Loading...
HomeMy WebLinkAbout5H Santee Circle Storm Sewer Lining Report 4646 Dakota Street SE Prior Lake, MN 55372 CITY COUNCIL AGENDA REPORT MEETING DATE: FEBRUARY 4, 2019 AGENDA #: 5H PREPARED BY: NICK MONSERUD, ASSISTANT CITY ENGINEER PRESENTED BY: NICK MONSERUD AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION ACCEPTING PROPOSALS AND AUTHORIZING VISU-SEWER TO INSTALL A C.I.P.P. STORM SEWER LINER ON SANTEE CIRCLE AS PART OF THE 2018 STREET RECON- STRUCTION PROJECT (TRN18-000001) DISCUSSION: Introduction The purpose of this agenda item is to accept the proposals for professional ser- vices related to lining a deteriorated storm sewer pipe north of Santee Circle, lo- cated within private property. This work will be considered part of the 2018 Woodside/Huron Street Reconstruction Project (TRN18-000001). History Part of the 2018 Woodside/Huron Street Reconstruction Project was to replace the existing storm sewer pipe within the street. During the replacement of storm sewer on Santee Circle, while connecting the new storm sewer to the existing storm sewer it was discovered that the existing pipe was in very poor condition. The existing pipe is corrugated metal and the bottom has rusted out. At that time proposals from the contractor were sought to line the pipe. Due to the cost of lining at that time it was determined to line this storm sewer with a larger lining project to get economies of scale. Since that time, while running the electric lines for a new street light, Xcel Energy trenched over the top of the storm sewer line and cut several holes in the top of the already deteriorated pipe. Public Works crews field fixed the pipe at the time and it was determined that this pipe needs to be lined prior to Heselton Construc- tion installing the pavement wear course in the summer. Part of the street will need to be removed to gain access to the pipe. Current Circumstances Staff has requested proposals from two firms for Cured-in-Place Pipe (CIPP) lin- ing, they include: Insituform Technologies USA and Visu-Sewer. Each of these firms has a positive history of pipe lining in Prior Lake. The results are tabulated below: FIRM NAME BASE PRICE Visu-Sewer $42,900.00 Insituform Technologies USA, LLC $48,096.00 2 Heselton Construction was also contacted to provide a price to remove and re- place the storm sewer in question. They responded that they could not do the work for less than the liner prices provided. Conclusion City staff has considerable experience working with Visu-Sewer on sanitary sewer repairs and televising and believe it is a reputable and experienced contractor. ISSUES: As mentioned previously, Xcel Energy (Xcel) damaged a portion of the storm sewer pipe to be lined. The City has submitted a Claim Application to Xcel re- questing partial reimbursement of the liner in the amount of $12,955. Xcel has 90 days to respond to the claim. At this time staff have not heard back from Xcel. Due to the current construction climate it is in the City’s best interest to get on Visu-Sewer’s schedule as soon as possible to guarantee that the CIPP liner work is completed prior to final paving of the Woodside/Huron Neighborhood. FINANCIAL IMPACT: The CIPP lining will be funded from the Water Quality Fund. Any payment from Xcel will be applied toward the total cost of the liner. ALTERNATIVES: 1. Approve a resolution accepting proposals and authorizing Visu-Sewer to in- stall a CIPP storm sewer liner on Santee Circle as part of the 2018 Street Reconstruction Project as part of the consent agenda. (TRN18-000001) 2. Remove this item from the consent agenda for additional discussion. RECOMMENDED MOTION: Motion and second to approve alternative #1. 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 19-___ A RESOLUTION AUTHORIZING VISU-SEWER TO INSTALL A C.I.P.P. STORM SEWER LINER ON SANTEE CIRCLE AS PART OF THE 2018 STREET RECONSTRUCTION PROJECT (TRN18-000001) Motion By: Second By: WHEREAS, Cured-in-Place Pipe (CIPP) lining is necessary for the 36” storm sewer located at the end of Santee Circle and, WHEREAS, The City does not have the equipment or expertise to provide these services; and WHEREAS, The City requested and evaluated proposals from qualified firms to provide CIPP lining for the Santee Circle storm sewer. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. Visu-Sewer is hereby selected to provide CIPP lining services in the amount of $42,900.00 and the proposal is attached to the City’s Standard Professional Services Contract. 3. The Mayor and City Manager are authorized to execute the City’s Standard Professional Services Agreement on behalf of the City. 4. A transfer of $42,900.00 from the Water Quality Fund F602 to the Construction Fund Account #501- 43500.00-55050.00 TRN18-000001. 5. Funding for these engineering services will be drawn from the Construction Fund Account #501- 43500.00-55050.00 TRN18-000001. PASSED AND ADOPTED THIS 4th DAY OF FEBRUARY 2019. VOTE Briggs Thompson Braid Burkart Erickson Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Frank Boyles, City Manager