Loading...
HomeMy WebLinkAbout5I Well 6 Maintenance REP Phone 952.447.9800 / Fax 952.447.4245 / www.cityofpriorlake.com 4646 Dakota Street SE Prior Lake, MN 55372 CITY COUNCIL AGENDA REPORT MEETING DATE: AUGUST 5, 2019 AGENDA #: 5I PREPARED BY: ANDY STEPHES, WATER FOREMAN ANDY BROTZLER, PUBLIC WORKS DIRECTOR/CITY ENGINEER PRESENTED BY: ANDY BROTZLER AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING MAINTENANCE OF WELL #6 GOAL AREA AND OBJECTIVE: Environmental Stewardship & Recreation 1. Provide clean and safe drinking water for the community and protect drinking water resources. DISCUSSION: Introduction The purpose of this agenda item is to seek City Council authorization to enter into the City Standardized Contract with Bergerson-Caswell to complete maintenance for Well #6 in the amount of $51,361.00. History The City operates seven wells to provide the water supply to the residents. Each year the above ground components are visually inspected. More in-depth inspections are completed every 6-8 years. These inspections include pulling the pump from the well, opening up the pump and testing the electrical components, televising the drop pipe and well bowl, and identifying necessary maintenance repairs. These repairs can range from pump maintenance, well casing replacement to full redevelopment (cleaning excess material out of the well cavern). Well #6 was installed in June 2001 and was a primary well for the City’s water supply system unitl 2009 when the water treatment plant was brought on-line. Not being connected to the water treatment plant, Well #6 has been used intermittently since 2009 during peak demand periods. In 2018, the City and SMSC entered into a joint powers agreement for the production and purchase of water from the newly constructed SMSC South Water Treatment Plant that is now on-line. As part of this collaborative effort, a raw water main line was extended from Well #6 to the SMSC South Water Treatment Plant to provide raw water for treatment. With the completion of this project, Well #6 will again be used as a daily production well. Current Circumstances An in-depth inspection of Well #6 was completed earlier this summer in preparation for placing the well back into daily production. From this inspection, it was found that several sections of the drop pipe need to be replaced, the head shaft needs to be replaced and the pump bowl assembly needs to be rebuilt. It will also involve reconditioning of the pump motor and reinstallation. ISSUES: The maintenance being proposed for Well #6 is typical for a well of this age. As the inspection was completed by Bergerson-Caswell, only one quote was solicited for this maintenance work for continuity. FINANCIAL IMPACT: The water operating budget includes funding for this type of maintenance on an annual basis. ALTERNATIVES: 1. Approve a resolution accepting quote and authorizing the execution of the City’s Standardized Contract with Bergerson-Caswell for the maintenance and repair of Well #6. 2. Table this agenda item for a specific reason. 3. Deny this agenda item for a specific reason and provide staff with direction. RECOMMENDED MOTION: Alternative #1 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 19-___ A RESOLUTION AWARDING A CITY STANDARDIZED CONTRACT BERGERSON- CASWELL FOR THE MAINTENANCE OF WELL #6 Motion By: Second By: WHEREAS, Well #6 was installed in 2001; and, WHEREAS, Well #6 is now connected to the SMSC South Water Treatment Plant to provide raw water for treatment; and, WHEREAS, A full inspection was completed on Well #6 by Bergerson-Caswell Company; and, completed the full inspection of the well and incorporates a warranty both of their inspection and repair work. WHEREAS, Certain maintenance and repairs are necessary to replace sections of the drop pipe, replacement of the head shaft, rebuilding of the pump bowl, and reconditioning of the pump motor. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The City Council authorizes a contract with Bergerson-Caswell with the expenditure of $51.361.00 for the maintenance of Well #6. 3. The funding for the well maintenance will be from 601-49400.00-54010.61. Passed and adopted by the Prior Lake City Council this ____ day of __________ 2019. VOTE Briggs Thompson Burkart Braid Erickson Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Michael Plante, City Manager