Loading...
HomeMy WebLinkAbout07 16 2018 2019-2028 CIP PresentationAugust 7, 2017 1 The purpose of this meeting is to review the proposed 2019-2023 Capital Improvement Program (CIP). Workshop Purpose 2 April 2:Long-Range Planning Workshop June 18:Capital Plans Review I July 16:Capital Plans Review II August 6:Public Hearing and Adopt 2019-2023 CIP Capital Plans Review I: •Transportation Plan •Street Overlay Plan •Equipment Replacement Plan •Park Plan •Facilities Management Plan Capital Plans Review II: •Technology Plan •Water Plan •Sewer Plan •Storm Water Plan •Financial Impacts •Planning for current & long-range IT needs •Existing Hardware and Software Maintenance Costs •Proposed Software Costs Technology Plan 6 Technology Plan 7 General Fund Computer Replacement (includes work station, lap tops, tough books, iPads, etc.) 2019: $26,520 2020: $15,455 2021: $8,949 2022: $10,993 City computers are on a six-year replacement schedule and laptops/tough books on a five-year replacement schedule. Website Redesign 2019: $45,000 2020: $8,000 (annual license fee) 2021: $8,000 2022: $8,000 Redesign of city website. An external audit of city’s network security indicated that the platform on which the city’s website resides is a security risk for hackers because the programming is outdated and no longer supported. New website would include email sign up on specific topics and capability to send alerts. Updated website would allow for live stream of Council meetings, which current system cannot support. Phone System Replacement 2019: $70,000 Current city phone system is over 12+ years old and failing. The new phone system combines 7 buildings’ phone systems into one. Managed Services Contract (virtual Helpdesk) 2019: $23,000 This contract would provide virtual Helpdesk support. Rather than hire additional FTEs at this time to support our IT Department, this contract would provide Helpdesk support as well as regular monitoring of our network to prevent ransomware, hackers and other security threats. (recurring annual cost moving forward) NIMBLE SANS Controller 2019 - $16,000 Upgrade the interface to the City’s network on the storage controller unit for virtual servers. Citizens Online Portal 2019 - $15,914 (Split between general/water/sewer funds) Online service request module for public works complaints. Technology Plan 8 Water Fund BS&A Utility Billing System 2019 - $17,552 2020 - $17,552 Switch from Incode to BS&A for water meter reading replacement project. Sewer Fund BS&A Utility Billing System 2019 - $17,552 2020 - $17,552 Switch from Incode to BS&A for water meter reading replacement project. Cable Fund Tightrope Channel 2022 - $7,727 Replacement of playback system on cable channel. Part of three-year Council Chamber audio/visual enhancement project. Audio System for Chambers 2019 - $15,000 Part of three-year Council Chamber audio/visual enhancement project. Utility Plans 9 •Minimal street reconstruction with utilities in 2019. (CR21/TH13 project: •Water -$100,000 / Sewer-$250,000) •Utility reconstruction on private streets: •Inguadona area in 2021 ($592,000) •Council direction to explore a Special Utility Billing district as a financing source for private street replacement (annual revenue: $200,000) Utility Plans 10 •Utility rate study ($25,000 per plan) •AMRS/Utility debt service beginning in 2019 (Annual average of $152k each water & sewer) Water Plan 11 SMSC Water Purchase & Expansion Agreement: •SMSC Joint Water Facility Capital Costs for Filter Cells ($2,100,000 funded from the Water Storage Fund) •Raw Watermain to support joint WTP in 2019 ($1,300,000 funded from Trunk Oversizing Fund ) •Plan updated for water purchase rate per agreement Water Plan 12 •Watermain replacements associated with five-year transportation plan street projects ($3,700,000) •Water Equipment Replacement Plan ($109,000 annually) Sanitary Sewer Plan 13 •Sanitary sewer replacements associated with five-year transportation plan street projects ($2,600,000) •Five-Year Concrete Sewer Lining ($1,900,000) •Sewer Equipment Replacement Plan ($68,000 annually) •Inflow/Infiltration Prevention ($150,000 annually) Sanitary Sewer Plan 14 •Summer Sewer Lock/Cost Break –average of February and April Billing Cycle Consumption •MCES portion of sewer rate-proposed cost increase of 7.5% Month Billing Cycle Feb Nov 21 - Jan 20 Apr Jan 21 - March 20 June March 21 - May 20 Aug May 21- July 20 Oct July 21-Sept 20 Dec Sept 21- Nov 20 Sanitary Sewer Plan 15 •Current plan –Fund balance drops below desired/recommended level •Council considerations: •Increase the city portion and MCES sewer rates •Modify or phase out the summer sewer lock •Issue debt to fund a portion of the 2020/2021 $2.2M capital needs. •Postpone future year project(s) •Consider a combination of the above. Stormwater/Water Quality Plan 16 •Storm Sewer Replacements associated with five-year transportation plan street projects ($1,500,000) •Stormwater System Maintenance and Retrofits ($2,800,000) •Experiencing an increase in stormwater infrastructure costs due to increased regulations and requirements. •Enterprise Funds •Water Fund 3% rate increase •Sewer Fund city portion rate increase of $0.60 in 2019 and $.50 in 2020, if no change in current plan structure •Sewer Fund MCES portion rate increase of $.20 in 2019 •Stormwater 5% rate increase in 2019 •Future adjustments to be defined by utility rate analysis Projected Change in Utility Fees: Projected Impact of Fees CIP Workshop 07.16.2018 Current & Proposed* Rates: 2018 2019 2020 2021 2022 2023 Water <25000 4.67$ 4.81$ 4.96$ 5.11$ 5.26$ 5.42$ Water >25000 6.44$ 6.63$ 6.83$ 7.03$ 7.25$ 7.46$ Sewer-MCES 2.70$ 2.87$ 3.02$ 3.17$ 3.33$ 3.49$ Sewer-City 2.94$ 3.54$ 4.04$ 4.12$ 4.20$ 4.29$ Storm Water 14.34$ 15.06$ 15.73$ 16.44$ 17.18$ 17.96$ CFAC-Water 5.00$ 5.00$ 5.00$ 5.00$ 5.00$ 5.00$ CFAC-Sewer 5.00$ 5.00$ 5.00$ 5.00$ 5.00$ 5.00$ Impact of CIP –Average User Utility Bill 19 Based on 8,000 gallons / cycle 2018 2019 2020 2021 2022 2023 Costs Per Cycle:106.81$ 114.86$ 121.84$ 125.59$ 129.48$ 133.52$ $$ Change from PY 4.55$ 8.05$ 6.98$ 3.75$ 3.89$ 4.04$ % Change from PY 4.4%7.5%6.1%3.1%3.1%3.1% Annual Costs:640.87$ 689.16$ 731.05$ 753.56$ 776.91$ 801.14$ $$ Change from PY 27.30$ 48.29$ 41.89$ 22.50$ 23.35$ 24.23$ % Change from PY 4.4%7.5%6.1%3.1%3.1%3.1% Tax Levies:2019 2020 2021 2022 2023 Equipment Revolving Fund 50,000 - - - - Revolving Park Equip Fund 101,108 93,984 94,373 105,183 271,081 Facilities Management Fund - 30,000 50,000 - 25,000 PIR Fund 95,000 80,000 - 10,000 - Debt Service 127,296 86,501 343,092 336,998 183,903 Total CIP Tax Levies 373,404 290,485 487,465 452,181 479,984 0.031 2019-2023 CIP Projected Change in CIP Tax Levy 2019 - Estimated % Increase in Tax Levy for CIP components only Projected five-year annual change in Total CIP Tax Levies: Historical annual change in Total CIP Tax Levies: Tax Levies:2016 2017 2018 2019 2020 2021 2022 2023 Equipment Revolving Fund 75,000 50,000 175,000 50,000 - - - - Revolving Park Equip Fund - 213,406 24,778 101,108 93,984 94,373 105,183 271,081 Facilities Management Fund - - - - 30,000 50,000 - 25,000 PIR Fund - - - 95,000 80,000 - 10,000 - Debt Service 512,213 221,387 (276,784) 127,296 86,501 343,092 336,998 183,903 Total CIP Tax Levies 587,213 484,793 (77,006) 373,404 290,485 487,465 452,181 479,984 0.056 0.043 (0.007) 0.031 2019-2023 CIP Projected Change in CIP Tax Levy % Change in Tax Levy for CIP components only Note 1 : In 2016 the Revolving Park Equipment Plan was included in the General Fund Tax Levy Note 2 : In 2018 the MV Debt Levy was reducted by $790k due to the 2017 final payment of the 2005 MV Parks Referendum Actual Annual projected total CIP tax levy by component Tax Levies:2019 2020 2021 2022 2023 Equipment Revolving Fund 600,000 600,000 600,000 600,000 600,000 Revolving Park Equip Fund 339,292 433,276 527,649 632,832 903,913 Facilities Management Fund - 30,000 80,000 80,000 105,000 PIR Fund 95,000 175,000 175,000 185,000 185,000 Debt Service 3,497,468 3,583,968 3,927,061 4,264,059 4,447,962 Total CIP Tax Levies 4,531,760 4,822,244 5,309,710 5,761,891 6,241,875 2019-2023 CIP Projected CIP Tax Levy Council Considerations: •Proposed utility rate changes •Sewer Fund options for modifying summer sewer lock •Utilize General Fund reserves for some 2019 proposed technology costs Council Discussion 23 Next steps: •Update plans based on council direction and new information •CIP Public Hearing –August 6, 2018 •Budget Workshop-August 20, 2018 Council Discussion 24 End of Presentation 25 Historical 2018 annual change in Tax Levies: 2018 Property Tax Levy Comparison Change 17 - 18 Property Taxes 2017 2018 Amount Percent Levy - Tax Capacity General Fund - Operating 7,192,793$ 7,779,182$ 586,389$ 8.15% Debt Service Funds 2,628,937 3,142,620 513,683 19.54% Revolving Equipment Fund 375,000 550,000 175,000 46.67% Revolving Park Equipment Fund 213,406 238,184 24,778 11.61% Facilities Management Fund - - - n/a 10,410,136$ 11,709,986$ 1,299,850$ 12.49% Levy - Market Value - General Fund 1,018,019 227,552 (790,467) -77.65% Levy - Economic Dev Authority 140,000 140,000 - 0.00% Total Levy 11,568,155$ 12,077,538$ 509,383$ 4.40% Projected five-year annual change in debt levy: 2019 2020 2021 2022 2023 Debt: Existing CIP (425,209) (162,795) 12,313 (24,001) (223,176) New CIP 545,639 242,296 319,059 359,849 396,308 Market Referendum 6,866 7,000 11,720 1,150 10,770 Change in Debt Levy 127,296 86,501 343,092 336,998 183,903 2019-2023 CIP Projected Change in Debt Levy 2018 project bonding with 2019 debt levy impact Fire Pumper Replacement •Fire Station #2 SCBA and Parking Lot Replacement •2018 Street Improvement Projects o Franklin Area o Huron Area •2018 Street Reconstruction Projects o Duluth Ave/TH 13 o County Wide Flashing Yellow Signal Conversion Impact of CIP –Large User Utility Bill 28 Based on 20,000 gallons / cycle 2018 2019 2020 2021 2022 2023 Costs Per Cycle:230.51$ 249.57$ 266.00$ 274.32$ 282.94$ 291.87$ $$ Change from PY 10.75$ 19.05$ 16.44$ 8.31$ 8.62$ 8.94$ % Change from PY 4.9%8.3%6.6%3.1%3.1%3.2% Annual Costs:1,383.08$ 1,497.39$ 1,596.02$ 1,645.91$ 1,697.63$ 1,751.24$ $$ Change from PY 64.49$ 114.31$ 98.63$ 49.89$ 51.71$ 53.61$ % Change from PY 4.9%8.3%6.6%3.1%3.1%3.2% Impact of CIP –Heavy User Utility Bill 29 Based on 30,000 gallons / cycle 2018 2019 2020 2021 2022 2023 Costs Per Cycle:342.45$ 370.91$ 395.51$ 407.91$ 420.75$ 434.07$ $$ Change from PY 16.20$ 28.47$ 24.59$ 12.40$ 12.85$ 13.32$ % Change from PY 5.0%8.3%6.6%3.1%3.1%3.2% Annual Costs:2,054.69$ 2,225.49$ 2,373.03$ 2,447.43$ 2,524.52$ 2,604.41$ $$ Change from PY 97.18$ 170.80$ 147.55$ 74.40$ 77.09$ 79.89$ % Change from PY 5.0%8.3%6.6%3.1%3.1%3.2%