MEETING DATE: APRIL 15, 2019
AGENDA #: 5G
PREPARED BY: JASON WEDEL, PUBLIC WORKS DIRECTOR/CITY ENGINEER
PRESENTED
BY:
NICK MONSERUD
AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING THE
PURCHASE OF LIFT STATION MONITORING EQUIPMENT
GOAL AREA
AND
OBJECTIVE:
DISCUSSION:
Environmental Stewardship & Recreation
5. Employ emerging technologies to preserve and protect our natural
resources.
Introduction
The purpose of this agenda item is to seek City Council approval of the
purchase of new lift station monitoring equipment.
History
The City currently operates 41 lift stations as part of the City’s sanitary sewer
system. This is a significant number of lift stations and is reflective of the City’s
topography around the lakes and the need to pump sewage up and away from
the lakes to connect into the Met Council trunk sanitary sewer system. The
operation of these lift stations is critical to ensure the health and safety of our
residents.
Each lift station is equipped with monitoring equipment. The monitoring
equipment evaluates such things as the sewage levels within the lift station, if
there are issues with either of the pumps, or if the temperature falls below
freezing in the control cabinet. If any of these types of issues are detected, a
notification is sent to the cell phone of the staff person at public works that is on
call at the time.
The issue with the existing monitoring equipment is that it is approaching the
end of its useful life. The cell phone technology used by the equipment is 3G.
The cell phone companies are ending their support of 3G, so upgrading the
equipment is necessary.
Current Circumstances
City staff obtained quotes from two different providers of lift station monitoring
equipment. The first quote was from Omni Site, which is the City’s current
provider. The second quote was from Fleetzoom.
There are several differences between the two providers. The Omni Site
system alerts the on call staff person if one of the alarms is triggered as
2
mentioned above. It does not provide any data as part of that notice. The on
call person must physically go to the lift station in question and determine the
severity of the situation.
The Fleetzoom system is more robust. It notifies the on call staff person if an
alarm has been triggered, similar to Omni Site. However, it can also be
monitored remotely. This allows City staff to review the situation and the data
from a computer or tablet and determine if it is necessary to make a trip out to
the lift station. This is particulary useful during the evenings or weekends. By
eliminating the need for staff to drive in and investigate lift station alarms during
evenings and weekends when they are on call it will help reduce overtime
costs as well as allow staff to be more efficient with their time.
The other benefit of the Fleetzoom system is the data collection and reporting
that is provided. One example is that staff can review the amount of time the
pumps are running in the lift station. This can then be correlated to rain fall
events during the same time period to determine if the lift station is
experiencing any issues with Inflow and Infiltration (I & I). Identifying and
correcting I & I issues can save the City significant charges from the Met
Council by eliminating rain water from entering the sanitary sewer system and
being treated at the waste water treatment plant.
There are two different costs to consider when evaluating the lift station
monitoring equipment. The first cost is the upfront purchase of the equipment
and the installation. The second cost is the ongoing annual service cost.
Up Front Cost Annual Maintenance
Omni Site $32,979.00 $20,286.00
Fleetzoom $106,984.00 $15,480.00
The Fleetzoom up front cost is substantially higher than Omni Site; however,
the annual maintenance cost is less. It is also estimated that the ability to
monitor and turn off the lift stations alarms remotely will save the City
approximately $10,000 in staff overtime by not having to travel to each lift
station when notified of an alarm.
The up front cost difference for Fleetzoom is $106,984 - $32,979 = $74,005
The annual maintenance cost savings is $20,286 - $15,480 = $ 4,806
The annual staff overtime cost savings is $10,000
Total annual savings $14,806
If you divide the up front cost difference by the projected savings, the pay back
period is 5 years ($74,005 / $14,806 = 5 years) for the Fleetzoom equipment.
The life expectancy for the monitoring equipment is 15 years.
Conclusion
Staff is recommending the purchase of the Fleetzoom equipment. The initial
cost is higher but the financial pay back is 5 years. In addition, by utilizing the
Fleetzoom equipment the City will have more tools to help identify I & I issues
and get them corrected which will save the City money in treatment costs from
3
the Met Council. Finally, the ability to monitor the lift stations remotely makes
the existing City staff more efficient and reduces their overtime burden.
ISSUES: There are no issues anticpated with this purchase.
FINANCIAL
IMPACT:
The Council approved the 2019 budgets and tax levy as part of the December
3rd, 2018 City Council agenda. The authorization for the purchase of this
equipment was included in the sanitary sewer enterprise fund (Fund 604)
portion of the budget. The amount of funds identified in the 2019 budget for
this equipment is $64,279.
The up front cost for the Fleetzoom product is $106,984 so the budget shortfall
is ($106,984 - $64,279 = $42,705).
To make up the short fall, staff is proposing to utilize additional funds identified
in the 2019 sanitary sewer enterprise fund as follows:
• There is $20,000 in the 2019 budget for some sanitary sewer lift station
control replacement and inspection that will actually get covered by the
proposed complete replacement of the monitoring equipment so those
funds are available.
• There is $20,000 in the 2019 budget for I & I repairs and sewer backups
and since this new equipment will be used to identify these types of
issues the use of these funds is appropriate.
• There remaining $2,705 short fall can be taken from the 2019 budget
that was going to be used for renting a back hoe to make sewer repairs
if necessary.
Utilizing these funds will allow the City to purchase the Fleetzoom equipment
without negatively impacting the sanitary sewer fund (Fund 604) for 2019 and
stay within the existing utility rates.
ALTERNATIVES: 1. Motion and second to approve a resolution as part of the consent
agenda authorizing the purchase of the Fleetzoom lift station monitoring
equipment as detailed in this report.
2. Motion and second to remove this item from the consent agenda for
additional discussion.
RECOMMENDED
MOTION:
Alternative #1.
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 19-___
A RESOLUTION AUTHORIZING THE PURCHASE OF LIFT STATION MONITORING
EQUIPMENT
Motion By: Second By:
WHEREAS, Each year the City Council adopts a Sanitary Sewer Fund (Fund 604) budget as
part of the annual budget and utility rates; and
WHEREAS, The 2019 Fund 604 budget contemplates the replacement of the City’s lift station
monitoring equipement; and
WHEREAS,
WHEREAS,
The 2019 Fund 604 budget programmed $64,279 for the replacement of this
equipment; and
The remaining funds necessary to purchase the recommended monitoring
equipment are available within the 2019 budget; and
WHEREAS, Quotes were received and are incorporated in the agenda report.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. Staff is authorized to dispose of the existing brine production equipment.
3. Staff is authorized to purchase new lift station monitoring equipment from Fleetzoom.
4. Funds will be drawn from the Sanitary Sewer Fund (604-49450.00-55570.00) - $64,279
Funds will be drawn from the Sanitary Sewer Fund (604-49450.00-54010.81) - $20,000
Funds will be drawn from the Sanitary Sewer Fund (604-49450.00-54010.82) - $20,000
Funds will be drawn from the Sanitary Sewer Fund (604-49450.00-54070.00) - $2,705
Passed and adopted by the Prior Lake City Council this 15 day of April, 2019
VOTE Briggs Thompson Burkart Braid Erickson
Aye ☐ ☐ ☐ ☐ ☐
Nay ☐ ☐ ☐ ☐ ☐
Abstain ☐ ☐ ☐ ☐ ☐
Absent ☐ ☐ ☐ ☐ ☐
______________________________
Michael Plante, City Manager