Loading...
HomeMy WebLinkAbout01(B) - CH 21 Entry Monuments Report ITEM: 1B CITY COUNCIL AGENDA REPORT MEETING DATE: February 18, 2020 PREPARED BY: Andy Brotzler Public Works Director/City Engineer Casey McCabe, Community Development Director PRESENTED BY: Andy Brotzler and Casey McCabe AGENDA ITEM: CH 21 Entry Monuments GOAL AREA Desirable & Sustainable Development OBJECTIVE: 5. Create appealing public spaces and transportation corridors to bring people together and foster a sense of place. RECOMMENDED ACTION: Review and discuss quotes and provide direction. BACKGROUND: Quotes were received at City Hall at 3:00 p.m. on February 5, 2020 for the CH 21 Entry Monuments. The request for quotes was distributed to eight contractors with quotes being received from two contractors. A summary of the quotes received is shown below: Egan Company $211,495.50 Killmer Electric Company, Inc. $246,418.45 The attached letter from Bolton & Menk summarizes the two quotes received and includes a breakdown of each quote for each group of entry monuments A, B, and C. Also included within the Bolton & Menk letter is a summary of estimated costs for the city to purchase decorative string lights for installation on the cables of each monument by city crews. The proposed lights are 5mm wide angle LED light strings and are an alternate to previously proposed lighting that is significantly lower in cost at an estimate of $2/LF. The attached drawings depict the location and design for each group of entry monuments. As previously discussed, when the project budget was updated in June 2019 following the bidding for the 21/13 project, an amount of $250,000 was included in the updated project budget for the completion of the entry monuments separately under city contract. At this time, staff is requesting Council direction for consideration to award the full project, or some portion of the project. To facilitate adequate lead time for the procurement of materials to complete the installation of the entry monuments concurrent with the completion of the 21/13 project work this spring/summer, final action will need to occur by the March 2, 2020 City Council meeting. ATTACHMENTS: City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372 Item 1B Page | 2 1. BMI Contract Award Recommendation 21 Entry Monuments 2. Downtown Entrance Monuments Dwgs 3. Downtown Entrance Monuments Lighting H:\PLAK\T62120103\6_Plans-Specs\B_Bid Tabulation\2020-02-07 BMI Contract Award Recommendation_CH 21 Entry Monuments.docx February 7, 2020 Andy Brotzler, Public Works Director/City Engineer City of Prior Lake 4646 Dakota St. SE Prior Lake, MN 55372 RE: CH 21 Entry Monuments Quote Set Dear Andy: Attached is the quote abstract for the project referenced above. The quotes were received at City Hall at 3:00 p.m. on February 5, 2020. There were a total of two quotes submitted on the project. The quotes have been tabulated and verified for accuracy, with errors and changes highlighted. The changes do not impact the apparent low quote. The low quote was Egan Company of Brooklyn Park, MN with the total quote price of $211,495.50. Egan Company is a large construction company and has a very good reputation in the Twin Cities area. They are also currently working on the Scott County T.H. 13/CSAH 21 Downtown Reconstruction Project as the electrical subcontractor to S.M. Hentges & Sons. Their existing role in construction along the CH 21 corridor is anticipated to streamline construction coordination. This quote is roughly $58,500 higher than the engineer’s estimate. Construction prices received were competitive, but a couple items we feel were bid too high, possibly due to a misunderstanding or comfort level of the contractor to install as designed. For example, the steel strand cable bid item accounts for nearly $40,000 of the overage. We feel we can award the contract and have opportunity to negotiate this particular item to a more reasonable cost if discussed in more detail with the contractor after bid award. The following table summarizes the total project cost for the Entry Monuments. The table shows itemized cost per monument grouping as quoted by the Contractor and the additional estimated City cost for furnishing and installing decorative string lights on the cables after Quoted Monuments are installed complete. Cost Estimate Summary Egan Company City of Prior Lake - String Lights (Furnish & Install) Total Estimated Cost – Monument Quote & City F&I String Lights Entry Monument A $63,282.00 640 LF $1,280 $64,562.00 Entry Monument B $85,931.50 1,075 LF $2,150 $88,081.50 Entry Monument C $62,282.00 640 LF $1,280 $63,562.00 Total $211,495.50 2,355 LF $4,710 216,205.50 Name: CH 21 Entry Monument Quote Set Date: 2020-02-07 Page: 2 H:\PLAK\T62120103\6_Plans-Specs\B_Bid Tabulation\2020-02-07 BMI Contract Award Recommendation_CH 21 Entry Monuments.docx We look forward to the successful completion of this project and thank you for allowing us to assist the City with its design and construction needs. Should you have any additional questions, please do not hesitate to contact me. Sincerely, Bolton & Menk, Inc. Samuel Kessel, P.L.A. Senior Project Landscape Architect Enclosure ABSTRACT OF QUOTES * quote amount changed due to found calculation/addition error CH 21 Entry Monuments City of Prior Lake Bid Date: 1/20/2020 1 2 ITEM APPROX. NO.ITEM QUANT. UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT BASE QUOTE Schedule 1 – Entry Monument A 1 Pole Type A – 18’-6” ht.1 EA $5,500.00 $5,500.00 $3,700.00 $3,700.00 $4,245.00 $4,245.00 2 Pole Type B – 24’ ht.1 EA $5,500.00 $5,500.00 $3,700.00 $3,700.00 $4,245.00 $4,245.00 3 Pole Type C – 30’ ht.1 EA $5,500.00 $5,500.00 $3,700.00 $3,700.00 $4,245.00 $4,245.00 4 3/4" Galvanized Steel Strand 642 LF $3.50 $2,247.00 $19.50 $12,519.00 $6.55 $4,205.10 5 Steel Strand Hardware (turnbuckles, spelter sockets – open and closed) 1 LS $680.00 $680.00 $1,265.00 $1,265.00 $11,430.00 $11,430.00 6 Helical Piles (Helical Pier Footings for Poles)3 EA $1,500.00 $4,500.00 $1,200.00 $3,600.00 $1,305.00 $3,915.00 7 Anchor Rod – Helical Style 12 EA $200.00 $2,400.00 $250.00 $3,000.00 $520.00 $6,240.00 8 Narrow Beam Uplight – 6 degree 6 EA $600.00 $3,600.00 $1,400.00 $8,400.00 $1,080.00 $6,480.00 9 Narrow Beam Uplight – 20 degree – Ground Mount 2 EA $600.00 $1,200.00 $1,500.00 $3,000.00 $1,170.00 $2,340.00 10 Concrete Base for Ground Mounted Uplight 2 EA $300.00 $600.00 $900.00 $1,800.00 $635.00 $1,270.00 11 Handholes 3 EA $500.00 $1,500.00 $1,150.00 $3,450.00 $875.00 $2,625.00 12 Wire - #6 AWG CU 275 LF $5.50 $1,512.50 $2.00 $550.00 $1.95 $536.25 13 Wire - #4 AWG CU 220 LF $5.50 $1,210.00 $2.20 $484.00 $2.40 $528.00 14 Direct Bury Cable 35 LF $3.50 $122.50 $7.00 $245.00 $9.60 $336.00 15 Conduit – 2” PVC/HDPE 82 LF $3.50 $287.00 $4.50 $369.00 $8.55 $701.10 16 Canvas Controller (controller for monument A and B) 1 EA $1,300.00 $1,300.00 $2,750.00 $2,750.00 $3,280.00 $3,280.00 17 Aria Transmitter (transmitter for monument A and B) 1 EA $750.00 $750.00 $1,500.00 $1,500.00 $1,645.00 $1,645.00 18 Landscape Service Cabinet with Heater – AL (includes service for monument A and B)1 EA $5,000.00 $5,000.00 $6,850.00 $6,850.00 $5,275.00 $5,275.00 19 Traffic Control (includes all traffic control items)1 LS $5,000.00 $5,000.00 $1,000.00 $1,000.00 $10,605.00 $10,605.00 20 Additional Pile Length Required 7 LF $200.00 $1,400.00 $775.00 $5,425.00 Schedule 1 Sub-Total $48,409.00 $63,282.00 $79,571.45 Schedule 2 – Entry Monument B 21 Pole Type A – 18’-6” ht.2 EA $5,500.00 $11,000.00 $3,700.00 $7,400.00 $4,245.00 $8,490.00 22 Pole Type B – 24’ ht.1 EA $5,500.00 $5,500.00 $3,700.00 $3,700.00 $4,245.00 $4,245.00 23 Pole Type C – 30’ ht.2 EA $5,500.00 $11,000.00 $3,700.00 $7,400.00 $4,245.00 $8,490.00 24 3/4" Galvanized Steel Strand 1075 LF $3.50 $3,762.50 $19.50 $20,962.50 $6.55 $7,041.25 25 Steel Strand Hardware (turnbuckles, spelter sockets – open and closed) 1 LS $1,140.00 $1,140.00 $1,265.00 $1,265.00 $18,385.00 $18,385.00 26 Helical Piles (Helical Pier Footings for Poles)5 EA $1,500.00 $7,500.00 $1,200.00 $6,000.00 $1,305.00 $6,525.00 27 Anchor Rod – Helical Style 20 EA $200.00 $4,000.00 $250.00 $5,000.00 $520.00 $10,400.00 28 Narrow Beam Uplight – 6 degree 10 EA $600.00 $6,000.00 $1,400.00 $14,000.00 $1,080.00 $10,800.00 29 Narrow Beam Uplight – 20 degree – Ground Mount 4 EA $600.00 $2,400.00 $1,500.00 $6,000.00 $1,170.00 $4,680.00 30 Concrete Base for Ground Mounted Uplight 4 EA $300.00 $1,200.00 $900.00 $3,600.00 $635.00 $2,540.00 31 Handholes 5 EA $500.00 $2,500.00 $1,150.00 $5,750.00 $875.00 $4,375.00 32 Wire - #6 AWG CU 450 LF $5.50 $2,475.00 $2.00 $900.00 $1.95 $877.50 33 Wire - #4 AWG CU 360 LF $5.50 $1,980.00 $2.20 $792.00 $2.40 $864.00 34 Direct Bury Cable 50 LF $3.50 $175.00 $7.00 $350.00 $9.60 $480.00 35 Conduit – 2” PVC/HDPE 136 LF $3.50 $476.00 $4.50 $612.00 $8.55 $1,162.80 36 Additional Pile Length Required 11 LF $200.00 $2,200.00 $775.00 $8,525.00 Schedule 2 Sub-Total $61,108.50 $85,931.50 $97,880.55 Engineer's Estimate Egan Company Killmer Electric Company, Inc. Bolton & Menk, Inc. ABSTRACT OF QUOTES * quote amount changed due to found calculation/addition error CH 21 Entry Monuments City of Prior Lake Bid Date: 1/20/2020 1 2 ITEM APPROX. NO.ITEM QUANT. UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT Engineer's Estimate Egan Company Killmer Electric Company, Inc. Bolton & Menk, Inc. Schedule 3 – Entry Monument C 37 Pole Type A – 18’-6” ht.1 EA $5,500.00 $5,500.00 $3,700.00 $3,700.00 $4,245.00 $4,245.00 38 Pole Type B – 24’ ht.1 EA $5,500.00 $5,500.00 $3,700.00 $3,700.00 $4,245.00 $4,245.00 39 Pole Type C – 30’ ht.1 EA $5,500.00 $5,500.00 $3,700.00 $3,700.00 $4,245.00 $4,245.00 40 3/4" Galvanized Steel Strand 642 LF $3.50 $2,247.00 $19.50 $12,519.00 $6.55 $4,205.10 41 Steel Strand Hardware (turnbuckles, spelter sockets – open and closed) 1 LS $680.00 $680.00 $1,265.00 $1,265.00 $11,430.00 $11,430.00 42 Helical Piles (Helical Pier Footings for Poles)3 EA $1,500.00 $4,500.00 $1,200.00 $3,600.00 $1,305.00 $3,915.00 43 Anchor Rod – Helical Style 12 EA $200.00 $2,400.00 $250.00 $3,000.00 $520.00 $6,240.00 44 Narrow Beam Uplight – 6 degree 6 EA $600.00 $3,600.00 $1,400.00 $8,400.00 $1,080.00 $6,480.00 45 Narrow Beam Uplight – 20 degree – Ground Mount 2 EA $600.00 $1,200.00 $1,500.00 $3,000.00 $1,170.00 $2,340.00 46 Concrete Base for Ground Mounted Uplight 2 EA $300.00 $600.00 $900.00 $1,800.00 $635.00 $1,270.00 47 Handholes 3 EA $500.00 $1,500.00 $1,150.00 $3,450.00 $875.00 $2,625.00 48 Wire - #6 AWG CU 275 LF $5.50 $1,512.50 $2.00 $550.00 $1.95 $536.25 49 Wire - #4 AWG CU 220 LF $5.50 $1,210.00 $2.20 $484.00 $2.40 $528.00 50 Direct Bury Cable 35 LF $3.50 $122.50 $7.00 $245.00 $9.60 $336.00 51 Conduit – 2” PVC/HDPE 82 LF $3.50 $287.00 $4.50 $369.00 $8.55 $701.10 52 Canvas Controller (controller for monument C)1 EA $1,300.00 $1,300.00 $2,750.00 $2,750.00 $3,280.00 $3,280.00 53 Aria Transmitter (transmitter for monument C)1 EA $750.00 $750.00 $6,850.00 $6,850.00 $1,645.00 $1,645.00 54 Landscape Service Cabinet with Heater – BL 1 EA $5,000.00 $5,000.00 $1,500.00 $1,500.00 $5,275.00 $5,275.00 55 Additional Pile Length Required 7 LF $200.00 $1,400.00 $775.00 $5,425.00 Schedule 3 Sub-Total $43,409.00 $62,282.00 $68,966.45 BASE QUOTE TOTAL $152,926.50 $211,495.50 $246,418.45 ADD ALTERNATE 56 MnDOT Light Foundation E Modified 11 EA $1,000.00 $11,000.00 $1,140.00 $12,540.00 Alternate Sub-Total $11,000.00 $12,540.00 BASE QUOTE TOTAL WITH ALTERNATE Base Quote Total with Alternate $209,295.50 $244,603.45 MONUMENT POLES TOTAL POLECOUNT POLE TYPE UNITED LIGHTING STANDARDS MODEL NUMBER HEIGHT A RTS-27-8011-AB-MODHH-MODHGT-(4)PE-(3)GFI-BALL-STD 18'-6"4 B RTS-30-8011-AB-MODHGT-(4)PE-(3)GFI-BALL-STD 24'3 C RTS-30-8011-AB-MODHGT-(4)PE-(3)GFI-BALL-STD 30'4 NOTE: TOTAL POLE COUNT QUANTIFIES POLES NEEDED FOR ALL ALL MONUMENTS PRODUCT INFORMATION NARROW BEAM UPLIGHT: PRODUCT - ACCLAIM DYNA ACCENT (DAS-241-AALN) OR APPROVED EQUAL ·6-DEGREE BEAM ANGLE FIXTURE ON POLES ·20-DEGREE BEAM ANGLE FIXTURE GROUND MOUNTED ·DETAILS: RGBW COLOR CHANGING LED; INTERNAL ARIA WIRELESS RECEIVER; OUTDOOR RATING (WET LOCATION); GRAY FINISH ·MOUNTING: MOUNT TO POLE BY ULS PROVIDED PAD/THREADED HOLE ·POWER CONSUMPTION: 35W AT STEADY STATE ·VOLATGE: 100-277 VAC, 50/60Hz CANVAS CONTROLLER: PRODUCT - CANVAS 2.0.1 (ORDER CODE: CAN100: CANVAS LIGHTING CONTROLLER) OR APPROVED EQUAL ·TO BE INSTALLED IN AL AND BL LANDSCAPE SERVICE CABINETS ARIA TRANSMITTER: PRODUCT - ARIA WIRELESS DMX 2.1.2 (MODEL: ARIA WDS) OR APPROVEDEQUAL ·TO BE INSTALLED IN AL AND BL LANDSCAPE SERVICE CABINETS WITHANTENNAE MOUNTED EXTERNALLY TO TOP OF CABINETS 3/4" GALVANIZED STEEL STRAND: PRODUCT: NATIONAL STRAND GALVANIZED STEEL STRAND, 3/4" DIAMETER OR APPROVED EQUAL STEEL STRAND HARDWARE: ·TURNBUCKLE: PRODUCT: INDUSCO JAW TURNBUCKLE (Part # 939 -----) OR APPROVED EQUAL- DETAILS: HOT DIPPED GALVANIZED, DROP FORGED.- SIZED TO RECEIVE SPELTER SOCKET AND TENSION REQUIREMENT ·SPELTER SOCKETS:PRODUCT: INDUSCO CLOSED SPELTER SOCKET (Part # 787 -----) OR APPROVED EQUAL- DETAILS: HOT DIPPED GALVANIZED - SIZED TO FIT 3/4" STEEL STRAND AND TENSION REQUIREMENT PRODUCT: INDUSCO OPEN SPELTER SOCKET (Part #787 -----) ORAPPROVED EQUAL - DETAILS: HOT DIPPED GALVANIZED - SIZED TO FIT 3/4" STEEL STRAND AND TENSION REQUIREMENT HELICAL STYLE ANCHOR RODPRODUCT: HELICAL ANCHOR ROD WITH MINIMUM 2400 POUND FAILURELOAD ·DETAILS: ONE-PIECE ANCHOR ROD, 4" HELIX, 1/2" x 30" SHAFT,GALVANIZED STEEL HELICAL PIER FOOTINGPRODUCT: CHANCE HELICAL FOUNDATION OR APPROVED EQUAL ·PER STRUCTURAL SPECIFICATIONS DARREN STRAFELDA MLAZGAR ASSOCIATES.(612)381-7615, DARRENS@MLAZGAR.COM CONTACT: 1-800-727-0665,WWW.INDUSCOWIREROPE.COM 800-455-2475, WWW.NATIONALSTRAND.COM CONTACT INFORMATION PLATT ELECTRIC SUPPLY 800-257-5288WWW.PLATT.COM HUBBELL POWER SYSTEMS, INC.855-477-2121 WWW.HUBBELL.COM R TH 13CH 21/EAGLE CREEK AVE TH 13GENERAL NOTES 1. THIS WORK CONSISTS OF FURNISHING AND INSTALLING THREE ENTRY MONUMENTS IN THE CITY OF PRIOR LAKE (SCOTT COUNTY). THE MONUMENTS ARE LOCATED WITHIN PLANTING AREAS OF CENTER MEDIANS ALONG CSAH 21 (BY OTHERS). MONUMENTS CONSIST OF POLE GROUPINGS WITH STEELSTRAND ASSEMBLIES AND LIGHTING ELEMENTS. 4. ALL WORK MUST BE COMPLETE BY JULY 15, 2020 IN COORDINATION WITH THE T.H. 13/C.S.A.H. 21 Downtown Reconstruction Project (13-21 PROJECT). 5. MEDIAN A WAS CONSTRUCTED IN 2019 AS PART OF THE 13-21 PROJECT. MEDIANS B AND C WILL BE CONSTRUCTED IN 2020 AS PART OF THE 13-21PROJECT. MONUMENT CONSTRUCTION SHALL BE COORDINATED WITH ROADWAY CONSTRUCTION EFFORTS TO MINIMIZE CONFLICTS AND ROADWAY CLOSURES. 6. ELECTRICAL CONDUIT TO THE ROADWAY MEDIANS IS INCLUDED IN THE 13-21 PROJECT CONTRACT. G0.02LOCATION PLAN AND GENERAL NOTESFEETSCALE 0 50 100 HORZ. EXISTING "LIGHT SYSTEM A" MEDIAN A MONUMENT, SEE SHEET C0.01 MEDIAN B MONUMENT, SEE SHEET C0.02 MEDIAN C MONUMENT, SEE SHEET C0.03MAIN AVENUEEXISTING SOURCE OF POWER, GROUNDMOUNTED TRANSFORMER PROPOSED "LIGHT SYSTEM B - LANDSCAPING SERVICE CABINET (BL)", SEE LIGHTING PLANS EXISTING SOURCE OF POWER,GROUND MOUNTED TRANSFORMER PROPOSED "LIGHT SYSTEM A LANDSCAPING SERVICE CABINET (AL)", SEE LIGHTING PLAN DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA. SHEET Bolton & Menk, Inc. 2020, All Rights ReservedcH:\PLAK\T62120103\CAD\C3D\120103G002.dwg 1/17/2020 3:02:28 PMDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO. R 12224 NICOLLET AVENUE BURNSVILLE, MINNESOTA 55337 Phone: (952) 890-0509Email: Burnsville@bolton-menk.com www.bolton-menk.comSAMUEL JAMES KESSEL50677 01/20/2020 CITY OF PRIOR LAKE, MINNESOTA CH21 ENTRY MONUMENTS MND MND SJK T62.120103 3/4" GALVANIZED STEEL STRAND (TYP) MEDIANCENTER LINE 8'-0"12'-8" 4'-0"4'-0"18'-6"30'-0"24'-0"6"1'-0"1'-0"7 1/2"4'-0"4'-0" 12'-0"7'-2"1'-0"6"10'-9"11'-5" 4'-0"4'-0" POLE TYPE A;SEE DETAIL 1/C0.05 POLE TYPE C;SEE DETAIL 1/C0.07 POLE TYPE B; SEE DETAIL 1/C0.06 STEEL STRAND ANCHOR AND CONNECTION, TYP MEDIANCENTER LINE NOTE: FOR STEEL STRAND AND LIGHT SOURCE CONNECTIONS, SEE SHEET C0.04 STEEL STRANDANCHOR ANDCONNECTION, TYP; SEE DETAIL 4/C0.04 GROUND MOUNTED NARROW BEAM UPLIGHT, TYP. SEE DETAIL 5/C0.04 1'-6" 1'-6" POLE 'A' - 18'-6" HT. POLE 'C' - 30' HT.POLE 'B' - 24' HT. GROUND MOUNTEDNARROW BEAM UPLIGHT, TYP. ENTRY MONUMENT GENERAL NOTES 1. CONTRACTOR SHALL PROVIDE PRODUCT CUT SHEETS FOR EACH POLE TYPE, STEEL STRAND, ATTACHMENTS & HARDWARE (TURNBUCKLE AND SPELTER SOCKETS), LIGHTING COMPONENTS, AND HELICAL PIERS & ANCHORS. SUBMIT TO OWNER/ENGINEER FOR APPROVAL. 2. STEEL STRAND TO HAVE 2" SAG TENSION. 3. SLIGHT FIELD ADJUSTMENTS TO STEEL STRAND ANCHOR LOCATIONS MAY BE NECESSARY. CONTRACTOR TO CONFIRM LAYOUT PRIOR TO CONSTRUCTION WITH OWNER/ENGINEER. 4. POLE BASE ELEVATION TO SIT 3” ABOVE THE NORTH AND SOUTH AVERAGE CURB HEIGHT. C0.01MEDIAN A MONUMENTFEETSCALE 0 5 10 HORZ. 47.5'18.6'30.4' MEDIANCENTER LINE MEDIANCENTER LINE BACK-OF-CURB EASTBOUND CH 21/EAGLE CREEK AVE WESTBOUND CH 21/EAGLE CREEK AVEBACK OF MEDIAN MAINTENANCE EDGE MEIDAN PLANTING BED 6 7 °74°63°6 8 ° 8 2 ° 7 5 °55°74°6 0 °82°72°65°HANDHOLE, TYP. CONDUIT, TYP. GROUND MOUNTED NARROWBEAM UPLIGHT, TYP. DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA. SHEET Bolton & Menk, Inc. 2020, All Rights ReservedcH:\PLAK\T62120103\CAD\C3D\120103C001.dwg 1/17/2020 3:02:38 PMDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO. R 12224 NICOLLET AVENUE BURNSVILLE, MINNESOTA 55337 Phone: (952) 890-0509Email: Burnsville@bolton-menk.com www.bolton-menk.comSAMUEL JAMES KESSEL50677 01/20/2020 CITY OF PRIOR LAKE, MINNESOTA CH21 ENTRY MONUMENTS MND MND SJK T62.120103 3/4" GALVANIZED STEEL STRAND (TYP) MEDIANCENTER LINE MEDIAN CENTER LINE 8'-0"12'-8" 4'-0"4'-0"18'-6"30'-0"24'-0"6"1'-0"1'-0"8"4'-0"4'-0" 12'-0"7'-2"1'-0"6"10'-9"11'-5" 4'-0"4'-0"1'-0"1'-0"8'-0"12'-8" 4'-0"4'-0"5"8"12'-0"7'-2" 4'-0"4'-0"18'-6"30'-0"POLE TYPE A;SEE DETAIL 1/C0.05 POLE TYPE C;SEE DETAIL 1/C0.07 POLE TYPE B; SEE DETAIL 1/C0.06 POLE TYPE A; SEE DETAIL 1/C0.05 POLE TYPE C;SEE DETAIL 1/C0.07 STEEL STRANDANCHOR ANDCONNECTION, TYP; SEE DETAIL 4/C0.04 NOTE: FOR STEEL STRAND AND LIGHT SOURCE CONNECTIONS, SEE SHEET C0.04 GROUND MOUNTED NARROW BEAM UPLIGHT, TYP. SEE DETAIL 5/C0.04 1'-6" 1'-6"1'-6" 1'-6" POLE 'A' - 18'-6" HT. POLE 'C' - 30' HT.POLE 'B' - 24' HT. POLE 'A' - 18' HT. POLE 'C' - 30' HT. STEEL STRAND ANCHORAND CONNECTION, TYP GROUND MOUNTEDNARROW BEAMUPLIGHT, TYP. ENTRY MONUMENT GENERAL NOTES 1. CONTRACTOR SHALL PROVIDE PRODUCT CUT SHEETS FOR EACH POLE TYPE, STEEL STRAND, ATTACHMENTS & HARDWARE (TURNBUCKLE AND SPELTER SOCKETS), LIGHTING COMPONENTS, AND HELICAL PIERS & ANCHORS. SUBMIT TO OWNER/ENGINEER FOR APPROVAL. 2. STEEL STRAND TO HAVE 2" SAG TENSION. 3. SLIGHT FIELD ADJUSTMENTS TO STEEL STRAND ANCHOR LOCATIONS MAY BENECESSARY. CONTRACTOR TO CONFIRM LAYOUT PRIOR TO CONSTRUCTION WITH OWNER/ENGINEER. 4. POLE BASE ELEVATION TO SIT 3” ABOVE THE NORTH AND SOUTH AVERAGECURB HEIGHT. E H E OU OUF F F F F F F F F F FFFF FFFFFFFFFFFFFFFFFF E E E EEEEEEEEEE C C C C C C C C C C C C C C0.02MEDIAN B MONUMENTFEETSCALE 0 10 20 HORZ. MEDIANCENTER LINE MEDIAN CENTER LINE BACK OF MEDIAN MAINTENANCE EDGE BACK-OF-CURBEASTBOUND CH 21/EAGLE CREEK AVE WESTBOUND CH 21/EAGLE CREEK AVE 55.5'18.6'30.4'15.6'23' MEIDAN PLANTING BED 6 7 °74°63°6 8 ° 8 2 ° 7 5 °55°74°6 0 °82°72°65°65°74°63°6 8 °55°68°82°75°7 4 ° HANDHOLE, TYP. CONDUIT, TYP. GROUND MOUNTED NARROWBEAM UPLIGHT, TYP. DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA. SHEET Bolton & Menk, Inc. 2020, All Rights ReservedcH:\PLAK\T62120103\CAD\C3D\120103C001.dwg 1/17/2020 3:02:47 PMDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO. R 12224 NICOLLET AVENUE BURNSVILLE, MINNESOTA 55337 Phone: (952) 890-0509Email: Burnsville@bolton-menk.com www.bolton-menk.comSAMUEL JAMES KESSEL50677 01/20/2020 CITY OF PRIOR LAKE, MINNESOTA CH21 ENTRY MONUMENTS MND MND SJK T62.120103 3/4" GALVANIZED STEEL STRAND (TYP) MEDIANCENTER LINE 8'-0"12'-8" 4'-0"4'-0"18'-6"30'-0"24'-0"6"1'-0"1'-0"7 1/2"4'-0"4'-0" 12'-0"7'-2"1'-0"6"10'-9"11'-5" 4'-0"4'-0" POLE TYPE A;SEE DETAIL 1/C0.05 POLE TYPE C;SEE DETAIL 1/C0.07 POLE TYPE B; SEE DETAIL 1/C0.06 STEEL STRAND ANCHOR AND CONNECTION, TYP MEDIANCENTER LINE NOTE: FOR STEEL STRAND AND LIGHT SOURCE CONNECTIONS, SEE SHEET C0.04 STEEL STRANDANCHOR ANDCONNECTION, TYP; SEE DETAIL 4/C0.04 GROUND MOUNTED NARROW BEAM UPLIGHT, TYP. SEE DETAIL 5/C0.04 1'-6" 1'-6" POLE 'A' - 18'-6" HT. POLE 'C' - 30' HT.POLE 'B' - 24' HT. GROUND MOUNTEDNARROW BEAM UPLIGHT, TYP.OUOUOU>>>>>>>>>>>>>>>>>>>>>ENTRY MONUMENT GENERAL NOTES 1. CONTRACTOR SHALL PROVIDE PRODUCT CUT SHEETS FOR EACH POLE TYPE, STEEL STRAND, ATTACHMENTS & HARDWARE (TURNBUCKLE AND SPELTER SOCKETS), LIGHTING COMPONENTS, AND HELICAL PIERS & ANCHORS. SUBMIT TO OWNER/ENGINEER FOR APPROVAL. 2. STEEL STRAND TO HAVE 2" SAG TENSION. 3. SLIGHT FIELD ADJUSTMENTS TO STEEL STRAND ANCHOR LOCATIONS MAY BE NECESSARY. CONTRACTOR TO CONFIRM LAYOUT PRIOR TO CONSTRUCTION WITH OWNER/ENGINEER. 4. POLE BASE ELEVATION TO SIT 3” ABOVE THE NORTH AND SOUTH AVERAGECURB HEIGHT. C0.03MEDIAN C MONUMENTFEETSCALE 0 10 20 HORZ. MEDIAN CENTER LINE MEDIANCENTER LINE BACK OF MEDIAN MAINTENANCE EDGE BACK-OF-CURBEASTBOUND CH 21/EAGLE CREEK AVE WESTBOUND CH 21/EAGLE CREEK AVE 139.2'18.6'30.4' MEIDAN PLANTING BED 6 7 °74°63°6 8 ° 8 2 ° 7 5 °55°74°6 0 °82°72°65°HANDHOLE, TYP. CONDUIT, TYP. GROUND MOUNTED NARROWBEAM UPLIGHT, TYP. DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA. SHEET Bolton & Menk, Inc. 2020, All Rights ReservedcH:\PLAK\T62120103\CAD\C3D\120103C001.dwg 1/17/2020 3:02:55 PMDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO. R 12224 NICOLLET AVENUE BURNSVILLE, MINNESOTA 55337 Phone: (952) 890-0509Email: Burnsville@bolton-menk.com www.bolton-menk.comSAMUEL JAMES KESSEL50677 01/20/2020 CITY OF PRIOR LAKE, MINNESOTA CH21 ENTRY MONUMENTS MND MND SJK T62.120103 Home Cool White - Standard Plug Light String, 50 LEDs, White Wire Cool White - Standard Plug Light String, 50 LEDs, White Wire SKU 1101725 Be the first to review this product Our standard plug commercial-grade 120V 5mm wide angle LED light strings are designed for heavy- duty use and can be used indoors and outdoors in trees and shrubs, to outline roofs or to wrap around columns. These cool white light strings on white wire offer unparalleled brightness in a small concave bulb and have a built-in rectifier that ensures the bulbs are flicker free. With end-to-end connection, power up to 45 light sets. Bring these standard plug commercial-grade 120V 5mm wide angle LED light strings to life by adding a 4-Channel Light String Controller (sold separately) to your light run. Choose from 8 lighting effects: 1.Combination 2.In Waves 3.Sequential 4.Slo-Glo 5.Chasing / Flash 6.Slow Fade 7.Twinkle / Flash 8.Steady On  50 LEDs, 4" Lead x 6" Bulb Spacing x 4" Tail, 25" 2" Total Length PRODUCT SPECS Power Source Plug-In Built in Controller No 4-Channel Light String Controller  Bulb Type 5MM Wide Angle LED Color Black Primary Bulb Color Cool White Reviews Related Products ADDRESS 3601 La Grange Parkway, Toano, VA 23168 © 2018 Copyright S4Lights. All rights reserved. PHONE +1 (888) 660-6640 EMAIL info@s4lights.com