HomeMy WebLinkAbout7D Sycamore Trail Reconstruction Adopt Assessment Report
4646 Dakota Street SE
Prior Lake, MN 55372
CITY COUNCIL AGENDA REPORT
MEETING DATE: OCTOBER 16, 2017
AGENDA #: 7D
PREPARED BY: JASON WEDEL, PUBLIC WORKS DIRECTOR/CITY ENGINEER
PRESENTED BY: JASON WEDEL
AGENDA ITEM: PUBLIC HEARING TO CONSIDER APPROVAL OF A RESOLUTION ADOPT-
ING THE ASSESSMENT ROLL FOR THE SYCAMORE TRAIL ROAD RECON-
STRUCTION IMPROVEMENT PROJECT (PROJECT #TRN17-000005)
DISCUSSION: Introduction
This agenda item is necessary to adopt the assessment roll for the Sycamore Trail
Road Reconstruction Improvement Project.
History
Each year the City reconstructs street segments that are scheduled for reconstruc-
tion as part of its Capital Improvement Program (CIP) and have exceeded their
useful design life. The City uses the Capital Improvement Program and its Pave-
ment Management Program to plan for infrastructure improvements and the fi-
nancing for capital improvements. At its September 26, 2016 meeting the City
Council adopted Resolution 16-121 authorizing staff to prepare a Feasibility Re-
port for the Sycamore Trail Road Reconstruction Project as outlined in the CIP.
The M.S. Chapter 429 process applies to all projects that will be financed in whole
or in part through special assessments or bond proceeds.
For bidding purposes, this project was combined with three other project areas.
This was done to simplify the bidding process and to better coordinate construc-
tion scheduling with one contractor.
Sycamore Trail includes improvements to Maplewood Townsite, RLS 33, RLS 94,
RLS 108, and Willows 1st Addition located in Section 3, Township 114, Range 22.
Structures in this area were built between 1928-1988 but most were generally built
in the 1970’s. The proposed improvements include street reconstruction or recla-
mation, storm sewer, storm water quality, sanitary sewer, watermain, concrete
curb and gutter, and appurtenant work.
At the November 28th, 2016 City Council meeting, the Council accepted the feasi-
bility study and scheduled the Public Hearing for January 23rd, 2017.
On January 23, 2017, the City Council held the Public Hearing and adopted Reso-
lution 17-010 ordering the improvement project.
Several options for a turnaround were brought to City Council and discussed, ulti-
mately staff was directed to provide a design for a hammerhead. Discussions with
the residents at the end of Sycamore Trail and the Willow Beach Association ulti-
mately determined the design in the plan set at the time. Residents of Sycamore
2
Trail still opposed a turnaround and requested to have it removed from the design
and the cost applied to burying the electric lines.
In addition to the Public Hearing, the City has held three informational meetings to
discuss the project. The last informational meeting was an open house held on
March 29, 2017 and offered residents the opportunity to comment on the proposed
plans. City staff explained the proposed design and went over potential property
impacts individually with residents.
On April 10, 2017 the City Council approved the project plans and specifications
and authorized the advertisement for bids for the 2017 Reconstruction Improve-
ment Projects.
On May 22, 2017 the City Council accepted bids and awarded the City’s standard-
ized construction contract for the 2017 Reconstruction Improvement Projects to
Geislinger and Sons, Inc. At this time the City Council removed the proposed
hammerhead turnaround from the project.
Current Circumstances
The proposed improvements include street reconstruction, storm sewer, storm wa-
ter quality, sanitary sewer, watermain, concrete curb and gutter, and appurtenant
work. Construction of the project is currently ongoing with the anticipated substan-
tial completion date of October 31, 2017.
ISSUES: The Assessment Review Committee has reviewed and agrees with the assessment
map, assessment rate, and method of assessment. The unit method for the as-
sessment is used due to the uniformity of benefit received by the benefited parcels
and the relative consistency in parcel size.
Pursuant to the Assessment Policy, the street and storm sewer reconstruction
should be assessed at up to 40% of the total project cost against the benefiting
properties. As been in past practice in residential neighborhoods, the Assessment
Review Workgroup recommends the unit method of assessment due to the fact that
lots in the project area are of similar size. The remaining amounts should be recov-
ered through the general ad valorem property tax.
The estimated assessment rate per the Feasibility Report is proposed at
$9,459.25/unit. A number of residents have shared their concerns that the as-
sessment rate was high and they are hoping for lower assessments once the bids
have been received. With the bids received, the estimated proposed assessment
is $10,527/unit. The project bid included the hammerhead turnaround. After
awarding the contract, the hammerhead turnaround was removed from the project
allowing additional savings, resulting in a revised assessment amount of
$9,142.22 per unit.
3
FINANCIAL
IMPACT:
The Sycamore Trail Road Improvement Project is proposed to be financed by Spe-
cial Assessments, tax levy, Sewer Fund, Water Fund, and Water Quality Fund. The
amount shown in the table below is an estimate based on the bid prices received.
Funding sources and amounts are as shown below:
Estimated Project Costs and Financing
Item
Estimated Project
Costs Assessments City Share
Streets1 $321,136 $128,454 $192,681
Sanitary Sewer $17,899 $17,899
Watermain $178,000 $178,000
Storm Sewer1 $79,884 $17,821 $62,063
Total $596,919 $146,276 $450,643
1 Includes Option 1 - Dead End
Total Assessed $146,276
Number of Units 16
Unit Assessment $9,142.22
Unit Assessment from Prelim Report $9,459.25
ALTERNATIVES: 1. Conduct the public hearing and if no new substantive information is offered, ap-
prove a resolution adopting the assessment roll as submitted for the Sycamore
Trail Road Improvement Project #TRN17-000005.
2. Deny this item for a specific reason and provide staff with direction.
3. Table this item until some date in the future.
RECOMMENDED
MOTION:
Motion and second for approval of alternative #1.
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 17-___
A RESOLUTION ADOPTING ASSESSMENTS FOR THE SYCAMORE TRAIL ROAD
RECONSTRUCTION IMPROVEMENT PROJECT (CITY PROJECT #TRN17-000005)
Motion By: Second By:
WHEREAS, Pursuant to proper notice duly given as required by law, the Council has met and heard and
passed upon all objections to the proposed assessments for the Sycamore Trail Road
Reconstruction Improvement Project, City Project #TRN17-000005.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The proposed assessment for the Sycamore Trail Road Reconstruction Improvement Project, City
Project #TRN17-000005, a copy of which is attached hereto and made part hereof, is hereby accepted
and shall constitute the special assessment against the lands named therein, and each tract of land
therein included is hereby found to be benefitted by the proposed improvement in the amount of the
assessment levied against it.
3. The portion of the cost of such improvements to be paid by the City is hereby declared to be $450,643,
and the portion of the cost to be assessed against benefited property owners is declared to be
$146,276.
4. Assessments shall be payable on an equal principal installment method extending over a period of ten
(10) years for the street improvements. The first installment shall be the annual principal plus interest
calculated from the public hearing date to the end of this year plus twelve months of the following year
and shall bear interest at the rate of 3.8% per annum from the date of the adoption of the assessment
resolution.
5. The owner of any property so assessed may, at any time prior to certificati on of the assessment to the
County Auditor, pay the whole of the assessment on such property, with interest accrued to the date of
the payment, except that no interest will be charged if the entire assessment is paid within thirty (30)
days, and he/she may, at any time thereafter, pay to the city treasurer the entire amount of the
assessment remaining unpaid, with interest accrued to December 31 of the year in which such
payment is made. Such payment must be made before November 15 or interest will be charged
through December 31 of the next succeeding year.
6. The Finance Director shall forthwith transmit a certified duplicate of this assessment to the County
Auditor to be extended on the property tax lists of Scott County. Such assessments shall be collected
and paid to the City in the same manner as other municipal taxes.
Passed and adopted by the Prior Lake City Council this 16th day of October, 2017
2
VOTE Briggs McGuire Thompson Braid Burkart
Aye ☐ ☐ ☐ ☐ ☐
Nay ☐ ☐ ☐ ☐ ☐
Abstain ☐ ☐ ☐ ☐ ☐
Absent ☐ ☐ ☐ ☐ ☐
______________________________
Frank Boyles, City Manager
FINAL ASSESSMENT ROLL
2017 Street Improvement Project - Sycamore Trail
Full Street Reconstruction
16
No.Legal Description Parcel Address PID Property Owner Assessible Units
Unit Assessment
Amount Total Assessments
1 SubdivisionName MAPLEWOOD
TOWNSITE Lot 001 SubdivisionCd 25098 3508 SYCAMORE TRL SW 250980010 HACKETT WILLIAM B 3508 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
2
SubdivisionName MAPLEWOOD
TOWNSITE Lot 002 SubdivisionCd 25098 3498 SYCAMORE TRL SW 250980020 WARMKA ROBERT E 3498 SYCAMORE TR SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
3
SubdivisionName MAPLEWOOD
TOWNSITE Lot 004 SubdivisionCd 25098
& LOT 5 EX W 12' OF LOT 5 3486 SYCAMORE TRL SW 250980040 ROBINSON LAURA 3486 SYCAMORE TR SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
4
SubdivisionName MAPLEWOOD
TOWNSITE Lot 006 SubdivisionCd 25098
& W 12' OF LOT 5 3478 SYCAMORE TRL SW 250980050 DAVENPORT WILLIAM G 3478 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
5
SubdivisionName MAPLEWOOD
TOWNSITE Lot 7&8 SubdivisionCd 25098 3470 SYCAMORE TRL SW 250980060 MADER WESLEY M & CHARLOTTE 3470 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
6
SubdivisionName MAPLEWOOD
TOWNSITE Lot 012 SubdivisionCd 25098
& LOT 13 & N1/2 OF 14 & P/O GOVT
LOT 3 COM N'ERLY COR LOT 12,
NW'ERLY ALONG NW'ERLY EXT
NE'ERLY LN LOT 12 TO SHORE,
SW'ERLY ALONG SHORE TO INT W/
W'ERLY EXT S LN N1/2 LOT 14, E'ERLY
ALONG W'E 3442 SYCAMORE TRL SW 250980080 SHORT KIMI C & CHRISTOPHER T 2835 COUGAR PATH NW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
7
SubdivisionName MAPLEWOOD
TOWNSITE Lot 015 SubdivisionCd 25098
& LOT 16 & S1/2 OF LOT 14 3420 SYCAMORE TRL SW 250980090 JOHNSON MARGARET A 3420 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
8
SubdivisionName MAPLEWOOD
TOWNSITE Lot O/L Block 00A
SubdivisionCd 25098 3483 SYCAMORE TRL SW 250980110 SPANIER MICHAEL T & KATHRYN A 3483 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
9
SubdivisionName MAPLEWOOD
TOWNSITE Lot O-L Block 00C
SubdivisionCd 25098 3437 SYCAMORE TRL SW 250980130 BAUCHLE JOHN F & DARLA D 3437 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
10
SubdivisionName MAPLEWOOD
TOWNSITE Lot O-L Block 00D
SubdivisionCd 25098 N'ERLY 120' OF 3415 SYCAMORE TRL SW 250980160 SUTHERLAND JOSHUA 3415 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
11
SubdivisionName MAPLEWOOD
TOWNSITE Lot O-L Block 00B
SubdivisionCd 25098 3469 SYCAMORE TRL SW 250980180 HANSON TIMOTHY D & TAMMIE J 3469 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
12
SubdivisionName RLS 033 Lot TCT Block
00E SubdivisionCd 25106 N 107.4' OF 3385 SYCAMORE TRL SW 251060160 SMITH SCOTT J 3385 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
13
SubdivisionName RLS 094 Lot TCT Block
00A SubdivisionCd 25195 LYING SW OF
LINE COM E COR, N 43-03-36 W 29.43'
TO POB, N 52-25-03 W 196' TO SHORE
& THERE TERMINATING 3454 SYCAMORE TRL SW 251950010 CHOUDEK DANIEL 3454 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
14
SubdivisionName RLS 108 Lot TCT Block
00B SubdivisionCd 25218 3380 SYCAMORE TRL SW 252180020 TRUST NUMBER 250 3380 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
15
SubdivisionName RLS 108 Lot TCT Block
00C SubdivisionCd 25218 3402 SYCAMORE TRL SW 252180030 CURRY RONALD D & KATHY J 3402 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
16
SubdivisionName RLS 108 Lot TCT Block
00D SubdivisionCd 25218 3406 SYCAMORE TRL SW 252180040 EICHTEN THOMAS J & EVE D 3406 SYCAMORE TRL SW PRIOR LAKE MN 55372 1 $9,142.22 $9,142.22
16 $146,275.52
Construction Method:
Total Units:
Property Owner Address
Prepared by: Bolton Menk, Inc.
2017 Street Reconstruction Project ǀ T18.112541
Assessment Roll
Full Street Reconstruction Page 1 of 1