Loading...
HomeMy WebLinkAbout03 19 2018 SRF PresentationCH 21 Downtown Prior Lake Reconstruction Colorado Street Review| 3.19.18 Colorado Street Review Goals •Identify Existing and Future Conditions –Traffic Volumes –Parking (On-and Off-Street) –Access, Roadway Geometry, and Traffic Controls –Pedestrian Accommodations (Gaps and Connectivity) •Develop and Evaluate Context-Sensitive Concepts •Coordinate with Area Stakeholders •Concept Refinement and Vision Selection 2 Traffic Volumes 3 Colorado Street (Duluth to Arcadia) 4 Lack of Pedestrian Connection (North Side) 4-foot Sidewalk (South Side) On-Street Parking Supply: North Side: 7 spaces South Side: 9 spaces Roadway Width (Curb-to-Curb): ~30 feet Right-of-Way: ~66 feet Concept –Colorado Street (Duluth to Arcadia) 5 Discussion: Parking, Sidewalks, Bump-outs North South 11’11’8’5’4’ Colorado Street (Arcadia to Main) 6 Lack of Pedestrian Connection (North Side) Wide Curb-Cut (Driveway) Areas -Access Roadway Width (Curb-to-Curb): ~30 feet * * ** ****** * * Off-Street Parking Supply: ~ 110 Spaces Concept A –Colorado Street (Arcadia to Main) 7 Refined Loading Area New Sidewalk Connection Parking Lot Reconfiguration and Access Modifications Crosswalk Improvements Reduced Roadway Width Curb Bump-Outs Access Change Discussion: Roadway, Access, Parking, Sidewalks, Bump-outs Concept B –Colorado Street (Arcadia to Main) 8 Refined Loading Area New Sidewalk Connection Parking Lot Reconfiguration and Access Modifications Reduced Roadway Width Curb Bump-Outs Access Change Discussion: Roadway, Access, Parking, Sidewalks, Bump-outs Crosswalk Improvements Next Steps •Refine Concept(s) Based on Feedback •Coordinate with Area Stakeholders (if Directed) •Finalize Future Colorado Street Vision 9 10