HomeMy WebLinkAbout05(D) - Approve Consultant Pool Work Order – Ponds and Memorial Park Improvements ReportPage 1 of 2 Public Works Consultant Pool Work Order Design and Construction Administration – Ponds & Memorial Park Improvements HKGi This work order (“Work Order”) is issued on this 16th day of February, 2021 by the City of Prior Lake (“City”) pursuant to the Public Works Consultant Pool – Master Agreement dated April 20, 2020 (“Contract”) between the City and HKGi (“Consultant”). Based on the mutual promises and covenants set forth herein, the sufficiency of which are hereby acknowledged, the City and Consultant agree as follows: 1. Scope of Work Order. Consultant agrees to provide, perform and complete all the services requested by the City in this Work Order and attached Exhibit 1 (“Work”), which Work shall be subject to the terms and conditions of this Work Order and the Contract. 2. Term of Work Order. All Work requested by this Work Order shall be completed by August 31, 2021. 3. Compensation for Work Order. City agrees to pay the Consultant a fixed sum of $58,600 as full and complete payment for the Work requested by this Work Order. 4. Consultant Representative. Consultant has designated Paul Paige, RLA to manage the Work Order subject to the supervision of Consultant’s representative. ISSUED BY CITY OF PRIOR LAKE ________________________________ City Manager RECEIVED AND ACCEPTED BY CONSULTANT By: Its: Page 2 of 2 Exhibit 1 – Scope of Work Order PLEASE SEE ATTACHMENT 2021 Ponds Park and Memorial Field Improvements 1 Creating Places that Enrich People’s Lives February 3, 2021  Andy Brotzler, PE  Public Works Director/City Engineer  City of Prior Lake  17073 Adelmann Street SE  Prior Lake, MN 55372  RE:  2021 Ponds and Memorial Field Improvement Projects   Dear Andy,  HKGi is pleased to submit the following design services proposal to support the City in the  continued development and revitalization of the Prior Lake park system. For the 2021 CIP park  improvement projects at Ponds Park and Memorial Ballfield, HKGi proposes to lead a design  process from preliminary design and construction document preparation to bidding and  recommending a qualified bidder to administering the construction process.  This approach will  ensure that the design decisions made through the process are carried into the details of the  construction.  Our team includes a qualified testing contractor for materials testing during  construction and a .    Project scope(s):  Ponds Park Athletic Complex ‐ The Ponds Park improvements will include a design process that  evaluates the current condition of the fencing, dugouts, and spectator areas at the center of  the (4) wheel fields within the athletic complex and will include the review of the connecting  trails from the core project area to adjacent parking areas.  Primary considerations will include  the review of accessibility and the fencing and backstop effectiveness of how well the current  design is working to contain foul balls.  Recommendations will be developed based on the  analysis findings, staff input, stakeholder input, and the related available funding.  Concepts  will be developed that integrate the input from staff and stakeholders.    Memorial Field Netting/Fencing – The project includes the review of the existing fencing  condition in the outfield at Memorial Field.  Recommendations will be developed to enhance  ball containment within the ballfield.  Options to be explored include supplemental netting  systems , higher fencing, or the combination of both.  Care will also be taken to understand the  potential impacts of the recommendations on the playability of the field including home run  distances, batters eye, and scoreboard protection.  Exhibit 1 2021 Ponds Park and Memorial Field Improvements 2     For both projects, preliminary and final cost estimates will be developed to verify the design  costs align with previous conceptual estimates and available funding.  We propose to  accomplish the projects with the following three phases with related tasks:    I. Preliminary Design Phase (Feb – Mar 2021)  Based on input and the related agreed upon refinements to the recently completed  Concept Design, the HKGi Team will further refine the design for the proposed features.  Final Design tasks will include developing a detailed site plan with enlarged plans to identify  locations, materials, and construction systems of proposed elements, related construction  details, materials selections, grading and drainage concepts, and planting concepts  necessary to implement the approved design. The following tasks will be completed during  the Preliminary Design phase of the work:    1. Conduct initial Stakeholder input user groups of each park ((2) virtual meetings)  2. Develop (2) conceptual alternatives for each of the project areas within the parks.   Alternatives will include a range of design options for fencing, netting, backstops, trail  alignments, and potentially the review of alternative field sizes and locations of home  plate for (1) or more of the existing fields.  3. Review alternatives with City staff (virtual meeting)  4. Updated with staff input to a preferred recommendation for each park.  5. Develop preliminary cost analysis of the preferred recommendation for each park.  6. Review with City staff (if required) and stakeholder group representatives (virtual  meeting).    II. Final Design Phase (April ‐ May 2021)  Based on input and the related agreed upon refinements to the recently completed  Concept Design, the HKGi Team will further refine the design for the proposed features. For  Ponds Park, the Final Design tasks will include developing a detailed site plan, materials,  and construction systems of proposed elements, related construction details, materials  selections, and restoration specifications necessary to implement the approved design. The  following tasks will be completed during the Final Design phase of the work:    7. Prepare general and technical specifications  8. Update preliminary cost estimate  9. Develop a draft construction document set to include the following:  i. Summary of Quantities Worksheet and Bid Form  ii. Site Materials Plan  iii. Grading and Erosion Control Plan  iv. Site Restoration Plan  v. Site Details  vi. Construction Details  vii. Technical specifications  viii. Final cost estimate  a. Review the draft  construction document progress set and updated cost  2021 Ponds Park and Memorial Field Improvements 3   estimates with staff (virtual meeting)  b. Update construction documents based on comments received.  c. Prepare final bid documents, including plans, specifications, summary of  quantities, and final cost estimate.    III. Bidding Support and Construction Administration Phase (May 2021 – Aug 2021)  Note: The Memorial Field improvements are assumed to utilize a quoting process that  will only require the solicitation of quotes from qualified installers.  HKGi will still  oversee the review of shop drawings and the administration of the project with the  selected installer.    For the Ponds Park project, the HKGi team will lead the bidding and construction  administration needs associated with the project including the following tasks:  1. Coordinate the publishing of the ad for bid and post bid documents online via  Quest CDN.  2. Respond to bidders’ questions and issue addendum if required.  3. Attend bid opening, develop the tabulation of bids, and the recommendation of a  qualified bidder.  4. Coordinate the agreements and notice to proceed with selected Contractor  5. Provide construction observation at key project intervals (3 trips assumed)  6. Review and approve submittals, shop drawings, mockups related to project design  elements.  7. Coordinate required site materials testing.  8. Prepare any necessary RFI and change orders.  9. Review pay requests and recommend payment amounts to the City.  10. Prepare preliminary punch list.  11. Prepare final punch list and facilitate the development of project closeout documents.    Project Assumptions:  1. Project budgets identified in the 2021 CIP are approximately  $400,000 for Ponds Park and $90,000 for Memorial Field.  2. Civil, Survey, Structural, Electrical and Mechanical engineering will  not be required as part of the design of the project elements, and  if deemed necessary will be considered an additional service.  3. The Ponds Park project will be bid once as one package.  Additional  bidding will be coordinated if deemed necessary on an hourly basis.  4. The Memorial Park project is anticipated to use a quoting process  with selected qualified vendors and will not need to be formally  advertised and bid.  5. Site survey and Irrigation design tasks are not assumed to be  included. Existing available base map information will be utilized for  the design.  6. Soil borings and/or soil corrections related design and engineering  are not included in the described scope of work.  If deemed  necessary, the tasks and related time will be reviewed and pre‐ approved by staff prior to work.  2021 Ponds Park and Memorial Field Improvements 4   7. No stormwater impacts and no watershed permit required.  8. Additional meetings or engagement (Public meetings, public  outreach, additional staff design meetings) will be pre‐ approved by  staff and tracked and billed hourly in addition to the proposed base  fee – if required.  PROFESSIONAL FEES  Professional fees related to the above defined scope of work include all expenses and will be  billed hourly commensurate with the work completed to date. Fee breakdown per phase of  work is as follows:    Phase of Work  Preliminary Design and Stakeholder Input     $11,500  Final Design and Construction Documents     $25,300  Bidding Support and Construction Administration         $11,100  Design Contingency (for soil borings or other design tasks if needed)     $7,500    Materials Testing           $3,200  Total Proposed Base Professional Fee      $58,600*      *inclusive of expenses related to mileage and printing    We look forward to the opportunity of continuing to help the City of Prior Lake with such   important community projects. Please call or email if you have any additional questions or  need additional information. I can be reached at paul@hkgi.com or 612.940.5285.    Sincerely,      Paul Paige, RLA   President    HKGi