Loading...
HomeMy WebLinkAbout5N 2018 Feasibility Report Soil Testing Report 4646 Dakota Street SE Prior Lake, MN 55372 CITY COUNCIL AGENDA REPORT MEETING DATE: JUNE 12, 2017 AGENDA #: 5N PREPARED BY: NICK MONSERUD, PROJECT ENGINEER PRESENTED BY: LARRY POPPLER, CITY ENGINEER/INSPECTIONS DIRECTOR AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION ACCEPTING PROPOSALS AND AUTHORIZING ELEMENT MATERIALS TECHNOLOGY TO PROVIDE SOIL BORINGS/TESTING FOR THE 2018 RECONSTRUCTION PROJECTS FEASIBILITY REPORTS. DISCUSSION: Introduction The purpose of this agenda item is to accept the proposals for professional ser- vices related to the Feasibility Reports for the 2018 Reconstruction Improvement Projects. History At the May 8, 2017 meeting the City Council ordered the preparation of feasibility reports for the Pershing St., Dunkirk Ave., Dutch Ave., Roanoke St., Spring St., Green Heights Trail, Park Avenue, Franklin Trail, Woodside Rd., Huron St., Wild- wood Cir., and Santee Circle. The project includes the evaluation of storm sewer, sanitary sewer, water main, concrete sidewalk, concrete curb and gutter, aggregate base, bituminous surfac- ing, and appurtenant work. Current Circumstances Before you tonight is an authorization for soil borings and sampling for the 2018 Reconstruction Projects. Soil boring and sampling includes testing of soils for particle size distribution, water content and organic content tests. Staff has requested proposals from four firms for construction testing, they include: American Engineering Testing, Element Materials Technology, Braun Intertec and Northern Technologies, Inc. We received proposals from three of the four com- panies that were provided a request for proposal. Each of these firms has a pos- itive history of providing soil borings and testing in Prior Lake. The results are tabulated below: FIRM NAME BASE PRICE Element $8,500.00 Northern Technologies, Inc. $8,950.00 American Engineering Testing, Inc. $13,723.00 2 The proposals received were each reviewed using an estimated number of 22 soil borings and overall depth of 333 lineal feet. For the purposes of evaluation, the consultant also provided a price per lineal foot for additional drilling depth. The results were analyzed and City Staff is recommending that Element Materials Technology be selected to perform soil borings for the City of Prior Lake. Conclusion With the authorization to prepare the 2018 road reconstruction feasibility reports, soil borings and testing are needed to determine road section designs for each reconstruction area. ISSUES: Soil borings and testing requires specific field and lab equipment and must be done by or under the supervision of a registered professional engineer and thus qualifies as a professional service. The City of Prior Lake is not equipped to per- form soil borings and testing for these projects. FINANCIAL IMPACT: The testing for this project will be funded through various funding sources as cal- culated in the project support costs analysis and preliminary project funding table in the capital improvement program. The final project funding will be determined after substantial completion of the construction activities and after the assessment hearing. ALTERNATIVES: 1. Approve a resolution accepting proposals and authorizing Element Materials Technology to provide soil borings and testing for the 2018 Reconstruction Feasibility Reports as part of the consent agenda. 2. Remove from the consent agenda for further discussion. RECOMMENDED MOTION: Motion and second to approve alternative #1. 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 17-___ A RESOLUTION ACCEPTING PROPOSALS AND AUTHORIZING ELEMENT MATERIALS TECHNOLOGY TO PROVIDE SOIL BORINGS/TESTING FOR THE 2018 RECONSTRUCTION PROJECTS FEASIBILITY REPORTS. Motion By: Second By: WHEREAS, Soil borings and testing are a necessary service needed to prepare the 2018 Feasibility Reports; and, WHEREAS, The City does not have the equipment or expertise to provide these services; and WHEREAS, The City solicited and evaluated proposals from qualified firms to provide soil borings and testing for the 2018 Reconstruction Improvement Projects Feasibility Reports. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. Element Materials Technology is hereby selected to provide soil borings and testing services for the 2018 Reconstruction Improvement Projects Feasibility Reports for a base price in the amount of $8,500.00 and the unit pricing rates shown in the proposal and attached to the City’s Standard Professional Services Contract. 3. The Mayor and City Manager are authorized to execute the City’s Standard Professional Services Agreement on behalf of the City. 4. Funding for these engineering services will be drawn from the Construction Fund Account #501-43500.00-55050.00. PASSED AND ADOPTED THIS 12th DAY OF JUNE 2017 VOTE Briggs McGuire Thompson Braid Burkart Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Frank Boyles, City Manager