HomeMy WebLinkAbout704 Utilities, Charges and Fees Public Ways & Property
City of Prior Lake
704/p1
SECTION 704
UTILITY RATES, CHARGES AND FEES
SUBSECTIONS:
704.100 PURPOSE
704.200 CONNECTION AND AVAILABILITY CHARGES DUE ON DEVELOPMENT
704.300 CONNECTION AND AVAILABILITY CHARGES DUE WITH PERMIT OR WORK
704.400 WATER AND SANITARY SEWER CHARGES AND RATES
704.500 STORM SEWER CHARGES AND RATES
704.600 OTHER CHARGES
704.700 ACCOUNTS RESPONSIBILITY OF OWNER
704.800 BILLS FOR SERVICE
704.900 CERTIFICATION
704.1000 PENALTY
704.100 PURPOSE
704.101 The rates, charges and fees established by this Part are for the purpose of paying:
1) The operation, construction, reconstruction, maintenance, repair, enlargement,
improvement, use and administrative expenses of the City water, storm sewer and
sanitary sewer facilities, and
2) The City’s share, as allocated by the Metropolitan Council, for the operation and
maintenance costs of the metropolitan disposal system and as defined in M.S.
473.121, Subd. 24.
704.102 Use and Availability Charges. The City Council may, as authorized by statute,
impose just and equitable charges for the use and for the availability of the City
facilities and for connection with them. Fee justification studies shall be prepared to
support changes in use and availability fee, except where the fees are established by
Metropolitan Council.
704.103 Annual Fee Schedule. Usage charges, connection charges, storm sewer, sanitary
sewer and water availability charges, permit fees and penalty fees, except those
imposed by special assessments, shall be set forth in the City’s fee schedule, adopted
annually by the City Council.
704.200 CONNECTION AND AVAILABILITY CHARGES DUE ON DEVELOPMENT
The City may impose utility connection and availability charges due upon development.
All such fees shall be set forth in the City fee schedule and shall be in addition to any
connection and availability charges imposed by the Metropolitan Council.
704.300 CONNECTION AND AVAILABILITY CHARGES DUE WITH PERMIT OR WORK
704.301 City Connection Charges. All City sanitary sewer and water connection charges
Public Ways & Property
City of Prior Lake
704/p2
shall be paid before a permit to connect to the public sanitary sewer or water facilities
will be issued, unless payment is deferred pursuant to the City’s deferral policy. The
amount of the connection charge shall be determined by the number of units that will
occupy the property as defined by the Metropolitan Council and based on the type of
land use that will be conducted on the property multiplied by the unit charge set forth in
the City fee schedule.
Upon any change in use of the property the charges shall be recalculated and any
additional charge resulting from the change in use or additional units shall be paid prior
to the issuance of building or connection permits.
704.302 Metropolitan Council. In addition to the City charges, the sanitary sewer availability
charge, as determined by Metropolitan Council, shall be paid prior to the issuance of
any building or connection permits.
704.303 Water Storage Availability Charge. A water storage availability charge shall be
determined by the City Council on an annual basis and set forth in the City fee schedule.
Said fees shall be placed in a fund maintained by the City to accumulate funds for the
construction of water storage facilities.
704.400 WATER AND SANITARY SEWER CHARGES AND RATES
704.401 Minimum Charges. Minimum charges for the availability of public water and/or sanitary
sewer shall be imposed on properties where water and/or sanitary sewer facilities are
available, regardless of the volume of water used or sewage discharged or whether the
property is connected to the facilities. For purposes of this Section, the definition of
available in Subsection 705.200 shall apply. For properties where water and/or sanitary
sewer become available, the minimum charges will be imposed beginning on the date of
connection or one year from the date such facilities become available, whichever occurs
sooner. The minimum charges shall be set forth in the City fee schedule and shall be
imposed per billing period per account.
704.402 Rates. Rates and charges for the collection and treatment of sewage and for the
treatment and distribution of water shall be established by the Council and set forth in
the City fee schedule. The rates may not exceed an amount reasonably calculated to
cover the cost of the proper maintenance and operation of the facilities, including the
cost of amortization of any indebtedness and a reserve for capital replacement. For
properties served by another entity the rates for sewer and water are set forth in the
intergovernmental agreement with that entity.
(Ord. Amd. 117-20, publ. 12/09/2017)
704.403 Users Not Connected to Public Water. Rates and charges for the collection and
treatment of sewage for those properties not connected to public water shall be set in
the City fee schedule.
704.404 Sanitary Sewer Rate Cap. The charge for sanitary sewer usage for each billing cycle
for bills issued in August and October (actual usage May 21 through September 20)
shall not exceed one hundred and fifty percent (150%) of the average charge for
sanitary sewer usage for the bills issued in February and April (actual usage November
Public Ways & Property
City of Prior Lake
704/p3
21 through March 20). The purpose for this sanitary sewer cap is to provide
consideration for lawn and garden sprinkling and other related outside water usage,
which does not flow into the sanitary sewer system. (Ord. Amd. 118-21, publ.
12/15/2018)
704.405 Metropolitan Council. In addition to the City charges, the sanitary sewer use rates,
as determined by Metropolitan Council, shall be imposed per billing cycle.
704.406 Bulk Water Rate. Charges for bulk water shall be set forth in the City fee schedule.
704.500 STORM SEWER CHARGES AND RATES
704.501 Stormwater Management Fee Calculation.
The Stormwater Management Fee is based on residential equivalency factors for
various land uses. The residential equivalency factor is the ratio of runoff volume, in
inches, for a particular land use, to the runoff volume, in inches, for an one-third acre
residential lot, assuming a four and two-tenths inches (4.2”) 10-year frequency rainfall
and USDA Hydrologic Soil Group B. The factors for various land uses are as follows:
Classification Land Use RE Factor
1 Single-Family Residential 1.00
2 Multiple-dwelling units (residential) 1.65
3 Business / Commercial 2.07
4 Industrial 1.82
5 Institutional (schools, churches and govt.
buildings)
1.38
704.502 Special Circumstances.
(1) Agricultural and conservation zoned areas which have a residential or commercial
building on the property will be considered a single family residential classification and
be charged the single family residential parcel rate.
(2) Property that has been platted or subdivided and has a structure on it will be
charged the single family residential parcel rate.
(3) Planned unit development zoning and government agency parcels other than the
City will be charged at the rate deemed most appropriate for each individual parcel.
704.503 The Stormwater Management Fee shall be determined by the following steps:
(1) The stormwater rate will be periodically determined and set by the City Council.
(2) The Stormwater Management Fee for all single family residential parcels shall be
the product of stormwater rate, the RE factor, and one-third of an acre.
(3) The Stormwater Management Fee for all individual parcels other than single family
residential parcels shall be defined as the product of the stormwater rate, the RE, and
the total acreage of the parcel.
(4) A minimum of one-third acre shall be computed for commercial site locations within
agricultural and conservation land areas.
704.504 Credits. The City Council, in its discretion, may adopt policies for adjustment of the
storm water management fee. Information to justify a fee adjustment must be supplied
by the property owner.
Public Ways & Property
City of Prior Lake
704/p4
704.505 Exemptions. The following land uses are exempt from the storm water management
fee:
• Public right of way.
• Lakes.
• Wetland (with easements dedicated to the City).
• Municipal owned property.
• Open space (cemeteries, golf courses).
• Property which has been platted or subdivided but does not have a structure on it.
• Property which has not been platted or subdivided and which does not have a
structure on it, such as agricultural and conservation zoned land.
704.600 OTHER CHARGES
704.601 Capital Facility Charge. A capital facility charge may be imposed for the purpose of
paying for the operation, construction, reconstruction, maintenance, repair,
enlargement, improvement, use and administrative expenses of the City’s capital
facilities.
704.602 Industrial User Extra Strength Charges. Each user receiving waste treatment
services within or served by the City for industrial strength waste shall be charged an
industrial strength charge in order to pay the charges allocated to the City by the
Metropolitan Council. The strength charge shall either be billed directly by the
Metropolitan Council to the user, or shall be billed by the Metropolitan Council to the
City and by the City to the user.
704.603 Water Meter Charges. Prior to issuance of a water meter for initial installation or for
replacement or repair due to damage caused by the owner, occupant or tenant, a
water meter charge, and if appropriate a pressure reducer charge and/or a frost plate
charge, shall be imposed in the amount set forth in the City fee schedule.
(Ord. Amd. 117-20, publ. 12/09/2017)
704.604 Meter Testing. Charges for testing of water meters shall be set forth in the City fee
schedule.
704.605 Water Shut Off and Door Hanger. Charges for shutting off or restoring water
services and for door hangers shall be set forth in the City fee schedule.
704.606 Metropolitan Council. In addition to the City charges, fee and charges as determined
by Metropolitan Council shall be imposed.
704.700 ACCOUNTS RESPONSIBILITY OF OWNER
All charges, rates, fines and penalties relating to City utilities are the responsibility of
the property owner regardless of whether the property is subject to a lease or occupied
by a person other than the owner.
Public Ways & Property
City of Prior Lake
704/p5
704.800 BILLS FOR SERVICE
704.801 Billing and Delinquency: Utilities, including water, sanitary sewer, storm water, and any
other utility services billable by the City shall be billed in the form and at intervals
determined by the City. All charges shall be delinquent if they are unpaid by the bill due
date. Each bill not paid by the due date shall be charged a late payment penalty of 1.5%
per month until paid or until certified to taxes. Utility charges are a lien against the
property, and the property owner remains responsible, at all times, for the payment of the
charges in a timely manner.
704.802 Faulty Meters: If a meter fails to register or accurately measure the water usage, the
water and sanitary sewer charges shall be paid for at the established rate based upon
past average billings as determined by the City.
704.900 CERTIFICATION
All charges and payments provided for herein are the primary responsibility of the owner
of the premises served and all such charges and payments shall be a lien upon the
property. Delinquent charges, including late payment penalties, shall be certified to the
County Auditor to be paid with property taxes. The Finance Director shall determine the
certification amounts for each property, including the applicable interest rate as set forth in
the Special Assessment Policy, and the delinquent assessment administrative charge set
by the City fee schedule. The owner of the property shall be given written notice stating
the amount due, the date by which payment shall be made to avoid certification, the time,
date, and location of the hearing where the City Council will consider certification, and the
interest rate on the certification. The amounts shall be certified to the County Auditor for
collection, in accordance with M.S. § 444.075, as it may be amended from time to time,
along with property taxes.
704.1000 PENALTY
704.1001 Civil penalties for violations of Sections 704, 705 and 706 shall be set forth in the City
fee schedule. Any violation of Sections 704, 705, or 706 which does not have a fee
associated with it shall be charged to the violator at the cost incurred by the City in
relation to the violation.
704.1002 In addition to the fees set forth in subsection 705.1001, any person violating any provision
of this Section shall, upon conviction thereof, be guilty of a misdemeanor and be
punishable in accordance with the penalties established by Minnesota Statute Section
609.02 as may be amended. A separate offense shall be deemed committed for each
day the violation shall continue. Any person violating any of the provisions of this Section
shall become liable to the City for any expense, loss or damage incurred by the City by
reason of such violation.
.
Ord. Amd. 115-17, publ. 06/13/15
Public Ways & Property
City of Prior Lake
704/p6
This space intentionally left blank.