HomeMy WebLinkAbout7A CIP Public Hearing PresentationAugust 6, 2018 1 Conduct a public hearing on the proposed projects within the 2019-2023 Capital Improvement Program (CIP) Purpose 2 The CIP is a multi-year planning document. It identifies projects for the next five years. Some projects are more developed than others. Some projects are dependent on partners including the County, MNDOT, SMSC, etc. What is CIP? 3 Transportation Plan Street Overlay Plan Equipment Replacement Plan Park Plan Facilities Management Plan Technology Plan Water Plan Sewer Plan Storm Water/Water Quality Plan Multi-Year Plans Included in CIP 4 Master Park Plan to be completed by late 2019. Review of current parks as well as the City’s future needs and new park location. 2019-2023 Total Projects Public Works/Parks -$3.2 million 5 Current Parks : ▪Capital project and park amenity replacements. ▪Trail and sidewalk replacements ▪The plan includes a phased increase in the tax levy from $100,000 in 2019 to $425,000 in 2024 to fund annual trail replacement. 2019-2023 Total Projects Public Works/Parks –(cont.) 6 New Parks : ▪2018 change for developers to install new neighborhood parks rather than having City staff construct the parks. 2019-2023 Total Projects Public Works/Parks -$3.2 million 7 Partnership Projects ▪2019-CR21/TH13/Main Ave/Arcadia ▪2020-CSAH 42 (CR83 to CR17) ▪Colorado Street Parking Lot City Jurisdiction Projects ▪Annual pavement recon projects detailed in transportation plan Street Overlay ▪Four miles per year 2019-2023 Total Projects Public Works/Streets -$39.9 million 8 Transportation Plan 9 Water -$5.5 million ▪Watermain replacements associated with street projects ($3,700,000) ▪SMSC Joint Water Facility Capital Costs for Filter Cells ($2,100,000) ▪Raw Watermain to support joint WTP in 2019 ($1,300,000) ▪Water Equipment Replacement Plan Sanitary Sewer -$4.3 million ▪Sewer replacements associated with street projects ($2,600,000) ▪Concrete Sewer Lining Replacement ▪Sewer System Equipment Replacement 2019-2023 Total Projects Public Works/Utility Funds 10 Storm Water/Water Quality -$2.8million ▪Storm Sewer Replacements associated with street projects ($1,500,000) ▪Stormwater Pond Maintenance ($300,000) ▪Stormwater Infrastructure Repairs 11 2019-2023 Total Projects Public Works/Utility Funds (cont.) Vehicles and Equipment -$5.1 million 2019: ▪Water Tanker (Fire) ▪9 Ton Dump Truck (Public Works) ▪Tractor (Parks) 2020-2023: ▪9 Ton Dump Truck (Parks) ▪Pumper Truck (Fire) ▪Loader (Public Works) ▪Truck –Boom (Parks) ▪Tractor (Parks) ▪Sidewalk Machine (Parks) 12 2019-2023 Total Projects (Cont.) Facilities -$1.1 million 2019: ▪Fire Station #1 Hoist/Crane ▪Library/Club Prior Irrigation system and tile walls 2020-2023: ▪Fires Station #1 Epoxy Flooring ▪City Hall & Police Station Carpet, Wall Covering & HVAC ▪Maintenance Center Parking Lot & Crane ▪Water Treatment Facility Ventilators, Carpet & HVAC 13 2019-2023 Total Projects (Cont.) Technology -$366,000 2019: ▪Phone system replacement ▪Utility Billing software replacement ▪Managed Services Contract (Virtual Helpdesk & Cybersecurity) 2020-2023: ▪Website redesign ▪Storage controller unit for virtual server ▪Computer Replacement ▪Copiers/Printers 2019-2023 Total Projects (Cont.) 14 Technology Plan (continued ): ‣Shifted projects and funding to mitigate the 2019 tax levy impact. ▪Phone system funding from General Fund Reserve in 2019 ▪Staff recommendation to delay the Website Redesign, Citizens Online Portal and SAN Controller to a future year 2019-2023 Total Projects (Cont.) 15 ‣The Park Plan includes expenditures of $250,000 for the Hwy 13 trail gap to be completed as part of the MNDOT TH 13 Reconstruction Project. Park Plan Changes 16 ‣2019-2023 bonding is estimated at $14,403,000. ▪This is an estimated reduction in five-year bonding of $5,440,000. ‣The timing of projects has been adjusted to: ▪coincide with the Scott County Transportation Plan ▪moderate the impact on the tax levy & utility rates Transportation Plan Changes 17 ‣Balanced full reconstruction projects, which include water & sewer utility replacement, with reclamation projects that only include street work. ▪The goal is to reduce the annual impact on the water & sewer funds for the full reconstruction projects.‣Added assessment funding for reclamation projects. Transportation Plan Changes 18 ‣Shifted the Green Heights/Pershing area project from 2019 to 2021. ▪This project includes a private street (Inguadona). ▪City to explore funding mechanism for private streets with utility replacement. Transportation Plan Changes 19 ‣Shifted Fish Point Rd from 2020 to 2019 ‣Shifted Northwood Rd area streets from 2021 and 2022 ‣Identified the Lakeside and Colorado area street project for 2023 Transportation Plan Changes 20 ‣The city needs to generate revenue to cover our total sewer flow metered by the Met Council ‣Summer sewer lock: ▪Used to determine sewer flow billed in summer months ▪Recognizes that water used to water lawns, fill pools, etc will not enter the sanitary sewer system ▪Summer sewer lock = (1.5 x Average of Feb & April water consumption) Utility Plans –Changes 21 ‣Summer sewer lock (continued): ▪Proposal to eliminate the summer sewer lock for the June and December billing cycles. Utility Plans –Changes cont. 22 Month Billing Cycle Feb Nov 21 - Jan 20 Apr Jan 21 - March 20 June March 21 - May 20 Aug May 21- July 20 Oct July 21-Sept 20 Dec Sept 21- Nov 20 ‣Summer sewer lock (continued) ▪Residents would still receive the summer sewer lock on their August & October utility bills (May 21-Sept 20 use) ▪This would generate revenue of $100k annually Utility Plans –Changes cont. 23 Month Billing Cycle Feb Nov 21 - Jan 20 Apr Jan 21 - March 20 June March 21 - May 20 Aug May 21 - July 20 Oct July 21 - Sept 20 Dec Sept 21 - Nov 20 ‣The sewer rate is also impacted by the fee charged by the Metropolitan Council to treat the City’s sewer. ▪The proposed cost increase is 7.5% ▪It is based on a rate increase and anticipated sewer flow increase. Utility Plans –Changes cont. 24 ‣Utility rate study in 2019 ▪Review all rates ▪Consider revising the tiered water rates to include a third tier ▪Goal to encourage water conservation Utility Plans –Changes cont. 25 Projected Change in Utility Fees: 2019: Total Sewer/Wastewater Rate Change (MCES & City Combined)10% Water rate change 3% Stormwater rate change 5% Projected Impact of Fees CIP Public Hearing 8.6.2018 Current & Proposed* Rates: 2018 2019 2020 2021 2022 2023 Water <25000 4.67$ 4.81$ 4.96$ 5.11$ 5.26$ 5.42$ Water >25000 6.44$ 6.63$ 6.83$ 7.03$ 7.25$ 7.46$ Sewer-MCES 2.67$ 2.81$ 2.95$ 3.09$ 3.25$ 3.41$ Sewer-City 2.94$ 3.39$ 3.79$ 3.90$ 4.02$ 4.14$ Storm Water 14.34$ 15.06$ 15.73$ 16.44$ 17.18$ 17.96$ CFAC-Water 5.00$ 5.00$ 5.00$ 5.00$ 5.00$ 5.00$ CFAC-Sewer 5.00$ 5.00$ 5.00$ 5.00$ 5.00$ 5.00$ Impact of CIP –Average User Utility Bill 27 Based on 8,000 gallons / cycle 2018 2019 2020 2021 2022 2023 Costs Per Cycle:106.58$ 113.13$ 119.28$ 123.27$ 127.41$ 131.71$ $$ Change from PY 4.32$ 6.54$ 6.16$ 3.99$ 4.14$ 4.30$ % Change from PY 4.2%6.1%5.4%3.3%3.4%3.4% Annual Costs:639.50$ 678.75$ 715.69$ 739.60$ 764.44$ 790.24$ $$ Change from PY 25.93$ 39.25$ 36.93$ 23.92$ 24.84$ 25.80$ % Change from PY 4.2%6.1%5.4%3.3%3.4%3.4% Projected five-year annual change in Total CIP Tax Levies: Tax Levies:2019 2020 2021 2022 2023 Equipment Revolving Fund 50,000 - - - - Revolving Park Equip Fund 101,108 93,984 94,373 105,183 271,081 Facilities Management Fund - 30,000 50,000 - 25,000 PIR Fund 95,000 80,000 - 10,000 - Debt Service 127,016 97,107 332,032 332,031 143,421 Total CIP Tax Levies 373,124 301,091 476,405 447,214 439,502 0.031 2019-2023 CIP Projected Change in CIP Tax Levy 2019 % Change in Tax Levy for CIP components only Annual projected total CIP tax levy by component Tax Levies:2019 2020 2021 2022 2023 Equipment Revolving Fund 600,000 600,000 600,000 600,000 600,000 Revolving Park Equip Fund 339,292 433,276 527,649 632,832 903,913 Facilities Management Fund - 30,000 80,000 80,000 105,000 PIR Fund 95,000 175,000 175,000 185,000 185,000 Debt Service 3,497,188 3,594,294 3,926,327 4,258,358 4,401,778 Total CIP Tax Levies 4,531,480 4,832,570 5,308,976 5,756,190 6,195,691 2019-2023 CIP Projected CIP Tax Levy Financial Impacts -Debt 30 Financial Impacts -Debt 31 ▪Tonight –Public Hearing ▪Council Discussion and Direction ▪Plan Adoption -August 8, 2018 Council Discussion 32