HomeMy WebLinkAbout4A Major PUD Amend Applewood Pointe Report
4646 Dakota Street SE
Prior Lake, MN 55372
PLANNING COMMISSION AGENDA REPORT
MEETING DATE: SEPTEMBER 23, 2019
AGENDA #: 4A
PREPARED BY: AMANDA SCHWABE, PLANNER
PRESENTED BY: AMANDA SCHWABE
AGENDA ITEM:
CONSIDER A MAJOR AMENDMENT TO THE PLANNED UNIT DEVELOP-
MENT (PUD) PLAN FOR APPLEWOOD POINTE ON OUTLOT B, JEFFERS
POND 1st ADDITION
DISCUSSION: Introduction
United Properties, on behalf of the property owner, Jeffers Foundation, has ap-
plied for an amendment to the Planned Unit Development (PUD) known as Jef-
fers Pond for the proposed Applewood Pointe project. The subject property is in
the southwest corner of the CSAH 42 and Fountain Hills Drive NW intersection,
along Jeffers Parkway NW.
History
The original PUD Plan for Jeffers Pond was approved in 2005. Since that time,
the residential neighborhoods have been platted and developed, as well as the
streets, public park/trail system, the elementary school and the fire station. Two
outlots (totaling three parcels) remain undeveloped, including:
• Outlot B – approximately 9.28 acres, designated as “future retail” in the
Preliminary PUD Plan.
• Outlot C – Two parcels, approximately 11 acres and 10 acres respec-
tively. This area was designated as “The Pier” which included commercial
and residential uses in the PUD Plan.
The Jeffers Pond PUD was designed and approved as a lifecycle housing project
which would offer various types of housing in a range of density and models in-
cluding small single-family homes, large single family detached homes, attached
one and two-story single-family townhomes, and apartment condominiums.
The following paragraphs outline the physical characteristics of the site, zoning
designations, and information as it relates to the proposed Applewood Pointe
project.
PHYSICAL SITE CHARACTERISTICS:
Site Area: Outlot B, Jeffers Pond 1st Addition consists of approximately 9.28
acres. A single detached accessory structure exists on the site.
Topography: This area has elevations which change approximately 13 feet from
889’ by the wetland on the west portion of the property to approximately 902’ at
the highest point near the center of the property.
2
Wetlands: One DNR protected wetland exists on the site. Any features associ-
ated with the Applewood Pointe project that may impact the wetland (example:
docks, fountains, etc.) may require review and/or permits from the DNR.
Access: The current access to the site is a single curb cut off CSAH 42. This
access is proposed to be removed. The site will be accessed from Jeffers Park-
way NW, south of the existing roundabout.
Zoning: The site is presently zoned Planned Unit Development (PUD).
PROPOSED APPLEWOOD POINTE PLAN
Lots: The development plan proposes one, four-story building with a total of 99
owner occupied units. The unit sizes range from approximately 1,295 sq. ft. to
1,912 sq. ft. Both underground and at grade parking is proposed.
Density: Density of the development is based on the net area of the site, which
is approximately 4.5 acres. A total of 99 units are proposed, for an overall density
of approximately 22 units per acre.
Building Setbacks: The developer is not requesting any changes to the previ-
ously approved PUD building setbacks.
Parks / Trails: The applicant proposes to construct a private trail surrounding
the proposed building which will connect to the existing regional trail along CSAH
42 to the north and Fountain Hills Dr NW to the east.
Tree Preservation/Landscaping: There are presumed to be significant trees
on the far west side of the property. Existing vegetation west of the wetland is
proposed to remain undisturbed. A conservation easement encompasses the
wooded and wetland area on the property. City Code requires 1 tree per 40 feet
of site perimeter, which equates to 46 trees. The applicant has prepared an ex-
tensive landscape plan which will incorporate 100 trees on this property.
Sanitary Sewer / Water Mains: Sanitary sewer and watermain service are avail-
able in Jeffers Parkway NW.
Grading / Storm water: The applicant proposes to direct storm water to a new
infiltration basin to the southwest. The new basin will function as part of the re-
gional storm water system designed for the Jeffers Pond development. The City
and the applicants engineer have discussed the City Engineering Department
comments related to storm water and grading.
Senior Cooperative: The proposed Applewood Pointe project is a cooperative
community for seniors which provides for ownership of units in addition to shared
ownership of the common areas including the property and grounds.
Fees and Assessments: This development will be subject to the standard de-
velopment fees, including utility service charges.
3
Public Comment: Staff has received communications both in support of and
against the proposed Major PUD Amendment for Applewood Pointe. The primary
concerns of those not in support are listed and addressed below:
Traffic: The original Jeffers Pond development completed a comprehen-
sive traffic study in 2004. In 2015, the study was updated to reflect a
change in the proposed use in the area of Outlot B from condominiums to
a mix of townhomes and retail. At that time, it was concluded that the
existing roadway network provides sufficient capacity. Per the applicants’
engineer, the proposed 99-unit senior cooperative will generate fewer to-
tal daily trips than what was proposed originally in 2004 and in 2015.
Views/Shadowing: The applicant provided a shadow study to identify the
anticipated shadowing as a result of the proposed building during different
times of the year. The building as proposed does not create shadows
which extend onto existing, adjacent Jeffers Pond residential lots.
Building Height: Due to the proposed grades of the structure, the build-
ing height will vary depending on which direction you are viewing the
building. Per City Code, the building front is the side of the building facing
Jeffers Parkway NW and heights are measured from the finished grade
level to the mid-point of the highest gable on a hip roof. As the applicant
addresses Staff comments related to storm water and grading, the pro-
posed building heights may be increased from what is shown in the pro-
vided elevations approximately four (4) feet. With that said, the proposed
building height from the average grade is not anticipated to exceed the
following:
Need: Maxfield Research and Consulting completed a Comprehensive
Housing Needs Assessment Study for the Scott County CDA in Novem-
ber 2016. The purpose of the study was to project housing demand for
each community in Scott County from 2017-2040. This study included for-
sale, general occupancy rental and senior housing products including af-
fordable (shallow-subsidy) and subsidized (deep subsidy). An update of
that study was completed in August 2019. Both the original study and the
update identify a need for senior ownership housing in Prior Lake. Accord-
ing to the Update, by 2040 the City of Prior Lake will need approximately
1,017 units. Of those, approximately 110 should be non-rental units.
Elevation Proposed Max.
Building Height
East 53’
South 50’
West 50’
North 54’
ISSUES:
PUD’s provide a flexible approach to development that allows creative, efficient
and effective use of land, including the mixing of land uses. The proposed Apple-
wood Pointe project offers a high-density residential housing option not currently
available in the Jeffers Pond Development. High density residential housing was
approved as part of the original PUD Plan and was always anticipated, in addition
to commercial uses in this area.
4
The PUD must be reviewed based on the criteria found in Section 1106 of the
Zoning Ordinance. The criteria which are applicable to the proposed Major
Amendment request are discussed below:
(1) Provides a flexible approach to development which is in harmony with the
purpose and intent of the City's Comprehensive Plan and Zoning Ordinance.
The proposed PUD Amendment is in harmony with the purpose and intent of
the Zoning Ordinance and consistent with the Comprehensive Land Use Plan
designations for this area.
(2) More creative, efficient and effective use of land, open space and public
facilities through mixing of land uses.
The proposed PUD amendment provides over 40% of open space on the site.
(3) Create a sense of place and provide more interaction among people;
The proposed PUD amendment proposes a multi-family residential structure
with an abundance of landscaping and features on the site including, but not
limited to: trails, garden, and athletic amenities which promote interaction
among the residents of the building in an outdoor setting while providing an
aesthetically pleasing addition to the Jeffers Pond development. The
proposed architectural design of the building is a continuation of the housing
styles in the development.
(4) Increase transportation options, such as walking, biking or bussing;
The proposed PUD amendment provides for private trails around the
proposed building which connect into the regional trail along CSAH 42 and
local train along Jeffers Parkway NW.
(5) Provide opportunities for life cycle housing to all ages.
The proposed PUD amendment provides opportunities for a senior
cooperative housing type that is appealing to seniors looking for an active
lifestyle and maintenance free living.
(6) Provide more efficient and effective use of streets, utilities, and public facilities
that support high quality land use development at a lesser cost.
The proposed PUD amendment will utilize existing street and utility
infrastructure which was designed and installed previously to accommodate
high density residential and commercial uses in the areas of Outlot B & C.
(7) Enhanced incorporation of recreational, public and open space components
in the development which may be made more useable and be more suitably
located than would otherwise be provided under conventional development
procedures. The PUD district also encourages the developer to convey
property to the public, over and above required dedications, by allowing a
portion of the density to be transferred to other parts of the site.
The proposed PUD amendment is consistent with the originally approved
plan related to high density residential and/or commercial in this area of the
Jeffers Pond development.
5
(8) Preserves and enhances desirable site characteristics and open space, and
protection of sensitive environmental features including, but not limited to,
steep slopes, wetlands, and trees. Where applicable, the PUD should also
encourage historic preservation, re-use and redevelopment of existing
buildings.
The proposed PUD amendment does not include any changes to the existing
wetland and wooded areas on the west half of the site.
(9) High quality of design compatible with surrounding land uses, including both
existing and planned.
The proposed PUD amendment design is compatible with the surrounding
residential land use. The applicant has committed to the use of architectural
standards including but not limited to: stone, brick, and lap siding, non-
monotony standards, as well as accent design features, and landscaping
standards that exceed city standards.
ALTERNATIVES:
Conclusion
City staff believes the developer is complying with the originally approved PUD
Plan for Jeffers Pond by incorporating a high-density residential life cycle housing
type option within the Jeffers Pond Development within the allowances for imper-
vious surface and residential units.
As noted in the attached staff memorandums, the developer must refine the de-
velopment plans to assure compliance with the Public Works Design Manual re-
quirements and City Zoning Ordinance prior to consideration by the City Council.
The City Staff feels these comments will not drastically alter the design of the
proposed amendment. Therefore, City staff does advise the Planning Commis-
sion to consider approval of the Major PUD Amendment for Applewood Pointe
with the following conditions:
1. The applicant shall revise the plans per the September 13, 2019 Memoran-
dum from WSB.
2. The applicant shall revise the plans per the September 18, 2019 City Com-
munity Development Department Memorandum.
1. Motion and a second recommending approval of the Major Amendment to the
Jeffers Pond PUD subject to the listed conditions, or others that may be added
or modified by the Planning Commission.
2. Motion and a second to recommend denial of the Major Amendment to the
Jeffers Pond PUD plan based on findings of fact.
3. Motion and a second to table this item to a future Planning Commission
meeting and provide the applicant with direction.
RECOMMENDED
MOTION:
Alternative #1.
ATTACHMENTS: 1. Location Map
2. Applicant Narrative
3. Existing Conditions
4. PUD Plans
5. Architectural Plans & Shadow Study
6
6. WSB (Engineering/Public Works Dept.) Memorandum – September 13,
2019
7. Pioneer Engineering Transportation Memorandum – September 16, 2019
8. Community Development Department Memorandum – September 18, 2019
9. Public Comment Email
140TH ST NW
JEFFERS PKW Y NWMCKENNA RD NWFOUNTAIN HILLS DR NWPARKVIEW LN NWJeffers Wildlife Pond
Ü
XXXX JEFFERS PARKWAY NW - Applewood PointeMajor PUD AmendmentLocation Map
UPPER PRIOR LAKEGD(904)
LOWER PRIOR LAKEGD(904)
PIKELAKENE(820.5)
MYSTICLAKENE
HAASLAKENE(907.3)
ARTICLAKENE(906.7)
MARKLEYLAKERD( )
HOWARD LAKENE(957.3)
SUBJECTPROPERTY
SUBJECTPROPERTY
PUD Amendment Submittal
Applewood Pointe Prior Lake
Prior Lake, Minnesota
August 29, 2019
Momentum Design Group, LLC
The Lyric at Carleton Place 765 N. Hampden Ave. Suite 180 St. Paul, Minnesota 55114 952.583.9788
1 | P a g e
Amanda Schwabe
Planner
City of Prior Lake
4646 Dakota Street SE
Prior Lake, MN 55372
RE: Applewood Pointe -Jeffers Pond PUD Amendment Submittal
Amanda,
On behalf of United Properties Residential, Momentum Design Group and Pioneer Engineering has prepared a
design and corresponding plans for a new 99-unit multifamily cooperative housing development.
The site is located on the southwest corner of Country Road 42 and Fountain Hills Road within the Jeffers Pond
Development. The project site is approximately 9.28 acres. There will be 116 underground parking stalls and 48
surface parking stalls in the project. The building consists of 4-stories containing residential units above the
parking garage. Common areas for the units are located at first and second levels.
The total building height from average grade level to midpoint of the sloped roof is 53'-0". The current zoning for
the site is a PUD, guided by R-HD, Urban High-Density Use in accordance with the Comprehensive Plan which
allows for 4 story buildings and up to 20 units per acre. Our proposed project has total of 9.28 acres with
approximately 5.75 acres of wetland and conservation easements reducing the buildable area to 3.5 acres. The
proposed project is 4 stories in height and 28 units per acre.
The entire massing consists of a rockface block, brick masonry base with cultured stone, metal lap siding,
composite panels, vinyl shake siding at the 4th floor and balconies at upper floors, with large windows and glass
patio doors throughout. The structure will be precast concrete at the garage level, with wood frame construction
above the concrete podium.
We would like to thank you for reviewing our application and submittal. If you have any questions, please let us
know.
Brian Gadient, Architect
Momentum Design Group, LLC
COUNTY ROAD 42
MCKENNA ROAD NWJEFFERS PARKWAY NWC 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN
765 North Hampden Avenue, #180
St. Paul, Minnesota 55114
952.583.9788
APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX00
PUD
SUBMITTAL08/29/1919032CheckerSHEET INDEX
ALL NECESSARY AND/OR REQUIRED TESTS, INSPECTIONS SHOP DRAWING
REVIEWS AND DRAWING INTERPRETATIONS, REQUIRED BY THE GENERAL
CONDITIONS, SHALL BE EXECUTED BY A REGISTERED ARCHITECT AND/OR BY A
REGISTERED ENGINEER; IF NOT, THE ARCHITECT OF RECORD AND/ OR THE
ENGINEER OF RECORD SHALL BE HELD HARMLESS FOR THAT PORTION OF THE
WORK IMPROPERLY EXECUTED. THE INSPECTION ARCHITECT AND/OR ENGINEER
SHALL BECOME RESPONSIBLE FOR THOSE INSPECTIONS, DECISIONS AND/OR
DOCUMENT INTERPRETATIONS MADE AS THEY RELATE TO THE CONTRACT
DOCUMENTS AND THEIR INTENT.
• ALL CONSTRUCTION SHALL MEET ALL APPLICABLE CODES AND MOST STRINGENT
SHALL APPLY.
• DIMENSIONS GIVEN FOR MASONRY ON ARCHITECTURAL DRAWINGS, ARE
NOMINAL UNLESS OTHERWISE NOTED.
• SCALED MEASUREMENTS OF DRAWINGS SHALL NOT BE ALLOWED.
• DIMENSION FOR STUD WALLS ARE TO FACE OF STUD AND DIMENSIONS FOR
MASONRY WALLS ARE TO FACE OF BLOCK UNLESS STATED OTHERWISE.
GENERAL NOTES PROJECT SUMMARY
SITE LOCATION MAP ABBREVIATIONS
DEVELOPMENT OF THE PROJECT SHALL INCLUDE THE CONSTRUCTION
OF 99 FOR SALE UNITS AND WILL CONSIST OF A MIXTURE OF UNIT TYPES.
THE SITE IS APPROXIMATELY 9.29 ACRES.
THE DEVELOPMENT SHALL BE A COMBINATION OF SURFACE PARKING
AND ONE LEVEL OF BELOW-GRADE PARKING. THE COOPERATIVE
STRUCTURE SHALL BE CONCRETE BELOW GRADE AND PRECAST
CONCRETE AT THE FIRST FLOOR TO ACCOMMODATE THE PROPER FIRE
SEPARATION BETWEEN THE PARKING AND HOUSING. THE UPPER
FLOORS SHALL BE TYPE V, WOOD FRAME CONSTRUCTION WITH AN
OUTDOOR PATIO LOCATED ON THE PROPERTY. THE EXTERIOR SKIN OF
THE BUILDING IS ANTICIPATED TO BE VENEER BRICK, SIMULATED STONE
AND SIDING.
APPLEWOOD POINTE -PRIOR LAKE
08-29 2019 PUD SUBMITTAL
Jeffers Pond
ARCHITECT
MOMENTUM DESIGN GROUP
BRIAN GADIENT
KELCIE ROBINSON
765 N. HAMPDEN AVE, STE 180
ST. PAUL, MINNESOTA 55114
DIRECT | 612.290.6523
DIRECT | 651.279.3294
brian@mdgarchitects.com
kelcie@mdgarchitects.com
DEVELOPER
UNITED PROPERTIES RESIDENTIAL
DAVE YOUNG
651 NICOLLET MALL, SUITE 450
MINNEAPOLIS, MN 55402
CELL | 612.282.7879
OFFICE | 952.837.8667
dave.young@upproperties.com
LANDSCAPE ARCHITECT
PIONEER ENGINEERING
PIONEER ENGINEERING
2422 ENTERPRISE DRIVE
MENDOTA HEIGHTS, MN 55120
OFFICE | 651.681.1914
CIVIL ENGINEER
PRIONEER ENGINEERING
NICK POLTA
2422 ENTERPRISE DRIVE
MENDOTA HEIGHTS, MN 55120
DIRECT | 651.251.0607
CELL | 651.587.7048
npolta@pioneereng.com
SPEC SPECIFICATION
SQ SQUARE
SSTL STAINLESS STEEL
STC SOUND
TRANSMISSION
COEFFICIENT
STRUCT STRUCTURAL
T TREAD
TO TOP OF
TOC TOP OF CONCRETE
TOS TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED
OTHERWISE
VCT VINYL COMPOSITION
TILE
VIF VERIFY IN FIELD
VT VINYL TILE
VTR VENT THROUGH
ROOF
VWC VINYL WALL
COVERING
WC WATER CLOSET
WD WOOD
WDW WINDOW
WH WATER HEATER
WP WATERPROOFING
WPM WATERPROOF
MEMBRANE
WWF WELDED WIRE
FABRIC
PAR PARALLEL
PART PARTITION
PC PRECAST
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PP POWER POLE
PSF POUNDS PER
SQUARE FOOT
PSI POUNDS PER
SQUARE INCH
PT PRESSURE
TREATED
PVMT PAVEMENT
QT QUARRY TILE
R&S ROD AND SHELF
RA RETURN AIR
RAD RADIUS
RCP REFLECTED CEILING
PLAN
RD ROOF DRAIN
RF ROCK FACE
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RWL RAIN WATER
LEADER
SC SOLID CORE
SF SQUARE FEET/FOOT
SHR SHOWER
SHTG SHEATHING
SIM SIMILAR
HT HEIGHT
HVAC HEATING
VENTILATION AND
AIR CONDITIONING
ID INSIDE DIAMETER
INCL INCLUDED/INCLUDIN
G
INSUL INSULATION
INT INTERIOR
INV INVERT
JST JOIST
LAM LAMINATE
LAV LAVATORY
LH LEFT HAND
LT LIGHT
MAS MASONRY
MAT MATERIAL
MECH MECHANICAL
MFR MANUFACTURER
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
NIC NOT IN CONTRACT
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OHD OVERHEAD DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
DW DISHWASHER
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
EP ELECTRICAL PANEL
EQ EQUAL
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FD FLOOR DRAIN
FEC FIRE EXTINGUISHER
CABINET
FF&E FURNITURE,
FIXTURES AND
EQUIPMENT
FFEL FINISH FLOOR
ELEVATION
FH FIRE HYDRANT
FND FOUNDATION
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL
CONTRACTOR
GYP GYPSUM
HB HOSE BIBB
HC HANDICAPPED
HDWR HARDWARE
HM HOLLOW METAL
ABV ABOVE
ACC ACCESSIBLE
AFF ABOVE FINISHED
FLOOR
ALUM ALUMINUM
APPROX APPROXIMATE
BLKG BLOCKING
BOT BOTTOM
BOW BOTTOM OF WALL
BPL BEARING PLATE
CB CATCH BASIN
CIP CAST-lN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE
MASONRY UNIT
CONC CONCRETE
CONT CONTINUOUS
CPT CARPET
CRS COURSE
CT CERAMIC TILE
DEMO DEMOLISH OR
DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
N
PARKING SCHEDULE
GARAGE 116
SURFACE 56
Grand total 172
GROSS BUILDING AREA BY FLOOR
GARAGE LEVEL 51864 SF
1ST FLOOR 51470 SF
2ND FLOOR 50608 SF
3RD FLOOR 50263 SF
4TH FLOOR 50263 SF
Grand total 254468 SF
UNIT MIX - AREA
COUNT NAME AREA TYPE
11 BRAEBURN 1295 SF 2 BED, 2 BATH
6 BRAEBURN W/SUNROOM 1382 SF 2 BED, 2 BATH
4 CORTLAND PLUS 1634 SF 2 BED PLUS DEN
4 CORTLAND PLUS REVERSE 1635 SF 2 BED PLUS DEN
4 FIRESIDE 1659 SF 2 BED PLUS DEN
8 GALA 1687 SF 2 BED PLUS DEN
4 GOLDEN BRAEBURN 1459 SF 2 BED, 2 BATH
8 HARALSON 1533 SF 2 BED PLUS DEN
6 HONEYCRISP 1558 SF 2 BED PLUS DEN
4 LIBERTY 1447 SF 2 BED, 2 BATH
4 OPAL 1652 SF 2 BED PLUS DEN
4 OPAL REVERSE 1652 SF 2 BED PLUS DEN
4 REGENT 1912 SF 3 BED
6 ROME BEAUTY 1643 SF 3 BED
4 SOUTHERN ROSE 1712 SF 3 BED
8 SOUTHERN ROSE W/SUNROOM 1760 SF 3 BED
2 WASHINGTON 1543 SF 2 BED, 2 BATH
4 YORK 1424 SF 2 BED PLUS DEN
4 YORK PLUS 1459 SF 2 BED PLUS DEN
Grand total: 99
ARCHITECTURAL - PUD
SHEET SHEET NAME DATE ISSUED
X00 PUD SUBMITTAL 08/29/19
X11 FLOOR PLANS 08/29/19
X12 EXTERIOR ELEVATIONS 08/29/19
X13 EXTERIOR ELEVATIONS 08/29/19
X14 EXTERIOR ELEVATIONS 08/29/19
X15 EXTERIOR ELEVATIONS 08/29/19
X16 EXTERIOR ELEVATIONS 08/29/19
X17 CONTEXT IMAGES 08/29/19
X18 SHADOW STUDIES 08/29/19
LANDSCAPE
SHEET SHEET NAME DATE ISSUED
L1 LANDSCAPE PLAN 08/29/19
CIVIL
SHEET SHEET NAME DATE ISSUED
C0.1 COVER SHEET 08/29/19
C0.2 LEGEND 08/29/19
C1.1 EXISTING CONDITIONS 08/29/19
C2.1 PUD PLAN 08/29/19
C2.2 SITE PLAN 08/29/19
C3.1 SHORELAND OVERLAY PLAN 08/29/19
C4.1 GRADING PLAN 08/29/19
C4.2 EROSION & SEDIMENT CONTROL PLAN 08/29/19
C4.3 WALL CONSTRUCTION PLAN 08/29/19
C4.4 GRADING DETAILS 08/29/19
C5.1 SANITARY & WATERMAIN PLAN 08/29/19
C6.1 STORM SEWER CONSTRUCTION 08/29/19
C7.1 PARKING LOT CONSTRUCTION 08/29/19
C8.1 CITY DETAILS 08/29/19
C8.2 CITY DETAILS 08/29/19
C8.3 CITY DETAILS 08/29/19
C8.4 CITY DETAILS 08/29/19
PARLOR LOBBY
CORTLAND
PLUS
CORTLAND
PLUS
REVERSE
HARALSON
YORK
LIBERTY
HARALSON
REVERSE
OPAL
REVERSE
OPALBRAEBURN
TRASH
MAIN
ENTRY
GREAT
ROOM
GUEST
GOLDEN
BRAEBURN
STORAGE VESTIBULEHONEYCRISP
STORAGE
LIBRARY
OFFICE SETBACK15' - 0"FRONT YARD SETBACK30'
- 0"SETBACK15' - 0"SETBACK15' - 0"RR
MAIL
ROME
BEAUTY
SOUTHERN
ROSE W/
SUN
YORK PLUS
GUEST
FITNESSRR
HOUSE
KEEPING
FIRESIDE
GALA
GALA
REVERSE
SOUTHERN
ROSE
BRAEBURN
W/ SUN
BRAEBURN
REGENT
SOUTHERN
ROSE W/
SUN
STORAGE
DATA
TRASH
STORAGE
ELEC
ELEV
LOBBY
ELEV
LOBBY
PACKAGE
ROOM
MECHSTORAGE
SEATING
ROME
BEAUTY
CORTLAND
PLUS
REVERSE
HARALSON
YORK
LIBERTY
HARALSON
REVERSE
OPAL
REVERSE
OPAL
GOLDEN
BRAEBURN
TRASH
STORAGE
HOUSEKEEPING
CLUB ROOM
CONF.
ROOM
SMALL
LOUNGE
HONEYCRISP
SOUTHERN
ROSE W/
SUN
LOUNGE
OPEN TO
BELOW
CORTLAND
PLUS
BRAEBURN
REVERSE
YORK PLUS
ARTS &
CRAFTS
LOUNGE
RR
MECH
OPEN TO
BELOW
GALA
REVERSE
SOUTHERN
ROSE
BRAEBURN
W/ SUN
STORAGE
DATA
TRASH
STORAGE
SOUTHERN
ROSE W/
SUN
REGENT
BRAEBURN
STORAGE
ELEV
LOBBY
BRAEBURN
WORK
ROOM
GALA
FIRESIDE
ELEV
LOBBY
ROME
BEAUTY
GALA
REVERSE
CORTLAND
PLUS
REVERSE
HARALSON
OPAL
REVERSE
OPAL
GOLDEN
BRAEBURN
ELEV
LOBBY
STORAGE
REGENT
TRASH
BRAEBURN
W/ SUN
SOUTHERN
ROSE W/
SUN SOUTHERN
ROSE
CORTLAND
PLUS
GALA
BRAEBURN
W/ SUN
YORK
HONEYCRISP
LIBERTY
HARALSON
REVERSE
HONEYCRISP
ROME
BEAUTY
REVERSE
SOUTHERN
ROSE W/
SUN
YORK PLUS
WASHINGTON
BRAEBURN BRAEBURN
REVERSE
FIRESIDE
BRAEBURN
STORAGE
TRASH
DATA
STORAGE
STORAGE
ELEC
GALA
LIBERTY
HARALSON
REVERSE
HONEYCRISP
ROME
BEAUTY
REVERSE
BRAEBURN
W/ SUN
SOUTHERN
ROSE W/
SUN
REGENT
OPAL
REVERSE
OPAL
ELEV 2
SOUTHERN
ROSE
STORAGE
GOLDEN
BRAEBURN
CORTLAND
PLUS
REVERSE
WASHINGTON
HARALSON
BRAEBURN
W/ SUN
YORK
GALA
REVERSE
SOUTHERN
ROSE W/
SUN
CORTLAND
PLUS
STAIR
YORK PLUS
BRAEBURN
REVERSE
BRAEBURN
HONEYCRISP
ROME
BEAUTY
FIRESIDE
ELEV
LOBBY
ELEV
LOBBY
BRAEBURN
TRASH
ELEC
STORAGE
TRASH
DATA
STORAGE
STORAGE
GARAGE
GARAGE
ENTRANCE
GARAGE
EXIT
HOBBY
SHOP
Golf Cart Parking
(14 Stalls)MECHTRASH
MECHANICAL
BIKE
REPAIR
MAINTENANCE
TRASH
ELEV
LOBBY
BUILDING
STORAGE
BUILDING
STORAGE
STORAGESTORAGE
STORAGE
MECH
GARDEN
STORAGE
RR
ELEV
LOBBY BUILDINGSTORAGESTORAGE
ELEV 1
STAIR
C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN
765 North Hampden Avenue, #180
St. Paul, Minnesota 55114
952.583.9788
APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX11
FLOOR PLANS08/29/1919032Checker1" = 30'-0"
First Floor
1" = 30'-0"
Second Floor
1" = 30'-0"
Third Floor
1" = 30'-0"
Fourth Floor
1" = 30'-0"
Garage Floor
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
4567899.1 7.9 6.9 5.6
W1
SPD2
SPD2
SPD2
W10
W10
W10
W10 W1
W1
W1W1
W1
W1
W10
W10
W10
W10
SPD2
SPD2
SPD2
SPD2
W22 W10
W10
W10
W10
PREFINISHED METAL LOUVER;
TO BE PAINTED TO MATCH
ADJACENT EXTERIOR FINISH,
TYP. SUBMIT PROPOSED
PAINT COLORS TO ARCHITECT
FOR REVIEW.
GROUND LINE FOR
REFERENCE ONLY. SEE CIVIL
FOR GRADING AND
LANDSCAPING INFORMATION
PREFINISHED METAL
RAILING
VINYL WINDOW; SEE
WINDOW SCHEDULE
VINYL DOOR; SEE UNIT
DOOR SCHEDULE
ASPHALT SHINGLE ROOF
FIBER CEMENT TRIM; SEE
EXTERIOR FINISH SCHEDULE
FOR COORDINATING FC
PANELS AND TRIM FIBER CEMENT ACCENT
TRIM
CAST STONE SILL & LINTEL AT
MASONRY OPENINGS, TYP.
PREFINISHED FASCIA,
BARGEBOARD & TRIM
CAST STONE CAP,
TYP. AT MASONRY
FYPON URETHANE
BRACKET
EXPOSED COLORED ROCK FACE
BLOCK ABOVE GROUND LINE,
CONFIRM FINAL EXTERIOR
GRADES AND PROPOSED
ELEVATIONS WITH CIVIL
CAST STONE CAP AT PIERS, TYP.
S1
S3
S2
MS1
M1 S2S3
S1
M1
S2
S2
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
HJKLM G F
PREFINISHED METAL LOUVER; TO
BE PAINTED TO MATCH ADJACENT
EXTERIOR FINISH, TYP. SUBMIT
PROPOSED PAINT COLORS TO
ARCHITECT FOR REVIEW.
GROUND LINE FOR REFERENCE
ONLY. SEE CIVIL FOR GRADING
AND LANDSCAPING
INFORMATION CAST STONE SILL & LINTEL AT
MASONRY OPENINGS, TYP.
PREFINISHED METAL RAILING
VINYL WINDOW; SEE WINDOW
SCHEDULE
DOOR; SEE UNIT DOOR
SCHEDULE
ASPHALT SHINGLE ROOF
FIBER CEMENT TRIM; SEE
EXTERIOR FINISH SCHEDULE
FOR COORDINATING FC
PANELS AND TRIM
FIBER CEMENT ACCENT TRIM
PREFINISHED FASCIA,
BARGEBOARD & TRIM
FIBER CEMENT
ACCENT TRIM
FYPON URETHANE
BRACKET
CAST STONE CAP; TYP.
ABOVE MASONRY &
MANUFACTURED STONE
W4
W4
W4
W22
W1
W1
W1
W1 W1
W1
W1
W1 W10
W10
SPD2
SPD2
W2
W2
W2
W2
W1
W1
W1
W1 SF01
W12 W12
W1
W1
SPD2
SPD2
W1
W1
W1
W1 W2
W2
W2
W2 W10
W10
W10
W4 W4
SPD2
SPD2
SPD2
W1
W1
W1
W1 W22
W1
W1
W1 W7
W7
W7
W7 D-49
D-49
D-49
D-49
W5
W5
W5
W5
S1
S2
M1
S3
S3 MS1 M1 S2
S1
S2
CAST STONE CAP AT PIERS, TYP.
S2
EXTERIOR FINISH SCHEDULE
S1 PREFINISHED VINYL SHAKE SIDING
S2 HORIZONTAL STEEL SIDING
S3 RAISED STUCCO TEXTURED PANEL SIDING - FIELD PAINTED
M1 BRICK
MS1 MANUFACTURED STONE
CMU COLORED ROCK FACE BLOCK
C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN
765 North Hampden Avenue, #180
St. Paul, Minnesota 55114
952.583.9788
APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX12
EXTERIOR
ELEVATIONS08/29/1919032CheckerSCALE 1/8" = 1'-0"1 NORTH ELEVATION - INTERIOR
SCALE 1/8" = 1'-0"2 EAST ELEVATION - INTERIOR
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
UT
D-49
D-49
D-49
D-49
W5
W5
W5
W5 W8
W8
W8
W8
W1
W1
W1
W1 W9
W9
W9
W9 SPD1
SPD1
SPD1
SPD1
W7
W7
W7
S1
S2
M1
GROUND LINE FOR
REFERENCE ONLY. SEE CIVIL
FOR GRADING AND
LANDSCAPING INFORMATION
CAST STONE SILL &
LINTEL AT MASONRY
OPENINGS, TYP.
VINYL WINDOW; SEE WINDOW
SCHEDULE
VINYL DOOR; SEE UNIT
DOOR SCHEDULE
FIBER CEMENT TRIM; SEE
EXTERIOR FINISH SCHEDULE
FOR COORDINATING FC
PANELS AND TRIM
FIBER CEMENT ACCENT TRIM
CAST STONE CAP; TYP.
ABOVE MASONRY &
MANUFACTURED STONE
PREFINISHED METAL RAILING
ASPHALT SHINGLE ROOF
EXPOSED COLORED ROCK FACE BLOCK
ABOVE GROUND LINE, CONFIRM FINAL
EXTERIOR GRADES AND PROPOSED
ELEVATIONS WITH CIVIL
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
7 8 9 10
W9
W9
W9
W9 SPD1
SPD1
SPD1
SPD1
W10
W1
W1
W1 W1
W1
W1
W1
W9
W9
W9
W9
W8
W8
W8
W8 W8
W8
W8
W8
W10
W10
W10
W10 W4
W4
W4
W22
W2
W2
W2
W2 W7
W7
W7
W7
SPD1
SPD1
SPD1
SPD1
S1
S2
M1
CMU S2
S1
S2
S1
PREFINISHED METAL LOUVER; TO
BE PAINTED TO MATCH
ADJACENT EXTERIOR FINISH,
TYP. SUBMIT PROPOSED PAINT
COLORS TO ARCHITECT FOR
REVIEW.
GROUND LINE FOR REFERENCE
ONLY. SEE CIVIL FOR GRADING AND
LANDSCAPING INFORMATION CAST STONE SILL & LINTEL AT
MASONRY OPENINGS, TYP.
VINYL WINDOW; SEE WINDOW
SCHEDULE
VINYL DOOR; SEE UNIT
DOOR SCHEDULE
FIBER CEMENT TRIM; SEE EXTERIOR
FINISH SCHEDULE FOR
COORDINATING FC PANELS AND TRIM
PREFINISHED
BARGEBOARD & TRIM
FIBER CEMENT ACCENT TRIM
CAST STONE CAP; TYP.
ABOVE MASONRY &
MANUFACTURED STONE
PREFINISHED METAL RAILING
ASPHALT SHINGLE ROOF
FYPON URETHANE
BRACKET
EXPOSED COLORED ROCK FACE
BLOCK ABOVE GROUND LINE,
CONFIRM FINAL EXTERIOR
GRADES AND PROPOSED
ELEVATIONS WITH CIVIL
ASPHALT SHINGLE ROOF
M1
W2
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
11.1 11.2 12.1 13.1 13.2
W2
W2
W2
W7
W7
W7
W7 SPD1
SPD1
SPD1
SPD1
W5
W5
W5
W5 W8
W8
W8
W8
W1
W1
W1
W1 W1
W1
W1
W1
SPD2
SPD2
SPD2
SPD2 W2
W2
W2
W2 W10
W10
W10
W10
SPD2
SPD2
SPD2
W10
W10
W10
W10
S1
CMU M1
S3
S1
S2
S1 S1
PREFINISHED METAL LOUVER; TO BE
PAINTED TO MATCH ADJACENT
EXTERIOR FINISH, TYP. SUBMIT
PROPOSED PAINT COLORS TO
ARCHITECT FOR REVIEW.
GROUND LINE FOR REFERENCE
ONLY. SEE CIVIL FOR GRADING AND
LANDSCAPING INFORMATION
CAST STONE SILL & LINTEL AT
MASONRY OPENINGS, TYP.
VINYL WINDOW; SEE WINDOW
SCHEDULE
VINYL DOOR; SEE UNIT
DOOR SCHEDULE
FIBER CEMENT TRIM; SEE
EXTERIOR FINISH SCHEDULE
FOR COORDINATING FC PANELS
AND TRIM
PREFINISHED
BARGEBOARD & TRIM
FIBER CEMENT ACCENT TRIM
CAST STONE CAP; TYP.
ABOVE MASONRY &
MANUFACTURED STONE
PREFINISHED METAL RAILING
ASPHALT SHINGLE ROOF
FYPON URETHANE
BRACKET
EXPOSED COLORED ROCK
FACE BLOCK ABOVE
GROUND LINE, CONFIRM
FINAL EXTERIOR GRADES
AND PROPOSED
ELEVATIONS WITH CIVIL
ASPHALT SHINGLE ROOF
S3
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
12 13 14 15
W10
W10
W10
W10 W10
W10
W10
W1 W1
W1
W1
W1 W10
W10
W10
W10 SPD2
SPD2
SPD2
SPD2 W10
W10
W10
W10
W8
W8
W8
W8
S1
S2
CMU
MS1
S3
S1
GROUND LINE FOR REFERENCE
ONLY. SEE CIVIL FOR GRADING
AND LANDSCAPING
INFORMATION
CAST STONE SILL & LINTEL AT
MASONRY OPENINGS, TYP.
VINYL WINDOW; SEE
WINDOW SCHEDULE
VINYL DOOR; SEE UNIT
DOOR SCHEDULE
FIBER CEMENT TRIM; SEE
EXTERIOR FINISH SCHEDULE
FOR COORDINATING FC PANELS
AND TRIM
PREFINISHED
BARGEBOARD & TRIM
FIBER CEMENT ACCENT TRIM
PREFINISHED METAL RAILING
ASPHALT SHINGLE ROOF
FYPON URETHANE
BRACKET
PREFINISHED METAL LOUVER; TO
BE PAINTED TO MATCH ADJACENT
EXTERIOR FINISH, TYP. SUBMIT
PROPOSED PAINT COLORS TO
ARCHITECT FOR REVIEW.
EXPOSED COLORED ROCK FACE
BLOCK ABOVE GROUND LINE,
CONFIRM FINAL EXTERIOR
GRADES AND PROPOSED
ELEVATIONS WITH CIVIL
ASPHALT SHINGLE ROOF
C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN
765 North Hampden Avenue, #180
St. Paul, Minnesota 55114
952.583.9788
APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX13
EXTERIOR
ELEVATIONS08/29/1919032CheckerSCALE 1/8" = 1'-0"1 SOUTHEAST ELEVATION - INTERIOR
SCALE 1/8" = 1'-0"2 SOUTH ELEVATION - INTERIOR
SCALE 1/8" = 1'-0"3 SOUTHWEST ELEVATION
SCALE 1/8" = 1'-0"4 SOUTH ELEVATION - EAST LEG
N.5N.9P.7Q.3
W8
W8
W8
W8
W4 W4 W4
W4 W4 W4
W4 W4 W4
W4 W4 W4 W4 W4 W4
W4W4W4
W4 W4 W4
W4 W4 W4 W8
W8
W8
W8
W2
W2
W2 W1
W1
W1
GROUND LINE FOR
REFERENCE ONLY. SEE CIVIL
FOR GRADING AND
LANDSCAPING INFORMATION
CAST STONE SILL &
LINTEL AT MASONRY
OPENINGS, TYP.
VINYL WINDOW; SEE
WINDOW SCHEDULE
FIBER CEMENT TRIM;
SEE EXTERIOR FINISH
SCHEDULE FOR
COORDINATING FC
PANELS AND TRIM
PREFINISHED FASCIA,
BARGEBOARD & TRIM
FIBER CEMENT
ACCENT TRIM
PREFINISHED METAL
RAILING
EXPOSED COLORED ROCK
FACE BLOCK ABOVE
GROUND LINE, CONFIRM
FINAL EXTERIOR GRADES
AND PROPOSED
ELEVATIONS WITH CIVIL
ASPHALT SHINGLE ROOF
S2
S1
MS1
S3
CMU S2 MS1
S1 S3
S1
S2
CAST STONE CAP
AT PIERS, TYP.
131415
PREFINISHED METAL
LOUVER; TO BE PAINTED
TO MATCH ADJACENT
EXTERIOR FINISH, TYP.
SUBMIT PROPOSED PAINT
COLORS TO ARCHITECT
FOR REVIEW.
W8
W8
W8
W8
W10
W10
W10
W10
SPD2
SPD2
SPD2
SPD2
W10
W10
W10
W10
W2
W2
W2
S3
MS1
S2
CMU
S1
S1
CAST STONE CAP
AT PIERS, TYP.
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
11.111.212.113.1
GROUND LINE FOR
REFERENCE ONLY. SEE CIVIL
FOR GRADING AND
LANDSCAPING INFORMATION
CAST STONE SILL &
LINTEL AT MASONRY
OPENINGS, TYP.
VINYL WINDOW; SEE
WINDOW SCHEDULE
VINYL DOOR; SEE UNIT
DOOR SCHEDULE
FIBER CEMENT TRIM; SEE
EXTERIOR FINISH SCHEDULE
FOR COORDINATING FC
PANELS AND TRIM
FIBER CEMENT ACCENT
TRIM
PREFINISHED METAL
RAILING
EXPOSED COLORED ROCK
FACE BLOCK ABOVE
GROUND LINE, CONFIRM
FINAL EXTERIOR GRADES
AND PROPOSED
ELEVATIONS WITH CIVIL
ASPHALT SHINGLE ROOF
W2
W2
W2
W22
W1
W1
W1 W10
W10
W10
W10
SPD2
SPD2
SPD2
SPD2
W1
W1
W1
W1 W1
W1
W1
W1 W2
W2
W2
W2 SPD1
SPD1
SPD1
SPD1
S2
S1
S1
M1
S2 M1 S3
S1
CAST STONE CAP
AT PIERS, TYP.
PREFINISHED FASCIA,
BARGEBOARD & TRIM
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
AB
W5 W5 W5
W5W5W5
W5W5W5
W5 W5 W5
S1
S2
S3
M1
CMU
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
5678910
11
GROUND LINE FOR REFERENCE
ONLY. SEE CIVIL FOR GRADING AND
LANDSCAPING INFORMATION
VINYL WINDOW; SEE WINDOW
SCHEDULE
VINYL DOOR; SEE UNIT
DOOR SCHEDULE
FIBER CEMENT TRIM; SEE
EXTERIOR FINISH SCHEDULE
FOR COORDINATING FC
PANELS AND TRIM
FIBER CEMENT ACCENT TRIM
PREFINISHED METAL RAILING
ASPHALT SHINGLE ROOF
FYPON URETHANE
BRACKET
EXPOSED COLORED ROCK FACE
BLOCK ABOVE GROUND LINE,
CONFIRM FINAL EXTERIOR GRADES
AND PROPOSED ELEVATIONS WITH
CIVIL
SPD1
SPD1
SPD1
SPD1
W8
W8
W8
W8 W5
W5
W5
W5
W1
W1
W1
W10 W10
W10
W10
W10
SPD2
SPD2
SPD2
W10
W10
W10
W10 W1
W1
W1
W1 W1
W1
W1
W1
W9
W9
W9
W9 W8
W8
W8
W8
W10
W10
W10
W10 W10
W1
W1
W1
W5
W5
W5
W5 W8
W8
W8
W8
CAST STONE SILL & LINTEL AT
MASONRY OPENINGS, TYP.
CAST STONE CAP; TYP.
ABOVE MASONRY &
MANUFACTURED STONE
S3
S1
CMU
S1 S3S2
M1
S3
S1
S2
PREFINISHED METAL LOUVER; TO BE
PAINTED TO MATCH ADJACENT EXTERIOR
FINISH, TYP. SUBMIT PROPOSED PAINT
COLORS TO ARCHITECT FOR REVIEW.
CAST STONE CAP AT PIERS, TYP.
PREFINISHED FASCIA,
BARGEBOARD & TRIM
S1S1
S2
C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN
765 North Hampden Avenue, #180
St. Paul, Minnesota 55114
952.583.9788
APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX14
EXTERIOR
ELEVATIONS08/29/1919032CheckerSCALE 1/8" = 1'-0"1 EAST ELEVATION - EAST LEG
SCALE 1/8" = 1'-0"2 NORTH ELEVATION - EAST LEG
SCALE 1/8" = 1'-0"3 NORTHEAST ELEVATION
SCALE 1/8" = 1'-0"4 EAST ELEVATION - NORTH LEG
SCALE 1/8" = 1'-0"5 NORTH ELEVATION
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
U T S
SPD1
SPD1
SPD1
SPD1
W2
W2
W2
W2
W1
W1
W1
W1
W9
W9
W9
W9
W1
W1
W1
W1 W1
W1
W1
W1 W1
W10
W10
W10
W5
W5
W5
W5
GROUND LINE FOR
REFERENCE ONLY. SEE CIVIL
FOR GRADING AND
LANDSCAPING INFORMATION
VINYL WINDOW; SEE WINDOW
SCHEDULE
VINYL DOOR; SEE UNIT
DOOR SCHEDULE
FIBER CEMENT TRIM; SEE
EXTERIOR FINISH SCHEDULE
FOR COORDINATING FC
PANELS AND TRIM
PREFINISHED FASCIA,
BARGEBOARD & TRIM
FIBER CEMENT ACCENT TRIM
PREFINISHED METAL RAILING
ASPHALT SHINGLE ROOF
FYPON URETHANE
BRACKET
EXPOSED COLORED ROCK
FACE BLOCK ABOVE GROUND
LINE, CONFIRM FINAL EXTERIOR
GRADES AND PROPOSED
ELEVATIONS WITH CIVIL
CAST STONE SILL & LINTEL AT
MASONRY OPENINGS, TYP.
CAST STONE CAP; TYP.
ABOVE MASONRY &
MANUFACTURED STONE
PREFINISHED METAL LOUVER;
TO BE PAINTED TO MATCH
ADJACENT EXTERIOR FINISH,
TYP. SUBMIT PROPOSED PAINT
COLORS TO ARCHITECT FOR
REVIEW.
S3
M1
S2
M1S3
S1 S3
S2
S1
CMU
CAST STONE CAP AT PIERS,
TYP.
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
H J K L M N P Q RGF
W1
W10
W10
W10 W10
W10
W10
W10
SPD2
SPD2
SPD2
SPD2 W10
W10
W10
W10 W1
W1
W1
W1
SPD2
SPD2
SPD2
SPD2
W10
W10
W10
W10 W2
W2
W2
W2 W1
W1
W1
W1
W9
W9 W8
W8
W10
W10
W10
W23 W20
W1
W1
W1 W10
W10
W10
W23 W23 W23 W23
SPD2
SPD2
SPD2
W10
W10
W10
W1
W1
W1
W1 W9
W9
W9
W9
W8
W8
W8
W8 W8
W8
W8
W8
W10
W10
W10
W10
W1
W1
W1 W4
W4
W4
SPD2
SPD2
SPD2
SPD2
GROUND LINE FOR REFERENCE
ONLY. SEE CIVIL FOR GRADING AND
LANDSCAPING INFORMATION
VINYL WINDOW; SEE WINDOW SCHEDULE
VINYL DOOR; SEE UNIT
DOOR SCHEDULE
FIBER CEMENT TRIM; SEE EXTERIOR
FINISH SCHEDULE FOR
COORDINATING FC PANELS AND TRIM
PREFINISHED
BARGEBOARD & TRIM
FIBER CEMENT ACCENT TRIM
PREFINISHED METAL RAILING
ASPHALT SHINGLE ROOF FYPON URETHANE
BRACKET
EXPOSED COLORED ROCK FACE
BLOCK ABOVE GROUND LINE, CONFIRM
FINAL EXTERIOR GRADES AND
PROPOSED ELEVATIONS WITH CIVIL
CAST STONE SILL & LINTEL AT
MASONRY OPENINGS, TYP.
CAST STONE CAP; TYP.
ABOVE MASONRY &
MANUFACTURED STONE
PREFINISHED METAL LOUVER; TO BE
PAINTED TO MATCH ADJACENT
EXTERIOR FINISH, TYP. SUBMIT
PROPOSED PAINT COLORS TO
ARCHITECT FOR REVIEW.
CAST STONE CAP AT
PIERS, TYP.
S1S1 S2 S1 S3
PREFINISHED FASCIA,
BARGEBOARD & TRIMS3S1 S1
M1
S2
M1
S3
CMU
S1
MS1M1MS1S2
S2
S1
S3
PREFINISHED METAL LOUVER; TO BE
PAINTED TO MATCH ADJACENT
EXTERIOR FINISH, TYP. SUBMIT
PROPOSED PAINT COLORS TO
ARCHITECT FOR REVIEW.
W1 W4
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
A B
W5 W5 W5
W5 W5 W5
W5 W5 W5
W5 W5 W5
CMU
M1
S3
GROUND LINE FOR
REFERENCE ONLY. SEE CIVIL
FOR GRADING AND
LANDSCAPING INFORMATION
VINYL WINDOW; SEE WINDOW
SCHEDULE
FIBER CEMENT TRIM; SEE
EXTERIOR FINISH SCHEDULE
FOR COORDINATING FC
PANELS AND TRIM
PREFINISHED METAL RAILING
ASPHALT SHINGLE ROOF
EXPOSED COLORED ROCK FACE
BLOCK ABOVE GROUND LINE,
CONFIRM FINAL EXTERIOR
GRADES AND PROPOSED
ELEVATIONS WITH CIVIL
CAST STONE SILL & LINTEL AT
MASONRY OPENINGS, TYP.
CAST STONE CAP; TYP.
ABOVE MASONRY &
MANUFACTURED STONE
CAST STONE CAP AT PIERS, TYP.
C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN
765 North Hampden Avenue, #180
St. Paul, Minnesota 55114
952.583.9788
APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX15
EXTERIOR
ELEVATIONS08/29/1919032CheckerSCALE 1/8" = 1'-0"2 NORTHWEST ELEVATION
SCALE 1/8" = 1'-0"3 WEST ELEVATION
SCALE 1/8" = 1'-0"1 WEST ELEVATION - NORTH LEG
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
1 2 3 4 5 6 7 8 9 9.17.96.95.6
W8
W8
W8
W8
W8
W8
W8
W8 W9
W9
W9
W9 W8
W8
W8
W8
W1
W1
W1
W1
SPD2
SPD2
SPD2
SPD2
W1
W1
W1
W1 W10
W10
W10
W10
SPD2
SPD2
SPD2
W1
W1
W1
W1 W10
W10
W10 W10
W10
W10
W10 W10
SPD2
SPD2
SPD2
GROUND LINE FOR REFERENCE
ONLY. SEE CIVIL FOR GRADING
AND LANDSCAPING INFORMATION
VINYL WINDOW; SEE WINDOW
SCHEDULE
VINYL DOOR; SEE UNIT
DOOR SCHEDULE
FIBER CEMENT TRIM; SEE
EXTERIOR FINISH SCHEDULE
FOR COORDINATING FC
PANELS AND TRIM
PREFINISHED FASCIA,
BARGEBOARD & TRIM
FIBER CEMENT ACCENT TRIM
PREFINISHED METAL RAILING
ASPHALT SHINGLE ROOF
FYPON URETHANE
BRACKET
EXPOSED COLORED ROCK FACE
BLOCK ABOVE GROUND LINE,
CONFIRM FINAL EXTERIOR GRADES
AND PROPOSED ELEVATIONS WITH
CIVIL
CAST STONE SILL & LINTEL AT
MASONRY OPENINGS, TYP.
CAST STONE CAP; TYP.
ABOVE MASONRY &
MANUFACTURED STONE
PREFINISHED METAL LOUVER; TO
BE PAINTED TO MATCH ADJACENT
EXTERIOR FINISH, TYP. SUBMIT
PROPOSED PAINT COLORS TO
ARCHITECT FOR REVIEW.
S3
M1
S1
S2 CMU
S3
S3
S2
M1
MS1
S1S3
CMU
CAST STONE CAP AT
PIERS, TYP.
S1
M1 S2
S1
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
QR
W8
W8
W8
W8
GROUND LINE FOR REFERENCE
ONLY. SEE CIVIL FOR GRADING AND
LANDSCAPING INFORMATION
VINYL WINDOW; SEE
WINDOW SCHEDULE
FIBER CEMENT TRIM; SEE
EXTERIOR FINISH SCHEDULE
FOR COORDINATING FC
PANELS AND TRIM
PREFINISHED FASCIA
FIBER CEMENT
ACCENT TRIM
PREFINISHED METAL RAILING
ASPHALT SHINGLE ROOF
EXPOSED COLORED ROCK FACE
BLOCK ABOVE GROUND LINE,
CONFIRM FINAL EXTERIOR GRADES
AND PROPOSED ELEVATIONS W/
CIVIL
CAST STONE CAP AT PIERS, TYP.
S3
M1
S1
S2
CMU
1ST FLOOR
0"
ROOF
42' -4 3/4"
2ND FLOOR
10' -11 1/4"
3RD FLOOR
21' -11 1/8"
4TH FLOOR
32' -11"
GARAGE LEVEL
-10' -8"
ROOF BEARING HT.
41' -10 3/4"
LM
NPQ
W1
W1
W1
W1 W10
W10
W10
W4 W4 W4 W4 W4 W4
W4 W4 W4 W4 W4 W4
W4 W4W4
W4 W4 W4 W4 W4 W4
W4W4W4
W10
W10
W10 W1
W1
W1
W1
D12
D-3
GROUND LINE FOR REFERENCE
ONLY. SEE CIVIL FOR GRADING AND
LANDSCAPING INFORMATION
VINYL WINDOW; SEE WINDOW
SCHEDULE
FIBER CEMENT TRIM; SEE EXTERIOR
FINISH SCHEDULE FOR
COORDINATING FC PANELS AND TRIM
PREFINISHED FASCIA,
BARGEBOARD & TRIM
FIBER CEMENT ACCENT TRIM
PREFINISHED METAL RAILING
ASPHALT SHINGLE ROOF
EXPOSED COLORED ROCK FACE BLOCK
ABOVE GROUND LINE, CONFIRM FINAL
EXTERIOR GRADES AND PROPOSED
ELEVATIONS WITH CIVIL
CAST STONE SILL & LINTEL AT
MASONRY OPENINGS, TYP.
CAST STONE CAP; TYP.
ABOVE MASONRY &
MANUFACTURED STONE
CAST STONE CAP AT PIERS,
TYP.
S3
M1
S2
MS1S2
M1
S3
S1
S3MS1
C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN
765 North Hampden Avenue, #180
St. Paul, Minnesota 55114
952.583.9788
APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX16
EXTERIOR
ELEVATIONS08/29/1919032CheckerSCALE 1/8" = 1'-0"1 SOUTH ELEVATION
SCALE 1/8" = 1'-0"2 EAST ELEVATION - REGENT
SCALE 1/8" = 1'-0"3 EAST ELEVATION - SOUTH LEG
UPUP
garage
entrance
60 parking stalls
entry
new drive
entrance patio areagarage exit
pickle ball
courts
standard size
P1
P2
P3
P4
C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN
765 North Hampden Avenue, #180
St. Paul, Minnesota 55114
952.583.9788
APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX17
CONTEXT
IMAGES08/29/1919032Checker1" = 50'-0"
Aerial Site Plan Perspective #1
Perspective #2 Perspective #4Perspective #3
C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN
765 North Hampden Avenue, #180
St. Paul, Minnesota 55114
952.583.9788
APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX18
SHADOW
STUDIES08/29/1919032CheckerMARCH & SEPTEMBER 21, NOONMARCH & SEPTEMBER 21, 9 AM MARCH & SEPTEMBER 21, 3 PM
JUNE 21, NOONJUNE 21, 9 AM JUNE 21, 3 PM
DECEMBER 21, NOONDECEMBER 21, 9AM DECEMBER 21, 3PM
L:\19 FILES\19 SUBDIVISIONS\PUD\Applewood Pointe - Major PUD Amendment\PC\Applewood Pointe - Review Memo 091319.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Memorandum
To: Nick Monserud, Project Engineer
Pete Young, Water Resources Engineer
From: Kris Keller, Dustin Simonson, Stephanie Hatten - WSB
Date: September 13, 2019
Re: Applewood Pointe Development
City Project No. DEV19-000024
WSB Project No. 10704-000
We have reviewed the PUD amendment Submittal documents submitted for the Applewood
Pointe Development dated September 4, 2019 as prepared by Pioneer Engineering. We have
the following comments with regards to engineering;
General
1. Submit for and provide copies to the City of any required permits from regulatory
agencies (MCES, Minnesota Pollution Control Agency, Minnesota Department of Health,
NPDES, etc.)
Stormwater Management
1. Provide a copy of the original stormwater management plan to include as an appendix in
the Stormwater Memo.
2. Provide a SWPPP meeting the requirements of the NPDES Construction Stormwater
Permit. The SWPPP must be reviewed and approved by the City before an Excavating
and Grading Permit is issued.
3. Labeling must be consistent between the drainage map and the HydroCAD nodes.
Currently, there are multiple nodes shown in the HydroCAD report not included in the
drainage map or labeled differently.
4. Time of concentration values in the HydroCAD model should be revised for consistency
based on drainage area size and curve number value.
5. Label elevations on the stormwater basin section detail. Elevations labeled should
include pond bottom, NWL, outlet, HWL, EOF, filtration basin bottom, etc. Elevations
should be consistent with those on the plans and in the HydroCAD model.
6. Rainfall depths used in the HydroCAD model should be Atlas 14 values. Required rainfall
depths for Prior Lake are 2.84 for the 2-year, 4.22 for the 10-year, and 7.39 for the 100-
year.
7. Consider using the curve number reductions provided in the Public Works Design Manual
to meet the volume control requirement. These methods include tree plantings, native
grass buffers, porous pavements, impervious disconnections, green roofs, and soil
amendments.
Applewood Pointe
September 13, 2019
Page 2
8. Confirm the bottom of the filtration basin has adequate separation from current
groundwater levels.
9. Low floor elevations must be 2 feet above the HWL of the stormwater basin and filtra tion
basin and 3 feet above the OHW of Wetland 10.
10. Low opening elevations must be 2 feet above any EOF elevations.
11. Show all EOF locations and elevations on the plans. Add the EOF from the pond into the
HydroCAD model.
12. The bottom of the pond in HydroCAD is 978, whereas the plans show the bottom at 980.
Revise so values are consistent.
13. Label contour lines for the filtration basin on the grading plan.
14. Provide water quality calculations confirming the water quality requirement of 60% TP
and 90% TSS removal is met.
15. Provide storm sewer calculations confirming that the facilities are designed to hand a 10-
year, 24-hour Atlas 14 rainfall event.
16. Provide calculations showing catch basins are receiving a maximum of 3 cfs and confirm
of additional catch basins are needed in the parking lot area to minimize overland flow.
17. Show locations of roof discharge points on the plans to confirm that roof drainage will be
directed to the stormwater basin.
18. Rate control discharge analysis should include the discharge from Subcatchment 3S that
currently drains offsite to the north.
19. A 10-foot-wide aquatic vegetation bench is required below the outlet elevation of the
pond, with a maximum slope of 10:1.
20. The EOF of the pond should be at least 1 foot higher than the HWL. The top berm
elevation should be at least 2 feet higher than the HWL.
21. The wet volume listed on the plans (0.72 ac-ft) does not match the value in the
HydroCAD model listed below the 886.5 outlet elevation. Revise and confirm values are
consistent throughout.
22. Device #2 (weir) in the HydroCAD model shows an elevation of 887. The outlet detail has
an elevation of 886.5. Confirm the correct value. Additionally, the weir is modeled as a 4-
foot length while the manhole diameter is shown at 5 feet.
23. Device #1 (15” culvert) in the HydroCAD model should have matching length, outlet invert
and slope to match what is shown on the plans. Please revise.
Grading
1. Grade around the ends of the retaining walls and in the driveways to m inimize the
amount of drainage that is directed down the ramps to the trench drains.
2. Show flow arrows and any spot elevations in the parking lot to confirm drainage patterns.
Applewood Pointe
September 13, 2019
Page 3
Utilities
1. Show the proposed water service in the profile under the storm sewer with the minimum
required 18” vertical separation and insulation.
2. Shift the proposed hydrant lead to connect to the service behind (to the west of) the gate
valve which connects to the existing.
3. Match the crowns of the proposed 15” pipe with the existing 18” pipe at existing structure
EX-CBMH-702.
4. Provide the invert elevation and size of the northern pipe at existing structure EX-CBMH-
702.
5. Consider additional structures to limit the length of surface flow and flow crossing driving
paths.
6. Provide proposed draintile elevations and grades.
7. The depths and cover of the catch basins associated with the trench drains are extr emely
shallow. It appears that they would be highly susceptible to freezing and frost heaving.
8. Verify that the water pressure will accommodate fire protection and supplying water for
the 4th floor. This is generally a lower pressure zone in the City.
9. Storm sewer pipe size and grade shall be greater than 15” ID and 0.5% slope.
Miscellaneous
1. The development/driveway entrance will need to be shifted to the southwest as far as
possible to minimize conflicts with roundabout traffic.
2. Provide additional easement for the existing public trail in the northeast portion of the
project.
3. Identify all pedestrian ramps in the development.
4. Describe the type of driveway that is proposed for the development. Both valley gutter
and commercial are provided with the submittal.
5. The catch basins in the driveway will need to be shifted to allow for the depressed curb of
the sidewalk crossing.
6. Shift the ‘accessible parking’ signs north to the appropriate spaces.
7. Verify the current City standard detail plates are being referenced.
8. Trail easements will need to be granted for the N.E. trail.
Wetland
1. There is currently a wetland delineation review for the development that is out for
comment. The comment period ends September 20. The report shows that no wetlands
occur within the proposed construction. If the wetland boundary from the submitted report
is approved, then there will not be any wetland impacts or concerned with this project.
Additional comments may follow the wetland review site visit and end of the comment
period.
PLSLWD
1. PLSLWD comments have been provided to the applicant.
Memorandum
To: Amanda Schwabe
Planner - City of Prior Lake
From: Nicholas Polta
Date: September 16, 2019
Subject: Applewood Pointe- Jeffers 9th Addition – Transportation
Some concern has been expressed in regards to the traffic generated by the proposed Applewood
Pointe Development. Some historical prospective will show these concerns are unwarranted in regards
to the road network.
The original 2004 Jeffers Pond development completed an EAW; as part of that EAW, SRF Consulting
Group provided a comprehensive traffic analysis of the development – See Attached. The infrastructure,
including streets, of the project is designed based on the information and recommendations found in
this study. The City of Prior Lake approved the project based on the projected traffic and the design of
the infrastructure as constructed.
In 2015, SRF Consulting Group updated the traffic analysis to reflect new proposed uses for the northern
commercial area, specifically outlots B and C of the original Jeffers Pond plat. The change is use from
114 residential condominium to 60 residential townhomes and 5000sf of retail space resulted in a
decrease in traffic generation. At that time SRF concluded “the existing roadway network will continue
to provide sufficient capacity”.
The proposed Applewood Pointe, is a 99-unit senior cooperative. By its nature “senior” related uses
generate fewer trips and occur more frequently outside of the peak travel hours. A quick comparison of
trip generation using the ITE Trip Generation Manual by land use is below:
Study Land Use AM PM Daily
in out In out
2004 Traffic Study 114 Residential
Condo’s
9 42 41 20 668
Revised 2015 Traffic Study 60 Townhomes and
500SF Retail
7 24 30 20 572
Applewood Pointe 99 Unit Senior
Cooperative
7 9 15 11 485
This comparison of the original traffic volume to the reduced traffic volume proposed, reflect our
assertion that the existing roadway network has sufficient capacity. For this development
If you have any questions or require additional information please feel free to call.
Phone 952.447.9800 / Fax 952.447.4245 / www.cityofpriorlake.com
Memo
The Community Development Department has reviewed the Major PUD Amendment for the
subject project with a plan date of 9-4-19 (Civil Set) and 8-29-19 (Architectural) we have the
following comments:
General
1. Development fees – The following development fees are to be collected at the time of
final plat approval: Trunk Water ($7,506/net acre), Trunk Sanitary Sewer ($4,450/net
acre), Trunk Storm Sewer ($6,735/net acre), and a 4% administrative fee and 5%
construction observation fee based on the total estimated construction costs (which
include grading and public utility connections).
2. Site details – All site details must meet requirements outlined in Section 1107 of the City
Code including but not limited to parking, signage, landscaping, bufferyards, tree
preservation, and architectural design. Further detailed review will be conducted during
formal site plan and building permit reviews.
3. As part of the Final Plat, easements will be required for all lateral utilities across adjacent
properties, trails, etc. Easements will be required to be identified on the plat.
4. Easements are required for all lateral utilities across adjacent properties. Identify
easements on plat.
5. City Signature lines shall include the Mayor and City Clerk on the final plat.
Date: September 18, 2019
To: Dave Young, United Properties
From: Amanda Schwabe, Planner
Subject: Applewood Pointe Major PUD Amendment
City Project #DEV19-000024
From:Mike Baynes
To:Casey McCabe
Cc:rpgeister55@gmail.com; lecollins0314@yahoo.com; harris481@msn.com; bradhansen012@gmail.com;
greybeard57@gmail.com; lynnchampine@gmail.com; klh0226@aol.com; Baynesm@aol.com;
mikem@slalom.com; plmcpherson@hotmail.com; christinepeters@mediacombb.net;
thesepehrfamily@yahoo.com; ahofschild@gmail.com; priorlakeleech@outlook.com; patlindamoriarty@gmail.com;
jmjpflaum@gmail.com; sweeney.sharon@me.com; alex@trevinomn.com; twolonnsinmn@aol.com;
judithdahl612@gmail.com; khaas31@gmail.com; vf702@hotmail.com; jspexa@gmail.com;
markpexa@hotmail.com; marrone.dave@gmail.com; kimmarrone@gmail.com; jenniferann3134@outlook.com;
robyn.thomas@ftr.com; golfmort@gmail.com; plmorty@gmail.com; brianjunso@gmail.com; mjjunso@aol.com
Subject:Please Share with the Planning Commission
Date:Wednesday, September 18, 2019 10:06:24 AM
** SENT BY EXTERNAL SENDER Please make sure you trust the sender before
responding, clicking links or opening attachments. **
Casey,
Thank you for your time on the phone on Monday. Due to a prior work
commitment, I will be unable to attend the Public Hearing to consider a
request for a MAJOR PUD AMENDMENT related to Outlot B Jeffers Pond 1st
addition. Parcel #254371690
As a matter of Full Disclosure, I live at 3588 Cove Point Circle and as such I
am not in favor of this project.
I understand that the city would like to see High Density development and as
such that is the current zoning. That same zoning was in place for our
development as well ( zoning can be modified to need / use).
I have several concerns about what is being proposed:
Building Height: a 4 story building will be very obtrusive to the neighboring
properties. Several homes and townhomes would have a shadow effect such
that this new development would block the existing views, along with the
majority of the sunlight. The wildlife would be displaced as well.
Traffic: As proposed this development would have 95 residential units and
all of these units would be reasonably be expected to have 1.25 cars. This is
nearly 120 cars that would be added to the traffic circle daily. This traffic,
could would reasonably occur all times of the day and night. With the other
side of the circle also scheduled for development, the traffic would have a
strong negative effect on the neighborhood surrounding.
Property Values in the area: Has anyone did a study as to what effect a 4
story building would have on surruronding property values ?
Misinformation: Several of our neighbors seem to be of the opinion that if
this isn’t approved, there will automatically be a low income housing
development in its stead. This seems to come from a conversation that one
of the residents had with the United Properties Representative.