Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
03 19 2018 SRF Presentation
CH 21 Downtown Prior Lake Reconstruction Colorado Street Review| 3.19.18 Colorado Street Review Goals •Identify Existing and Future Conditions –Traffic Volumes –Parking (On-and Off-Street) –Access, Roadway Geometry, and Traffic Controls –Pedestrian Accommodations (Gaps and Connectivity) •Develop and Evaluate Context-Sensitive Concepts •Coordinate with Area Stakeholders •Concept Refinement and Vision Selection 2 Traffic Volumes 3 Colorado Street (Duluth to Arcadia) 4 Lack of Pedestrian Connection (North Side) 4-foot Sidewalk (South Side) On-Street Parking Supply: North Side: 7 spaces South Side: 9 spaces Roadway Width (Curb-to-Curb): ~30 feet Right-of-Way: ~66 feet Concept –Colorado Street (Duluth to Arcadia) 5 Discussion: Parking, Sidewalks, Bump-outs North South 11’11’8’5’4’ Colorado Street (Arcadia to Main) 6 Lack of Pedestrian Connection (North Side) Wide Curb-Cut (Driveway) Areas -Access Roadway Width (Curb-to-Curb): ~30 feet * * ** ****** * * Off-Street Parking Supply: ~ 110 Spaces Concept A –Colorado Street (Arcadia to Main) 7 Refined Loading Area New Sidewalk Connection Parking Lot Reconfiguration and Access Modifications Crosswalk Improvements Reduced Roadway Width Curb Bump-Outs Access Change Discussion: Roadway, Access, Parking, Sidewalks, Bump-outs Concept B –Colorado Street (Arcadia to Main) 8 Refined Loading Area New Sidewalk Connection Parking Lot Reconfiguration and Access Modifications Reduced Roadway Width Curb Bump-Outs Access Change Discussion: Roadway, Access, Parking, Sidewalks, Bump-outs Crosswalk Improvements Next Steps •Refine Concept(s) Based on Feedback •Coordinate with Area Stakeholders (if Directed) •Finalize Future Colorado Street Vision 9 10