HomeMy WebLinkAbout9B Applewood Pointe PUD Amend Agenda Report 4646 Dakota Street SE Prior Lake, MN 55372 CITY COUNCIL AGENDA REPORT MEETING DATE: NOVEMBER 18, 2019 AGENDA #: 9B PREPARED BY: AMANDA SCHWABE, PLANNER PRESENTED BY: AMANDA SCHWABE AGENDA ITEM: CONSIDER A MAJOR AMENDMENT TO THE JEFFERS POND 1st ADDITION PLANNED UNIT DEVELOPMENT (PUD) PLAN FOR APPLEWOOD POINTE GOAL AREA AND OBJECTIVE: Desirable & Sustainable Development 4. Encourage development and preservation of quality life-cycle residential housing options. DISCUSSION: Introduction United Properties, on behalf of the property owner, Jeffers Foundation, has ap- plied for an amendment to the Planned Unit Development (PUD) known as Jef- fers Pond for the proposed Applewood Pointe project. The subject property is in the southwest corner of the CSAH 42 and Fountain Hills Drive NW intersection, along Jeffers Parkway NW. History The original PUD Plan for Jeffers Pond was approved in 2005. Since that time, residential neighborhoods have been platted and developed, as well as the streets, public park/trail system, the elementary school and the fire station. Two outlots (totaling three parcels) remain undeveloped, including: • Outlot B – approximately 9.28 acres, designated as “future retail” in the Pre- liminary PUD Plan. • Outlot C – Two parcels, approximately 11 acres and 10 acres respectively. This area was designated as “The Pier” which included commercial and resi- dential uses in the PUD Plan. The Jeffers Pond PUD was designed and approved as a lifecycle housing project which would offer various types of housing in a range of density and models in- cluding small single-family homes, large single-family detached homes, attached one and two-story single-family townhomes, and apartment condominiums. The original PUD approval anticipated 693 total housing units; however, as many individual phases of development were submitted for review, the housing densi- ties were proposed to be reduced. In 2015, the City of Prior Lake and Metropol- itan Council approved an amendment to the Jeffers Pond PUD related to Outlots B, C and D. The amendment reduced the overall residential units from 693 at a density of 3.57 units per acre to 663 at a density of 3.42 units per acre. The resolution also stated the overall density shall be no less than 605 housing units at a density of 3.10 units per acre. 2 To date, nine neighborhoods have been developed within Jeffers Pond. These neighborhoods were originally anticipated to provide 579 units; however, only 345 units have been created. As PUD amendments have been approved for Jeffers Pond over the years, this residential density shortfall has been transferred from the individual neighbor- hoods to The Village, which is a commercial mixed-use area proposed across Outlots B and C. The city of Prior Lake has anticipated between 260 and 318 additional residential units would be added to Jeffers Pond between Outlots B and C in order to meet the minimum residential density requirements. If ap- proved, Applewood Point would provide 99 additional housing units, leaving a balance of 161 to 219 units to be constructed on Outlot C. Current Circumstances The following paragraphs outline the physical characteristics and zoning related requirements of the site as it relates to the proposed Applewood Pointe project as well as the process to date. PHYSICAL SITE CHARACTERISTICS: Site Area: Outlot B, Jeffers Pond 1st Addition consists of approximately 9.28 acres. A single detached accessory structure exists on the site. Topography: This area has elevations which change approximately 13 feet from 889’ by the wetland on the west portion of the property to approximately 902’ at the highest point near the center of the property. Wetlands: One DNR protected wetland exists on the site. Any features associ- ated with the Applewood Pointe project that may impact the wetland (example: docks, fountains, etc.) may require review and/or permits from the DNR. Access: The current access to the site is a single curb cut off CSAH 42. This access is proposed to be removed. The site will be accessed from Jeffers Park- way NW, south of the existing roundabout. Zoning: The site is presently zoned Planned Unit Development (PUD). PROPOSED APPLEWOOD POINTE PLAN Lots: The development plan proposes one, four-story building with a total of 99 owner occupied units. The unit sizes range from approximately 1,295 sq. ft. to 1,912 sq. ft. Both underground and at grade parking is proposed. Density: Density of the development is based on the net area of the site, which is approximately 4.5 acres. A total of 99 units are proposed, for an overall density of approximately 22 units per acre. Building Setbacks: The developer is not requesting any changes to the previ- ously approved PUD building setbacks. Parks / Trails: The applicant proposes to construct a private trail surrounding the proposed building which will connect to the existing regional trail along CSAH 3 42 to the north and Fountain Hills Dr NW to the east. Public access is provided via an existing public trail along Jeffers Parkway/Fountain Hills to CSAH 42. Tree Preservation/Landscaping: Existing vegetation west of the wetland is pro- posed to remain undisturbed as it is located within an existing conservation ease- ment which encompasses both the wooded and wetland area on the property. City Code requires 1 tree per 40 feet of site perimeter, which equates to 46 trees. The applicant has prepared an extensive landscape plan which will incorporate approximately 100 trees on this property. The applicant has also offered to install trees on two of the adjacent residential properties to address screening concerns. Sanitary Sewer / Water Mains: Sanitary sewer and watermain service are avail- able in Jeffers Parkway NW. Grading / Storm water: The applicant proposes to direct storm water to a new infiltration basin to the southwest. The new basin will function as part of the re- gional storm water system designed for the Jeffers Pond development. The City and the applicant’s engineer have discussed the City Engineering Department comments related to storm water and grading. Senior Cooperative: The proposed Applewood Pointe project is a cooperative community for seniors which provides for ownership of units in addition to shared ownership of the common areas including the property and grounds. Fees and Assessments: Park dedication for this development has been satis- fied with prior parkland dedications. This development will be subject to all other standard development fees, including utility service charges as part of the final plat process. Public Comment: Staff has received communications both in support of and against the proposed Major PUD Amendment for Applewood Pointe. The primary concerns of those not in support are listed and addressed below: Traffic: The original Jeffers Pond development completed a comprehen- sive traffic study in 2004. In 2015, the study was updated to reflect a change in the proposed use in the area of Outlot B from condominiums to a mix of townhomes and retail. At that time, it was concluded that the existing roadway network provides enough capacity. Per the applicants’ engineer, the proposed 99-unit senior cooperative will generate approxi- mately 485 daily trips compared to 668 daily trips associated with 114 residential condominiums (proposed in 2004) and 572 daily trips associ- ated with 60 townhomes and 5,000 SF retail (proposed in 2015). Views/Shadowing: The applicant provided elevation exhibits as well as a shadow study to provide examples of what the proposed structure would look like and to identify the anticipated shadowing as a result of the pro- posed building during different times of the year. The building as proposed does not create shadows which extend onto existing, adjacent Jeffers Pond residential lots. Building Height: Due to proposed grades of the structure, the building height will vary between 50-52.5 feet depending on which direction you 4 are viewing the building. Per City Code, the building front is the side of the building facing Jeffers Parkway NW and heights are measured from the finished grade level to the mid-point of the highest gable on a hip roof. The Planning Commission recommended approval of a building height not to exceed 54 feet. The applicant has further refined the grading and engineering for the site which results in a maximum building height of 51.5 feet along the Jeffers Parkway frontage. Is There a Need: Maxfield Research and Consulting completed a Com- prehensive Housing Needs Assessment Study for the Scott County CDA in November 2016. The purpose of the study was to project housing de- mand for each community in Scott County from 2017-2040. This study included for-sale, general occupancy rental and senior housing products including affordable (shallow-subsidy) and subsidized (deep subsidy). An update of that study was completed in August 2019. Both the original study and the update identify a need for senior ownership housing in Prior Lake. According to the update, the projected senior housing demand by 2040 in the City of Prior Lake is approximately 1,017 senior units; of those, approximately 110 should be senior ownership. ISSUES: Below is a list of the meetings and dialogue that has occurred related to the Ap- plewood Pointe project to date: • 8/12/19 Applicant conducted neighborhood interest informational meeting. • 9/4/19 Application for Major Amendment PUD deemed complete. • 9/23/19 Public Hearing at the Planning Commission meeting. • 10/4/19 Applicant mailed letters to the property owners of 3580 and 3588 Cove Point Circle NW offering the installation of trees on their properties for screening purposes. • 10/8/19 Director McCabe attended meeting hosted by property owner of 3588 Cove Point Circle NW. • 10/14/19 Applicant submitted revised plans to lower the building height from 54 feet to 52 feet. • 10/18/19 Applicant met with property owner on site. • 10/22/19 Applicant provided the photometric study requested by the Planning Commission. • 10/29/19 Applicant created an additional architectural elevation from 3588 Cove Point Circle NW to illustrate views as well as initial landscape installa- tion view and 5-year forecasted growth view. • 10/29/19 Applicant conducted neighborhood meeting to listen and respond to resident concerns raised at the Planning Commission meeting. PUD’s provide a flexible approach to development that allows creative, efficient and effective use of land, including the mixing of land uses. The proposed Apple- wood Pointe project offers a high-density residential housing option not currently available in the Jeffers Pond Development. High density residential housing was approved as part of the original PUD Plan and was always anticipated, in addition to commercial uses in this area. 5 The PUD must be reviewed based on the criteria found in Section 1106 of the Zoning Ordinance. The criteria which are applicable to the proposed Major Amendment request are discussed below: (1) Provides a flexible approach to development which is in harmony with the purpose and intent of the City's Comprehensive Plan and Zoning Ordinance. The proposed PUD Amendment is in harmony with the purpose and intent of the Zoning Ordinance and consistent with the Comprehensive Land Use Plan designations for this area. (2) More creative, efficient and effective use of land, open space and public fa- cilities through mixing of land uses. The proposed PUD amendment provides over 40% of open space on the site. (3) Create a sense of place and provide more interaction among people; The proposed PUD amendment proposes a multi-family residential structure with an abundance of landscaping and features on the site including, but not limited to: trails, garden, and athletic amenities which promote interaction among the residents of the building in an outdoor setting while providing an aesthetically pleasing addition to the Jeffers Pond development. The pro- posed architectural design of the building is a continuation of the housing styles in the development. (4) Increase transportation options, such as walking, biking or bussing; The proposed PUD amendment provides for private trails around the pro- posed building which connect into the regional trail along CSAH 42 and local train along Jeffers Parkway NW. (5) Provide opportunities for life cycle housing to all ages. The proposed PUD amendment provides opportunities for a senior coopera- tive housing type that is appealing to seniors looking for an active lifestyle and maintenance free living. (6) Provide more efficient and effective use of streets, utilities, and public facilities that support high quality land use development at a lesser cost. The proposed PUD amendment will utilize existing street and utility infrastruc- ture which was designed and installed previously to accommodate high den- sity residential and commercial uses in the areas of Outlot B & C. (7) Enhanced incorporation of recreational, public and open space components in the development which may be made more useable and be more suitably located than would otherwise be provided under conventional development procedures. The PUD district also encourages the developer to convey prop- erty to the public, over and above required dedications, by allowing a portion of the density to be transferred to other parts of the site. The proposed PUD amendment is consistent with the originally approved plan related to high density residential and/or commercial in this area of the Jeffers Pond development. 6 (8) Preserves and enhances desirable site characteristics and open space, and protection of sensitive environmental features including, but not limited to, steep slopes, wetlands, and trees. Where applicable, the PUD should also encourage historic preservation, re-use and redevelopment of existing build- ings. The proposed PUD amendment does not include any changes to the existing wetland and wooded areas on the west half of the site. (9) High quality of design compatible with surrounding land uses, including both existing and planned. The proposed PUD amendment design is compatible with the surrounding residential land use. The applicant has committed to the use of architectural standards including but not limited to stone, brick, and lap siding, non-monot- ony standards, as well as accent design features, and landscaping standards that exceed city standards. ALTERNATIVES: Conclusion City staff believes the developer is complying with the originally approved PUD Plan for Jeffers Pond by incorporating a high-density residential life cycle housing type option within the Jeffers Pond Development within the allowances for imper- vious surface and residential units. The developer has worked closely with staff as well as adjacent property owners to listen and respond to concerns. The Planning Commission reviewed the PUD amendment on September 23rd, conducted a public hearing, and unanimously (5-0) recommended approval of the major amendment request. The approval of a major amendment to the approved Final PUD Plan requires an affirmative vote of 4/5ths (supermajority) of all the members of the City Council. If approved, the applicant will be requesting Final Plat approval from the City Council at a future meeting to plat Outlot B, Jeffers Pond First Addition as Lot 1, Block 1 Jeffers Pond Ninth Addition. 1. Motion and a second to approve the Major Amendment to the Jeffers Pond PUD and adopt an ordinance to allow for a 99-unit senior cooperative com- munity on Outlot B, Jeffers Pond 1st Addition. 2. Motion and a second to deny the Major Amendment to the Jeffers Pond PUD. RECOMMENDED MOTION: Alternative #1. ATTACHMENTS: 1. Location Map 2. Applicant Narrative 3. Property Owner Narrative 4. PUD Plans 5. Elevations & Shadow Study 4646 Dakota Street SE Prior Lake, MN 55372 CITY OF PRIOR LAKE ORDINANCE NO. 119-12 AN ORDINANCE AMENDING THE APPROVED PUD FINAL PLAN FOR JEFFERS POND TO ALLOW A 99-UNIT SENIOR COOPERATIVE COMMUNITY ON OUTLOT B JEFFERS POND 1st ADDITION WHEREAS, United Properties, on behalf of the property owner Jeffers Foundation, has applied for a Major Amendment to the Planned Unit Development (PUD) known as Jeffers Pond to allow a 99-unit senior cooperative community on Outlot B, Jeffers Pond 1st Addition (PID 254371690); and WHEREAS, The City Council approved the original PUD Final Plan for Jeffers Pond per Resolution 05-107 on June 6, 2005; and WHEREAS, WHEREAS, WHEREAS, The Prior Lake Planning Commission conducted a public hearing on September 23, 2019 to consider the Major Amendment to the PUD to allow a 99-unit senior cooperative community on Outlot B Jeffers Pond 1st Addition; and Notice of the public hearing was duly published and posted in accordance with the applicable Minnesota Statutes and Prior Lake Ordinance; and The Prior Lake City Council considered the Major Amendment on November 18, 2019; and WHEREAS, WHEREAS, The Planning Commission and City Council have reviewed the Major Amendment to the PUD according to the applicable provisions of the Prior Lake Zoning and Subdivision Ordinances and found said Major Amendment to the PUD to be consistent with the provisions of said Ordinances; and The City Council has the authority to impose reasonable conditions on a Major Amendment to the PUD. The City Council of the City of Prior Lake, Minnesota, does hereby ordain that: 1. The above recitals are incorporated herein as set forth above. 2. The Jeffers Pond PUD includes the following elements: a. The PUD is a mixed-use development consisting of retail space and offices, single family homes, residential condominiums, townhomes, senior apartments, an elementary school site, a fire station site, transit station site, and parks and trails. b. The total number of units on the site will not exceed 693. c. Density within the Shoreland Tiers must be consistent with plans dated January 18, 2005. d. There will be a 50’ wide buffer, measured from the Ordinary High Water Elevation, around Jeffers Pond. This buffer will remain undisturbed with the exception of 10’ wide trail. Page 2 of 3 e. The elements of the plan will be shown on the plans dated January 18, 2005, except for modifications approved as part of the final PUD plan. 3. It hereby adopts the following findings: a. Provides a flexible approach to development which is in harmony with the purpose and intent of the City’s Comprehensive Plan and Zoning Ordinance. The proposed PUD Amendment is in harmony with the purpose and intent of the Zoning Ordinance and consistent with the Comprehensive Land Use Plan designations for this area. b. More creative, efficient and effective use of land, open space and public facilities through mixing of land uses. The proposed PUD amendment provides over 40% of open space on the site. c. Create a sense of place and provide more interaction among people. The proposed PUD amendment proposes a multi-family residential structure with an abundance of landscaping and features on the site including, but not limited to: trails, garden, and athletic amenities which promote interaction among the residents of the building in an outdoor setting while providing an aesthetically pleasing addition to the Jeffers Pond development. The proposed architectural design of the building is a continuation of the housing styles in the development. d. Increase transportation options, such as walking, biking or bussing. The proposed PUD amendment provides for private trails around the proposed building which connect into the regional trail along CSAH 42 and local train along Jeffers Parkway NW. e. Provide opportunities for life cycle housing to all ages. The proposed PUD amendment provides opportunities for a senior cooperative housing type that is appealing to seniors looking for an active lifestyle and maintenance free living. f. Provide more efficient and effective use of streets, utilities, and public facilities that support high quality land use development at a lesser cost. The proposed PUD amendment will utilize existing street and utility infrastructure which was designed and installed previously to accommodate high density residential and commercial uses in the areas of Outlot B & C. g. Enhanced incorporation of recreational, public and open space components in the development which may be made more useable and be more suitably located than would otherwise be provided under conventional development procedures. The PUD district also encourages the developer to convey property to the public, over and above required dedications, by allowing a portion of the density to be transferred to other parts of the site. Page 3 of 3 The proposed PUD amendment is consistent with the originally approved plan related to high density residential and/or commercial in this area of the Jeffers Pond development. h. Preserves and enhances desirable site characteristics and open space, and protection of sensitive environmental features including, but not limited to, steep slopes, wetlands, and trees. Where applicable, the PUD should also encourage historic preservation, re-use and redevelopment of existing buildings. The proposed PUD amendment does not include any changes to the existing wetland and wooded areas on the west half of the site. i. High quality of design compatible with surrounding land uses, including both existing and planned. The proposed PUD amendment design is compatible with the surrounding residential land use. The applicant has committed to the use of architectural standards including but not limited to stone, brick, and lap siding, non-monotony standards, as well as accent design features, and landscaping standards that exceed city standards. 4. The Jeffers Pond PUD is hereby amended to allow a 99-unit senior cooperative community on Outlot B, Jeffers Pond 1st Addition. This ordinance shall become effective upon its passage and publication. Passed by the City Council of the City of Prior Lake this 18th day of November 2019. ATTEST: _________________________ __________________________ Jason Wedel, City Manager Kirt Briggs, Mayor Published in the Prior Lake American on the 23rd day of November 2019. 140TH ST NW JEFFERS PKW Y NWMCKENNA RD NWFOUNTAIN HILLS DR NWPARKVIEW LN NWJeffers Wildlife Pond Ü XXXX JEFFERS PARKWAY NW - Applewood PointeMajor PUD AmendmentLocation Map UPPER PRIOR LAKEGD(904) LOWER PRIOR LAKEGD(904) PIKELAKENE(820.5) MYSTICLAKENE HAASLAKENE(907.3) ARTICLAKENE(906.7) MARKLEYLAKERD( ) HOWARD LAKENE(957.3) SUBJECTPROPERTY SUBJECTPROPERTY TO: Amanda Schwabe Planner City of Prior Lake FROM: Dave Young DATE: November 12, 2019 RE: Jeffers Pond PUD Amendment United Properties is requesting a major PUD Amendment to Outlot B of Jeffers Pond to a 99-unit senior cooperative, for-sale housing development. The design team is comprised of Momentum Design Group and Pioneer Engineering. The site is located on the north edge of the mostly developed Jeffers Pond community and is bordered by County Rd 42 to the north and Fountain Hills Dr to the east. The project site is approximately 9.28 acres and will incorporate 116 underground parking stalls along with 56 surface stalls totaling 172 stalls for the 99 units. The building will consist of 4-stories above 1-story of underground parking. Common areas for this community are located on the 1st and 2nd floors and include a great room, club room, fitness center, craft room, business center and library. Exterior amenities include a patio with grills, community gardens, firepit, gazebo, pickleball court, and more. The total building height from the average grade to the mid-point of the roof is ranges from 50’ to 52’-6” depending on the elevation. The current zoning for the site is a PUD, guided by R-HD, Urban High Density Use in accordance with the Comprehensive Plan which allows for 4-story buildings and up to 20- units per acre. Our project has a total of 9.28 acres with approx. 5.75 acres protected by an existing conservation easement and wetland on the west side of the site, reducing the buildable area to approximately 3.5 acres creating 28 units per net acre. The entire massing consists of rockface block, brick, cultured stone, cement fiber board, steel siding and vinyl shake siding at the 4th floor. The average size of the homes are 1,560 sqft and each home will consist of at least 2-bedrooms, 2-bathrooms, a patio or deck and full laundry room in the home. United Properties has successfully developed 15 Applewood Pointes since 2005 with a 16th set to break ground in Eden Prairie in the coming months. Thank you for reviewing this application and submittal. Please let us know if you request any other information. Sincerely, Dave Young Senior Development Manager October 15, 2019 Mayor and Counsellors of City of Prior Lake By email as to all addressees Re: Jeffers Pond – Outlot B request for major PUD amendment Gentlemen and Lady: I am writing to you as the CEO of Jeffers Foundation (“Jeffers”) , the owner of Outlot B, Jeffers Pond, and prior thereto, the developer of the P.U.D. known as Jeffers Pond, with respect to the pending Major P.U.D. amendment permitting the development of Outlot B by United Properties as a senior cooperative community commonly known as “Applewood Pointe”. Firstly, I want to share information concerning the history of the development of Jeffers Pond. My client for many years prior to his death, was Robert W. Jeffers. He wanted to teach children that, if they destroyed the water they drink or polluted the air they breathed, that they would all die, irrespective of their personal religious beliefs. In his will, Bob left to me property valued at approximately $21,000,000 to protect land throughout the metropolitan area for people to enjoy nature and “recharge their batteries” in the setting of a frenetic urban life. I accomplished this by platting Jeffers Pond to contain about 187 acres of recreational area and about 37 acres protected by a conservation area to insure that the land would be preserved in its natural state. At the time that Jeffers Pond was platted, the Prior Lake-Savage School District was planning an additional elementary school in the area of #21 and #42. Wensmann Realty released Jeffers of its interest in a part of the land in Jeffers Pond so that Jeffers could sell the land to the school district in an area which adjoined the area protected by the conservation easement so that the children 2 could use the protected area to focus on an environment-based education. In connection with the development of the school, Jeffers platted Outlot D in the northwest corner of the development and specified this area for development of senior housing. The idea was that the seniors could mentor the children in the elementary school, and the paths around the large Jeffers Pond were hard- surfaced so that the seniors could get from their senior housing to the school by golf cart without the need to make the trip on the busy highways. After housing construction started following the depression of 2008, Jeffers elected to build single-family housing on Outlot D because there was no market for high-density senior housing. The change in density on Outlot D from senior housing to single-family housing required the approval of the Metropolitan Council to provide a location where the shortfall in housing units could be replaced. This required the approval of the city and the Metropolitan Council. In the development of suburban properties, the Metropolitan Council requires a minimum density of housing to justify the needed services such as water and sewerage. To secure the approval for single-family housing on Outlot D, Jeffers and the city agreed that the shortfall on Outlot D would be replaced by an increase in the housing density of Outlots B and C. This seemed reasonable and appropriate because Outlots B and C bordered County Road #42 where single-family housing would not be desirable due to the noise of highway road traffic. One of the objections of the neighbors to the development of Applewood Point on Outlot B is the density of the living units in the project. However, as your city planners can verify, this density is required in order to satisfy the terms of the existing agreement with the Metropolitan Council. The neighbors raise all sorts of objections to the Applewood Pointe project concerning noise, density of housing and traffic. In truth, however, a simple consideration will tell you that, except for noise resulting from hearing impediments of the elderly, the senior housing will result in less noise, volume of vehicle traffic and similar intrusions than any other conceivable residential use of the land. And, finally to United Properties and Applewood Pointe as a member of the Prior Lake community - there is no similar retirement community in the city. Consider the fact that Applewood Pointe is a community where people go to 3 live a new life style, while most other rental senior facilities are a place where people go to die. In the lifestyle of Applewood Pointe, the residents are “empty nesters” whose families have grown and whose neighbors have either moved or died. They join a new neighborhood when they purchase in Applewood Pointe, they develop new friends and new activities. In some ways, their way of life changes, but their sense of belonging in a community remains the same – but only in the geography of their physical location. In short, I believe that the city should be honored by the decision of United Properties to develop an Applewood Pointe project in Prior Lake –like the other sixteen cities in which they are presently located. I urge you to support the requested planned PUD amendment. Sincerely, Paul W. Oberg, CEO 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" DD SPD2 SPD2 SPD2 W10 W10 W10 W10 DD DD DDDD DD DD W10 W10 W10 W10 SPD2 SPD2 SPD2 SPD2 W22 W10 W10 W10 W10 PREFINISHED METAL LOUVER; TO BE PAINTED TO MATCH ADJACENT EXTERIOR FINISH, TYP. SUBMIT PROPOSED PAINT COLORS TO ARCHITECT FOR REVIEW. PROPOSED GRADE PREFINISHED METAL RAILING VINYL WINDOW; SEE WINDOW SCHEDULE VINYL DOOR; SEE UNIT DOOR SCHEDULE ASPHALT SHINGLE ROOF FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM FIBER CEMENT ACCENT TRIM CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. PREFINISHED FASCIA, BARGEBOARD & TRIM CAST STONE CAP, TYP. AT MASONRY FYPON URETHANE BRACKET EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL CAST STONE CAP AT PIERS, TYP. S1 S3 S2 MS1 M1 S2 S3 S1 M1 S2 S2 AVG HT OF ROOF8' - 3 1/2"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION52' - 6 1/4"1' - 10"(902'-5") EXISTING GRADE 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" PREFINISHED METAL LOUVER; TO BE PAINTED TO MATCH ADJACENT EXTERIOR FINISH, TYP. SUBMIT PROPOSED PAINT COLORS TO ARCHITECT FOR REVIEW. PROPOSED GRADE CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. PREFINISHED METAL RAILING VINYL WINDOW; SEE WINDOW SCHEDULE DOOR; SEE UNIT DOOR SCHEDULE ASPHALT SHINGLE ROOF FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM FIBER CEMENT ACCENT TRIM PREFINISHED FASCIA, BARGEBOARD & TRIM FIBER CEMENT ACCENT TRIM FYPON URETHANE BRACKET CAST STONE CAP; TYP. ABOVE MASONRY & MANUFACTURED STONE W4 W4 W4 W22 DD DD DD DD DD DD DD DD W10 W10 W2 W2 W2 W2 DD DD DD DD SF01 W12 W12 W8 W8 SPD2 SPD2 DD DD DD DD W2 W2 W2 W2 W10 W10 W10 W4 W4 SPD2 SPD2 SPD2 DD DD DD DD W22 DD DD DD W2 W7 W7 W7 D-49 D-49 D-49 D-49 W13 W5 W5 W5 S1 S2 M1 S3 S3 MS1 M1 S2 S1 S2 CAST STONE CAP AT PIERS, TYP. S2 AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 5 1/4"AVG HT OF ROOF8' - 3 1/2"9"(902'-5") EXISTING GRADE EXTERIOR FINISH SCHEDULE S1 PREFINISHED VINYL SHAKE SIDING S2 HORIZONTAL STEEL SIDING S3 RAISED STUCCO TEXTURED PANEL SIDING - FIELD PAINTED M1 BRICK MS1 MANUFACTURED STONE CMU COLORED ROCK FACE BLOCK C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN 765 North Hampden Avenue, #180 St. Paul, Minnesota 55114 952.583.9788 APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX12 EXTERIOR ELEVATIONS10/29/1919032CheckerSCALE 1/8" = 1'-0"1 NORTH ELEVATION - INTERIOR SCALE 1/8" = 1'-0"2 EAST ELEVATION - INTERIOR 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" D-49 D-49 D-49 D-49 W5 W5 W5 W13 W10 W8 W8 W8 DD DD DD DD W9 W9 W9 W9 SPD1 SPD1 SPD1 D-49 W7 W7 W2 S2 M1 CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. VINYL WINDOW; SEE WINDOW SCHEDULE VINYL DOOR; SEE UNIT DOOR SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM FIBER CEMENT ACCENT TRIM CAST STONE CAP; TYP. ABOVE MASONRY & MANUFACTURED STONE PREFINISHED METAL RAILING ASPHALT SHINGLE ROOF EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL8"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 4 1/4"AVG HT OF ROOF8' - 3 1/2"(902'-5")EXISTING GRADE 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4"W9 W9 W9 W9 SPD1 SPD1 SPD1 D-49 W10 DD DD DD DD DD DD DD W8 W10 W10 W10 W10 W4 W4 W4 W22 W2 W2 W2 W2 W2 W2 W2 W2 D-49 SPD1 SPD1 SPD1 S1 S2 M1 S2 S1 S2 S1 PREFINISHED METAL LOUVER; TO BE PAINTED TO MATCH ADJACENT EXTERIOR FINISH, TYP. SUBMIT PROPOSED PAINT COLORS TO ARCHITECT FOR REVIEW. PROPOSED GRADECAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. VINYL WINDOW; SEE WINDOW SCHEDULE VINYL DOOR; SEE UNIT DOOR SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM PREFINISHED BARGEBOARD & TRIM FIBER CEMENT ACCENT TRIM CAST STONE CAP; TYP. ABOVE MASONRY & MANUFACTURED STONE PREFINISHED METAL RAILING ASPHALT SHINGLE ROOF FYPON URETHANE BRACKET EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL ASPHALT SHINGLE ROOF M1 W2 AVG HT OF ROOF8' - 3 1/2"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 5 1/4"9"(902'-5") EXISTING GRADE 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" W2 W2 W2 W2 W2 W2 W2 D-49 SPD1 SPD1 SPD1 W13 W13 W13 W13 W10 W10 W10 W10 DD DD DD DD DD DD DD DD W2 W2 W2 W2 W10 W10 W10 W10 SPD2 SPD2 SPD2 W10 W10 W10 W10 S1 CMU M1 S3 S1 S2 S1 S1 PREFINISHED METAL LOUVER; TO BE PAINTED TO MATCH ADJACENT EXTERIOR FINISH, TYP. SUBMIT PROPOSED PAINT COLORS TO ARCHITECT FOR REVIEW. PROPOSED GRADE CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. VINYL WINDOW; SEE WINDOW SCHEDULE VINYL DOOR; SEE UNIT DOOR SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM PREFINISHED BARGEBOARD & TRIM FIBER CEMENT ACCENT TRIM CAST STONE CAP; TYP. ABOVE MASONRY & MANUFACTURED STONE PREFINISHED METAL RAILING ASPHALT SHINGLE ROOF FYPON URETHANE BRACKET EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL ASPHALT SHINGLE ROOF S3 10"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 6 1/4"AVG HT OF ROOF8' - 3 1/2"(902'-5") EXISTING GRADE 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" W10 W10 W10 W10 W10 W10 W10 DD DD DD DD DD W10 W10 W10 W10 SPD2 SPD2 SPD2 SPD2 W10 W10 W10 W10 W8 W8 W8 W8 S1 S2 CMU MS1 S3 S1 PROPOSED GRADE CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. VINYL WINDOW; SEE WINDOW SCHEDULE VINYL DOOR; SEE UNIT DOOR SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM PREFINISHED BARGEBOARD & TRIM FIBER CEMENT ACCENT TRIM PREFINISHED METAL RAILING ASPHALT SHINGLE ROOF FYPON URETHANE BRACKET PREFINISHED METAL LOUVER; TO BE PAINTED TO MATCH ADJACENT EXTERIOR FINISH, TYP. SUBMIT PROPOSED PAINT COLORS TO ARCHITECT FOR REVIEW. EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL ASPHALT SHINGLE ROOF AVG HT OF ROOF8' - 3 1/2"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION52' - 0 13/16"(902'-5") EXISTING GRADE C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN 765 North Hampden Avenue, #180 St. Paul, Minnesota 55114 952.583.9788 APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX13 EXTERIOR ELEVATIONS10/29/1919032CheckerSCALE 1/8" = 1'-0"1 SOUTHEAST ELEVATION - INTERIOR SCALE 1/8" = 1'-0"2 SOUTH ELEVATION - INTERIOR SCALE 1/8" = 1'-0"3 SOUTHWEST ELEVATION SCALE 1/8" = 1'-0"4 SOUTH ELEVATION - EAST LEG W8 W8 W8 W8 W4 W4 W4 W4 W4 W4 W4 W4 W4 W4 W4 W4 W4 W4 W4 W4W4W4 W4 W4 W4 W4 W4 W4 W8 W8 W8 W8 W2 W2 W2 DD DD DD PROPOSED GRADE CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. VINYL WINDOW; SEE WINDOW SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM PREFINISHED FASCIA, BARGEBOARD & TRIM FIBER CEMENT ACCENT TRIM PREFINISHED METAL RAILING EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL ASPHALT SHINGLE ROOF S2 S1 MS1 S3 CMU S2 MS1 S1 S3 S1 S2 CAST STONE CAP AT PIERS, TYP.AVG HT OF ROOF8' - 3 1/2"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 6 1/4"10"EXISTING GRADE PREFINISHED METAL LOUVER; TO BE PAINTED TO MATCH ADJACENT EXTERIOR FINISH, TYP. SUBMIT PROPOSED PAINT COLORS TO ARCHITECT FOR REVIEW. W8 W8 W8 W8 W10 W10 W10 W10 SPD2 SPD2 SPD2 SPD2 W10 W10 W10 W10 W2 W2 W2 S3 MS1 S2 S1 S1 CAST STONE CAP AT PIERS, TYP.AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 6 1/4"10"1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" PROPOSED GRADE CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. VINYL WINDOW; SEE WINDOW SCHEDULE VINYL DOOR; SEE UNIT DOOR SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM FIBER CEMENT ACCENT TRIM PREFINISHED METAL RAILING EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL ASPHALT SHINGLE ROOF W2 W2 W2 W22 DD DD DD W10 W10 W10 W10 SPD2 SPD2 SPD2 SPD2 W9 W9 W9 W9 DD DD DD DD W2 W2 W2 W2 SPD1 SPD1 SPD1 D-49 S2 S1 S1 M1 S2 M1 S3 S1 CAST STONE CAP AT PIERS, TYP. PREFINISHED FASCIA, BARGEBOARD & TRIM 10"AVG HT OF ROOF8' - 3 1/2"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 6 1/4"(902'-5") EXISTING GRADE 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" W5 W5 W5 W5W5W5 W5W5W5 W5 W5 W5 S1 S2 S3 M1 (902'-5") 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" PROPOSED GRADE VINYL WINDOW; SEE WINDOW SCHEDULE VINYL DOOR; SEE UNIT DOOR SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM FIBER CEMENT ACCENT TRIM PREFINISHED METAL RAILING ASPHALT SHINGLE ROOF FYPON URETHANE BRACKET EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL D-49 SPD1 SPD1 SPD1 W8 W8 W8 W8 W5 W5 W5 W5 W10 W10 W10 W10 W10 W10 W10 W10 SPD2 SPD2 SPD2 W2 W2 W2 W2 DD DD DD DD DD DD DD DD W9 W9 W9 W9 W8 W8 W8 W8 W10 W10 W10 W10 W10 W10 W10 W10 W5 W5 W5 W5 W8 W8 W8 W8 CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. CAST STONE CAP; TYP. ABOVE MASONRY & MANUFACTURED STONE S3 S1 S1 S3S2 M1 S3 S1 S2 PREFINISHED METAL LOUVER; TO BE PAINTED TO MATCH ADJACENT EXTERIOR FINISH, TYP. SUBMIT PROPOSED PAINT COLORS TO ARCHITECT FOR REVIEW. CAST STONE CAP AT PIERS, TYP. PREFINISHED FASCIA, BARGEBOARD & TRIM S1S1 S2 W2 W2 W2 W2AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 8 1/4"AVG HT OF ROOF8' - 3 1/2"1' - 0"(902'-5") EXISTING GRADE C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN 765 North Hampden Avenue, #180 St. Paul, Minnesota 55114 952.583.9788 APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX14 EXTERIOR ELEVATIONS10/29/1919032CheckerSCALE 1/8" = 1'-0"1 EAST ELEVATION - EAST LEG SCALE 1/8" = 1'-0"2 NORTH ELEVATION - EAST LEG SCALE 1/8" = 1'-0"3 NORTHEAST ELEVATION SCALE 1/8" = 1'-0"4 EAST ELEVATION - NORTH LEG SCALE 1/8" = 1'-0"5 NORTH ELEVATION 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" D-49 D-49 D-49 D-49 W2 W2 W2 W2 DD DD DD DD W7 W10 W10 W10 W10 DD DD DD DD DD DD DD DD W5 W5 W5 W5 PROPOSED GRADE VINYL WINDOW; SEE WINDOW SCHEDULE VINYL DOOR; SEE UNIT DOOR SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM PREFINISHED FASCIA, BARGEBOARD & TRIM FIBER CEMENT ACCENT TRIM PREFINISHED METAL RAILING ASPHALT SHINGLE ROOF FYPON URETHANE BRACKET EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. CAST STONE CAP; TYP. ABOVE MASONRY & MANUFACTURED STONE PREFINISHED METAL LOUVER; TO BE PAINTED TO MATCH ADJACENT EXTERIOR FINISH, TYP. SUBMIT PROPOSED PAINT COLORS TO ARCHITECT FOR REVIEW. S3 M1 S2 M1S3 S1 S1 S2 S1 CAST STONE CAP AT PIERS, TYP.10"AVG HT OF ROOF8' - 3 1/2"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 6 1/4"(902'-5") EXISTING GRADE 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" DD DD DD DD W10 W10 W10 W10 SPD2 SPD2 SPD2 SPD2 W10 W10 W10 W10 DD DD DD DD SPD2 SPD2 SPD2 SPD2 W10 W10 W10 W10 W2 W2 W2 W2 DD DD DD DD W9 W9 W8 W8 W10 W10 W10 W23 W20 DD DD DD W2 W2 W2 W23 W23 W23 W23 SPD2 SPD2 SPD2 W10 W10 W10 DD DD DD DD W8 W8 W10 W10 W10 W10 W10 W10 W10 SPD2 SPD2 SPD2 SPD2 PROPOSED GRADE (HATCH) VINYL WINDOW; SEE WINDOW SCHEDULE VINYL DOOR; SEE UNIT DOOR SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM PREFINISHED BARGEBOARD & TRIM FIBER CEMENT ACCENT TRIM PREFINISHED METAL RAILING ASPHALT SHINGLE ROOF FYPON URETHANE BRACKET EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. CAST STONE CAP; TYP. ABOVE MASONRY & MANUFACTURED STONE PREFINISHED METAL LOUVER; TO BE PAINTED TO MATCH ADJACENT EXTERIOR FINISH, TYP. SUBMIT PROPOSED PAINT COLORS TO ARCHITECT FOR REVIEW. CAST STONE CAP AT PIERS, TYP. S1S1 S2 S1 S3 PREFINISHED FASCIA, BARGEBOARD & TRIMS1S1 S1 M1 S2 CMU S1 MS1M1MS1S2 S2 S1 S3 PREFINISHED METAL LOUVER; TO BE PAINTED TO MATCH ADJACENT EXTERIOR FINISH, TYP. SUBMIT PROPOSED PAINT COLORS TO ARCHITECT FOR REVIEW. W10W2 W2 W2 W8 W8 W8 W8 W8 W8 W10 W10 W10 W10 6"AVG HT OF ROOF8' - 3 1/2"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 2 1/4"(902'-5") EXISTING GRADE 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" W5 W5 W5 W5 W5 W5 W5 W5 W5 W5 W5 W5 M1 S3 PROPOSED GRADE VINYL WINDOW; SEE WINDOW SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM PREFINISHED METAL RAILING ASPHALT SHINGLE ROOF EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. CAST STONE CAP; TYP. ABOVE MASONRY & MANUFACTURED STONE CAST STONE CAP AT PIERS, TYP. (902'-5") EXISTING GRADE C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN 765 North Hampden Avenue, #180 St. Paul, Minnesota 55114 952.583.9788 APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX15 EXTERIOR ELEVATIONS10/29/1919032CheckerSCALE 1/8" = 1'-0"2 NORTHWEST ELEVATION SCALE 1/8" = 1'-0"3 WEST ELEVATION SCALE 1/8" = 1'-0"1 WEST ELEVATION - NORTH LEG 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" W8 W13 W13 W13 W13 W13 W13 DD DD DD DD D-49 D-49 D-49 D-49 DD DD DD DD W10 W10 W10 W10 SPD2 SPD2 SPD2 DD DD DD DD W10 W10 W10 W10 W10 W10 W10 W10 SPD2 SPD2 SPD2 PROPOSED GRADE VINYL WINDOW; SEE WINDOW SCHEDULE VINYL DOOR; SEE UNIT DOOR SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM PREFINISHED FASCIA, BARGEBOARD & TRIM FIBER CEMENT ACCENT TRIM PREFINISHED METAL RAILING ASPHALT SHINGLE ROOF FYPON URETHANE BRACKET EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. CAST STONE CAP; TYP. ABOVE MASONRY & MANUFACTURED STONE PREFINISHED METAL LOUVER; TO BE PAINTED TO MATCH ADJACENT EXTERIOR FINISH, TYP. SUBMIT PROPOSED PAINT COLORS TO ARCHITECT FOR REVIEW. S3 M1 S1 S2 CMU S3 S2 M1 MS1 S1S1 CMU CAST STONE CAP AT PIERS, TYP. S1 S2 S1 AVG HT AT ROOF8' - 3 1/2"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 8 1/4"1' - 0"AVERAGE GRADE THIS ELEVATION (902'-5") EXISTING GRADE 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" PROPOSED GRADE VINYL WINDOW; SEE WINDOW SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM PREFINISHED FASCIA FIBER CEMENT ACCENT TRIM PREFINISHED METAL RAILING ASPHALT SHINGLE ROOF EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS W/ CIVIL CAST STONE CAP AT PIERS, TYP. S1 S2 CMU W11 W11 W11 W11 7"8' - 3 1/2"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 3 1/4"(902'-5") EXISTING GRADE 1ST FLOOR 0" ROOF 42' -4 3/4" 2ND FLOOR 10' -11 1/4" 3RD FLOOR 21' -11 1/8" 4TH FLOOR 32' -11" GARAGE LEVEL -10' -8" ROOF BEARING HT. 41' -10 3/4" DD DD DD DD W4 W4 W4 W4 W4 W4 W4 W4 W4 W4 W4 W4 W4 W4W4 W4 W4 W4 W4 W4 W4 W4W4W4 DD DD DD DD D12 D-3 PROPOSED GRADE VINYL WINDOW; SEE WINDOW SCHEDULE FIBER CEMENT TRIM; SEE EXTERIOR FINISH SCHEDULE FOR COORDINATING FC PANELS AND TRIM PREFINISHED FASCIA, BARGEBOARD & TRIM FIBER CEMENT ACCENT TRIM PREFINISHED METAL RAILING ASPHALT SHINGLE ROOF EXPOSED COLORED ROCK FACE BLOCK ABOVE GROUND LINE, CONFIRM FINAL EXTERIOR GRADES AND PROPOSED ELEVATIONS WITH CIVIL CAST STONE SILL & LINTEL AT MASONRY OPENINGS, TYP. CAST STONE CAP; TYP. ABOVE MASONRY & MANUFACTURED STONE CAST STONE CAP AT PIERS, TYP. S3 M1 S2 MS1S2 M1 S3 S1 S3MS1 W6 W6W6W6 W6 W6 W6 W6 W6W6 W6 W6W6W6 W6 W6 AVG HT OF ROOF8' - 3 1/2"AVERAGE EXPOSED BUILDING HEIGHT THIS ELEVATION51' - 8 1/4"(902'-5") EXISTING GRADE C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN 765 North Hampden Avenue, #180 St. Paul, Minnesota 55114 952.583.9788 APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX16 EXTERIOR ELEVATIONS10/29/1919032CheckerSCALE 1/8" = 1'-0"1 SOUTH ELEVATION SCALE 1/8" = 1'-0"2 EAST ELEVATION - REGENT SCALE 1/8" = 1'-0"3 EAST ELEVATION - SOUTH LEG UPUP garage entrance 60 parking stalls entry new drive entrance patio areagarage exit pickle ball courts standard size P1 P2 P3 P4 C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN 765 North Hampden Avenue, #180 St. Paul, Minnesota 55114 952.583.9788 APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX17 CONTEXT IMAGES08/29/1919032Checker1" = 50'-0" Aerial Site Plan Perspective #1 Perspective #2 Perspective #4Perspective #3 C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN 765 North Hampden Avenue, #180 St. Paul, Minnesota 55114 952.583.9788 APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX18 SHADOW STUDIES08/29/1919032CheckerMARCH & SEPTEMBER 21, NOONMARCH & SEPTEMBER 21, 9 AM MARCH & SEPTEMBER 21, 3 PM JUNE 21, NOONJUNE 21, 9 AM JUNE 21, 3 PM DECEMBER 21, NOONDECEMBER 21, 9AM DECEMBER 21, 3PM INITIAL PLANTING VIEW 20 - 25' MAPLE 15 - 20' CONIFER 5-YEAR GROWTH VIEW PARLOR LOBBY CORTLAND PLUS CORTLAND PLUS REVERSE HARALSON YORK LIBERTY HARALSON REVERSE OPAL REVERSE OPALBRAEBURN TRASH MAIN ENTRY GREAT ROOM GUEST GOLDEN BRAEBURN STORAGE VESTIBULEHONEYCRISP STORAGE LIBRARY OFFICE SETBACK15' - 0"FRONT YARD SETBACK30' - 0"SETBACK15' - 0"SETBACK15' - 0"RR MAIL ROME BEAUTY SOUTHERN ROSE W/ SUN YORK PLUS GUEST FITNESSRR HOUSE KEEPING FIRESIDE GALA GALA REVERSE SOUTHERN ROSE BRAEBURN W/ SUN BRAEBURN REGENT SOUTHERN ROSE W/ SUN STORAGE DATA TRASH STORAGE ELEC ELEV LOBBY ELEV LOBBY PACKAGE ROOM MECHSTORAGE SEATING ROME BEAUTY CORTLAND PLUS REVERSE HARALSON YORK LIBERTY HARALSON REVERSE OPAL REVERSE OPAL GOLDEN BRAEBURN TRASH STORAGE HOUSEKEEPING CLUB ROOM CONF. ROOM SMALL LOUNGE HONEYCRISP SOUTHERN ROSE W/ SUN LOUNGE OPEN TO BELOW CORTLAND PLUS BRAEBURN REVERSE YORK PLUS ARTS & CRAFTS LOUNGE RR MECH OPEN TO BELOW GALA REVERSE SOUTHERN ROSE BRAEBURN W/ SUN STORAGE DATA TRASH STORAGE SOUTHERN ROSE W/ SUN REGENT BRAEBURN STORAGE ELEV LOBBY BRAEBURN WORK ROOM GALA FIRESIDE ELEV LOBBY ROME BEAUTY GALA REVERSE CORTLAND PLUS REVERSE HARALSON OPAL REVERSE OPAL GOLDEN BRAEBURN ELEV LOBBY STORAGE REGENT TRASH BRAEBURN W/ SUN SOUTHERN ROSE W/ SUN SOUTHERN ROSE CORTLAND PLUS GALA BRAEBURN W/ SUN YORK HONEYCRISP LIBERTY HARALSON REVERSE HONEYCRISP ROME BEAUTY REVERSE SOUTHERN ROSE W/ SUN YORK PLUS WASHINGTON BRAEBURN BRAEBURN REVERSE FIRESIDE BRAEBURN STORAGE TRASH DATA STORAGE STORAGE ELEC GALA LIBERTY HARALSON REVERSE HONEYCRISP ROME BEAUTY REVERSE BRAEBURN W/ SUN SOUTHERN ROSE W/ SUN REGENT OPAL REVERSE OPAL ELEV 2 SOUTHERN ROSE STORAGE GOLDEN BRAEBURN CORTLAND PLUS REVERSE WASHINGTON HARALSON BRAEBURN W/ SUN YORK GALA REVERSE SOUTHERN ROSE W/ SUN CORTLAND PLUS STAIR YORK PLUS BRAEBURN REVERSE BRAEBURN HONEYCRISP ROME BEAUTY FIRESIDE ELEV LOBBY ELEV LOBBY BRAEBURN TRASH ELEC STORAGE TRASH DATA STORAGE STORAGE GARAGE GARAGE ENTRANCE GARAGE EXIT HOBBY SHOP Golf Cart Parking (14 Stalls)MECHTRASH MECHANICAL BIKE REPAIR MAINTENANCE TRASH ELEV LOBBY BUILDING STORAGE BUILDING STORAGE STORAGESTORAGE STORAGE MECH GARDEN STORAGE RR ELEV LOBBY BUILDINGSTORAGESTORAGE ELEV 1 STAIR C 2019 MOMENTUM DESIGN GROUP LLCDateProject ArchitectProject NumberARCHITECTURAL SHEETS ISSUED FOR REFERENCE ONLYPUD SUBMITTAL - PRELIMINARY DESIGN 765 North Hampden Avenue, #180 St. Paul, Minnesota 55114 952.583.9788 APPLEWOOD POINTE OF PRIOR LAKEJeffers PondX11 FLOOR PLANS08/29/1919032Checker1" = 30'-0" First Floor 1" = 30'-0" Second Floor 1" = 30'-0" Third Floor 1" = 30'-0" Fourth Floor 1" = 30'-0" Garage Floor