HomeMy WebLinkAbout1B Infrastructure Benefit Study CC WorkshopInfrastructure Benefit
Study
CITY OF PRIOR LAKE
Allocation Update
-Projects under Consideration
-Allocation Process Refresher
-Allocation Example
-Allocation Outcomes
-Questions
Future Projects Project Number Location
1 CH 21 / Revere Way
2 Hwy 282 / CH 17
3 CH 12 / CH 17
4 CH 82 / CH 17
5 CH 42 / O'Loughlin Prop.
6 CH 21 / North Berens Rd.
7 CH 21 / Fountain Hills Dr.
8 CH 42 / Pike Lake Trl.
9 CH 42 / Meadowlawn Trl.
10 CH 18 / 138th St.
11 CH 42 / Crownline-Aspen
12 CH 21 / Carriage Hills Pkwy.
13 Hwy 13 / Franklin-Anna
14 In Annexation Area
15 In Annexation Area
16 In Annexation Area
17 In Annexation Area
18 In Annexation Area
19 In Annexation Area
20 In Annexation Area
21 E-W. North of Annexation Area
22 N-S Segment in Annexation Area
23 E-W Segment in Annexation Area
Allocation Process
Infrastructure
Cost
Allocation
Proportion
Developable
Parcels
Parcel
Proportion
Infrastructure
Cost
Allocation
Proportion
Developable
Acreage
Parcel
Proportion
Infrastructure Cost
Infrastructure
Cost
Allocation
Proportion
Developable
Acreage
Parcel
Proportion
Allocation
Proportion
Future
Roadway
Network
Population
and
Employment
Forecasts
2040
Land Use
Plan
2040 Land Use
Infrastructure
Cost
Allocation
Proportion
Developable
Parcels
Parcel
Proportion
Developable Parcels
•370 total developable parcels
were identified by city staff
•Wetlands were removed from
parcels to determine
developable acreage
•Developable parcels near
projects will be allocated
infrastructure costs
Project Benefit Area
•This is an example of the
benefitting parcels for Project 5
•Developable parcels near each
project were determined based
on:
•Proximity
•Potential travel patterns
•Roadway network configuration
Infrastructure
Cost
Allocation
Proportion
Developable
Acreage
Parcel
Proportion
Allocation Formula
Developable
Land Proportion
Parcel Developable
Acreage / TAZ
Developable Acreage
TAZ
Proportion
TAZ Forecasted
Use / Total
Project Use
Parcel
ProportionX=Formula:
Variable
Calculation:
Parcel Proportions
Allocation Outcomes
Questions