HomeMy WebLinkAbout11A - Frost Point Circle
MEETING DATE:
AGENDA #:
PREPARED BY:
AGENDA ITEM:
DISCUSSION:
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
CITY COUNCIL AGENDA REPORT
JANUARY 3,2006
11A
LARRY POPPLER, ASSISTANT CITY ENGINEER
CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING CITY STAFF TO
ORGANIZE A NEIGHBORHOOD MEETING TO DISCUSS RECONSTRUCTION
OF FROST POINT CIRCLE
Introduction
This agenda item is necessary to provide Staff with direction on how to proceed
with a request from a resident to review Frost Point Circle for reconstruction in
the summer of 2006.
History
Frost Point Circle was originally included in the 2005 Street Improvement Project
(Project 05-11). Frost Point went through the feasibility stage, public hearing,
design, and bidding. Along the way, Frost Point residents questioned the need
for the project. Some of these residents met with City Staff and Council
members during the design process. Frost Point Circle was included in the
scope of the 2005 Improvement Project because of its proximity to the majority
of the work and the severity of the roadway deterioration. Typically cul-de-sacs
such as Frost Point experience less wear and tear than through streets, however
since the City is reconstructing adjacent streets, these cul-de-sacs are included
in the project scope. Frost Point Circle was originally constructed in 1974, which
is the same time frame that other streets in this area were originally constructed.
Frost Point Circle is now the last remaining street in this region that hasn't been
reconstructed.
At the May 16th, 2005 meeting, with strong encouragement from residents of the
neighborhood, the City Council elected to omit Frost Point Circle from the 2005
Improvement Project scope. All the residents of Frost Point Circle except one
were in the crowd that night and each wore green t-shirts in opposition of the
project. The green t-shirts read "Overlay Frost Point". At the time of the May
meeting, the estimated assessment was $8,094.00 per property.
Since the May 16th meeting the City has had a number of conversations with
some of the residents of Frost Point. They have witnessed the reconstruction of
the neighboring streets including the condition of he sewer and water pipes and
have decided that it is appropriate to reconstruct Frost Point Circle including
utilities at this time.
Current Circumstances
At its regular meeting on December 5th, John Titus, a resident on Frost Point
Circle appeared at the forum and asked that the City Council consider
reconstruction of Frost Point Circle during the summer of 2006. At that meeting,
G:\Recon_Projects\Ol0306 Frost Point revisited. DOC
www.cityofpriorlake.com
Phone 952.447.4230 / Fax 952.447.4245
the City Council directed staff to prepare an agenda report on the topic with
potential steps for the decision making process on this street.
ISSUES:
Since the project was so poorly supported in May, City Staff is recommending
the following process in order to proceed with a reconstruction project:
It is unclear if the majority of the residents of Frost Point Circle really do want the
City to reconstruct the street. Mr. Titus indicated he was not speaking on behalf
of the neighborhood residents. City Staff recommends that a neighborhood
meeting be held with residents to discuss the reconstruction project and re-
educate the residents on the reasons why this street should be reconstructed.
Once that meeting is held, Staff would recommend the residents "petition" the
City Council pursuant to Chapter 429 asking the City to prepare a Feasibility
Report for Frost Point Circle. City Staff recommends that at least 75% of the
residents sign the petition asking that a Feasibility Report be prepared for this
project. Chapter 429 requires a minimum of 35 percent of the owners petition
the City, however due to the previous project opposition Staff is recommending a
higher percentage. The City Council should also give direction to Staff as to how
the Feasibility Report should be paid for. In the past on petition driven projects,
City Staff has completed the Feasibility Report without reimbursement from the
petitioners. The funds for completion of the Feasibility Report were then
encumbered through the general tax levy. If the projects were completed 40% of
the feasibility costs were recovered through assessments.
Since the Feasibility Report, design, and bidding were recently completed for
Frost Point Circle for the 2005 Improvement Project, the costs for revising the
Feasibility Report for this street should be minimal. However, City Staff believes
the costs for completing this report should be borne by the petitioners since this
is a second feasibility report that would have been unnecessary had the project
proceeded as proposed.
Once the Feasibility Report has been completed, City Staff would ask the City
Council to accept the feasibility report and order a Public Hearing on the
reconstruction of Frost Point Circle. As a public improvement project the City
must follow State of Minnesota Statute 429. Attached to this agenda report is a
flowchart of the 429 process. This process applies to all projects that will be
financed in whole or part through special assessments or bond proceeds. Since
special assessments will fund the project, the Staff recommends the following to
assure that the City is not faced with numerous appeals as occurred within the
2005 project.
1. Initiate the project only if a petition is received from 75% of the benefiting
properties agreeing to waive their right of special assessment appeal.
FINANCIAL
IMPACT:
The original special assessment estimate was $8,094.00 per benefited property.
However, it is anticipated that the costs for the street improvements on Frost
Point Circle could be substantially greater than the original estimated
assessment. There are a number of reasons for the increase in costs. First, the
cost of construction materials continue to escalate due to increases in the cost of
G:\Recon]rojects\010306 Frost Point revisited. DOC
petroleum products. Second, originally Frost Point was bid in conjunction with
the construction of the neighboring streets. This was over a $3,000,000 project.
Economy of scale allowed the City to receive reduced unit prices for this project.
Frost Point Circle, as a stand alone project may not receive as favorable unit
prices because it will be such a small project.
The 2006 budget does not include Frost Point Circle reconstruction. However,
because it is such a small project, the City can bond for the City's costs for the
improvements.
The apportioning of the costs should follow the City Assessment Policy in which
the residents of the reconstruction area are assessed 40% of the street and
storm sewer costs.
ALTERNATIVES: The alternatives are as follows:
RECOMMENDED
MOTION:
Reviewed by:
1. Approve a resolution authorizing Staff to organize a neighborhood meeting to
discuss the reconstruction of Frost Point Circle.
2. Deny this item for a specific reason and provide Staff with direction.
3. Table this item until some date in the future.
Alternative 1, A motion and second to adopt a Resolution authorizing Staff to
organize a neighborhood meeting to discuss the reconstruction of Frost Point
Circle. Once the neighborhood meeting is completed the Council would take
additional steps only if the petition from 75% of the benefiting properties is
received.
rJ-At
Steve Albrecht, P blic Works Director
Manager
G:\Recon]rojects\Ol0306 Frost Point revisited.DOC
Maintenance Center
17073 Adelmann Street s.E.
Prior Lake, Minnesota 55372
RESOLUTION 06-xx
RESOLUTION AUTHORIZING CITY STAFF TO ORGANIZE A NEIGHBORHOOD MEETING TO
DISCUSS RECONSTRUCTION OF FROST POINT CIRCLE
Motion By:
. Second By:
WHEREAS, It is proposed to hold a neighborhood meeting and to discuss construction of storm
sewer, sanitary sewer and watermain repair, aggregate base, concrete curb and
gutter, bituminous surfacing, and appurtenant work; and
WHEREAS, It is proposed to assess the benefited property for all or a portion of the cost of the
improvements, pursuant to Minnesota Statutes, Chapter 429,
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The City Engineer is authorized to organize a neighborhood meeting to discuss the
reconstruction of Frost Point Circle.
PASSED AND ADOPTED THIS 3RD DAY OF JANUARY, 2006.
YES
NO
Haugen Haugen
Dornbush Dornbush
Erickson Erickson
LeMair LeMair
Millar Millar
Frank Boyles, City Manager
G:\Recon_Projects\Frost Point revisited resolution OI0306.DOC
www.cityofpriorlake.com
Phone 952.440.9675 / Fax 952.440.9678
FROST
POINT CIR SE
D PROJECT LOCATION
Last Updated Dacember 2005
City of Prior Lake Engineering Department
G:\Recon _ProjectsIFrost_PoinUocation.apr
o
400 Feet
This drawing is neither a legally racorded map nor a survey
and is not intended to be used as ona. This drawing is a
compilation of records, information and data from various
city, county and state offices and other sources. This document
should be used for reference only. No reprasentation is made
that features presented accurately reflect true location. The
City of Prior Leke, or any othar entity from which data was
obtained, assumes no liability for any errors or omissions herein.
If discrepancies are found, please contact the City of Prior Lake.
-x-,,":J
~~:<;,
-..--.----. ---'_._"-"---'--I---~-"-""'_._..".."'.' --._-~-_._......_._...__......__...--..._-_._..
PUBLIC IMPROVEMENT PROCESS
FOR SPECIAL ASSESSMENT PROJECTS
(Minnesota Statutes Chapter 429)
Staff Activitiesrrasks
Prepare proposed Capital Improvement
Program
Feasibility report; prepare cost estimate,
project budget, and schedule; determine
benefited area and proposed assessments
Mail hearing notices
Prepare plans & specs
Open bids; accept bids; award contract;
prepare & execute contract; administer
construction.
Prepare and mail hearing notices
Certify assessment to County Auditor
/
~
I~
k(
/
~
/
~
/
City Council Decisions
-
Modify/approve Capital Improvement
Program and Resolution ordering
preparation of feasibility report
Accept report and call for hearing
Hold public hearing on the proposed
project and order the improvement and
preparation of plans
Approve plans and order advertisement
for bids
Authorize amount to be assessed and
schedule assessment public hearing
Hold final assessment public hearing;
adopt assessment roll
G:\PROJECTS\2005\11_FishPoint_Fairlawn\lnfomational Meetings\info mtg packet.doc
_"~.~~'_'""'__"_'~_____" .. ~~.W'"._"""'_"_"'~,__..__.~....".........-~.,.._,,,.,___"~,,.__~ "
I
-,._---~,._--_.---....--,_.,--._._"" _._.._-_.,..~.~---'~"~~-,-~--~-_._..,---~--.."..._,-,--.-.---.-..."-.-