HomeMy WebLinkAbout06(C) - Consider a resolution authorizing the distribution of the Seven Acres Environmental Assessment Worksheet (Project 2020-10) Report
ENVIRONMENTAL
ASSESSMENT WORKSHEET
SEVEN ACRES PROPERTY
Prior Lake, MN 55372
December 18, 2020
Proposer:
Highmark Builders, Inc.
8720 Eagle Creek Parkway
Savage, MN 55378
RGU:
City of Prior Lake
4646 Dakota Street SE
Prior Lake, MN 55372
WSB PROJECT NO. 016563-000
page 1
ENVIRONMENTAL ASSESSMENT WORKSHEET
This Environmental Assessment Worksheet (EAW) form and EAW Guidelines are available at the
Environmental Quality Board’s website at:
http://www.eqb.state.mn.us/EnvRevGuidanceDocuments.htm. The EAW form provides information
about a project that may have the potential for significant environmental effects. The EAW Guidelines
provide additional detail and resources for completing the EAW form.
Cumulative potential effects can either be addressed under each applicable EAW Item, or can be
addresses collectively under EAW Item 19.
Note to reviewers: Comments must be submitted to the RGU during the 30-day comment period
following notice of the EAW in the EQB Monitor. Comments should address the accuracy and
completeness of information, potential impacts that warrant further investigation and the need for an EIS.
1. Project title: Seven Acres EAW
2. Proposer: 3. RGU
Contact person: Jim Moras Contact person: Nick Monserud
Title: Highmark Builders Inc. Title: Assistant City Engineer
Address: 8720 Eagle Creek Parkway Address: 4646 Dakota St. SE
City, State, ZIP: Savage, MN 55378 City, State, ZIP: Prior Lake, MN 55372
Phone: 952-882-8904 Phone: 952-447-9834
Fax: Fax:
Email: jim.m@highmarkcos.com Email: nmonserud@cityofpriorlake.com
4. Reason for EAW Preparation: (check one)
Required: Discretionary:
EIS Scoping Citizen petition
X Mandatory EAW RGU discretion
Proposer initiated
If EAW or EIS is mandatory give EQB rule category subpart number(s) and name(s):
MN Rules 4410.4300 subpart 27B (Public waters, public water wetlands, and wetlands):
For projects that will cause an impact to a total of one acre or more of wetland, regardless of type,
within a shoreland area.
5. Project Location:
County: Scott
City/Township: Prior Lake
PLS Location (¼, ¼, Section, Township, Range): 30, 115, 21
Watershed (81 major watershed scale): 33 Minnesota River-Shakopee
GPS Coordinates: 44.735595, -93.389028
Tax Parcel Number: 258010500, 251180010
page 2
At a minimum attach each of the following to the EAW:
• County map showing the general location of the project (Figure 1);
• U.S. Geological Survey 7.5 minute, 1:24,000 scale map indicating project boundaries (Figure 2)
and
• Site plans showing all significant project and natural features. Pre-construction site plan (Figure
3) and post-construction site plan (Figure 4).
6. Project Description:
a. Provide the brief project summary to be published in the EQB Monitor, (approximately 50
words).
The proposed project includes the demolition of two residential homes and their garages along the
shore of Upper Prior Lake and the construction of one single-family home and a detached
outbuilding in their place. The 1.01-acre wetland in the eastern half of the property will be filled
and graded.
b. Give a complete description of the proposed project and related new construction, including
infrastructure needs. If the project is an expansion include a description of the existing facility.
Emphasize: 1) construction, operation methods and features that will cause physical
manipulation of the environment or will produce wastes, 2) modifications to existing equipment
or industrial processes, 3) significant demolition, removal or remodeling of existing structures,
and 4) timing and duration of construction activities.
The proposed project is for the redevelopment of two parcels in order to construct a new single-
family home and a detached outbuilding located along Cove Avenue SE in Prior Lake, MN. As
part of the project, ongoing drainage issues will also be addressed. The project includes
demolition of two existing single-family homes and their garages located at 14756 (PID
258010500) and 14744 (PID 251180010) Cove Avenue SE, as well as the demolition of an
additional detached garage on the 14756 parcel. The project proposer will then construct one
home, attached garage, detached outbuilding, new bituminous driveway, and stormwater
management best management practices (BMPs). The home will be constructed in the location of
the existing homes on these parcels. A garage will be constructed in the location of the existing
detached garage on the 14756 parcel, east of Cove Avenue SE. The new home and the garage will
be attached. A portion of Cove Avenue SE south of Seven Acres Street and across from PID
251180010 will be vacated extending from 14744 Cove Avenue north to Seven Acres St. The
project will also fill the 1.01-acre wetland that is located north of Kneafseys Street SE to re-route
surface water that drains to the wetland and causes ongoing flooding and drainage issues. To
accommodate stormwater runoff from the surrounding drainage area, stormwater management
BMPs will be constructed on the east side of the parcel adjacent to Oakland Beach Avenue SE.
Following wetland fill, an approximately 7000 square foot outbuilding and driveway will be
constructed.
Demolition is planned to be completed in spring 2021 and the house and outbuilding construction
will be completed by fall 2021.
page 3
c. Project magnitude:
Total Project Acreage 2.71
Linear project length N/A
Number and type of residential units 1 single family
Commercial building area (in square feet) N/A
Industrial building area (in square feet) N/A
Institutional building area (in square feet) N/A
Other uses – specify (in square feet) N/A
Structure height(s) 2 stories
d. Explain the project purpose; if the project will be carried out by a governmental unit, explain the
need for the project and identify its beneficiaries.
This project is being proposed by the property owner. The project will consist of the construction
of a single residential home and a detached building in the place of two existing homes. In
addition, a wetland currently exists on the property and causes drainage issues in the area,
including flooding of Kneafseys Street to the south. The project proposes to fill the wetland and
treat stormwater using new stormwater BMPs that will be located on the eastern portion of the
property. This project will benefit the homeowners to the south of the project by addressing
existing flooding issues and improving water quality by providing stormwater treatment.
e. Are future stages of this development including development on any other property planned or
likely to happen? Yes x No
If yes, briefly describe future stages, relationship to present project, timeline and plans for
environmental review.
f. Is this project a subsequent stage of an earlier project? Yes x No
If yes, briefly describe the past development, timeline and any past environmental review.
7. Cover types: Estimate the acreage of the site with each of the following cover types before and after
development:
Before After Before After
Wetlands 1.01 0 Lawn/landscaping 0.55 1.30
Deep
water/streams
0 0 Impervious
surface
0.15 0.50
Wooded/forest 1 0.21 Stormwater BMPs 0 0.70
Brush/Grassland 0 0 Other (describe) 0 0
Cropland 0 0
TOTAL 2.71 2.71
page 4
8. Permits and approvals required: List all known local, state and federal permits, approvals,
certifications and financial assistance for the project. Include modifications of any existing permits,
governmental review of plans and all direct and indirect forms of public financial assistance including
bond guarantees, Tax Increment Financing and infrastructure. All of these final decisions are
prohibited until all appropriate environmental review has been completed. See Minnesota Rules,
Chapter 4410.3100.
Unit of government Type of application Status
Federal
US Army Corps of Engineers (USACE) Section 404 Permit To be obtained
State
Pollution Control Agency (PCA) NPDES Construction Stormwater
Permit (NPDES CSW)
To be obtained
Section 401 Certification To be obtained
Demolition/Renovation notification To be obtained
Department of Natural Resources (DNR) Water Appropriation Permit To be obtained
Local
Prior Lake/Spring Lake Watershed
District (PLSLWD)
Watershed District Permit To be obtained
City of Prior Lake Wetland Conservation Act
Replacement Plan
To be obtained
Demolition Permit To be obtained
Excavating and Grading Permit To be obtained
Building Permit To be obtained
Driveway Permit To be obtained
Right-of-way Permit To be obtained
Preliminary/Final Plat Application To be obtained
Vacation of Easement/Right-of-way To be obtained
MS4 Stormwater Compliance To be obtained
Cumulative potential effects may be considered and addressed in response to individual EAW Item
Nos. 9-18, or the RGU can address all cumulative potential effects in response to EAW Item No. 19.
If addressing cumulative effect under individual items, make sure to include information requested
in EAW Item No. 19
9. Land use:
a. Describe:
i. Existing land use of the site as well as areas adjacent to and near the site, including parks,
trails, prime or unique farmlands.
This project is located along the shoreline of Upper Prior Lake within the city of Prior
Lake, MN. The primary land use within the area is residential single-family housing on the
western half and storm water drainage on the eastern side. The adjacent area also includes
page 5
single-family housing as well as the lake adjacent to the west of the property area. Oakland
Beach Park is located approximately 3 blocks northeast from the site.
ii. Plans. Describe planned land use as identified in comprehensive plan (if available) and
any other applicable plan for land use, water, or resources management by a local,
regional, state, or federal agency.
The City of Prior Lake developed a comprehensive plan that would guide the city through
2040. The 2040 Comprehensive Land Use Plan indicates the area as R-LD Urban Low
Density. The land use is shown on Figure 6.
iii. Zoning, including special districts or overlays such as shoreland, floodplain, wild and
scenic rivers, critical area, agricultural preserves, etc.
The zoning map is included in Figure 7. The project area is currently zoned as R-1: Low
Density Residential. The zoning of the property will not change with progression of this
project. The land to the east, north, and west of the project is zoned as single family
residential by the City of Prior Lake. The 100-year floodplain covers a portion of the
property, but proposed work appears to be taking place outside the 100-year floodplain
boundary. The majority of the property is located within the 500-year flood zone (Figure
11). The property is located within the shoreland district of Upper Prior Lake. The lake is
classified as a General Development lake and requires a 75-foot structural setback from
Upper Prior Lake.
b. Discuss the project’s compatibility with nearby land uses, zoning, and plans listed in Item 9a
above, concentrating on implications for environmental effects.
The proposed project will be compatible with the current uses of the surrounding area. The
property should not require rezoning as it will continue to be residential. The wetland
located in the eastern half of the property will be filled and graded. Stormwater BMPs will
be constructed to the east of where the existing wetland is located. The proposed
outbuilding size does not meet the City rules. The design will need to be reviewed through
the Community Development group and a variance may be necessary.
c. Identify measures incorporated into the proposed project to mitigate any potential incompatibility
as discussed in Item 9b above.
Permitting through the WCA, USACE, and MPCA will be required for filling of the
wetland area. Compensatory mitigation will be required for wetland impacts. Additional
permitting through the PLSLWD and DNR will be required for development and
dewatering.
10. Geology, soils and topography/land forms:
a. Geology - Describe the geology underlying the project area and identify and map any susceptible
geologic features such as sinkholes, shallow limestone formations, unconfined/shallow aquifers,
or karst conditions. Discuss any limitations of these features for the project and any effects the
project could have on these features. Identify any project designs or mitigation measures to
address effects to geologic features.
page 6
According to the Minnesota Geologic Survey, surface geology at the project area consists of till
deposits from Altamont Moraine of the Des Moines Lobe (Figure 8, Appendix A). These surface
deposits consist of gray to reddish brown calcareous, shale rich, clayey till that occur in irregular,
elongated hills with rounded tops and steep sides. Bedrock at the project area consists of sandy
dolomite with thin beds of quartzose sandstone of the Lower Ordovician Series in the Prairie du
Chien Group (Figure 9, Appendix A). Bedrock is estimated to be approximately 160 feet below
grade based upon findings from the Minnesota Department of Health (MDH) Minnesota Well
Index which identified one well ~1,500 feet south of the Project area (unique well ID 109909)
that encountered bedrock at a depth of 160 feet below grade.
The Minnesota DNR Aggregate Resource Web Map did not identify any gravel pits at the project
area or within 1,000 feet and the sand and gravel quality was identified as blank with no potential.
According to the Minnesota Karst Land Map, the project area is not located in a region that is
prone to surface karst feature development. Based upon these findings, the potential for geologic
conditions to be problematic for future development is low.
b. Soils and topography - Describe the soils on the site, giving NRCS (SCS) classifications and
descriptions, including limitations of soils. Describe topography, any special site conditions
relating to erosion potential, soil stability or other soils limitations, such as steep slopes, highly
permeable soils. Provide estimated volume and acreage of soil excavation and/or grading.
Discuss impacts from project activities (distinguish between construction and operational
activities) related to soils and topography. Identify measures during and after project
construction to address soil limitations including stabilization, soil corrections or other
measures. Erosion/sedimentation control related to stormwater runoff should be addressed in
response to Item 11.b.ii.
The site topography is generally flat in the areas where houses have been developed with a
gradual decrease in elevation sloping towards the central wetland on the site. The western-most
part of the site slopes to the west, between the homes and Prior Lake. Site elevations range from
904 to 916 feet above sea level (AMSL). The US Department of Agriculture (USDA) Natural
Resources Conservation Service (NRCS) Web Soil Survey depicts five mapped soil types within
the project area (Table 10-1, Figure 10). Site topography is not expected to be problematic.
Table 10-1: Scott County Soil Survey for the Belzer Wetland Project area.
Map Symbol Soil Name % Slope
Ba Beach materials, sandy
HaB Hayden loam 2 to 6
HaC Hayden loam 6 to 10
INT Water, intermittent
Ma Marsh
Much of the site perimeter consists of sand and gravel (Ba) shoreland soils that are moderately
well drained and not classified as prime farmland. These soils may contain 10 percent minor
components of poorly drained hydric soils. The larger central part of the site is classified as very
poorly drained Marsh (Ma).
page 7
NOTE: For silica sand projects, the EAW must include a hydrogeologic investigation assessing the
potential groundwater and surface water effects and geologic conditions that could create an increased
risk of potentially significant effects on groundwater and surface water. Descriptions of water
resources and potential effects from the project in EAW Item 11 must be consistent with the geology,
soils and topography/land forms and potential effects described in EAW Item 10.
11. Water resources:
a. Describe surface water and groundwater features on or near the site in a.i. and a.ii. below.
i. Surface water - lakes, streams, wetlands, intermittent channels, and county/judicial ditches.
Include any special designations such as public waters, trout stream/lake, wildlife lakes,
migratory waterfowl feeding/resting lake, and outstanding resource value water. Include
water quality impairments or special designations listed on the current MPCA 303d Impaired
Waters List that are within 1 mile of the project. Include DNR Public Waters Inventory
number(s), if any.
The project site is adjacent to Lower Prior Lake (DNR PWI No. 70002600). Lower Prior
Lake has an EPA-approved impairment for fishes bioassessments and mercury in fish tissue
on the MPCA 303d Impaired Waters List. These impairments are considered to be
construction-related parameters and require additional best management practices (BMPs)
found in items 23.9 and 23.10 of the NPDES/SDS CSW permit. Six additional public waters
basin are located within one mile: unnamed basin (DNR PWI No. 70017300), unnamed basin
(DNR PWI No. 70017200), Cate’s Lake (DNR PWI No. 7001800), unnamed basin (DNR
PWI No.70026400), unnamed basin (DNR PWI No. 70017400), and unnamed basin (DNR
PWI No. 70017500). The Credit River (DNR PWI No. 105605) is located one mile southeast
of the site and is impaired for benthic macroinvertebrate bioassessments, chloride,
Escherichia coli, and fishes bioassessments. These impairments are also considered
construction related.
One wetland is mapped by the DNR National Wetlands Inventory in the eastern half of the
project site. This wetland was classified as a deep marsh during the wetland delineation. This
wetland is isolated within the parcel and likely receives hydrology from groundwater lake
levels and stormwater runoff. Surface waters near the site are shown on Figure 11.
ii. Groundwater – aquifers, springs, seeps. Include: 1) depth to groundwater; 2) if project is
within a MDH wellhead protection area; 3) identification of any onsite and/or nearby wells,
including unique numbers and well logs if available. If there are no wells known on site or
nearby, explain the methodology used to determine this.
Depth to groundwater within the site is mapped as being 0 to 10 feet below the ground
surface. The wetland located within the parcel is likely connected via groundwater to Prior
Lake given the permeable sand and gravel soils of the site.
During high water level periods, wetland water overtops Seven Acres Street and flows north
via a 40-foot wide overflow point to a pond.
The project site is not located within a Minnesota Department of Health (MDH) wellhead
protection area or a drinking water supply management area. Wellhead protection area 87701
page 8
is located southeast of the project area. According to the Minnesota Well Index, no wells are
located within the project site and three wells are located within 500 feet of the site (Table
11-1, Figure 12).
Table 11-1. Verified Wells within 500 Feet of the Project Area.
Well ID Type Location
from
Project
Area
Status Well
Depth
(ft)
Static Water
Level (ft)
Aquifer
207080 Domestic S Active 118 65 Quaternary undiff.
207236 Domestic SE Active 115 70 Quat. Buried unconf.
Aquif.
207084 Domestic NE Sealed 130 90 Quat. Buried unconf.
b. Describe effects from project activities on water resources and measures to minimize or mitigate
the effects in Item b.i. through Item b.iv. below.
i. Wastewater - For each of the following, describe the sources, quantities and composition
of all sanitary, municipal/domestic and industrial wastewater produced or treated at the
site.
1) If the wastewater discharge is to a publicly owned treatment facility, identify any
pretreatment measures and the ability of the facility to handle the added water and
waste loadings, including any effects on, or required expansion of, municipal
wastewater infrastructure.
The existing homes will be disconnected from the sanitary system and the new house
will connect to the District 1 municipal sewer system. Wastewater from the Project
Area will be discharged to the Blue Lake Wastewater Treatment Facility located in
nearby Shakopee, MN. The facility has the capacity to treat 32 million gallons of
wastewater per day and treats on average 27 million gallons a day. The project will
disconnect one home from the system; therefore, it will not exceed the treatment
facility’s capacity or require any additional expansion of the existing municipal
wastewater infrastructure.
2) If the wastewater discharge is to a subsurface sewage treatment systems (SSTS),
describe the system used, the design flow, and suitability of site conditions for such a
system.
Wastewater will not discharge to a subsurface sewage treatment system.
3) If the wastewater discharge is to surface water, identify the wastewater treatment
methods and identify discharge points and proposed effluent limitations to mitigate
impacts. Discuss any effects to surface or groundwater from wastewater discharges.
page 9
Wastewater will not be discharged to surface waters. Blue Lake Wastewater will
meet state and local standards to ensure adequate treatment and separation from
groundwater
ii. Stormwater - Describe the quantity and quality of stormwater runoff at the site prior to
and post construction. Include the routes and receiving water bodies for runoff from the
site (major downstream water bodies as well as the immediate receiving waters). Discuss
any environmental effects from stormwater discharges. Describe stormwater pollution
prevention plans including temporary and permanent runoff controls and potential BMP
site locations to manage or treat stormwater runoff. Identify specific erosion control,
sedimentation control or stabilization measures to address soil limitations during and
after project construction.
Existing Conditions
In existing conditions, the site consists of two residential homes, a garage, and a wetland.
Land use is classified as residential, which has surface water and trees within the parcels.
According to floodplain revisions done in 2018 and approved by FEMA, the 100-year
floodplain boundary covers about 10 percent of the site. Approximately 80 percent of the
site sits within the 500-year FEMA floodplain and the remaining 10 percent of the site is
outside of the FEMA flood boundary.
Existing stormwater runoff flows to two collection points: an existing wetland north of
Kneafsey Street and directly to Lower Prior Lake. Stormwater enters these receiving
waters directly without water quality treatment. The east portion of the site, 9.11 acres
including offsite drainage, flows to the existing wetland via storm sewer and overland
flow. Approximately 2.70 acres of the wetland drainage area is impervious surface.
During periods of high water, water from the wetland overtops Seven Acres Street and
flows north via a 40-foot wide overflow point to a pond. From that pond, water flows
through a channel to Lower Prior Lake. However, the overflow elevation of Seven Acres
Street is higher than the elevation of Kneafsey Street SE, so flooding occurs on Kneafsey
Street before the wetland overflows to the north. This flooding occurs when long-term
precipitation is above average, or during lake flooding events. Recent flooding occurred
in both 2014 and 2019 and is present for a longer duration (not during precipitation
events).
The west portion of the site, 0.35 acres, overland flows directly to Lower Prior Lake, 0.08
acres of which is untreated impervious surface. Existing runoff rates from the site,
determined from a preliminary analysis and subject to change as additional survey is
obtained, are shown in Table 11-2.
Table 11-2. Existing Runoff Rates
Storm Event Runoff Rate (cfs)
2-year 0.53
10-year 1.11
100-year 31.97
page 10
Proposed Conditions
Post development, the site will consist of a single-family home and outbuilding. The
existing wetland will be filled; a new stormwater basin with a piped outlet following the
existing drainage route will be located adjacent to Oakland Beach Avenue. The
stormwater basin will capture 8.98 acres of total drainage with 2.98 acres of the drainage
area as impervious surface. The drainage area to Lower Prior Lake will be increased from
existing conditions to 0.48 acres with 0.15 acres being impervious surface. From existing
to proposed conditions, there will be a net increase of impervious surface of 0.35 acre.
Proposed runoff rates have not yet been determined for the project because the best
management practices have not been finalized, but proposed runoff rates are required to
be less than or equal to existing runoff rates as outlined in the requirements below.
Relevant Regulations and Considerations
Stormwater quality and quantity to receiving waterbodies will be improved upon from
existing to proposed conditions because required best management practices will be
designed in accordance with governing agency regulations. Because total disturbance
exceeds one acre, the project will be required to apply for permits regulating stormwater
discharge from Prior Lake/Spring Lake Watershed District (PLSLWD), the City of Prior
Lake, and the Minnesota Pollution Control Agency (MPCA). The site must follow the
most stringent criteria from the agencies.
• Proposed peak runoff rates may not exceed existing runoff rates for the 2-, 10-,
and 100-year events.
• No net increase from pre-project conditions on an annual average basis of
stormwater discharge volume, total suspended solids, and total phosphorus.
o Retain a runoff volume equal to one-inch times the area of the proposed
increase of impervious surfaces on-site.
• Provide a 60 percent reduction in total phosphorus and a 90 percent reduction in
total suspended solids from the proposed development draining to the best
management practice to meet the water quality treatment standard.
Stormwater BMPs will be designed adjacent to Oakland Beach Avenue to provide rate
control, volume control, and water quality requirements for the site redevelopment. The
total net new impervious amount for the proposed development is 0.35 acres. Retaining
one inch of runoff from net new impervious surfaces requires 1,270 cubic feet of volume
control to meet the requirement. Further investigation into the site conditions and soil
infiltration rates will be done during the final design phase to ensure the volume control
requirement is met.
Stormwater management practices will be designed to meet governing agency
requirements and mitigate negative environmental effects from stormwater discharge.
Currently, Lower Prior Lake (PWI ID# 70-0026-00) is listed as impaired for fish
bioassessments and for uses including aquatic consumption and aquatic life. A TMDL
has been approved for mercury in fish tissue. The impairments show that Lower Prior
Lake has poor aquatic health. If not properly managed, stormwater runoff can contribute
to poor aquatic health by introducing nutrients and excess sediment into surface waters,
causing algal blooms, low dissolved oxygen levels, and increased turbidity.
page 11
Temporary and permanent stormwater management practices have not yet been designed
for the site, but final design will include a stormwater pollution prevention plan (SWPPP)
and a stormwater management plan. The SWPPP and associated runoff controls will be
designed in accordance with the NPDES permit. Sediment control practices will be
established on all downgradient perimeters of the site. Erosion control practices will be
initiated immediately when construction activity has temporarily or permanently ceased.
A permanent stormwater basin will be located north of Kneafseys Street and will collect
95 percent of the total site runoff. To address soil limitations during project construction,
sediment laden runoff will be managed by temporary sediment control practices such as
sediment control logs, silt fence, storm drain inlet protection, and street sweeping. Runoff
from exposed areas will be prevented by immediate stabilization using erosion control
blankets, sod, and native plantings. Following construction, a permanent stormwater
basin will manage stormwater runoff and limit the discharge of sediment to downstream
waterbodies.
iii. Water appropriation - Describe if the project proposes to appropriate surface or
groundwater (including dewatering). Describe the source, quantity, duration, use and
purpose of the water use and if a DNR water appropriation permit is required. Describe
any well abandonment. If connecting to an existing municipal water supply, identify the
wells to be used as a water source and any effects on, or required expansion of,
municipal water infrastructure. Discuss environmental effects from water appropriation,
including an assessment of the water resources available for appropriation. Identify any
measures to avoid, minimize, or mitigate environmental effects from the water
appropriation.
Water appropriation will be needed during construction to remove water from the
wetland area. The inlet of the pump will be protected to prevent the transport of latent
sediments. The outlet will be protected with best management practices that prevent
erosion and scour from flowing water. Discharge must be free from sediment and
turbidity must be checked throughout the operation. The contractor will need to apply for
a water appropriation permit during construction if they will be pumping more than
10,000 gallons of water per day or 1 million gallons per year. Best management practices
outlined in the NPDES permit will be followed.
iv. Surface Waters
a) Wetlands - Describe any anticipated physical effects or alterations to wetland
features such as draining, filling, permanent inundation, dredging and vegetative
removal. Discuss direct and indirect environmental effects from physical
modification of wetlands, including the anticipated effects that any proposed wetland
alterations may have to the host watershed. Identify measures to avoid (e.g.,
available alternatives that were considered), minimize, or mitigate environmental
effects to wetlands. Discuss whether any required compensatory wetland mitigation
for unavoidable wetland impacts will occur in the same minor or major watershed
and identify those probable locations.
page 12
The National Wetlands Inventory (NWI) identifies a single wetland located within
the property (Figure 11). A wetland delineation was conducted within the project
parcel and classified this 1.01-acre wetland as a deep marsh. This wetland currently
stores stormwater runoff for the surrounding residential area; however, the wetland
often overtops and leads to flooding of Seven Acres Street and residential homes
nearby each year. The wetland will be permanently filled and graded during
construction and stormwater runoff will be relocated to a constructed pond located to
the east. The project will impact 1.01 acres of wetland. Mitigation will be required at
a 2:1 ratio through either on-site mitigation or the purchase of USACE-approved
wetland banking credits.
This wetland’s functions likely include protection of water quality in Prior Lake
through capture excess nutrients from stormwater runoff, provide a carbon sink,
provide habitat for wildlife, maintain surface water flows, and store flood waters.
These functions will be replaced through the construction of the stormwater pond.
Loss of wetland may temporarily result in loss of wildlife habitat in the project area,
but this will be replaced once the stormwater pond is constructed and vegetated.
During final design of the project the developer will apply for WCA, USACE Section
404, and MPCA Section 401 approvals. The developer will provide a detailed
alternatives analysis for the proposed project and outline mitigation measures to
offset the impacts. These approvals must be obtained prior to construction.
b) Other surface waters- Describe any anticipated physical effects or alterations to
surface water features (lakes, streams, ponds, intermittent channels, county/judicial
ditches) such as draining, filling, permanent inundation, dredging, diking, stream
diversion, impoundment, aquatic plant removal and riparian alteration. Discuss
direct and indirect environmental effects from physical modification of water
features. Identify measures to avoid, minimize, or mitigate environmental effects to
surface water features, including in-water Best Management Practices that are
proposed to avoid or minimize turbidity/sedimentation while physically altering the
water features. Discuss how the project will change the number or type of watercraft
on any water body, including current and projected watercraft usage.
Upper Prior Lake is also located within the Project Area but will not be impacted by
the project. The homes along the shoreline on the property will be demolished and a
new single residence will be constructed in their place. Although this construction
will be taking place close to the shoreline of the lake, there is no modification
planned for the shoreline or the lake itself at this property. The property will adhere
to the shoreland district requirement by providing a 75-foot setback from the ordinary
high-water level to the proposed structure. Best management practices (BMPs) will
be in place to avoid any contamination of the water or surrounding ecosystems. This
project will not affect the amount of watercraft on Upper Prior Lake as there are two
single-family homes currently there and the project will replace those with one
single-family home.
page 13
12. Contamination/Hazardous Materials/Wastes:
a. Pre-project site conditions - Describe existing contamination or potential environmental hazards
on or in close proximity to the project site such as soil or ground water contamination,
abandoned dumps, closed landfills, existing or abandoned storage tanks, and hazardous liquid or
gas pipelines. Discuss any potential environmental effects from pre-project site conditions that
would be caused or exacerbated by project construction and operation. Identify measures to
avoid, minimize or mitigate adverse effects from existing contamination or potential
environmental hazards. Include development of a Contingency Plan or Response Action Plan.
The Minnesota Pollution Control Agency and Minnesota Department of Agriculture (MDA)
databases were reviewed to identify verified and potentially contaminated sites that may be
encountered during the proposed project. The following databases were reviewed:
1. MPCA “What’s in My Neighborhood?” (WIMN) website search
2. MDA “What’s in My Neighborhood?” website search
No MDA sites were identified within 1,000 feet of the Project area. Additionally, no MPCA
WIMN sites were identified at the project area, but two construction stormwater sites (sites
142669 and 214569) and one multiple activity listing (site not depicted in Figure 13) were
identified within 1,000 feet of the project area (Figure 13). This multiple activity listing consists
of an active hazardous waste generator, an inactive leak site, and an active above ground storage
tank site. All MPCA WIMN listings are approximately 950 feet southeast of project area.
Based on the type of listings, regulatory status, and distance from the project area, the potential to
encounter contaminated soil and/or groundwater is low. If contaminated materials are
encountered during construction, construction activities will cease and a Construction
Contingency Plan (CCP) will be implemented.
Two single-family homes will be demolished during the project. A demolition permit will be
required by the City of Prior Lake and a Demolition/Renovation notification will be submitted to
the MPCA asbestos program 10 days prior to applying for this permit.
b. Project related generation/storage of solid wastes - Describe solid wastes generated/stored
during construction and/or operation of the project. Indicate method of disposal. Discuss
potential environmental effects from solid waste handling, storage and disposal. Identify
measures to avoid, minimize or mitigate adverse effects from the generation/storage of solid
waste including source reduction and recycling.
Project activities will generate wastes and debris typical of construction operation. All waste and
unused materials will be properly contained and disposed of off-site and not allowed to be carried
by runoff to receiving waters. Post-development, the home will be serviced by licensed waste
haulers and trash will be disposed of in a landfill. Recycling service is also offered by several
garbage haulers in Prior Lake and will be available to the residence following construction.
c. Project related use/storage of hazardous materials - Describe chemicals/hazardous materials
used/stored during construction and/or operation of the project including method of storage.
Indicate the number, location and size of any above or below ground tanks to store petroleum or
other materials. Discuss potential environmental effects from accidental spill or release of
page 14
hazardous materials. Identify measures to avoid, minimize or mitigate adverse effects from the
use/storage of chemicals/hazardous materials including source reduction and recycling. Include
development of a spill prevention plan.
Products, materials, or wastes typical of construction sites will be present during the construction
of this project (e.g. gasoline, diesel fuel, oil, hydraulic fluid, portable toilets, etc.). In compliance
with NPDES Construction Stormwater permit, products that have the potential to leach pollutants
will be stored under cover; hazardous materials will be stored in sealed containers and will have
secondary contaminant to prevent spills, solid wastes will be collected and disposed of properly,
and vehicle and equipment washing will not be allowed on site.
d. Project related generation/storage of hazardous wastes - Describe hazardous wastes
generated/stored during construction and/or operation of the project. Indicate method of
disposal. Discuss potential environmental effects from hazardous waste handling, storage, and
disposal. Identify measures to avoid, minimize or mitigate adverse effects from the
generation/storage of hazardous waste including source reduction and recycling.
The proposed project is not expected to generate any hazardous wastes during construction or
operation. If hazardous wastes are generated by contractor, it will be the responsibility of the
contractor to recycle and/or dispose of the waste in accordance with State and Federal
regulations.
page 15
13. Fish, wildlife, plant communities, and sensitive ecological resources (rare features):
a. Describe fish and wildlife resources as well as habitats and vegetation on or in near the site.
Habitat within the site is very limited. The parcel contains a wetland surrounded by a few large trees
which may provide minimal foraging and resting habitat for migratory birds, such as ducks and geese.
Another pond is located 200 feet to the north and may provide similar habitat. Fish species within the
pond are unknown and likely absent, as the pond freezes through each winter. Large trees surrounding
the wetland may provide nesting or roosting habitat to medium to small birds and bats.
Approximately 75 – 100 trees will be cleared with the construction of this project. Parcels 251180010
and 258010500 each contain a single-family residence. The yards of the homes may provide some
habitat for small mammals, birds, and insects. These parcels contain shoreline of Upper Prior Lake
which provides habitat for birds, fish, reptiles and amphibians, small invertebrates (such as
crustaceans and insects), as well as a water source for animals such as deer or raccoons, and a
possible food source for birds and small mammals.
b. Describe rare features such as state-listed (endangered, threatened or special concern) species,
native plant communities, Minnesota County Biological Survey Sites of Biodiversity Significance, and
other sensitive ecological resources on or within close proximity to the site. Provide the license
agreement number (LA-____) and/or correspondence number (ERDB 20210057) from which the data
were obtained and attach the Natural Heritage letter from the DNR. Indicate if any additional
habitat or species survey work has been conducted within the site and describe the results.
A query of the DNR Natural Heritage Information System (NHIS) database identified one species of
concern (red shouldered hawk, Buteo lineatus), and one threatened species (Blanding’s turtle,
Emydoidea blandingii) within one mile of the project site. Correspondence from the DNR is available
in Appendix B and summarized below.
Red shouldered hawk
Red shouldered hawks typically nest in broadleaved forests, often in trees located near a pond,
stream, or swamp. Nests can be found in suburban neighborhoods and parks. A majority of the trees
surrounding the wetland on the project site are medium sized ash trees that may provide nesting
habitat. If these trees are to be removed between April and July they should be surveyed for active
nests. If active nests are present, the developer should contact the DNR. General construction
disturbance should also be avoided near active nests between April and May.
Blanding’s turtle
The project also has the potential to impact Blanding’s turtles through habitat disturbance such as
dewatering, fill, or construction activities. Efforts to minimize impacts to the turtle should be
implemented during construction such as:
• avoiding wetland impacts between October 15 and April 15
• use of only natural erosion control netting
• providing the DNR’s Blanding’s turtle fact sheet to contractors working on the site
• monitoring for turtles during construction and reporting of any sightings to the DNR.
page 16
Federal species were also identified within Scott County via the USFWS online IPaC application. The
northern long-eared bat (Myotis septenrionalis) is a federally threatened species located in Scott
County, MN. According to the DNR, no known hibernacula or maternity roost trees are located
within the project township. No impacts to northern long-eared bat are expected.
Bald eagles (Haliaeetus leucocephalus), Black Terns (Chlidonias niger), Dunlins (Calidris alphina
arcticola), Lesser Yellowlegs (Tringa flavipes), Semipalmated Sandpipers (Calidris pusilla), Short-
billed Dowitchers (Limnodromus griseus), and Wood Thrushes (Hylocichla mustelina) are migratory
birds found within the Scott County. The Black Tern, Dunlin, Lesser Yellowlegs, Semipalmated
Sandpiper, Short-billed Dowitcher, and Wood Thrush are on the US Fish and Wildlife Service’s Birds
of Conservation Concern (BCC) list and the Bald Eagle is protected by the Eagle Act. While the
project may cause some temporary disturbance, it is not expected to impact these species or their
habitats.
c. Discuss how the identified fish, wildlife, plant communities, rare features and ecosystems may be
affected by the project. Include a discussion on introduction and spread of invasive species from the
project construction and operation. Separately discuss effects to known threatened and endangered
species.
Development of residential housing on the existing residential land will not likely affect wildlife that
are currently present in the area. Filling in the wetland has the potential to temporarily displace
species which use the wetland for habitat and food sources. There are other similar wetlands nearby,
as well as Upper Prior Lake, to help with any displacement caused from this project. This project will
remove 1.01 acres of wetland from the site. No ecologically sensitive habitats are located within or
adjacent to the project area, and therefore will not likely be impacted by this project.
Noted rare species include the red shouldered hawk and blanding’s turtle. Measures to minimize
disturbance to these species are summarized in Item 13b.
d. Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to fish,
wildlife, plant communities, and sensitive ecological resources.
Mitigation for plant communities (wetland) will occur through the WCA program using the 2:1
ratio mitigation. For fish and wildlife resources using/in the ponded area will likely migrate to the
next nearest wetland area or Upper Prior Lake itself. The project will also construct stormwater
management BMPs just east of the existing wetland. Though they will not be used as direct
mitigation for the wetland losses, the design of the BMPs will be such that they will provide
habitat for area wildlife. The area surrounding the BMPs will be vegetated with native species.
Measures to minimize disturbance to the red shouldered hawk and blanding’s turtle are
summarized in Item 13b.
14. Historic properties:
Describe any historic structures, archeological sites, and/or traditional cultural properties on or in
close proximity to the site. Include: 1) historic designations, 2) known artifact areas, and 3)
architectural features. Attach letter received from the State Historic Preservation Office (SHPO).
Discuss any anticipated effects to historic properties during project construction and operation.
page 17
Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to historic
properties.
The State Historic Preservation Office (SHPO) database query indicated no archaeological records
within the project area (Appendix B). One historic property was listed approximately one-half mile
north along Rutgers Street, but this property will not be affected by the project. If unknown historical
or archaeological resources are encountered during project construction the City and SHPO will be
informed and consulted.
15. Visual:
Describe any scenic views or vistas on or near the project site. Describe any project related visual
effects such as vapor plumes or glare from intense lights. Discuss the potential visual effects from the
project. Identify any measures to avoid, minimize, or mitigate visual effects.
No scenic vistas are present at this site. The proposed home will be constructed across two existing
parcels which currently contain homes.
16. Air:
a. Stationary source emissions - Describe the type, sources, quantities and compositions of any
emissions from stationary sources such as boilers or exhaust stacks. Include any hazardous air
pollutants, criteria pollutants, and any greenhouse gases. Discuss effects to air quality including
any sensitive receptors, human health or applicable regulatory criteria. Include a discussion of
any methods used assess the project’s effect on air quality and the results of that assessment.
Identify pollution control equipment and other measures that will be taken to avoid, minimize, or
mitigate adverse effects from stationary source emissions.
No stationary sources of emission such as boilers or stacks are planned with this project.
b. Vehicle emissions - Describe the effect of the project’s traffic generation on air emissions.
Discuss the project’s vehicle-related emissions effect on air quality. Identify measures (e.g. traffic
operational improvements, diesel idling minimization plan) that will be taken to minimize or
mitigate vehicle-related emissions.
The project consists of a single-family residence and will not impact traffic in the area. The
project will not change the number of vehicles in the area since homes and vehicle-users already
occupy the area. The project will not impact air quality as a result of vehicle-related emissions.
c. Dust and odors - Describe sources, characteristics, duration, quantities, and intensity of dust and
odors generated during project construction and operation. (Fugitive dust may be discussed
under item 16a). Discuss the effect of dust and odors in the vicinity of the project including
nearby sensitive receptors and quality of life. Identify measures that will be taken to minimize or
mitigate the effects of dust and odors.
During construction, particulate emissions will temporarily increase due to generation of fugitive
dust. The nearest and most sensitive receptors to the construction activity are the residential
properties that immediately surround the project area. Construction dust control is required to be
in conformance with the NPDES Construction Stormwater permit that will be required for this
project.
page 18
The construction of the proposed project is not anticipated to involve processes that would
generate odors.
17. Noise
Describe sources, characteristics, duration, quantities, and intensity of noise generated during
project construction and operation. Discuss the effect of noise in the vicinity of the project including
1) existing noise levels/sources in the area, 2) nearby sensitive receptors, 3) conformance to state
noise standards, and 4) quality of life. Identify measures that will be taken to minimize or mitigate the
effects of noise.
The proposed location is located within a suburban area and is surrounded by low- and medium-
density residential areas as well as some commercial and open/park spaces. Existing noise sources are
those typical of suburban residential areas and consist mainly of traffic on the area roadways, which
includes State Highway 13 to the east and surrounding residential streets.
Construction noise levels and types will be typical of construction equipment and will occur as a
result of this project. Construction noise will be limited to daytime hours consistent with the City of
Prior Lake construction and noise ordinances. Construction equipment will be fitted with mufflers
that will be maintained throughout the construction process. The table below, Table 2, summarizes
the peak noise levels of common types of roadway construction equipment.
Table 2: Typical Roadway Construction Equipment Noise Levels at 50 Feet
Equipment Type Manufacturers
Sampled
Total Number of
Models in Sample
Peak Noise Level
Range Average
Backhoe 5 6 74-92 83
Front Loader 5 30 75-96 85
Dozer 8 41 65-95 85
Grader 3 15 72-92 84
Scraper 2 27 76-98 87
Pile Driver N/A N/A 95-105 101
Source: United States Environmental Protection Agency and Federal Highway Administration
There are no sensitive receptors (such as hospitals) near the site which raise special concerns for
further study. The project is not anticipated to generate noise other than that typical of residential
areas once construction is complete
18. Transportation
a. Describe traffic-related aspects of project construction and operation. Include: 1) existing and
proposed additional parking spaces, 2) estimated total average daily traffic generated, 3)
estimated maximum peak hour traffic generated and time of occurrence, 4) indicate source of trip
generation rates used in the estimates, and 5) availability of transit and/or other alternative
transportation modes.
The site is currently developed and located northwest of State Highway 13 in a residential
neighborhood. There is no transit service in the immediate area. There are no existing trails or
dedicated bike lanes in the area. The project will vacate a portion of Cove Avenue SE in front of
existing PID 251180010 and PID 251180020.
page 19
A traffic study has not been completed for this project and it is not expected to affect the level or
timing of traffic in the area.
b. Discuss the effect on traffic congestion on affected roads and describe any traffic improvements
necessary. The analysis must discuss the project’s impact on the regional transportation system.
If the peak hour traffic generated exceeds 250 vehicles or the total daily trips exceeds 2,500, a
traffic impact study must be prepared as part of the EAW. Use the format and procedures
described in the Minnesota Department of Transportation’s Access Management Manual,
Chapter 5 (available at: http://www.dot.state.mn.us/accessmanagement/resources.html) or a
similar local guidance,
A traffic study has not been completed for this project. The project is a single-family residence.
The existing Project Area contains two occupied homes. Following construction only one
occupied home will exist. The number of vehicles associated with the Project will be reduced by
one occupied home.
c. Identify measures that will be taken to minimize or mitigate project related transportation effects.
No new traffic will come from the project.
19. Cumulative potential effects: (Preparers can leave this item blank if cumulative potential effects are
addressed under the applicable EAW Items)
a. Describe the geographic scales and timeframes of the project related environmental effects that
could combine with other environmental effects resulting in cumulative potential effects.
The effects of this project are not anticipated to combine with other environmental effects.
b. Describe any reasonably foreseeable future projects (for which a basis of expectation has been
laid) that may interact with environmental effects of the proposed project within the geographic
scales and timeframes identified above.
The City’s Capital Improvement Program has not identified any future projects that would
interact with the proposed project at this time.
c. Discuss the nature of the cumulative potential effects and summarize any other available
information relevant to determining whether there is potential for significant environmental
effects due to these cumulative effects.
Areas of environmental effect for this project include:
• Conversion of wetland habitat to upland.
o This conversion will temporarily impact wildlife habitat in the area. This habitat
will be replaced at the proposed stormwater pond.
o Wetland losses will be reviewed by the applicable regulatory agencies and
mitigated at a 2:1 ratio.
• Stormwater quality and treatment volumes will improve in the area once runoff is
managed and directed to the new stormwater management BMPs, which will be designed
to manage the volume and will reduce flooding in the area.
page 20
Environmental effects from this project are not expected to combine with those of other projects.
20. Other potential environmental effects: If the project may cause any additional environmental
effects not addressed by items 1 to 19, describe the effects here, discuss the how the environment will
be affected, and identify measures that will be taken to minimize and mitigate these effects.
This project will not cause additional environmental effects that were not addressed previously in this
document.
page 21
RGU CERTIFICATION. (The Environmental Quality Board will only accept SIGNED Environmental
Assessment Worksheets for public notice in the EQB Monitor.)
I hereby certify that:
• The information contained in this document is accurate and complete to the best of my
knowledge.
• The EAW describes the complete project; there are no other projects, stages or components other
than those described in this document, which are related to the project as connected actions or
phased actions, as defined at Minnesota Rules, parts 4410.0200, subparts 9c and 60, respectively.
• Copies of this EAW are being sent to the entire EQB distribution list.
Signature ________________________________ Date _______________________________
Title ________________________________
APPENDIX A
Figures
APPENDIX B
Agency Coordination
COUNTY CITYTWP PROPNAME ADDRESS TOWNSHIPRANGESECTIONQUARTERSUSGS REPORTNUMNRHPCEFDOEINVENTNUM
Scott
Prior Lake
house 14329 Rutgers St.115 21 30 SW-NW-NE Prior Lake SC-PLC-014