Loading...
HomeMy WebLinkAbout5H - CenterPoint Energy Agree. 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 MEETING DATE: AGENDA #: PREPARED BY: AGENDA ITEM: DISCUSSION: ISSUES: FINANCIAL IMPACT: ALTERNATIVES: RECOMMENDED MOTION: CITY COUNCIL AGENDA REPORT March 6, 2006 5H CY\ \ Frank Boyles, City Manager\ '\ CONSIDER APPROVAL ENTERPOINT ENERGY AGREEMENT FOR INSTALLATION OF GAS MAIN AND/OR GAS SERVICES FOR PRIOR LAKE CITY HALL AND FIRE STATION. Introduction The purpose of this agenda item is to request approval of two agreements with CenterPoint Energy regarding the Police Station and City Hall project. Historv In order to install temporary and permanent gas meters and services to the new City Hall and Police Station, CenterPoint Energy requires the execution of certain agreements. Current Circumstances The City Attorney has reviewed each of the proposed agreements. Her modifications have been included in the documents by CenterPoint Energy. Conclusion The Council should consider adoption of these agreements as part of the consent agenda. A number of minor revisions were made to the documents. We asked that each document specifically identify the building for future reference purposes. Additional changes are included in paragraphs 3, 6, 9 and 10. None. 1. Approve the agreements as part of the consent agenda. 2. Direct the staff to prepare additional information. Alternative #1. Copies of the agreements are included together with this agenda item. www.cityofpriorlake.com _>3 t%6W:r:952. ij41!f.~,1)23{F r-p~k 452.447.4245 . CenterPoint@ Energy 700 West linden Avenue PO Box 1165 Minneapolis. MN 55440-1165 AGREEMENT This Agreement is made this 10th day of February, 2006, between CenterPoint Energy, a division of CenterPoint Energy Resources Corp., d/b/a CenterPoint Energy Minnesota Gas, and its successors, ("CenterPoint Energy"), and City of Prior Lake, and it successors, (the "Owner"). The Owner is developing property in Prior Lake and desires to have natural gas main and/or services installed. CenterPoint Energy is a natural gas public utility that desires to serve this area. Therefore, the parties agree as follows: 1. CenterPoint Energy agrees to install natural gas main andlor services to serve the area described on Attachment A and incorporated herein by reference, Prior lake City Hall (4646 Dakota) - 39578219 (''The Project"). The Owner represents and warrants to CenterPoint Energy that it is the owner, or authorized agent of the same, of all property within the Project. Therefore, in consideration of CenterPoint Energy agreeing to design and install the natural gas main and/or services described above, the Owner grants CenterPoint Energy the exclusive right to transport natural gas to all residential andlor commercial structures ("Structures") within the Project. If another entity transports natural gas to any Structures within the Project, then the Owner will reimburse CenterPoint Energy for CenterPoint Energy's costs in the design and installation of its natural gas main and services, in addition to any other remedies CenterPoint Energy may have against the Owner. The Owner represents and warrants that the initial purchaser or lessor of land andlor Structures from the Owner within the Project will use natural gas transported by CenterPoint Energy for space heating and water heating. 2. The Owner agrees to abide by installation requirements on Attachment B. 3. All natural gas mains and/or services installed by CenterPoint Energy shall be and remain the property of CenterPoint Energy, and the Owner shall acquire no right, title or interest in any gas main andlor services installed under this Agreement. The Owner will grant to CenterPoint Energy all easements necessary or desirable for the installation and operation of all natural gas mains and other facilities related to providing service to the project as requested by CenterPoint Energy. 4. The parties warrant that each has full right, power and authority, and has received all required approvals to enter into this Agreement and to perform fully its obligations hereunder. 5. The Owner may not assign this Agreement. This is the complete Agreement between the Owner and CenterPoint Energy and it may not be changed except in writing and signed by both parties. Minnesota law governs this Agreement. 6. The term of this Agreement is five years or until the construction of all structures in this Project is complete. 7. The Owner agrees to clearly mark all privately-owned underground facilities including but not limited to: septic tanks, drain fields, sewer lines, sump pump extensions, water wells, sprinkler systems, invisible fences, electric lines, and pipelines. CenterPoint Energy and its representatives are not responsible for damage to these items if they are not clearly marked at time of installation. 8. The Owner is responsible for extra-ordinary construction charges including: the use of directional boring equipment and hand digging expense due to obstructions on the property, special permit fees, and charges associated with SWPPP compliance and custom fabrication if required. The Developer is responsible for all restoration after gas instal/. 9. Meter locations will be determined by CenterPoint Energy, based on written request from Owner, cost of installation, code compliance, and safety. Should there be a request to move the meter after initial install, it will be at the cost of the Owner. 10. The Owner agrees to pay Out of Season Charges (if applicable) for installations between December 1st and March 31st. See enclosed Out of Season flyer for more details. OWNER City of Prior lake By CENTERPOINT ENERGY, A division of CenterPoint Energy Resources Corp., d/b/a CenterPoint Energy Minnesota Gas ~q.~ By Title Title Sales Consultant Date Date 2/10/2006 . CenterPoint@ Energy 700 West Linden Avenue PO Box 1165 Minneapolis, MN 55440-1165 AGREEMENT This Agreement is made this 10th day of February, 2006, between CenterPoint Energy, a division of CenterPoint Energy Resources Corp., d/bla CenterPoint Energy Minnesota Gas, and its successors, ("CenterPoint Energy"), and City of Prior Lake, and it successors, (the "Owner"). The Owner is developing property in Prior Lake and desires to have natural gas main and/or services installed. CenterPoint Energy is a natural gas public utility that desires to serve this area. Therefore, the parties agree as follows: 1. CenterPoint Energy agrees to install natural gas main and/or services to serve the area described on Attachment A and incorporated herein by reference, Prior lake Police Station (4649 Dakota) - 39577791 ("The Project"). The Owner represents and warrants to CenterPoint Energy that it is the owner, or authorized agent of the same, of all property within the Project. Therefore, in consideration of CenterPoint Energy agreeing to design and install the natural gas main and/or services described above, the Owner grants CenterPoint Energy the exclusive right to transport natural gas to all residential andlor commercial structures ("Structures") within the Project. If another entity transports natural gas to any Structures within the Project, then the Owner will reimburse CenterPoint Energy for CenterPoint Energy's costs in the design and installation of its natural gas main and services, in addition to any other remedies CenterPoint Energy may have against the Owner. The Owner represents and warrants that the initial purchaser or lessor of land and/or Structures from the Owner within the Project will use natural gas transported by CenterPoint Energy for space heating and water heating. 2. The Owner agrees to abide by installation requirements on Attachment B. 3. All natural gas mains and/or services installed by CenterPoint Energy shall be and remain the property of CenterPoint Energy, and the Owner shall acquire no right, title or interest in any gas main andlor services installed under this Agreement. The Owner will grant to CenterPoint Energy all easements necessary or desirable for the installation and operation of all natural gas mains and other facilities related to providing service to the project as requested by CenterPoint Energy. 4, The parties warrant that each has full right, power and authority, and has received all required approvals to enter into this Agreement and to perform fully its obligations hereunder. 5. The Owner may not assign this Agreement. This is the complete Agreement between the Owner and CenterPoint Energy and it may not be changed except in writing and signed by both parties. Minnesota law governs this Agreement. 6, The term of this Agreement is five years or until the construction of all structures in this Project is complete. 7. The Owner agrees to clearly mark all privately-owned underground facilities including but not limited to: septic tanks, drain fields, sewer lines, sump pump extensions, water wells, sprinkler systems, invisible fences, electric lines, and pipelines. CenterPoint Energy and its representatives are not responsible for damage to these items if they are not clearly marked at time of installation. 8. The Owner is responsible for extra-ordinary construction charges including: the use of directional boring equipment and hand digging expense due to obstructions on the property, special permit fees, and charges associated with SWPPP compliance and custom fabrication if required. The Developer is responsible for all restoration after gas install. 9. Meter locations will be determined by CenterPoint Energy, based on written request from Owner, cost of installation, code compliance, and safety. Should there be a request to move the meter after initial install, it will be at the cost of the Owner. 10. The Owner agrees to pay Out of Season Charges (if applicable) for installations between December 151 and March 31st. See enclosed Out of Season flyer for more details. OWNER City of Prior lake By CENTER POINT ENERGY, A division of CenterPoint Energy Resources Corp., dIbla CenterPoint Energy Minnesota Gas ~q.~ By Title Title Sales Consultant Date Date 2/10/2006 1? ~ ~p~' ~ ~ (') en (') 0 G> c ~.g;iD~'~ z z en i6~a~~ ~ ~ ~ 6 a> .., -:f=CD (J1 (') c ~ Q~(1)c5~' .... :':t ;.0 m fG'~ g>z:e ~ (') ~ ;.0 )>...............5")>)>m (J)-(J) t11 iil )> "'C ~ -....I cJ, 00 "'C "'C ~" <:J< _(1)Slll(') ~ "'\J ~ -. . c: (1) ~ cO' "'\J "'C __ =1:1: - 6>"'C "'C 00 (') 00 ;.o~lili!!.~ <0 en ;.0 .., .;:..)>..... ..,..,- CD 6>0 CD c: ~ o = 0) = 0 0 S. {g8CG)~ N :J X -i:J =.....x Xco .o-:E lll:Ji6~Q. a. . 0 .. cCO (1) r CJ'103a.-i~I\)""'';:'' -.00 :[~Oa (1) :J 0 -:JCDO)~-....I-....I = "'C - =1:1: ~ 'tl 0.,< m 'TI m "'C -- =1:1:..... O(5"~gi6 0 !!!. = :E Z s: CJ'1IW ~Q)CD"'fO m o!:!': -i (')CD .....~CO S' ~ ~ ;''< en -0 0(')- CJ'1.;:..CJ'1 ~8r~g. G5 CD:J r-r-~ .....=-....1 (1):J~':<!!!' z ~. 'TI :E )> 0 m O-i-....l ... . co ~a wa~a= O);:u~ ~~g-~:J (1)~:J:J. :J:J :E0)00 ~(')..... gz(1)O.:<' ~co O)Q:Q):E r- g :J;y I ~ ~lD 0 - '< 0) (J) CJ'1 . (1) ~ 0- -i)>- (J) o CD<(J) ~ :E CDCDm CD < (J) o. m CD -....IWCJ'15"S: ~05S:OO-i m 0= -i Q) ;:u < (')= <~. .....:E OJ::nOIO r-~(J)~=I:I: g s: =W 'TI)>co Z -. -. CJ'1 -....-....1 o IR\OO) ~ \~ a. I'\) =r I'\)CDI\) :E ""OCD..... 0) (J) 00 = -00 :E;:u -N 0-.., :t5:E 0)- 000- 00'< :E"g -00 men ;:u -i (J)-(J) <~< oQ)(') CD-<:: .0 - < cW -. CJ'1 0 "'C -=1:1: =1:1:..... CJ'1IW .....CO .....-CJ'1 CJ'1 ~ _I ..... - ~ O-iO) O);:u~ ~(')co r- I 0) (J) CD ~. o CD @ :J 00 c: CD (') o .., :J CD .., o - 0- 0: co 0)>...............5" 0"'C ~ -....I cJ, 00 oo"'C -.=I:I:_~ CD..,.;:..)>......., 000 = 0)= ::::?<-iS~"t 0.....030.0)..... S:~:J CD"'C ~ CDZ~ = (J) 0 0" -i ..,-:J 0 0S:'T1 :E O)CD::+ W a. !:!': ;:uCD:J :E o~co 0) <CD '< <0 -i - CD s: CD CD 00 c: CD :E 0) ^ ~ ....0\3: 0 ~~ rilfi:" nneV'lV'ln ~...... -. m ~2i~~~a~~~ ~ t;J~~ G) oWe;) :z .. :z """-N _. :::~ )> V'l 3:;<:Ifi:q ~7g m ..r-~ -dmm !=? 0 ;<:I€ ~n;<:l~:?~ OU1g ~ U1 U1 ~~I ~~~~~~ \D 0 ....=> ~ VI ~:z e:~n~a''' :I: m 000 <_mO\-e !!l .... ;<:I ~ ~~~....g:~ .... ~ ~ .. ~ ~ ~ ei g, W .... .... - mo........ I "" . U1 0 ~Kl ~ 0 U1 :8 no e >0 VI 8m ~ cl rn~ ~ ~ ~-j m.. 'i:l ~mCl-l':>-~ o~=<!l{l~n :C;:~i l2"lC ~~ ~~. ~ 0 lR ~ ~ ~ 8 . ~ 8l VI n . 1'\).....CJ'15"s: OJi'3S:OO-i (J) 0= -i 6> ;:u z"'(')-:E OJ3io"to r- 0 ..... OCD(J)~=I:I: :J s: =W < . 'TI)>co < -. :J CJ'1 CD ~o~ !e. \~ a. I\) :E I\)CD..... ~ ""Orow (J)~ ~;:u o-N ,<'" "'C~ 0)0- 00,< oo"'C :E 0) -00 moo ;:u -i * !ll0 II * 8 i1ii 2:i1iil'l'g III "" "-I ~ = .. ID.:>- ~ "" 3:WW ""\0\0 ;::lUlU! 0......" OClO" ~N" O~\O ;<:1\0..... s;: ^ m )> ...... ...... Q) (") :;j 3 CD :;, ...... )> - ~ ~ oo+z m --'" (') "'\J o ;.0 Z 0 "Tl)>"'\J oz;!! mom ~ ~ - ;.0 ~ -< e ~~ ~~ :::i ar ~ c:5 S. 8'" Attachment B . CenterPoint@ Energy Location requirements for natural gas installations Plan for utilities at the design stage. To avoid construction delays. plan for utilities during the design stage and use the following guidelines. Natural gas meter requirements May vary by city · 3' from fresh air intake or any opening to building · 3' from doors or operating windows · 3' from water spigots · 3' from any ignition source · Away from driveway or vehicle traffic · Avoid locations directly below roof valleys, water downspouts, decks, stairs, or partial overhangs · Banked meters are preferable for townhouse buildings · Regulator and relief valve must be located where gas can escape freely away from any opening into the building. · Must have all exterior walls framed before meter can be installed. If changes are made after meter installation and meter no longer meets codes, you will be charged to move the meter. Natural gas service line requirements · Minimum of 3' from property line (unless easement exists) · 6' from building structure, if line will be parallel to it · Approximately 8' from buried fuel tanks (varies by municipality) · 10' from wells and septic tanks · Installed in a straight line perpendicular to main · Conduit crossings must be installed prior to service line installation (if applicable) Meter protection - guard posts Meter sets should be located away from potential damage from vehicles. Guard posts must be installed if meters may be exposed to vehicle damage. Guard posts must be: · 4" diameter steel posts filled with concrete · On a 15" diameter concrete footing, 3' deep and 3' above grade · Placed no greater than 4' apart and not closer than 3' from meter set Cost for installation 4 posts - $650, 3 posts - $630, 2 posts - $500, 1 post - $250 Installation requirements · Site must be within 6" of final grade · Clear path from the gas main to service entrance · Request 7" we or 2 psi delivery pressure · Clearly mark the location of private underground facilities* such as: - Sewer lines - Invisible fences - Electric lines - Septic systems - Sump pump extensions - Drain fields - Water wells - Buried fuel lines - Underground sprinkler systems * CenterPoint Energy and our representatives are not responsible for damage to these items if they are not clearly marked at the time of installation. For more information or to request service Call 612-342-5123 (1-800-342-4166). Fax 612-321-5573 (1-800-365-9188) CenterPointEnergy.com Minimum clearances for gas meter installation (Some cities may require greater distances.) Drawing not to scale Fire de t. "V" connector Water spigot_1" Finished grade 'A/C, including circuit breaker , , X~~~%. @200S CenterPoint Energy Drawing not to scale o +-Electric meter Operating window or door o Finished " t grade '\ ~ lO"rin. ~~~<<;(~~~~%<~%%.~~~~~~%<~~~, . j i The 3' clear zone is measured from ,;/ the gas relief valve vent. NC.S1991