CITY COUNCIL AGENDA REPORT
SEPTEMBER 19, 2005
9B
AL FRIEDGES, PARKS AND FLEET MAINTENANCE SUPERVISOR
STEVE ALBRECHT, PUBLIC WORKS DIRECTORlCITYENGINEER
CONSIDER APPROVAL OF A RESOLUTION ACCEPTING THE BIDS AND
AWARDING THE CITY'S STANDARDIZED CONTRACT FOR THE
CONSTRUCTION OF CONCESSIONS/RESTROOM BUILDING ADDITIONS
AND REMODELING AT THE PONDS ATHLETIC COMPLEX.
Introduction
The purpose of this agenda item is to accept the bids and award the city's
standardized contract for the construction of concessions/restroom building
additions and remodeling at the Ponds Athletic Complex.
History
The Council authorized staff to solicit bids for the proposed addition and
remodeling at the August 15th meeting. At the November 15, 2004 City Council
meeting, plans and specifications and authorization to solicit bids for the
construction of a concession room addition and upgrades to existing restrooms
was approved. At the January 3, 2005 City Council meeting, the Council
rejected all bids for the construction of the concession/restroom building at the
Ponds Athletic Complex. The total estimated cost for the restroom/concessions
addition and renovation was $95,000. The low bid was $182,207 (including
alternates) from Greystone Construction Co. Since this was significantly higher
than our estimates, staff recommended re-bidding the project at a later date.
Current Circumstances
To save money on the construction of this building, the City would act as a
general contractor and bid the sub-contractors individually. This practice was
used on the Memorial Park building, Lakefront Park Pavilion and the Thomas~ ...
Ryan Memorial Park building very successfully. In all of the past cases, using
this method has saved a substantial amount of money for the City.
In addition to being the general contractor, city staff would complete the
demolition, grading, utility hook-ups, painting/staining and roofing. To complete
the remaining needed improvements, we solicited bids for eleven (11) divisions
and received bid for the following work:
1.
2.
3.
4.
5.
6.
7.
C:\Documents and Settings\cgreen\Local Settings\Temporary InteWWW~(le4ftM\md award contract ponds concession 9-19-05.DOC
Phone 952.447.4230 I Fax 952.447.4245
Bids were received and opened on September ih, 2005. A total of nine (9) bids
were received for one or more of the above divisions. The table below shows
the bidders for each division:
Concrete
Hardware
6663
Contractor Tile Plumbing Electrical
Keith Pumoer $40,640
Canon
Greystone
Vesley Electric $ 9.745
Jeff Shearer $24 875
Jerry Connolly $18.300
The lowest responsible bidder is underlined in the above table. Each bidder
that was the lowest responsible bidder has met the selection criteria.
Issues
By the City being the general contractor and doing a number of tasks in house,
there will be significant savings to the City. The initial cost estimate was
$132,000, but after the bids were received and the city staff work and materials
tabulated, the new cost estimate for the Ponds Athletic Complex upgrades
totaled $137,000. The recent bids totaled $107,656.00 to complete most of the
work versus last years bid of $182,207.
City staff will perform the following activities to further keep costs down:
· Roof (shingles)
· SewerlWater Hook-up
· Earthwork
. Demolition
. Painting and Staining
· Installation of toilet partitions and accessories
· Purchase cabinets and stainless steel service counters
The cost of materials for the above work totals $29,344.00. This brings the
total cost of the project to $137,000.00. Still a significant savings from the
original bid of $182,207.
The CIP identified $95,000 for the improvements. However, the CIP planning
did not include the need to update the restrooms to the new American Disability
Act (ADA) standards. Based on ADA Standards there are significant upgrades
C:\Documents and Settings\cgreen\Local Settings\Temporary Internet Files\OLKI62\approve bids and award contract ponds concession 9-19-05.DOC
FINANCIAL
IMPACT:
ALTERNATIVES:
RECOMMENDED
MOTION:
REVIEWED BY:
needed to the restroom sizes and amenities that substantially increased the
costs. This was brought to the City's attention by the architect during the initial
design stages and after the CIP planning was complete.
Conclusion
City staff recommends to accept the bids and award the city's standardized
contract for the construction of the concession/restroom building addition and
remodeling at the Ponds Athletic Facility to the contractors listed in the above
table.
The CIP cost estimates for the addition/remodeling was $95,000. The total
bids for all divisions for the remodeling project totaled $107,656.00. Materials
for city staff activities will cost an additional $29,344.00. The additional
$42,000.00 needed to complete the project is available from the Capital Park
Fund. Funding for the entire project will total $137,000.00 and is budgeted
from the Capital Park Fund.
The alternatives are as follows:
1. Approve a resolution accepting the bids and awarding the contracts for the
construction of Concession/Restroom Building Addition and Remodeling at
The Ponds Athletic Facility.
2. Table this agenda item for a specific reason.
3. Deny this agenda item for a specific reason and provide staff with direction.
orks Director/City Engineer
C:\Documents and Settings\mmccormick\Local Settings\Temporary Internet Files\OLK4\approve bids and award contract ponds concession 9-19-051.DOC
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
RESOLUTION OS-xx
A RESOLUTION ACCEPTING THE BIDS AND AWARDING THE CITY'S STANDARDIZED
CONTRACT FOR THE CONSTRUCTION OF CONCESSIONS/RESTROOM BUILDING
ADDITIONS AND REMODELING AT THE PONDS ATHLETIC COMPLEX
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
MOTION BY: SECOND BY:
Because of the continued growth of Prior Lake and updated health,
handicapped access and safety requirements, the Capital Improvement
Program contains funds for upgrades and additions to the
Concession/Restroom Building at The Ponds Athletic Complex (2005);
and
The City Council authorized staff to advertise for bids at the August 15th,
2005 Council Meeting; and
A total of nine (9) bids were opened and received on September 7'h,
2005. The following contractors were each awarded one or more of the
division bids:
Contractor Division Amount
Canon Concrete $4,169.00
Canon Carpentry $20,474.00
Canon Hardware $6,663.00
Greystone Masonry $23,430.00
Vesley Electric Electrical $9,745.00
Jeff Shearer PlumbinQ $24,875.00
Jerry Connolly Tile $18,300.00
Total Cost $107,656.00
; and
The City will act as the general contractor for the construction and
perform several tasks to complete the building in a most cost effective
manner. The total construction cost of all bids ($107,656.00) and
materials ($29,344.00) was $137,000.00.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, that:
1. The recitals set forth above are incorporated herein.
2. The Mayor and City Manager are hereby authorized to execute the City's standardized
construction contract with each bidder listed above in the name of the City of Prior Lake
for the Construction of Concession/Restroom Building Addition and Remodeling at The
Ponds Athletic Facility.
3. The City Manager is hereby authorized and directed to return to all bidders the deposits
made with their bid once the contracts have been signed.
4. The funding for the restroom/concession building shall come from the Capital Park
Fund.
C:\Documents and Settings\cgreen\Local Settings\Temporary Internet Files\OLKI62\approve bids and award contract ponds concession 9-19-
OS.DOC www.cityofpriorlake.com
Phone 952.447.4230 / Fax 952.447.4245
Passed this 19th day of September 2005.
HauQen HauQen
FleminQ FleminQ
LeMair LeMair
Petersen Petersen
Zieska Zieska
YES
NO
{ Seal }
Frank Boyles, City Manager