Loading...
HomeMy WebLinkAbout10B - Jeffers S. Trail Improv. MEETING DATE: AGENDA # PREPARED BY: AGENDA ITEM: DISCUSSION: FISCAL IMPACT: Maintenance Center 17073 Adelmann Street S.E. Prior Lake, Minnesota 55372 CITY COUNCIL AGENDA REPORT SEPTEMBER 6, 2005 108 STEVE ALBRECHT, PUBLIC WORKS DIRECTOR/CITY ENGINEER CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING STAFF TO COMPLETE JEFFERS SOUTH TRAIL IMPROVEMENTS AS PART OF 2005 TRAIL IMPROVEMENT PROJECT Introduction The purpose of this agenda item is to accept payment from Wensmann Homes for City staff to build a boardwalk and trail extensions in the Jeffer's South Development as part of the 2005 Trail Improvement Project. Historv The Developer's Contract for Jeffers South stipulated that Wensmann homes rough- grade and construct retaining walls for the proposed trail. The City would then install the base and pave the trail in accordance with the agreement. After careful consideration by City staff and Wensmann Homes, it was concluded that by building the proposed retaining wall, extensive tree loss would result. Therefore, City staff provided an alternative boardwalk proposal, which would avoid the potential tree loss and provide a unique trail opportunity in this development. This alternative saves the City approximately $20,000 in trail construction costs because Wensmann Homes is paying the entire cost associated with the trail connection and boardwalk. Wensmann Homes will save an estimated $14,000 and a substantial amount of trees located along the back of adjacent lots. The attached exhibit shows the proposed boardwalk and trail connection. Current Circumstances Examples of City staff built boardwalks can be found at Lakefront Park and Haas Lake Park. Both boardwalks are widely utilized and enjoyed by many residents of the City. If approved, City staff would build the boardwalk during the winter, when there is adequate time and staff to do so, and would install and secure the boardwalk in the spring. The additional trail connection would be added to 2005 Trail Improvement Project which was awarded to Prior Lake Blacktop, Inc. at the July 18th Council meeting. The payment of $66,000.00 by Wensmann Homes would cover the costs of city staff labor and materials for the boardwalk and bituminous trail. The funding would be allocated as follows: $10,000 for the bituminous trail connection and $56,000 for the boardwalk construction and installation. The total project costs for the boardwalk and trail extensions at Jeffers South Development project is $66,000.00. Wensmann Homes has provided the City with a check for the full amount required for construction of the trail extensions and boardwalk in lieu of rough-grading the trail and constructing the required retaining wall. As www.cityofpriorlake.com al!enda accent money for boardwalk wensmann 9-6-05 Phone 952.440.9675 / Fax 952.440.9678 ALTERNATIVES: RECOMMENDED MOTION: APPROVED BY: discussed above the City will save and estimated $20,000 in future trail construction costs. The alternatives are as follows: 1. Approve Resolution 05-xx authorizing staff to complete Jeffers South Trail Improvements as part of 2005 Trail Improvement Project. 2. Table this item for a specific reason. 3. Deny this agenda item for a specific reason and provide staff with direction. Frank Boyles, agenda accept money for boardwalk wensmann 9-6-05 City of Prior Lake 2005 PROPOSED TRAIL LOCATION , \ , , - PROPOSED BOARDWALK PROPOSED TRAIL rv C EXISTING TRAIL MUNICIPAL PARK 150 o 150 Feet This drawing is neither a legally recorded map nor a survey and is not intended to be used as one. This drawing is a compilation of records, infonnation and data from various city, county and state offices and other sources, This document should be used for reference only. No representation is made that features presented accurately reflect true location. The City of Prior Lake, or any other entity from which data was obtained, assumes no liability for any errors or omissions herein, If discrepancies are found, please contact the City of Prior Lake.