Loading...
HomeMy WebLinkAbout02 20 2018 Assessment Policy PresentationAssessment Policy Discussion February 20, 2018 AGENDA 1.Brief overview of existing policy 2.Review of improvement funding 3.Options for policy amendment Assessment Policy (May 23, 2016) 1.Methods of Assessments a.Unit b.Area c.Front footage 3.Types of assessment projects a.Streets (100% initial and 40/60 split for recon) b.Street Overlay (per unit in fee schedule) c.Sewer & Water (100% initial and 0 for recon) 4.Assessment Terms a.Streets –10 years b.Street Overlay –5 years c.Sanitary sewer and water –20 years Assessment Policy (May 23, 2016) 5.Supplemental Guidelines a.Utility Impact –costs associated with the restoration for utility work will not be assessed for street improvement projects. b.Private Streets and Common Driveways – properties accessed from a private street or common driveway within an improvement area or adjacent to the improvements will be assessed. The Assessment Policy does not address how the cost of replacing private streets or driveways, as a result of a sewer and water projects, is to be covered Improvement Funding Fund Description Funding Source Use 225 Park Dedication Fee Development Fees Initial construction of new park improvements 430 Revolving Park Equipment Fund Tax Levy Replacement of existing park equipment 450 Permanent Improvement Revolving (PIR) Fund Tax Levy Mill and overlay projects 502 Trunk Storm Sewer Acreage Charge Development Fees Pays for construction of facilities designed to serve areas beyond the immediate development. Includes extra pipe sizing and depth. 502 Trunk Water Acreage Charge Development Fees Pays for construction of facilities designed to serve areas beyond the immediate development. Includes extra pipe sizing and depth. 502 Trunk Sanitary Sewer Acreage Charge Development Fees Pays for construction of facilities designed to serve areas beyond the immediate development. Includes extra pipe sizing and depth. 502 Trunk Line Availability Charge -Sanitary Sewer Development Fees Pays for the cost of bringing the sewer infrastructure to the subject property. 502 Trunk Line Availability Charge -Water Development Fees Pays for the cost of bringing the water infrastructure to the subject property. 502 Sewer Connection Charge Building Permit Pays for permitting and inspection. 502 Water Connection Charge Building Permit Pays for permitting and inspection. 503 Street Oversize Acreage Charge Development Fees Pays for construction of streets in excess of 36-feet in width in combination with MSAS funds. 505 Water Storage Availability Charge Building Permit For construction of water storage facilities 601 Water Fund Utility Rates To cover costs for maintenance, operations and future replacement 602 Storm Water Fund Utility Rates To cover costs for maintenance, operations and future replacement 604 Sanitary Sewer Fund Utility Rates To cover costs for maintenance, operations and future replacement Private Street Map Total Private Streets = 10.1 miles Private Street with utilities beneath them = 8.5 miles Options for Policy Amendment 1.Assess for private street cost 2.Increase sewer and water rates across the entire City to cover cost of replacing private streets and driveways 3.Create special sewer and water district for properties on private streets and charge them higher utility rates to cover cost of replacing private streets 4.Make residents on private streets responsible for replacing their own sewer and water 5.Other? QUESTIONS?