HomeMy WebLinkAbout7A Woodside Huron Public Hearing Presentation2018 Street Reconstruction Project – Woodside/Huron Neighborhood Street Improvements December 11, 2017 Public Improvement Hearing Project Objectives •Reconstruct Deteriorated Streets •Upgrade City Underground Utilities •Sanitary Sewer •Watermain •Storm Sewer Project Area Street Improvements (Reconstruction) Existing •30-34’ wide bituminous street with mountable concrete curb & gutter •Overall Condition Index (OCI) = 19.67 Proposed •Narrow road to 28’ wide with B618 concrete curb •Traffic calming •Speeding concerns were brought up at the kick of meeting and in questionnaires •Will require “No Parking” on one side of street •Street lights per City Standard (300ft) •7-ton design street section •4” Bituminous •8” Aggregate Base •18” Granular Material Street Improvements (Reconstruction) Construction Impacts •Residents will not be able to get to their homes during construction hours (7am –7pm) at times. •Road is closed to through traffic. •Road will be dirt at times. •Portions of driveways will be torn up and rock. •Mail delivery will occur outside of the construction area at a location designated by the Post Office. What’s Under My Street Utility Improvements Proposed Utility Improvements •Sanitary Sewer: Replace 8” VCP with new PVC pipe. •Water Main: Replace existing with 8” PVC •Storm Sewer: Replacement and extension of storm sewer system, stormwater basin. Watermain Existing •Constructed in late 1960s •6” Cast Iron Pipe (CIP) Proposed •Replace 6” CIP with 8” PVC •Replace existing water services to the Right-of-way •Replace curb stops •Replace hydrants •Replace gate valves. Construction Impact •Temporary water service •Water shutdowns •Planned water shutdowns will be noticed. •Unplanned shutdowns can happen without notice. Watermain Issues Sanitary Sewer Existing •Constructed in late 1960’s and early 1970’s •8” Vitrified Clay Pipe (VCP) Proposed •Replace 8” VCP with 8” PVC •Replace existing sanitary sewer services to the Right-of-way •Replace manholes Construction Impact •Road will be torn up with 10-14’ excavations for pipe installation. •Service replacement can get beyond right-of-way and into front yards with excavation. Sanitary Sewer Issues Storm Sewer Existing •Constructed in 1986 •Reinforced concrete pipe Proposed •Due to the proposed road alignment the storm sewer will have to be replaced. •Replace pipe •Replace manholes •Add storm water management basin to aid in road drainage issues. Construction Impact •Road will be torn up with 4-8’ excavations for pipe and structure installation. Estimated Project Costs Estimated Project Costs and Financing ITEM ESTIMATED PROJECT COSTS ASSESSMENTS CITY SHARE Streets1 $1,321,700 $450,980 $870,720 Sanitary Sewer $639,900 $639,900 Watermain $611,600 $611,600 Water Quality $54,200 $54,200 Storm Sewer1 $124,900 $49,960 $74,940 Total $2,752,300 $500,940 $2,251,360 Estimated Project Costs Project Funding ITEM PROJECT TOTAL Tax Levy $945,660 Assessments $500,940 Sewer Fund $639,900 Water Fund $611,600 Water Quality Fund $54,200 Assessment Roll (Per Unit) Reconstruction $8,280 Total $2,752,300 Assessment Review Workgroup •Met on October 25, 2017 •Reviewed the Assessment Map •Reviewed the Estimated Project Cost •Reviewed the Method of Assessment: Area vs Unit •Reviewed the Estimated Assessment Amount Estimated Assessments •Street and Storm Assessment 10 Year Period •Typical Lot (1 unit) ~ $8,280 ($828 per year plus interest) •Duplex (1.5 units) ~ $12,420 ($1,242 per year plus interest) •Assessment Rate 2% greater than Project Bond Rate (2017 Rate 3.80%) •Assessments Based on Benefit Determined by an Appraisal Reconstruction Assessment (40%) Street & Storm $500,940 Assessment –Unit Method Assessable Area 60.5 Units Estimated Unit Assessment $8,280/Unit Assessment Map Preliminary Project Schedule ACTIVITY DATE Held First Informational Meeting June, 2017 Accept Feasibility Report / Call for Public Hearing November 20, 2017 Second Informational Meeting December 6, 2017 Conduct Public Hearing/Order Project December 11, 2017 Third Informational Meeting February 2018 Approve Plans and Specifications / Order Advertisement for Bids February 2018 Open Bids March 2018 Accept Bids/Award Contract May 2018 Begin Construction May 2018 Complete Base Course of Bituminous Pavement September 2018 Authorize Amount to be Assessed/Schedule Assessment Hearing September 2018 Conduct Assessment Hearing/Adopt Assessment Roll October 2018 Project Feedback Informational Meeting •Held December 6, 2017 •8 property owners in attendance •Introduction to the project •Discussed typical project, process, and timeline Project Questionnaire •12 questionnaires were filled out and turned into City •Concerns with speeding •Concerns with Assessments •Concerns with drainage Questions? •A super majority (4/5 vote) is required to order the project. Curb Type B618 D412 SURMOUNTABLE