Developer shall obtain the required permits from other state or local
agencies prior to applicable on the site
ISSUES: PUD’s provide a flexible approach to development that allows creative, efficient
and effective use of land, including the mixing of land uses. The proposed
project includes a mix of housing types and lot sizes. A PUD tends to preserve
more unique features on site and provides more open space. Despite smaller
lots and townhomes in this plan, the overall net housing density remains low
(3.4 units per acre).
The PUD must be reviewed based on the criteria found in Section 1106 of the
Zoning Ordinance. The criteria which are applicable to the Trillium Cove PUD
are discussed below:
(1) Provides a flexible approach to development which is in harmony with the
purpose and intent of the City's Comprehensive Plan and Zoning
Ordinance.
The proposed PUD is consistent with the Comprehensive Land Use Plan
designations on the entire site. The PUD approach allows the location of
the different land uses in ways that preserve and enhance the natural
features of the site.
(2) More creative, efficient and effective use of land, open space and public
facilities through mixing of land uses.
The proposed PUD plan clusters the residential areas, and provides over
37% of open space on the site.
(3) Create a sense of place and provide more interaction among people;
The PUD plan proposes trails, and other pedestrian elements to connect
the residential elements. A unique and innovative site design incorporates
varying building setbacks, increased safety views at street intersections,
and better view corridors that enhance the pedestrian and vehicular
experience as residents navigate the development.
(4) Increase transportation options, such as walking, biking or bussing;
The plan includes a network of trails that will connect to the regional trail
system. A trail around the large wetland provides a unique natural
walking/biking experience as well. The developer also proposes 10 parallel
parking stalls along the east side of Meadowlawn Trail adjacent to the
proposed City park land.
(5) Provide opportunities for life cycle housing to all ages.
The PUD plan includes several housing types, including one-story single
family dwellings, attached multi-story townhouses, and multi-story
traditional single family homes. This mix will provide housing options to
many different buyers.
(6) Provide more efficient and effective use of streets, utilities, and public
facilities that support high quality land use development at a lesser cost.
The development utilizes a mix of public and private streets. The public
streets provide access through the development and to connectivity to
adjacent areas. The private streets are used for the townhome
development, and will be maintained by a homeowners’ association.
(7) Enhanced incorporation of recreational, public and open space components
in the development which may be made more useable and be more suitably
located than would otherwise be provided under conventional development
procedures. The PUD district also encourages the developer to convey
property to the public, over and above required dedications, by allowing a
portion of the density to be transferred to other parts of the site.
The PUD incorporates preservation of a large natural trail system around
the wetland area, as well as an active park location nearby the wetland
feature. The developer proposes parkland dedication over and above the
necessary requirement of 10% of the site area.
(8) Preserves and enhances desirable site characteristics and open space, and
protection of sensitive environmental features including, but not limited to,
steep slopes, wetlands, and trees. Where applicable, the PUD should also
encourage historic preservation, re-use and redevelopment of existing
buildings.
The plan includes a trail around the high-quality wetland as well as
preservation of the wetland itself as a focal point within a public park,
curvilinear sidewalks, and a system of trails connecting to other trails in
adjacent developments to create a unique and innovative pedestrian
experience.
(9) High quality of design compatible with surrounding land uses, including both
existing and planned.
The proposed design is compatible with the surrounding low density
residential land uses.
ALTERNATIVES: 1. Motion and a second to recommend approval of the Preliminary Plat and
Preliminary Planned Unit Development Plan for Trillium Cove subject to the
listed conditions, or others that may be added or modified by the
Commission.
2. Motion and a second to recommend denial of the Preliminary Plat and
Preliminary Planned Unit Development Plan for Trillium Cove based upon
findings of fact.
3. Motion and a second to table this item to a future Planning Commission
meeting and provide the applicant with direction on the issues that have
been discussed.
RECOMMENDED
MOTION:
Alternative #1
ATTACHMENTS: 1. Location Map
2. Development Plans - March 23, 2017
3. Applicant Narrative – March 23, 2017
4. Engineering/Public Works Dept. Memorandum - April 21, 2017
5. Community & Economic Development Dept. Memorandum - April 24, 2017
LOWER PRIOR LAKE
GD
(904)
140TH ST NE C R E S T A V N E
P I K E L A K E T R L N E
B L U E B I R D T R L N E
F I S H E R A V N E
S H O R E T R L N E
D
O
V
E
C
T
N
E
C A R R I A G E H I L L R D N E
F E R N D A L E A V N E
C O A C H M A N L N N E
C A N D L E W O O D L N N E
R
A V
E
N
C
T
N
E
Lower Prior Lake
Scott County GIS
Ü
Trillium Cove Prelim Plat and Prelim PUDLocation Map
UPPER PRIOR LAKEGD(904)
SPRING LAKEGD(912.8)
LOWER PRIOR LAKEGD(904)
PIKELAKENE(820.5)
MYSTICLAKENE
HAASLAKENE(907.3)
BLINDLAKERD(948.7)
ARTICLAKENE(906.7)
MARKLEYLAKERD( )
HOWARD LAKENE(957.3)
CRYSTAL LAKENE(943.3)
RICE LAKENE(945)
CLEARY LAKENE
CAMPBELLLAKENE(Not Estab.)
Scott County GIS
SUBJECTPROPERTY
SUBJECTPROPERTYSUBJECTPROPERTY
SUBJECTPROPERTY
Phone (952) 937-5150 7699 Anagram Drive
Fax (952) 937-5822 Eden Prairie, MN 55344
Toll Free (888) 937-5150
Phone (952) 937-5150 7699 Anagram Drive
Fax (952) 937-5822 Eden Prairie, MN 55344
Toll Free (888) 937-5150
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Phone (952) 937-5150 7699 Anagram Drive
Fax (952) 937-5822 Eden Prairie, MN 55344
Toll Free (888) 937-5150
Phone (952) 937-5150 7699 Anagram Drive
Fax (952) 937-5822 Eden Prairie, MN 55344
Toll Free (888) 937-5150
x
x
x
TOTAL SURVEYED DBH:50494 CAL IN
TOTAL SURVEYED SIGNIFICANT TREES SAVED:10217 CAL IN.
SURV. REMOVALS FOR PUBLIC INFRASTRUCTURE:11217 CAL IN
SURV. REMOVALS FOR DEVELOPMENT:29060 CAL IN
TOTAL SURVEYED TREE REMOVALS:40277 CAL IN
ALLOWABLE TREE REMOVAL:35%
ALLOWABLE TREE REMOVAL:17673 CAL IN
TREE REMOVALS BY DEVELOPER:29060 CAL IN
LESS ALLOWABLE TREE REMOVAL:17673 CAL IN
EXCESS REMOVALS BY DEVELOPER:11387 CAL IN
CREDIT FOR HERITAGE TREES SAVED:
78 HERITAGE TREES SAVED 3048.5 CAL IN
TREE REMOVAL CREDIT:6097 CAL IN
TREE REPLACEMENT REQUIRED:2645 CAL IN
(11,387" less 6097" credit * 0.5)
T R E E
R E M O V A L
T R E E
R E P L A C E M E N T
R E Q M T S
Phone (952) 937-5150 7699 Anagram Drive
Fax (952) 937-5822 Eden Prairie, MN 55344
Toll Free (888) 937-5150
Phone (952) 937-5150 7699 Anagram Drive
Fax (952) 937-5822 Eden Prairie, MN 55344
Toll Free (888) 937-5150
1
We Build Consumer Inspired Homes and Communities to Make Lives Better
“TRILLIUM COVE”
APPLICATION FOR:
PRELIMINARY PLAT & PRELIMINARY PLANNED UNIT DEVELOPMENT PLAN
PRIOR LAKE, MINNESOTA
March 23, 2017
Introduction
Pulte Homes of Minnesota (“Pulte”) is pleased to be submitting this application for Preliminary Plat and
Preliminary Planned Unit Development Plan.
Pulte’s company vision is “Building Consumer Inspired Homes and Communities to Make Lives
Better”. We are nationwide company with a corporate office in Atlanta, Georgia. We currently operate
under three distinct brands of homebuilding throughout the country: Pulte Homes, Centex Homes, and
Del Webb. Pulte’s Minnesota Division has an office in Eden Prairie and will sell approximately 450
homes in the Twin Cities in 2017. We take pride in offering very popular floor plans, creating innovative
neighborhoods, and working with integrity.
Pulte will act as both developer of the property and builder of the homes within Trillium Cove. The primary
contact for Pulte is:
Paul Heuer, Director of Land Planning & Entitlement
7500 Office Ridge Circle, Suite 325
Eden Prairie, MN 55344
952-229-0722
Paul.Heuer@PulteGroup.com
The owners of the property are:
Meadowlawn Development Corporation
Charles and Richard Bolger
14560 Trillium Cove Trail NE
Prior Lake, MN 55372
612-750-9942
cbolger@bolgerinc.com
Lot 1 Partnership
Sue Griffith
C/O Mr. Brian Pankratz
LaSalle Plaza
8000 LaSalle Avenue, Suite 1900
Minneapolis, MN 55402
952-924-4665
Brian.pankratz@cbre.com
2
Legal Description
SECTION 25 TOWNSHIP 115 RANGE 022 P/O W1/2 NW1/4 COM SW COR NW 1/4, N 303.93' TO
POB. E 586.02' TO CL OF GRAVEL DRIVE, N12.1
SUBDIVISIONNAME EAGLE RIDGE ACRES LOT O-L BLOCK 002 SUBDIVISIONCD 25052 EX LYING
S'ERLY OF LN 20' N OF NW COR LOT 1 TO PT 40'
SECTION 25 TOWNSHIP 115 RANGE 022 P/O W1/2 NW1/4 COM SW COR NW 1/4, N 303.93', E
586.02' TO CL OF GRAVEL DRIVE (POB), N 12.13
The Property
The Trillium Cove property is unique and complex from a number of standpoints.
The Last Puzzle Piece
Trillium Cove sits among fully developed neighborhoods to the east and west. County Road 42 lies along
the northern border of the property. Carriage Hills Parkway, upon completion, will act as the southern
border of the property. Trillium Cove is a true infill development which substantially completes
development in this area.
Site Attributes & Constraints
The property contains a number of beautiful attributes which also pose development constraints. The
north half of the property contains woods, scattered wetlands, and steep, rolling hills. The entire property
has complex drainage patterns which release storm water in various directions. The complex drainage
patterns have been dealt with through detailed civil engineering strategies. The woods and wetlands pose
both constraints and opportunities in creating a vision and innovative concept plan for this new
neighborhood.
Property Recent History
This property is complicated to develop for a variety of reasons outlined elsewhere in this narrative. For
the past 15 to 20 years developers have been attempting find a way to successfully develop the property.
We believe it is important to describe the most recent applications. Both the 2013 and 2014 applications
failed due to the various complexities and related costs.
K Hovnanian Preliminary Plat Application (2013)
In 2013, builder/developer K Hovnanian submitted an application for preliminary plat for the east half of
the property. The City Council ultimately denied this application.
Pulte Homes Concept Plan Application (2014)
In 2014, Pulte Homes submitted an application for concept plan review with standard R-1 zoning for the
west half, the east half, and some property along Prior Lake. The application was received very well by
City staff, the Planning Commission, and the City Council.
Pulte Homes Preliminary Plat Application (2014)
In 2014, Pulte Homes submitted an application for preliminary plat with standard R-1 zoning for the west
half, the east half, and some property along Prior Lake. Unfortunately, Pulte Homes withdrew the
application shortly thereafter due to lack of financial feasibility. It should be noted that the name of the
3
community with this application was “Meadowlawn”. The sellers recently requested that we change the
name so that their remainder property could retain this historic family name.
Pulte Homes Concept Plan Plat Application (2017)
In 2017, Pulte Homes submitted an application for concept plan with PUD zoning. The application was
received very well by City staff, the Planning Commission, and the City Council. Please note that the
name “Griffith Woods” was used for this application.
Pulte Homes Neighborhood Meeting (2017)
In 2017, Pulte Homes held a neighborhood meeting to present the concept plan and received feedback.
Many questions were fielded, primarily dealing with traffic and potential future Rolling Oaks Circle
improvements.
Neighborhood Vision
As we set upon the task of creating a new neighborhood, it was important to us to utilize the beautiful
natural features of the Trillium Cove property and to showcase them. We worked hard to incorporate the
wetlands, woods, and rolling hills. Our vision for Trillium Cove incorporates the following high level goals:
1. Appeal to a variety of demographic groups – We have found that a neighborhood with housing
that appeals to a variety of demographic groups has more vitality and energy which is very
attractive to residents. See “Homes” section of this narrative for more details on the homes.
2. Showcase the wonderful natural amenities – Although standard engineering design requirements
limit our ability to preserve natural amenities, we recognized that we could focus preservation
efforts in high visual impact areas.
3. Innovative site design - We hired Rick Harrison Design Studio, a nationally renowned design firm
to create an innovative design which would blend our goals, the City’s goals and his own creative
design process.
4. Street connectivity and pedestrian orientation – Due to the infill nature of this property, there are
numerous opportunities to make street and trail/sidewalk connections which complete multiple
transportation networks. Of particular importance is completing the last section of Carriage Hills
Parkway , connecting County Road 42 with Carriage Hills Parkway, and creating pedestrian
connections between County Road 42, the beautiful wetland in the central part of this property,
Carriage Hills Parkway, North Shore Oaks Park, and Sandpoint Beach.
City G oals
We monitored the K Hovnanian application in 2013 and listened closely to what was liked as well as
disliked by the City. Through our 2014 application process we also learned a great deal about City goals
for this particular property and region of the City. Here is a summary of the goals that we heard strongly
and consistently expressed by the City for the Trillium Cove property:
1. Develop the two properties together
2. Street and pedestrian connectivity
3. Build Carriage Hills Parkway
4. Limit access to Carriage Hills Parkway
5. Build the north/south collector street
6. Preserve the large, high quality wetland
7. Build a public trail around the large wetland
8. Provide space for a new public park near the large wetland
4
In creating this new neighborhood, our goal was to satisfy all of the above listed City goals and to
incorporate them into the Pulte neighborhood vision.
Innovative Design
Pulte Homes is known for the extraordinary steps that we take to ensure that we are designing and
building homes that meet the needs and desires of home buyers (see “Our Homes” section of this
narrative). We also focus intently on designing neighborhoods that are beautiful and pleasant to live in. As
such, we have hired nationally renowned neighborhood designer Rick Harrison Design Studio. Rick
Harrison has invented several planning methods and created specialized software used in land planning
across the country. He continues to refine the cutting edge, innovative design approach previously known
as “coving”. Pulte Homes utilizes Rick’s specialized skills because we find great value in creating
innovative and beautiful neighborhoods that have the following positive attributes:
1. Attractive from the Outside – While driving past many neighborhoods, drivers see a row of homes
with the rears facing the perimeter street. Typically, the rears of homes are the least attractive
sides. In addition, homes tend to look similar when they are lined up in a row. From our
standpoint, this first impression of a new neighborhood is not as strong as it could be. With
Trillium Cove, drivers on County Road 42 and Carriage Hills Parkway will see open space,
woods, view corridors, and primarily fronts and sides of homes. Through this intentional design
strategy, Trillium Cove will leave a positive and lasting impression on the eyes of the public.
2. Attractive Driving Through – It is very common in traditional neighborhoods to see straight streets
with homes set back from the streets at the same distance. This type of uniformity makes it
difficult to create an attractive neighborhood. A Rick Harrison neighborhood typically has
curvilinear streets and varied home setbacks from the street. This creates a feeling of
spaciousness while driving down the street. It also creates a feeling of constant variation, interest,
and beauty. Another design strategy that Rick incorporates is “view corridors”. Instead of lining
both sides of the primary streets with homes, Rick is adept at placing the streets next to wetlands,
ponds, and woods, thereby creating beautiful view corridors for the driving public. Bringing natural
beauty continuously into view creates a strong feeling of quality, beauty, timelessness, and the
integration of nature into a neighborhood.
3. Better Views from Within the Homes – The curvilinear streets and varying home setbacks result
in the homes having different orientations with respect to each other. In other words, the homes
are not lined up side by side. This varying orientation creates more and better views from inside
the homes to the surrounding areas, thereby bringing additional beauty and value to the
homeowners.
After many iterations through the Concept Plan stage, we are very pleased with the outcome of the
neighborhood design. It satisfi es all identified City goals, integrates nature into the neighborhood, and
provides a variety of housing types within one master planned community. We are particularly pleased
with the elements of beauty:
• A strong sense of entry
• Buffers around the perimeter of the neighborhood, many of them wooded
• Curv ilinear streets
• View corridors while driving
After the Concept Plan was presented to and reviewed by the City, we undertook engineering design of
the neighborhood. We are pleased to report that the overall layout is nearly identical to the Concept Plan.
Revisions have been very minor in scope.
5
Key Facts
• Addresses of property: 14175 Rolling Oaks Cir NE, Prior Lake, MN 55372 for the property in the
northwest corner. The other two properties have no addresses.
• Comprehensive Land Use Plan designation is R-LD Urban Low Density (0-4 units/acre)
• Use District is R-1 Low Density Residential
• Proposed zoning is Planned Unit Development (PUD)
• Estimated 207 homes
o 90 single family homes (58 3-car and 32 2-car)
o 52 single level homes
o 65 townhomes
• Gross area is = 91.17 acres (includes 11.15 acres of outlots within the plat but not part of the
development)
• Net area is 61.86 acres
• Gross density is 2.27 units/acre; net density is 3.35 units/acre
• Total open space is 29.90 gross acres within the 80.02 gross acre development = 37%
Single Family Dimension Standards (minimums)
Lot Width at home setback 60 feet for 2-car; 70 feet for 3-car
Front yard setback 25 feet
Side yard setback to home 10 feet
Side yard setback to garage 10 feet
Rear yard setback 25 feet
Single Level Dimension Standards (minimums)
Lot Width at home setback 55 feet
Front yard setback 25 feet
Side yard setback to home 10 feet
Side yard setback to garage 5 feet
Rear yard setback 20 feet
Townhome Dimension Standards (minimums)
Front set back to public streets 20 feet
Distance between buildings 20 feet
Private street width (back to back of curb) 22 feet
Our Homes
Pulte Homes is known for the extraordinary steps that we take to ensure that we are designing and
building homes that meet the needs and desires of home buyers. We continually reach out to the public
and Pulte homeowners to get feedback to improve our home designs. It is what we call Life Tested®. We
actually build prototypical rooms and homes in warehouses across the country and pay members of the
public to walk through and provide written feedback on the homes. Through this intensive process, we
have conceived of and incorporated many innovative features such as the Pulte Planning Center, the
Everyday Entry, Super Laundry, Oversized Pantry, and the Owner’s Retreat. This exhaustive process has
played a major part in Pulte’s success in “Building Consumer Inspired Homes and Communities to Make
Lives Better”.
One of the primary goals in creating our vision for Trillium Cove is to provide different housing products
that would appeal to a variety of demographic groups. As mentioned earlier, we have found that a
neighborhood with housing that appeals to a variety of demographic groups has more vitality and energy.
We will be building three different types of homes that are designed to appeal to different demographic
groups. Each is described briefly below. Attached you will find example front elevations of each housing
product.
6
Single Family Homes
This property is located within the celebrated Prior Lake-Savage Area School District. Strong school
districts are highly desirable to families. We anticipate that there will be strong demand for our single
family homes which will be in the anticipated range of the mid-$300k’s to the high-$400k’s. Single family
homes will be located in the northwest and southeast parts of the neighborhood.
Single Level Homes
We commonly hear that cities are learning that they do not have adequate housing to serve the empty
nest population. Many of these homebuyers raised their families in your community, volunteered, are
invested heavily in the larger community, and are now ready to move into a smaller, single level home.
Many cities express a concern that these residents will move out of their communities due to a lack of
adequate housing. Trillium Cove will offer the single level homes with lawn maintenance and snow
removal for which these buyers are looking. Although not age restricted, we anticipate that the primary
buyers of these homes will be couples or singles age 55 or older. We anticipate the single level home
prices to range from the low-$300k’s to the low $400k’s. Single level homes will be located in the
southwest part of the neighborhood and along the north side of the large wetland.
Townhomes
We will be building townhomes in Trillium Cove which will have an attainable entry price and will also
provide association maintained lawn, snow removal, and building exterior maintenance. This type of
home appeals to many singles and first time home buying families. We anticipate the townhome prices to
range from the low-$200k’s to the high $200k’s. Townhomes will be located in the northeast part of the
neighborhood.
Parks & Trails
The City has expressed a strong interest in creating a neighborhood park within the open space in
Trillium Cove. We support this approach and the amount of land that we are dedicating to the City is
plentiful for this use. In addition, there are a number of trails connections that are desired through the new
neighborhood. We have planned to construct all of these trails.
Required Park Dedication
Ordinance 1004.1000 outlines the park dedication requirements for each development: 10% of net area
calculated as gross area less storm water outlots, wetland outlots, major right-of -way dedication. Below is
a calculation of net area:
7
Therefore, park dedication is required to be 10% of 61.86 acres = 6.19 acres of land.
Actual Park Dedication
We have consistently heard that the City would like us to preserve the large, high quality wetland in the
central portion of the property, to retain some woods surrounding it, and to build a public trail around the
wetland. We have designed the neighborhood to accomplish these goals and have designed trails and
trail connections that are consistent with the City’s Comprehensive Plan.
Our park dedication requirements will be more than fulfilled by a combination of park/open space land
dedication around the large wetland, park/open space land dedication adjacent to North Shore Oaks
Park, construction of various public trails shown on the City Comprehensive Plan within Trillium Cove,
and construction of park parking stalls.
1. Land – We will be dedicating the following outlots to the City:
a. Outlot L – 11.74 gross acres – 5.55 acres wetland = 6.19 acres of upland woods, open
space, and park land
b. Outlot K – 1.91 gross acres – 0.23 acres of pond = 1.68 acres of upland woods, open
space and park land
Total land dedicated to the City will be 7.87 acres, exceeding the required 6.19 acres by 1.68
acres. The value of the additional land dedicated to the City is 1.68 acres x $110k/net acre =
$185,000.
2. Trails – We will construct all of the public trails shown on our application. We estimate the
construction cost of this work to be $280,000.
3. Park Parking - Our design accommodates the future City construction of a tot lot along
Meadowlawn Trail. We show an illustrative example on our submittal drawings which
demonstrates a logical location for the tot lot. We also included an example photo below which
shows a typical tot lot design. As part of our infrastructure work, we will be constructing ten
parallel “bay” style parking stalls along Meadowlawn Trail to serve the future tot lot. The
estimated cost of this park parking is $30,000.
Total land dedication, public trail construction, and park parking construction exceeds the City
park dedication ordinance requirements by approximately $500,000. We request that the City
construct the tot lot in 2018.
Infrastructure
As an infill development, public infrastructure is available at or near the perimeter of the property in
multiple locations.
A substantial part of Trillium Cove will be served by a sanitary sewer currently at the intersection of
County Road 42 and Rolling Oaks Circle, northwest of the property. We will connect to this sewer, extend
the sewer down part of Rolling Oaks Circle, and then extend the sewer into Trillium Cove. This sewer
8
extension and the associated restoration of the gravel street will be completed and funded by Pulte
Homes. We have worked in detail with City staff to compose conditions of approval f or Trillium Cove
which provide for a potential City reconstruction project of Rolling Hills Circle, if desired by the City
Council.
It should also be noted that due to this property being “the last puzzle piece”, an inordinate amount of
regional transportation improvements are desired by the City and County to be constructed in conjunction
with development of Trillium Cove. These regional transportation improvements (shown in red in the
below graphic) include:
1. Construction of the last section of Carriage Hills Parkway, which will
create a continuous connection between County Road 42 and County
Road 21.
2. Construction of a collector road connecting County Road 42 with
Carriage Hills Parkway.
3. Reconstruction of the intersection of County Road 42 and the new
collector road, resulting in a new full access intersection serving this
region.
4. Reconstruction of the intersection of County Road 42 and Rolling Oaks
Circle, thereby creating a right in right out limited access intersection.
5. Reconstruction of the intersection of County Road 42 and Ferndale
Avenue, thereby creating a right in right out limited access intersection.
Although these improvements benefit a much broader area than the Trillium Cove neighborhood, and
some of the improvement provide no benefit to Trillium Cove (#4 and #5), Pulte Homes is planning to
complete all of these regional transportation improvements at significant expense.
The City has traditionally charged developers a “Street Oversize Acreage” fee. The purpose of this fee is
to fund regional transportation improvements in a fair manner. For instance, it would not be fair for the
first developer in an area to pay the entire cost of a regional roadway. Similarly, it would not be fair for the
last developer in an area to pay the entire cost of a regional roadway. However, in the case of Trillium
Cove, the fee does not work. We happen to be the last developer in an area and we are required to pay
for an abundance of regional transportation improvements, many of which do not even benefit Trillium
Cove.
The estimated net amount of this fee for Trillium Cove is $225,000. The estimated cost of the desired
regional transportation improvements is $1,100,000 (see details below). We realize that the City has a
strong interest in having these regional transportation improvements constructed in conjunction with
development of Trillium Cove. Therefore, we are proposing to construct all of the improvements outlined
below at Pulte’s cost. The value of the regional transportation improvements in excess of the
potential fee is $875,000. We request that construction of these regional transportation improvements
satisfies our “Street Oversize Acreage” fee.
9
Shoreland District
A small part of the southern portion of Trillium Cove lies within the shoreland district for Prior Lake. The
purpose of shoreland district requirements is to protect the quality of nearby surface waters. In this
particular case, requirements are satisfied by having all storm water within the shoreland district infiltrate
into the ground and therefore will not reach Prior Lake.
Planned Unit Development (PUD)
Traditionally, PUD zoning is utilized to preserve natural topographic features and to provide win-win
situations for cities and developers. In this particular case, due to the fact that this is “the last puzzle
piece”, the City will obtain a great deal:
1. A beautiful new neighborhood which…
2. Serves various demographic groups
3. The two properties will be developed together as one
4. Sanitary sewer will be installed through half of Rolling Oaks Circle at no City cost
5. Pedestrian connectivity and new public trails
6. Carriage Hills Parkway finally completed
7. A round-a-bout on Carriage Hills Parkway to calm traffic speeds
8. Limited access to Carriage Hills Parkway
9. North/south collector street connecting Carriage to County Road 42
10. County Road 42 improvements at collector street
11. County Road 42 improvements at Rolling Oaks Circle
12. County Road 42 improvements at Ferndale Avenue
13. Trunk water main connection beneath Carriage Hills Parkway
14. Preservation of most wetlands, including the large, high quality wetland
15. 6.19 acres of publicly dedicated woods/open space around large wetland w/trail
16. The above referenced public space is adequate in size to accommodate a park/tot lot
17. 1.68 acres of publicly dedicated woods/open space adjacent to North Shore Oaks Park
18. Landscaped islands
19. Professionally managed HOA’s
20. $500,000 in value of additional land, trails, park parking above and beyond park dedication
requirements
21. $1,100,000 of regional transportation improvements in lieu of $225,000 of street oversize fees
With a PUD, Pulte will receive the benefit of being able to create a beautiful new neighborhood that
serves multiple demographic groups, preserves trees and wetlands, and contains modern lot sizes.
Phasing & Schedule
Following is a summary of our preliminary schedule for development:
May 1, 2017 City Council potentially approves rezoning, preliminary PUD
May 22, 2017 City Council potentially approves final plat 1st Addition
Summer/fall 2017 Site development work
January 2018 Begin selling homes
2021 Full development buildout
We anticipate developing Trillium Cove in three construction phases as outlined in the attached
preliminary Phasing Plan. Grading of all phases will be completed with Phase 1.
10
Outlot Ownership & Maintenance
Ownership of outlots will be as shown in the below table:
Maintenance of specific infrastructure within Trillium Cove will be as follows:
• The owner of each outlot will be responsible for maintaining the outlot, other than exceptions
outlined below.
• The Trillium Cove homeowners association will be responsible for maintaining irrigation, lawn,
and landscaping within the island at the end of Sweetwater Circle, the island at the end of
Ferndale Avenue, the island within Griffith Woods Parkway, and the island within Meadowlawn
Trail. A maintenance agreement and/or easement will be prepared and recorded, thereby
memorializing this maintenance right/obligation.
• We will record trail easements within Outlots H and J, thereby allowing the City to maintain public
trails running through these outlots and thereby controlling critical pedestrian connections.
This submittal includes:
• This narrative with legal descriptions of existing properties
• Preliminary PUD application
• Preliminary plat application
• Application fees totaling $8,330
• Preliminary plans
• Example home elevations
• Mailing labels
• Geotechnical report
Greenfield
Riverton
Westchester
Hilltop
Mercer
Newberry
Continental
Abbeyville
Ascend
Castle Rock
Martin Ray
Blueridge & Portsmill
Phone 952.447.9800 / Fax 952.447.4245 / www.cityofpriorlake.com
Memo
Date: April 21, 2017
To: Community Development Department
From: Engineering Department – Larry Poppler, City Engineer
Engineering Department – Nick Monserud, Project Engineer
Public Works Department – Pete Young, Water Resources Engineer
Subject: Trillium Cove Preliminary Plat Review (Project #DEV17-000003)
The Engineering and Public Works Departments have reviewed the preliminary plat for the subject
project with a plan date of March 23, 2017. The plans were reviewed for consistency with City
Ordinances and Standards detailed in the City of Prior Lake Public Works Design Manual. The
following list details deviations from standards or requests for additional information that must be
reconciled prior to project approval. The applicant or its representatives are invited to contact the
engineering department with any questions at 952-447-9830. Comments highlighted in bold are of
particular concern:
General
1. The final plat plans should follow the requirements of the Public Works Design Manual
(PWDM).
2. Permits from the Met Council, Minnesota Pollution Control Agency, Scott County, and
Department of Health are needed.
3. Benchmark information and City Project #DEV17-000003 should be shown on all plan
sheets.
4. All plans should be drafted according to the City of Prior Lake layer system. A digital copy
of the plans in pdf or tif format is required prior to construction. All drawings should use
the Scott County Coordinate System.
5. Provide graphic to show where Meadowlawn Trail lines up to the north. Show travel lanes
to the north lining up with Meadowlawn Trail.
6. The median and monument sign should be moved back out of County right of way.
Grading
1. Please add additional existing and proposed contour labels.
2. Retaining walls over 4’ in height will require a retaining wall permit from the City. They
must be designed and reviewed by a Structural Engineer.
3. Retaining walls within public right-of-way and Outlots to be dedicated to the City shall be
modular block. No boulder walls are allowed.
4. Any backyard drainage paths must be sodded and protected at the conclusion of grading
activities. Please label these areas on the grading plans and show silt fence protection.
5. Show slopes for maintained areas at no more than 4:1, unmaintained at 3:1. Areas that are
steeper than 3:1 include: the wetland side of block 12 lots, contours on pond 9PTP at the
corner of Meadowlawn Trl and Trillium Cove.
6. Show construction limits in all areas (including areas adjacent to tree preservation areas).
Silt fence will also be required in these areas.
7. Proposed grading beyond property lines will require easement/agreement or revise grades
to stay within project area.
8. Provide easements for all storm sewer pipes, structures and drainage swales located within
common lots.
9. Please review roadway grades at property lines to assure proper elevations at adjacent
properties
10. The minimum allowed slope of swales is 2%. Several swales have portions that are less
than 2%. Please revise accordingly.
11. Show driveway slopes. Driveway slopes shall not exceed 10%.
12. A minimum of 10 feet beyond the house should have a slope less than 10:1.
13. Revise backyard drainage and utility easements to include swales in the following areas:
Block 4 Lots 14, 15, 16, 17; Block 3 Lots 1, 2, 3.
14. Contours on Carriage Hills Pkwy should correspond to the road alignment.
15. Adjust drainage and utility easement for storm sewer pipe in Block 9 Lot 8.
16. Show emergency overflows for all for wetlands specifically W3. Please show 100-yr
back to back storms high water level since this is a landlocked basin.
Utilities
1. A detail review will take place once final plat (plan and profile) has been submitted.
Below are general comments regarding the utility plans that were submitted with the
preliminary plat.
2. Easements over the utilities will need to be in place throughout the Townhouse
Development area. It is our understanding that the streets will be private in this area.
3. Add manholes to the storm line draining to Outlot E infiltration basin.
4. FES-92 should be extended down to the NWL of Pond 2PTP.
5. Add flared end section to Outlot E outlet pipe.
6. See Public Works plan redlines.
7. Add hydrant to dead end watermain south of roundabout.
8. Add a watermain stub with a gate valve to the south on Rolling Oaks Circle.
9. Please include a note to install wyes on the sanitary sewer in Rolling Oaks Circle.
10. Show 12” watermain for the north south roadway. Oversizing will be provided for the
difference in pipe sizing.
11. The length of Trillium Cover is over 1,700 feet. The watermain should be looped by
connecting down Rolling Oaks to CSAH 42.
12. Please utilize PVC for watermain for the project.
13. Please add additional manholes for the sanitary sewer on Rolling Oaks to keep the
sanitary sewer in the center of the right of way.
Streets
1. A detail review will take place once final plat (plan and profile) has been submitted.
Below are general comments regard the street plans that were submitted with the
preliminary plat.
2. Provide turning template for roundabout.
3. Sidewalks that are on private property shall have easements over them.
4. The high point on Hampton St. NE at station 17 seems to be un-necessary. Please review
and remove.
5. Cul-de-sacs and parkway design do not meet City standards. Due to future maintenance
of these areas, the City would prefer not having these areas. A homeowners association
can disband or be ineffective in performing maintenance over the long term.
6. Provide street and storm sewer sheets.
7. Provide details of connections to existing streets.
8. Provide signage and striping plan.
9. Final plat drawings should show ped crossing locations.
10. Please show how Ash Circle squares up with the curvature of Ferndale. Intersection
detail will be needed.
Hydrology and Stormwater Management
1. A detail review will take place once final plat (plan and profile) has been submitted.
Below are general comments regard the street plans that were submitted with the
preliminary plat.
2. The City standard for rate control is based on NOAA Atlas 14 precipitation data
along with the MSE3 rainfall distribution. The submitted HydroCAD calculations
use the MSE3 distribution but not the Atlas 14 data. Areas draining to the Prior
Lake Outlet Channel (PLOC) may utilize the old rainfall amounts (2.8”, 4.2”, 6.0”)
and distribution (NRCS Type II). Other areas must be calculated using the newer
data.
3. Considering the topography it can be expected that multiple ponds are needed, but
can some of these ponding areas be combined. Certain ponding areas are so small
they may not function well. Regional ponding is always more desirable.
4. Please review the low floor elevations and EOF for lots 1-5 block 7.
5. Assure safety bench is provided for all ponding facilities.
6. The invert elevations of pond inlet flared end sections shall match the OE of the pond.
Submerged outlets will only be allowed at the discretion of the City.
7. The EOF of a pond should be at least 1 foot higher than the HWL. The top of dike
elevation should be at least 2 feet higher than the HWL.
8. Show or define access routes for maintenance purposes to all stormwater
infrastructure and ponding areas (maximum of 8% grade, maximum of 2% cross
slope, and minimum of 10' wide). Drainage and utility easements shall be dedicated
at the time of final platting to provide this access.
9. Pond outlets shall provide floatable debris skimming for the 10-year, 24-hour rainfall
event (NRCS MSE3 rainfall distribution). A manhole with a baffle wall with orifice or
notch is recommended to control rate. Outlet rate control manholes shall have a top
mitered to conform to fill. A 66" minimum diameter is required to provide access to both
sides of the weir wall. Please provide a detail for proposed pond outlet structures.
SWPPP
1. A detail review will take place once final plat (plan and profile) has been submitted.
Below are general comments regard the street plans that were submitted with the
preliminary plat.
2. A SWPPP that meets the requirements of the NPDES Construction Stormwater Permit
must be prepared for all construction activity that results in land disturbance of equal to
or greater than 1 acre. The SWPPP must be reviewed and approved by the City before an
Excavating and Grading Permit is issued. All provisions of the NPDES Construction
Stormwater Permit & SWPPP must be adhered to for the duration of the City grading
permit.
Wetlands
1. The City must review and approve the Wetland Permits Application submitted for this
project on 4/14/2017. This submittal is still under review. Any drainage, fill, excavation
or other alteration of a public waters or wetlands is regulated by the Wetland
Conservation Act (WCA), State Statutes 103G.245 and regulations adopted hereunder.
The City is the Local Governing Unit (LGU) under these rules.
2. Wetland 1 is one of the highest quality wetlands remaining within the City. It is
considered “highly susceptible” to stormwater impacts per MnRAM. The project, as
proposed, would have significant impacts on this wetland by changing its watershed
and reducing the volume of water available. The plant community in this wetland
relies on consistent hydrology. Please route additional runoff to the wetland to
maintain its hydrology. The current proposal reduces runoff volume to the wetland
for the 2-, 10-, and 100-year rainfall events by 29%, 34%, and 37%, respectively.
3. Buffer strips shall be identified within each parcel by permanent monuments. A
monument shall be required at each parcel line where it crosses a buffer strip and shall
have a maximum spacing of 200 feet along the edge of the buffer strip. An additional
monument shall be placed at the midpoint of each lot and/or as necessary to accurately
define the edge of the buffer strip (considering curvature). A monument shall consist of a
post and a buffer strip sign. The signs shall comply with City Plate #203, Wetland
Boundary Signs. The signs shall be installed prior to the issuance of a Building Permit
and should be shown on the approved plans. Buffer strip signs must be purchased from
the City at a cost shown on the latest fee schedule.
Phone 952.447.9800 / Fax 952.447.4245 / www.cityofpriorlake.com
Memo
The Community & Economic Development Department has reviewed the Preliminary Plat and
PUD plans for the subject project with a plan date of 03-23-2017 and we have the following
comments.
General
1. Development Fees – The following development fees are to be collected prior to
recording of any approved final plat: Park Dedication of unit(s) at $3,750 per unit,
Trunk Water ($6,960/net acre), Trunk Sanitary Sewer ($3,678/net acre), Trunk Storm
Sewer ($3,376/net acre), Street Oversize ($5,953/net acre), $9,000 Water Connection
Fee, $9,000 Sewer Connection Fee, and a 4% administrative fee and 5% construction
observation fee based on the total estimated construction costs (which include
landscaping, streets, public trails, and public utilities).
2. Private/Public Agreements – Private Use of Public Property Agreements shall be
prepared with Final Plat review for all center island areas. Agreements shall detail the
maintenance obligations of the HOA for these features within the public right-of-way.
3. Sidewalk easements – Sidewalk agreements shall be prepared for all public sidewalk
areas within private lot areas.
4. Warranty Deeds – Submit draft warranty deeds for future public ownership Outlots with
Final Plat application.
Preliminary Plat
5. Existing Zoning – List existing zoning as R-1 (Low Density Residential)
6. Outlot F & G – Developer has expressed interest to subdivide outlot F & G from plat
prior to final plat approval via a Metes and Bounds subdivision. Is this still the proposed
process?
7. Park Dedication – Identify acreage of Outlot K proposed for tree removal and ponding.
This area may/may not be considered for parkland dedication credit by the City Council
since it exceeds 10% slope. Per Section 1104.1000 the City Council has discretion to
accept these areas for park dedication.
8. PUD Zoning Modifications – In addition to other proposed public improvement
modifications, the developer requests modifications to the typical R-1 zoning
requirements in the following areas:
a. Lot size – Min. proposed – 7,559 sq. ft., Min. required (R-1) – 12,000 sq. ft.
b. Lot width – Min. proposed – 55 feet, Min. required – 86 ft.
Date: April 24, 2017
To: Paul Heuer, Pulte Homes
From: Jeff Matzke, Planner
Subject: Trillium Cove Preliminary Plat and PUD
City Project #DEV17-00003
c. Side Setback – Min proposed – 5 feet, Min. required – 10 feet
d. Front Setback – Min. proposed 20 feet, Min. required – 25 feet
e. Rear Setback – Min proposed 20 feet, Min. required – 25 feet
9. Setback Table – Indicate setback table on plans with proposed yard encroachment details
(The City has done this for other PUD developments such as Jeffers Pond and it allows
for more efficient building permit review process. Please consider all encroachments
including A/C units, cantilevers, roof overhangs, window wells, etc.)
Grading Plan
10. Retaining walls – Walls exceeding 4 feet in height will require a building permit
application.
Tree Preservation/Landscape Plan
11. Tree placement – On landscape plan/details plan, indicate placement of all trees a
minimum of 10 feet from front property lines within front yards.
12. Tree replacement formula – Tree replacement of 864 trees is based on 3” trees. Revise
landscape plan to identify minimum tree size 3 inches or increase number of tree
replacement.
13. Buffer shrubs – While recommended at subdivision entrance areas, bufferyard shrubs are
not applicable to tree replacement requirements. Additional trees will be required instead
of proposed 53 shrubs to meet this requirement.
14. Center island trees – Maintenance of trees located within center islands will be the
responsibility of the HOA.
15. Final tree locations – Tree locations may be subject to change depending on field
construction of public/private utilities and maintenance access locations for ponding and
utilities.