HomeMy WebLinkAbout8C - Public Hearing (MS4) & (SWPPP)
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
CITY COUNCIL AGENDA REPORT
MEETING DATE:
AGENDA #:
PREPARED BY:
JUNE 26, 2006
8C
ROSS BINTNER, WATER RESOURCES ENGINEER
AGENDA ITEM:
PUBLIC HEARING TO RECEIVE COMMENTS ON THE CITY OF
PRIOR LAKE 2005 SMALL MUNICIPAL SEPARATE STORM SEWER
SYSTEM (MS4) STORM WATER POLLUTION PREVENTION
PROGRAM.
DISCUSSION:
Introduction
The purpose of the agenda report is to consider input from the public on the
Storm Water Pollution Prevention Program (SWPPP) and review changes
made to the document.
Historv
The City of Prior Lake is regulated under the NPDES Phase II Small Municipal
Separate Storm Sewer Systems (MS4) permit. This permit is granted under
the Federal Clean Water Act and State Statute. This permit requires the City to
implement a Storm Water Pollution Prevention Program (SWPPP) and hold an
annual public meeting to discuss and take public comment on the SWPPP.
The SWPPP requires the City to implement several Best Management
Practices (BMP) on an annual basis. These BMP's include:
1. Public Education and Outreach
2. Public Participation and Involvement
3. Illicit Discharge Detection and Elimination
4. Construction Site Storm Water Runoff Control Measures
5. Post Construction Storm Water Management Measures
6. Pollution Prevention and Good Housekeeping Measures
The SWPPP was created to serve the 5 year permit cycle from 2003 to 2008;
however, due to a statewide legal challenge, the MPCA was forced to revise
the permit midway though the permit cycle, and issue a new permit.
The revised permit required modification to the current, or creation of a new
SWPPP. The new SWPPP is intended to serve from 2006-2011.
A summary of the 2003-2005 SWPPP and BMP's has been prepared, as well
as a copy of the 2006-2011 SWPPP.
Current Circumstances
By June 30, 2006 the City must hold a public meeting to review the
effectiveness of the above BMP's during 2005. At this meeting the changes
made to the SWPPP will be discussed as well.
www.cityofpriorlake.com
R:\Agenda Reports\June 26 2006\MSf>lWfl~a9~2~4-r.~~~Cfax 952.447.4245
The attached draft report details the prior and current version of the City of
Prior Lake SWPPP and BMP's. City Staff will review any public comments
received at the June 26 City Council Meeting, and assess the need for
changes to the new SWPPP during the next year.
Conclusion
The Council should open the public hearing, receive public input and then
close the public hearing. Council should direct staff to consider modifications,
or additions to the new SWPPP or BMP's if appropriate or warranted.
ISSUES:
None.
FINANCIAL
IMPACT:
The costs associated with this work are paid for by the City. This combination
of Federal and State regulation is considered an unfunded mandate.
ALTERNATIVES:
1. Approve a resolution directing staff to consider public comment, if any,
propose modifications or additions as appropriate, and submit an annual
report to the MPCA.
2. Deny this item for a specific reason and provide staff with direction.
3. Table this item until some date in the future.
RECOMMENDED
MOTION:
Alternative #1.
Frank Boyles,
fl---
Steve Albrecht, Public Works Director/City Eng.
R:\Agenda Reports\June 26 2006\MS4 Annual Report Agenda.doc
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
RESOLUTION 06-xx
A RESOLUTION DIRECTING STAFF TO CONSIDER PUBLIC COMMENT, AND
PROPOSE MODIFICATIONS OR ADDITIONS AS APPROPRIATE.
Motion By:
Second By:
WHEREAS, the City of Prior Lake is a regulated small MS4 that developed a Storm Water
Pollution Prevention Program (SWPPP) and obtained this permit on March 10, 2003;
and
WHEREAS, the City of Prior Lake will prepare a 2005 MS4 Annual Report for compliance with
NPDES Phase II permit regulations; and
WHEREAS, 30 days prior to the public meeting notice was published; and
WHEREAS, the City of Prior Lake City held a public meeting on June 26, 2006 to receive public
comment.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. City staff is directed to prepare and submit an Annual Report and supporting documents to the
MPCA.
PASSED AND ADOPTED THIS 26th DAY OF JUNE 2006.
YES
NO
Haugen Haugen
Dornbush Dornbush
Erickson Erickson
LeMair LeMair
Millar Millar
Frank Boyles, City Manager
www.cityofpriorlake.com
Reports\June 26 2006\MS1>R5A~It9!92;~Qf7.4230 / Fax 952.447.4245
BMPs
BROCHURES, HANDOUTS AND NEWSLETTERS 1.1
Minimum Control Measures Addressed by This BMP
,---
X Public education and outreach ~ Construction site runoff controls
X Public participation and involvement X Post-construction stormwater management
-
X Illicit discharge detection and elimination X Pollution prevention/ good housekeeping
BMP Description:
The City will produce and distribute articles and information on the City's Storm Water Pollution
Prevention Plan including information on the annual public hearing, illicit discharges, erosion control,
shoreline management, composting and pollution prevention and other applicable best management
practices. This publication will be distributed through City mailings and newsletters.
Education Goal: Timeline I Implementation Schedule:
This program is designed to develop an This activity will begin in 2003 and continue
understanding of the SWPPP among residents. annually through 2008.
Measurable Goals: Audience:
Document the number of publications and This activity will be directed to City residents,
households served by each publication. property owners, and business owners.
Responsible Person:
Name: Sue McDermott
Title: City Engineer
Phone: 952-447-4230
E-mail: smcdermott@cityofpriorlake.com
Recorded Activities Completed:
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
SWPPP STAFF TRAINING 1.2
Minimum Control Measures Addressed by This BMP
x
Public education and outreach
Public participation and involvement
Illicit discharge detection and elimination
BMP Description:
The City will provide training opportunities for City Staff in erosion control, best management practices,
good housekeeping, and pollution prevention. These may include but are not limited to: MnOOT erosion
control certification, SWPPP workshops, and BMP workshops.
Education Goal: Timeline / Implementation Schedule:
The goal of this action is to introduce ideas and This activity will begin in 2003 and continue
develop an understanding of the SWPPP among annually through 2008.
City staff.
x
X
X
Construction site runoff controls
Post-construction stormwater management
Pollution prevention/ good housekeeping
Measurable Goals:
The City will provide a minimum of one training
opportunity and document the number of training
sessions and the number of participants in
attendance.
Audience:
City Staff involved in public works projects,
construction projects, construction inspection,
and maintenance.
Responsible Person:
Name: Sue McDermott
Title: City Engineer
Phone: 952-447-4230
E-mail: smcdermott@cioriorlake.com
Recorded Activities Completed:
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
Swppp WEB PAGE 1.3
Minimum Control Measures Addressed by This BMP
X Public education and outreach
X Public participation and involvement
X Illicit discharge detection and elimination
BMP Description:
The City will incorporate public information on SWPPP issues into a separate page on the City's website.
This would specifically describe the SWPPP, each minimum control measure, the goals and actions
planned by the City, provide links to BMPs, articles on each control measure and collect feedback from
site visitors.
X
X
X
Construction site runoff controls
Post-construction stormwater management
Pollution prevention/ good housekeeping
Education Goal:
The City will provide information on stormwater
pollution prevention, best management practices, the
City SWPPP, and outside entity resources available
to City residents.
Timeline / Implementation Schedule:
This activity will begin in 2004 and continue
annually until 2008.
Measurable Goals:
The City will develop a separate SWPPP web page
and document the number of publications produced
and the number of hits to the web site.
Audience:
All City residents, property owners, and
business owners.
Responsible Person:
Name: Sue McDermott
Title: City Engineer
Phone: 952-447-4230
E-mail: smcdermott@ciofriorlake.com
Recorded Activities Completed:
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
ANNUAL PUBLIC MEETING 2.1
Minimum Control Measures Addressed by This BMP
X Public education and outreach
X Public participation and involvement
Illicit discharge detection and elimination
BMP Description:
The City will conduct a public meeting on the City's Stormwater Pollution Prevention Program; solicit
public opinion on the plan, and consider written and oral input into the SWPPP.
Construction site runoff controls
Post-construction stormwater management
Pollution prevention/ good housekeeping
Measurable Goals:
Hold the public meeting, record attendance, keep
minutes, record statements and written comments
and document changes made to the SWPPP.
Timeline / Implementation Schedule:
This activity will be completed annually
beginning in 2004 and continue through the life of
this permit, 2008.
Responsible Person:
Name: Sue McDermott
Title: City Engineer
Phone: 952-447-4230
E-mail: smcdermott@ciofriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
ILLICIT DISCHARGE ORDINANCE 3.1
Minimum Control Measures Addressed by This BMP
Public education and outreach
Public participation and involvement
X lllicit discharge detection and elimination
BMP Description:
The City will develop an ordinance, which will address the issue of non-stormwater discharges in the
City's storm sewer system. Elements of this ordinance will include but are not limited to defining
allowable discharges, setting policy as it pertains to violations and penalties and mitigation requirements.
Construction site runoff controls
Post-construction stormwater management
Pollution prevention/ good housekeeping
Measurable Goals:
The City will review existing ordinances and, if
necessary, prepare and adopt a stormwater system
illicit discharge ordinance.
Timeline / Implementation Schedule:
Draft ordinance 2005
Public comment period 2006
City council review 2006
Adopt ordinance 2006
Responsible Person:
Name: Sue McDermott
Title: City Engineer
Phone: 952-447-4230
E-mail: smcdermott@ciofriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
RECYCLING PROGRAM 3.2
Minimum Control Measures Addressed by This BMP
r-- Public education and outreach - Construction site runoff controls
X
I--- Public participation and involvement ~
Post-construction stormwater management
- -
X Illicit discharge detection and elimination Pollution prevention/ good housekeeping
BMP Description:
The City or its designee will discourage illegal dumping by educating the public on alternative uses for
unwanted materials and providing drop-off sites for household hazardous waste. This BMP includes
providing information on recycling options, services, and programs within the City.
Measurable Goals: Timeline / Implementation Schedule:
The City will distribute recycling program literature This activity will be conducted and evaluated
to residents a minimum of one time annually. annually from 2004 -2008.
Responsible Person:
Name: Mackenzie McCormick
Title: Public Works Coordinator
Phone: 952-447-4230
E-mail : mmccormick@cityofpriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
STORM SEWER MAP 3.3
Minimum Control Measures Addressed by This BMP
Public education and outreach
Public participation and involvement
X Illicit discharge detection and elimination
BMP Description:
The City currently has a map identifying all ponds, lakes, streams, storm sewer pipes and conveyances as
well as outfalls and discharge points leaving the City. As part of the SWPPP the City will annually
update this map to include changes to the storm sewer system throughout the City including but not
limited to, new development, street improvements, water quality projects, wetland mitigation projects
and any changes to the storage or conveyance of stormwater within the City.
Construction site runoff controls
Post-construction stormwater management
Pollution prevention/ good housekeeping
Measurable Goals:
The City will map all storm sewer pipe owned by the
City and annually document changes in the storm
sewer system.
Timeline / Implementation Schedule:
The City will conduct annual reviews of this
activity (2003-2008).
Responsible Person:
Name: Sue McDermott
Title: City Engineer
Phone: 952-447-4230
E-mail: smcdermott@ciofriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
EROSION CONTROL ORDINANCE 4.1
Minimum Control Measures Addressed by This BMP
Public education and outreach
x
Construction site runoff controls
Public participation and involvement
Illicit discharge detection and elimination
BMP Description:
The City will review their current permit review processes and include managing site erosion and
sediment control as part of the conditions of the permit. Staff will review current ordinances and City
codes and update as necessary.
Post-construction stormwater management
Pollution prevention/ good housekeeping
Measurable Goals:
The City will review and update as necessary the
City's Erosion Control Ordinance.
Timeline / Implementation Schedule:
The City will review the current permit in 2004,
and add additional requirements in 2005.
The enforcement of new permit requirements
will be' in 2005 and last until 2008.
Responsible Person:
Name: Sue McDermott
Title: City Engineer
Phone: 952-447-4230
E-mail: smcdermott@ciofriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
STAFF TRAINING 4.2
Minimum Control Measures Addressed by This BMP
~
X Public education and outreach X Construction site runoff controls
i---
Public participation and involvement - Post-construction stormwater management
Illicit discharge detection and elimination X Pollution prevention/ good housekeeping
BMP Description:
The City will provide training to its staff on how to prevent soil erosion on a construction site, proper
erosion control, and review the components of the stormwater pollution prevention plan (SWPPP)
annually with the staff.
Measurable Goals: Timeline I Implementation Schedule:
The City will hold a minimum of one training session a The City will begin documentation in 2004
year and document the number of employees with and continuing annually through 2008.
Mn/DOT certification, the number of workshops/
training sessions held, and keep attendance at each
workshop / training session.
Responsible Person:
Name: Sue McDermott
Title: City Engineer
Phone: 952-447-4230
E-mail: smcdermott@citvofpriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
SURFACE WATER MANAGEMENT PLAN 5.1
Minimum Control Measures Addressed by This BMP
,--- Public education and outreach Construction site runoff controls
I--
Public participation and involvement X Post-construction stormwater management
I-- Illicit discharge detection and elimination Pollution prevention/ good housekeeping
BMP Description:
The City currently has a Comprehensive Surface Water Management Plan. As part of this permit, the
City will review the policies, requirements and Best Management Practices included within this
document annually and will make amendments as necessary, as well as implement the plan.
Measurable Goals: Timeline / Implementation Schedule:
The City will implement the City's Surface Water The City will review its program annually
Management Plan and update the plan annually if beginning in 2003.
necessary .
Responsible Person:
Name: Sue McDermott
Title: City Engineer
Phone: 952-447-4230
E-mail: smcdermott@cityofpriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
DEVELOPMENT REVIEW 5.2
Minimum Control Measures Addressed by This BMP
Public education and outreach
Construction site runoff controls
Public participation and involvement
Illicit discharge detection and elimination
BMP Description:
The City will continue to use existing development review policies currently in place to minimize the
negative impacts storm water runoff may have on water quality within the City. Utilizing these existing
policies, all development proposals must address water quality, water quantity, erosion control and site
grading, utilizing BMP's for each of these activities.
Measurable Goals:
The City will review new development plans for
conformance with BMP's outlined in the SWPPP and
document the number of development plans
reviewed annually.
x
Post-construction stormwater management
Pollution prevention/ good housekeeping
Timeline / Implementation Schedule:
The City will follow this activity annually 2003
through 2008.
Responsible Person:
Name: Sue McDermott
Title: City Engineer
Phone: 952-447-4230
E-mail: smcdermott@cioriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
STORM SEWER INSPECTION PROGRAM 6.1
Minimum Control Measures Addressed by This BMP
Public education and outreach
Construction site runoff controls
Public participation and involvement
X Illicit discharge detection and elimination
BMP Description:
In the year 2000, Prior Lake conducted an inspection of all outfalls, sediment basins and ponds within
the city's storm sewer system. The results of these inspections were compiled in a report, which noted
recommended maintenance schedules. As part of this BMP, the City will follow the recommendations
of this study and continue to monitor these outfalls.
X
Post-construction stormwater management
Pollution prevention/ good housekeeping
Measurable Goals:
The City will record the number of outfalls
inspected, and rate the condition of outfalls and
ponds. The inspection of all storm sewers will be
complete over the 5-year permit period.
Responsible Person:
Name: Sue McDermott
Title: City Engineer
Phone: 952-447-4230
E-mail: smcdermott@ciofriorlake.com
Timeline / Implementation Schedule:
The City will begin this action in the year 2004
and continue until all inspections are complete
prior to the 2008 permit expiration.
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
EQUIPMENT AND HAZARDOUS MATERIAL STORAGE 6.2
Minimum Control Measures Addressed by This BMP
Public education and outreach
Public participation and involvement
X Illicit discharge detection and elimination
BMP Description:
The City will train staff, implement procedures, and incorporate best management practices in handling
of equipment and hazardous materials used by City staff.
Construction site runoff controls
X
Post-construction stormwater management
Pollution prevention/ good housekeeping
Measurable Goals: Timeline / Implementation Schedule:
The City will review activities undertaken by its staff The City will review its activities annually
to prevent illicit discharges from daily activities. beginning in 2004.
Responsible Person:
Name: Bud Osmundson
Title: Public Works Director
Phone: 952-447-4230
E-mail: bosmundson@cioriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
LANDSCAPING AND LAWNCARE PRACTICES 6.3
Minimum Control Measures Addressed by This BMP
Public education and outreach
Public participation and involvement
Illicit discharge detection and elimination
BMP Description:
The City will annually review and, if necessary, adjust its current practices in the use of fertilizer,
pesticide and herbicide application, mowing and discharge operations, grass clipping collection,
mulching and composting.
Measurable Goals:
The City will annually document the results of the
review and the number of staff who receive
training.
Construction site runoff controls
Post-construction stormwater management
Pollution prevention/ good housekeeping
x
Timeline / Implementation Schedule:
This activity will be conducted annually
beginning in 2004.
Responsible Person:
Name: AI Friedges
Title: Parks and Fleet Supervisor
Phone: 952-447-4230
E-mail: afriedes@ciofriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
ROAD SALT APPLICATION 6.4
Minimum Control Measures Addressed by This BMP
Public education and outreach
Public participation and involvement
X Illicit discharge detection and elimination
BMP Description:
The City will annually review and, if necessary, adjust its practices and policies related to road salt
application. This review will include the use of alternative products and the need for calibration of
equipment, inspection of vehicles and staff training.
Construction site runoff controls
Post-construction stormwater management
Pollution prevention/ good housekeeping
X
Measurable Goals:
The City will document the results of the review and
the actions taken.
Timeline / Implementation Schedule:
This activity will be conducted annually 2003-
2008.
Responsible Person:
Name: Craig Eldred
Title: Streets and Utilities Supervisor
Phone: 952-447-4230
E-mail: celdred@ciofriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
STREET SWEEPING PROGRAM 6.5
Minimum Control Measures Addressed by This BMP
Public education and outreach
Public participation and involvement
X Illicit discharge detection and elimination
BMP Description:
The City will sweep streets twice annually in an effort to reduce the amount of sediment and trash
reaching the storm sewer system.
Construction site runoff controls
Post-construction stormwater management
Pollution prevention/ good housekeeping
X
Measurable Goals:
The City will record the annual number of times
streets are swept as well as document any
additional activities that were undertaken
regarding this program.
Responsible Person:
Name: Craig Eldred
Title: Streets and Utilities Supervisor
Phone: 952-447-4230
E-mail: celdred@ciofriorlake.com
Timeline / Implementation Schedule:
This activity will be conducted annually
through the lifetime of the permit (2003-2008).
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
BMPs
NPDES PERMIT FOR INDUSTRIAL ACTIVITY 6.6
Minimum Control Measures Addressed by This BMP
Public education and outreach Construction site runoff controls
Public participation and involvement
Illicit discharge detection and elimination
BMP Description:
The City will evaluate its maintenance facility and apply for a General Storm Water Permit for
Industrial Activities in accordance to the NPDES requirements.
x
Post-construction stormwater management
Pollution prevention/ good housekeeping
Measurable Goals:
The City will submit Industrial Storm Water Permit
Inspection Reports or a No Exposure Exemption as
required by the permit.
Timeline / Implementation Schedule:
The City will submit a permit application by the
required March 2003 deadline. Subsequent
inspections will be conducted as required by the
permit.
Responsible Person:
Name: Bud Osmundson
Title: City Engineer
Phone: 952-447-4230
E-mail: bosmundsoncitoriorlake.com
Recorded Activities Completed
Outlined below is a description of the specific activities that were undertaken by the City over the
past year that document the City has met the measurable goals associated with this BMP.
I hereby certify that the above activities were completed.
Signature of Responsible Official
Title
Date
~NESO~~
City of Prior Lake
MS4 Permit Application
&
Stonn Water Pollution Prevention Program
(SWPPP)
2006-2011
Precipitati on R an kin g
Apr 01-Nov 14,2005
Sil
SilS
es
70
so
30
20
o low est-100 high est
Sute Climltolo gy 0 flce . 11.14-2005
-
~......-:Y~
~
Minnesota
Pollution
Control
Agency
General Stormwater Permit (MN R 040000)
Application for Small Municipal Separate
Storm Sewer Systems (MS4s)
RETURN THIS APPLICATION TO:
Minnesota Pollution Control Agency
520 Lafayette Road North
St. Paul, MN 55155-4194
NO FEE
Application deadline: June 1,2006
PLEASE READ: As you complete this form, read the instructions carefully. Use your keyboard's "Tab" key to move
through the fields of this form. Select check-boxes and enter text as indicated. Save, and print.
I. MS4 Information
A. Application Type
DNew applicant (this MS4 has no previous application for MS4 coverage on file at MPCA)
[Z]Application for re-issuance of coverage (this MS4 applied in 2003)
B. MS4 Owner General Contact (the community, municipality, agency or other party having ownership or
operation control of the MS4)
City of Prior Lake
Community, municipality, agency or other party having ownership or operational control of the MS4
17073 Adelmann Street S.E.
Mailing Address
Prior Lake
MN
55372-1714
City
Scott
County
41-600-5469
State
Zip Code
906-8901
Federal Tax ID
State Tax ID
C. General Contact (official, staff member, consultant or other) for all general correspondence about Permit
compliance issues between the MPCA and your MS4
Bintner Ross Water Resource Engineer
Last Name First Name Title
17073 Adelmann Street S.E
Mailing Address
Prior Lake
City
952-447-9831
MN
55372-1714
State Zip Code
rbintner@cityofpriorlake.com
E-mail Address
Telephone (include area code)
wq-strm4-52
1
3/06
II. Certification of the Storm Water Pollution Prevention Program (SWPPP)
A. Have you developed a Storm Water Pollution Prevention Program for your MS4? [Z]Ves
Municipalities must demonstrate how their Storm Water Pollution Prevention Program will be
implemented and enforced over the term of the five-year Permit. SWPPPs must incorporate appropriate
educational components, all required BMPs and the measurable goals associated with each. Storm Water
Pollution Prevention Programs must address the specific requirements contained in Part V. G. of the
Permit. SWPPPs must outline how the six minimum control measures will be addressed, the contact
person, department in charge, timeline and measures that will be implemented to meet the schedules
required by the Permit. Attach a BMP Summary Sheet to this application for each BMP in your SWPPP.
B. Does your SWPPP address all of the six Minimum Control Measures as outlined in the Permit? [{]Ves
The General Permit requires that you incorporate all six of the defined Minimum Control Measures in
your Stormwater Pollution Prevention Program. You are required to implement mandatory BMPs which
are directly associated to each of the Six Minimum Control Measures.
C. Have you attached the included BMP Summary Sheets, one for each of the Best Management [{)Ves
Practices required by the Permit?
There are 34 required BMPs all of which require that the provided BMP Summary Sheet be filled out
completely and included with your Storm Water Pollution Prevention Program. If any of these required
sheets are missing, your application will not be considered complete and will be returned to you.
A. I have read and understand Part VI Evaluating, Recordkeeping, and Reporting of the MS4 General
Permit and certify that we intend to comply with the applicable requirements of those sections as
well as the Permit as a whole.
B. Where will your SWPPP be available to the public for review?
City offices www.cityofpriorlake.coml
Name of Location
16200 Eagle Creek Avenue SE
Street Address
Prior Lake
City
Ross Bintner
If your SWPPP is available electronically, indicate location
MN
55372-1787
ZIP Code
State
952-447-9831
Contact Name Contact Phone Number
8:00am - 4:30pm M-F excluding City recognized holidays
Hours of Availability
IV. Limitations of Coverage
A. Part II Limitations on Coverage and Appendix C
I have read and understand Part II Coverage Under This Permit and Appendix C Limitations on
Coverage of the MS4 General Permit and certify that we intend to comply with the applicable
requirements of those sections as well as the Permit as a whole.
B. Outstanding Resource Value Waters (ORVWs)
Please refer to the Guidance Manual for Small Municipal Separate Storm Sewer Systems (MS4s) to
complete this section. An interactive map is available on the MPCA Web site that identifies Special
Waters: htto:/ /oca-gis04.oca.state.mn.us
[{]v es
wq-strm4-52
2
3/06
1. Prohibited Waters
Does the MS4 discharge into Prohibited Waters as defined in Minn. R. 7050.0180, subp. 3,4, []Yes 0No
and 5? See Attachment Four of the Guidance Manualfor Small Municipal Separate Storm Sewer
Systems (MS4s) for further information.
2. Restricted Discharge
Does the MS4 discharge into waters with a Restricted Discharge as defined in Minn. R. DYes [{]N 0
7050.0180, subp. 6, 6a, and 6b? If yes, please list below and comply with Part IX, Appendix C,
Item B. See Attachment Four of the Guidance Manualfor Small Municipal Separate Storm
Sewer Systems (MS4s) for further information.
3. Prohibited or Restricted Waters
If you answered "yes" to either Question 1 or 2, have you included a map that outlines, at a DYes DNo
minimum, the DNR minor sub-watersheds in your jurisdiction with ANY discharges to
Prohibited or Restricted Waters? You are required by the Permit to provide this map along with
your application. [IX.D.2.b]
Identify all discharges to Outstanding Resource Value Waters (ORVWs) from your MS4:
N a m e 0 f W a t e r B 0 d Y T Y P e ( I a k e , s t r e a m , r i v e r )
4. If you answered "yes" to either Question 1 or 2, who is the person responsible for ensuring
compliance with this Permit condition?
Name: Position: Phone:
C. Special Waters
1. Trout Waters
Does the MS4 discharge into Trout Waters as defined in Minn. R. 6264.0050 subp. 2 & 4? If []Yes ({]No
yes, please list below and comply with Part IX, Appendix C, Item C. See Attachments Two
and Three of the Guidance Manual for Small Municipal Separate Storm Sewer Systems
(MS4s) for further information.
2. Wetlands
Does the MS4 discharge into Wetlands as defined in Minn. R. 7050.0130, subp. F? [{]yes []No
3. Environmental Review
Does the MS4 have a process to assure coordination with appropriate Agencies and to [{]yes []No
evaluate discharges that require applicable Environmental Review as required by State or
federal laws? See Part IX of the Guidance Manual for Small Municipal Separate Storm Sewer
Systems (MS4s) for further information.
Who is the person responsible for ensuring compliance with this Permit condition?
Name: Ross Bintner Position: Water Resource Engineer Phone: 952-447-9831
4. Endangered or Threatened Species
Does the MS4 have a process to assure coordination with appropriate Agencies and to [l)y es []No
evaluate discharges whose direct, indirect, interrelated, interconnected, or independent
impacts may jeopardize a listed Endangered or Threatened Species or adversely modify a
designated critical habitat? See Part IX of the Guidance Manual for Small Municipal Separate
Storm Sewer Systems (MS4s) for further information.
wq-strm4-52
3
3/06
Who is the person responsible for ensuring compliance with this Permit condition?
Name: Ross Bintner Position: Water Resource Engineer Phone: 952-447-9831
5. Historic Places and Archeological Sites
Does the MS4 have a process to assure coordination with appropriate Agencies and to
evaluate discharges which may adversely affect properties listed or eligible for listing in the
National Register of Historic Places or affecting known or discovered archeological sites?
See Part IX of the Guidance Manual for Small Municipal Separate Storm Sewer Systems
(MS4s) for further information.
Who is the person responsible for ensuring compliance with this Permit condition?
Name: Ross Bintner Position: Water Resource Engineer Phone: 952-447-9831
6. Drinking Water Sources
Does the MS4 have any discharges that may affect Source Water Protection as defined in part
IX.H of the General Permit?
If ''yes,'' does the MS4 have BMPs incorporated into the SWPPP to protect drinking water
sources that the MS4 discharge may affect?
[lJy es []No
[lJy es DNo
[lJyes []No
wq-strm4-52
4
3/06
v. Owner or Operator Certification
The person with overall, MS4 legal responsibility must sign the application. This person shall be duly authorized to
sign the application and may be either a principal executive officer or ranking elected official. (see Minn. R. 7001.0060).
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision
in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the infonnation
submitted. Based on my inquiry of the person or persons, who manage the system, or those persons directly responsible
for gathering the infonnation, the infonnation submitted is, to the best of my knowledge and belief, true, accurate, and
complete (Minn. R. 7001.0070).
I also certify under penalty of law that I have read, understood, and accepted all tenns and conditions of the National
Pollutant Discharge Elimination System (NPDES) General Stonn Water Pennit for MS4s that authorizes stonn water
discharges identified in this application fonn.
I understand that as a Pennittee, I am legally accountable under the Clean Water Act to ensure compliance with the
terms and conditions of the NPDES General Storm Water Permit for MS4s.
I also understand that MPCA enforcement actions (pursuant to Minn. Stat. ~ 115.07, 116.072, and Section 309 of the
Clean Water Act) may be taken against me or the MS4 if the terms and conditions of the NPDES General Storm Water
Pennit for MS4s are not met.
C. General Contact (official, staff member, consultant or other) for all general correspondence about Permit
compliance issues between the MPCA and your MS4
x
Authorized Signature
Date
Albrecht
Last Name
Stephen
First Name
Director of Public Works / City Engineer
Title
17073 Adelmann Street S.E.
Mailing Address
Prior Lake
City
952-447-9890
MN
55372-1714
Telephone (include area code)
State ZIP Code
salbrecht@cityofpriorlake.com
E-mail Address
wq-strm4-52
5
3/06
CITY OF PRIOR LAKE SWPPP
STORM WATER POLLUTION PREVENTION PROGRAM
FOR THE MANAGEMENT
OF MUNICIPAL SEPARATE STORM SEWER SYSTEMS
WITHIN THE CITY OF PRIOR LAKE
CERTIFICATION
I hereby certify that this plan, specification or report was prepared by me or
under my direct supervision and that I am a duly Licensed Professional
Engineer under the laws of the State of Minnesota.
Ross T. Bintner, P.E.
Date: June 1, 2006
Lic.No.44570
City or Prior Lake
Slorm Water Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
TABLE OF CONTENTS
I. General Storm Water Permit Application for MS4s.
II. Storm Water Pollution Prevention Plan
A. Introduction
B. Evaluation
C. Forward to BMP summary sheets.
D. MCM 1 - Public Education and Outreach
1. la-l Distribute Educational Materials
11. I b-l Implement an Education Program
111. lc-l Education Program: Public Education and Outreach
IV. Ic-2 Public Participation
v. Ic-3 Education Program: Illicit Discharge Detection and
Elimination
VI. Ic-4 Education Program: Construction Site Runoff Control
V11. Ic-5 Education Program: Post-Construction Storm Water
Management in New Development and Redevelopment
V111. I c-6 Education Program: Pollution Prevention/Good
Housekeeping for Municipal Operations
IX. I d-l Coordination of Education Program
x. le-l Annual Public Meeting
E. MCM 2 - Public Participation / Involvement
i. 2a-1 Comply with Public Notice Requirements
ii. 2b-1 Solicit Public Input and opinion on the Adequacy of the
SWPPP
111. 2c-1 Consider Public Input
F. MCM 3 - Illicit Discharge Detection and Elimination
1. 3a-1 Storm Sewer System Map
11. 3b-1 Regulatory Control Program
111. 3c-1 Illicit Discharge Detection and Elimination Program
IV. 3d-1 Public and Employee Illicit Discharge Information Program
v. 3e-1 Identification of Non Storm Water Discharges and Flows
G. MCM 4 - Construction Site Storm Water Runoff Control
i. 4a-1 Ordinance or other Regulatory Mechanism
ii. 4b-l Construction Site Implementation of Erosion and Sediment
Control BMPs
111. 4c-l Waste Controls for Construction Site Operators
IV. 4d-1 Procedure of Site Plan Review
City of Prior Lake
Storm \Vatc.:r Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
v. 4e-l Establishment of Procedures for the Receipt and
Consideration of Reports of Storm Water Noncompliance
V1. 4f-l Establishment of Procedures for Site Inspections and
Enforcement.
H. MCM 5 - Post Construction Storm Water Management in New
Development and Redevelopment
i. 5a-l Development and Implementation of Structural and/or Non-
structural BMPs
11. 5b-l Regulatory Mechanism to Address Post Construction Runoff
from New Development and Redevelopment
111. 5c-l Long-term Operation and Maintenance ofBMPs
I. MCM 6 - Pollution Prevention / Good Housekeeping
1. 6a-l Municipal Operations and Maintenance Program
11. 6a-2 Street Sweeping
111. 6b-2 Annual Inspection of All Structural Pollution Control Devices
IV. 6b-3 Inspection of a Minimum of 20 percent of the MS4 Outfalls,
Sediment Basins and Ponds Each Year on Rotating Basis
v. 6b-4 Annual Inspection of All Exposed Stockpile, Storage and
Material Handling Areas
Vi. 6b-5 Inspection Follow-up Including the Determination of
Whether Repair, Replacement, or Maintenance Measures are
Necessary and the Implementation ofthe Corrective Measures
Vll. 6b-6 Record Reporting and Retention of all Inspections and
Responses to the Inspections
V111. 6b-7 Evaluation of Inspection Frequency
J. Additional BMPs
i. Part IV - Total Maximum Daily Load
ii. Part IX - Source Water Protection
iii. Part X - Nondegradation for Selected MS4s
K. Background
III. Implementation Schedule
IV. Annual Report Framework
V. Reference Documents
A. Joint Storm Water Education Plan
City of Prior lake
Storm Water Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
II.A INTRODUCTION
This Storm Water Pollution Prevention Program (SWPPP) has been prepared in
conformance with the National Pollutant Discharge Elimination System (NPDES), Phase
II Rules as amended, (33 V.S.C. 1251ET SEQ; hereafter, the "Act"), 40 CFR 122, 123,
and 124, as amended, ET SEQ; Minnesota Statutes Chapters 115 and 116, as amended
and Minnesota Rules, Chapter 7001.
The goal of the National Pollutant Discharge Elimination System Permit is to restore and
maintain the chemical, physical, and biological integrity of waters of the state through
management and treatment of urban storm water runoff. The Department of Natural
Resources Wetland and Waters, and the wetlands identified in the National Wetland
Inventory. This program requires that this be accomplished through the management of
Municipal Separate Storm Sewer Systems (MS4s) through the preparation of a Storm
Water Pollution Prevention Program (SWPPP).
The SWPPP identifies the goals and the Best Management Practices (BMPs) that will be
undertaken to meet the requirements of the NPDES Phase II rules. Measurable goals
have been established for each of the BMPs included in the SWPPP along with an
implementation plan and the persons responsible for implementing the BMPs.
The SWPPP was created to conform to the requirements of the MPCA set forth in both
the 2006-2011 general permit and associated guidance documents. The use of
standardized BMP sheets, numbering system, and topic list was required. BMP summary
sheets for minimum control measure (MCM) 1 reference the Joint Stormwater Education
Plan for Scott County, which is attached as part of the SWPPP in section V. The Joint
Stormwater Education Plan is intended to serve as the SWPPP for MCM 1. BMP
summary sheets for MCM 2-6, contain all required information and are intended to serve
as the SWPPP.
These six minimum control measures are:
1. Public education and outreach on storm water impacts.
2. Public participation and involvement.
3. Illicit discharge detection and elimination.
4. Construction site runoff control.
5. Post construction storm water management in new development and
redevelopment.
6. Pollution prevention/good housekeeping for municipal operations.
For each of these six minimum control measures, appropriate BMPs have been identified
along with measurable goals, an implementation schedule, and the persons responsible to
complete each measure.
City of Prior lake
Storm \Vakr Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
The City of Prior Lake is a Selected MS4 as defined in Appendix E of the general permit.
Under Appendix E, a loading analysis and nondegradation analysis are required to be
prepared by December 1, 2007.
This SWPPP is the second iteration of this document. The original SWPPP was intended
to serve from 2003-2008, but due to the revision of the general permit it was only in
effect from 2003-2005. The revised SWPPP (2006-2011) is built off of the experience
gained under the first iteration and picks up many of its goals in various levels of
completion. Where appropriate, the BMP sheets include the status of the current
program.
This SWPPP is intended to manage and minimize the discharge of pollutants from MS4s
to the maximum extent practicable (MEP). This will be accomplished through the
implementation of the BMPs outlined within this SWPPP. These BMPs are a
combination of education, maintenance, control techniques, system design and
engineering methods, and other provisions appropriate to meet the requirements of the
NPDES Phase II permit. BMPs have been prepared to address each of the six minimum
control measures as outlined in the rules.
II.D MUNICIPAL SEPARATE STORM SEWER SYSTEM
EVALUATION
An evaluation of the storm sewer system was completed under the previous permit to
determine the factors affecting the Maximum Extent Practicable (MEP) standards set
forth within the NPDES Phase II Rule.
1. Sources of pollutants
2. Potential polluting activities being conducted in the watershed
3. Sensitivity of receiving waters and wetlands within the system
4. Intended uses of receiving waters
5. Local concerns and storm water issues
6. The size of the MS4, the available staff, and the number of residents
7. BMP implementation schedules
8. Ability to finance storm water related programs
9. Hydraulics and hydrology of the watershed
10. Geology
11. Ability to finance and perform operation and maintenance of the MS4
12. Land uses
13. Development and redevelopment expectations
14. Watershed characteristics
15. Organizational structure of the municipal operator
An inventory of these factors and policies developed to manage water resources within
the City can be found in the City's Local Surface Water Management Plan (LSWMP).
City of Prior lake
Storm Water Pollution Prevcntion Program
CITY OF PRIOR LAKE SWPPP
During the preparation of the 2003-2008 SWPPP, a number of non-storm water
discharges were evaluated to determine if they are significant contributors of pollutants to
the storm sewer system. Non-storm water discharges which were evaluated include:
1. Flushing of municipal waterlines
2. Residential, commercial and agricultural landscape irrigation
3. Stream flow diversions
4. Groundwater outputs and rising elevations
5. Uncontaminated pumped ground water
6. Uncontaminated groundwater infiltration
7. Filtration backwash from municipal water treatment facility
8. Discharge of foundation drains into the MS4
9. Potable water source discharges
10. Condensation from air conditioning units
11. Car washing by individual residents
12. Discharges from the chlorinated swimming pools
13. Wash water from street sweeping activities
14. Water discharged from fire fighting activities
These sources of non-storm water inputs into the municipal separate storm sewer system
were determined not to be significant contributors of pollutants. Therefore, BMPs were
not prepared to address these storm water discharges.
This SWPPP incorporates new activities and existing practices to develop a program,
designed to protect water quality as required by the Clean Water Act. The BMPs
included within this SWPPP, are the results of the City carefully and thoughtfully
evaluating the storm water discharges within their jurisdiction, and as a result believe
implementation of these BMPs meet the prescribed "maximum extent practicable"
standard.
II.C FORWARD TO BMP SUMMARY SHEETS
This Storm Water Pollution Prevention Program outlines the Best Management Practices
which are appropriate for the City of Prior Lake to control or reduce the pollutants in
storm water runoff to the maximum extent practicable.
The City of Prior Lake reserves the right to amend and/or delete the described BMPs
based on the availability of funding for this program. Furthermore, the City may
coordinate the responsibility of selected BMPs with other governing agencies such as
community groups, non-profit organizations, soil and water conservation districts,
watershed districts, watershed management organizations, school districts, University of
Minnesota Extension, or county, regional, state, and federal government programs, which
represent storm water within the City.
Best Management Practices (BMPs) have been prepared for each of the six minimum
control measures and are described on the requisite BMP summary sheets. A description
City or Prior Lake
Storm Water Pollution Prc';ention Program
CITY OF PRIOR LAKE SWPPP
of each BMP, an implementation schedule, measurable goals that determine the success
or benefit, and the person responsible to complete each BMP is included.
SECTION II, D-I BMP SHEETS FOLLOW:
MCM 1.0 references the joint storm water education plan, which can be found under Part
V, Reference Documents.
MCM 2-6 all information is provided on the BMP summary sheets.
City of Prior Lake
Storm Water Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: I-PUBLIC EDUCATION AND OUTREACH
Unique BMP Identification Number: la-l
BMP Title: Distribute Educational Materials
BMP Description: (V.G.1.a)
The City will produce and distribute articles and information on the City's Storm Water Pollution
Prevention Plan such as; information on the annual public hearing, illicit discharges, erosion control,
shoreline management, composting and pollution prevention or other applicable best management
practices.
This publication will be distributed through City mailings, newsletters, newspaper articles,
pamphlets and flyers.
Detailed information for MCM 1 can be found in the Joint Storm Water Education Plan (Part V,
Reference Documents)
Measurable Goals:
Track total number of Publications.
Include sample publication in annual report.
Timeline/Implementation Schedule:
This activity will begin in 2006 and continue annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City or Prior Lake
Storm Water PollulioJl PreveJllion Progralll
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: I-PUBLIC EDUCATION AND OUTREACH
Unique BMP Identification Number: 1b-1
BMP Title: Implement an Education Program
BMP Description: (V.G.l.b)
The City will coordinate activities under the Joint Storm Water Education Plan for which it has
coordination authority and will participate in events coordinated by others as described in the plan.
Detailed information for MCM 1 can be found in the Joint Storm Water Education Plan (Part V,
Reference Documents)
Measurable Goals:
Provide summary of activities coordinated in annual report.
Provide summary of activities participated in annual report.
TimelinelImplementation Schedule:
This activity will begin in 2006 and continue annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City 01' Prior Lake
Storm Water Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: I-PUBLIC EDUCA nON AND OUTREACH
Unique BMP Identification Number: lc-l
BMP Title: Educational Program: Public Education and Outreach
Audience(s) Involved: (V.G.1.c)
General public and focused groups such as, development community, contractors, students, land
owners, and City staff.
Educational Goals for Each Audience:
Increase public awareness and understanding of storm water issues within the community. Inform
and educate the public about the impacts and storm water runoff on water quality.
Activities Used to Reach Educational Goals:
A variety of activities are detailed in the Joint Storm Water Education Plan.
Activity Implementation Plan:
An implementation schedule is given in the Joint Storm Water Education Plan.
Performance Measures:
A schedule of outcomes is described in the Joint Storm Water Education Plan.
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works I Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City or Prior lake
Sturm Water Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: I-PUBLIC EDUCATION AND OUTREACH
Unique BMP Identification Number: lc-2
BMP Title: Educational Program: Public Participation
Audience(s) Involved: (V.G.1.c)
General public and focused groups such as, development community, contractors, students, land
owners, and City staff.
Educational Goals for Each Audience:
Increase public awareness and understanding of storm water issues within the community. Inform
and educate the public about the impacts and storm water runoff on water quality.
Activities Used to Reach Educational Goals:
A variety of activities are detailed in the Joint Storm Water Education Plan.
Activity Implementation Plan:
An implementation schedule is given in the Joint Storm Water Education Plan.
Performance Measures:
A schedule of outcomes is described in the Joint Storm Water Education Plan.
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of Prior lake
Storm Water Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: I-PUBLIC EDUCA nON AND OUTREACH
Unique BMP Identification Number: 1c-3
BMP Title: Educational Program: Illicit Discharge Detection and Elimination
Audience(s) Involved: (V.G.1.c)
General public and focused groups such as, development community, contractors, students, land
owners, and City staff.
Educational Goals for Each Audience:
Increase public awareness and understanding of storm water issues within the community. Inform
and educate the public about the impacts and storm water runoff on water quality.
Activities Used to Reach Educational Goals:
A variety of activities are detailed in the Joint Storm Water Education Plan.
Activity Implementation Plan:
An implementation schedule is given in the Joint Storm Water Education Plan.
Performance Measures:
A schedule of outcomes is described in the Joint Storm Water Education Plan.
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City or Prior Lake
Storm Water Pollution Prevention Program
ClTY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: I-PUBLIC EDUCATION AND OUTREACH
Unique BMP Identification Number: Ic-4
BMP Title: Educational Program: Construction Site Runoff Control
Audience(s) Involved: (V.G.l.c)
General public and focused groups such as, development community, contractors, students, land
owners, and City staff.
Educational Goals for Each Audience:
Increase public awareness and understanding of storm water issues within the community. Inform
and educate the public about the impacts and storm water runoff on water quality.
Activities Used to Reach Educational Goals:
A variety of activities are detailed in the Joint Storm Water Education Plan.
Activity Implementation Plan:
An implementation schedule is given in the Joint Storm Water Education Plan.
Performance Measures:
A schedule of outcomes is described in the Joint Storm Water Education Plan.
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of Prior Lake
Storm Water Po\iUlion Prevention Pl"llgralll
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: I-PUBLIC EDUCATION AND OUTREACH
Unique BMP Identification Number: Ic-5
BMP Title: Education Program: Post-Construction Storm Water Management in New
Development and Redevelopment
Audience(s) Involved: (V.G.1.c)
General public and focused groups such as, development community, contractors, students, land
owners, and City staff.
Educational Goals for Each Audience:
Increase public awareness and understanding of storm water issues within the community. Inform
and educate the public about the impacts and storm water runoff on water quality.
Activities Used to Reach Educational Goals:
A variety of activities are detailed in the Joint Storm Water Education Plan.
Activity Implementation Plan:
An implementation schedule is given in the Joint Storm Water Education Plan.
Performance Measures:
A schedule of outcomes is described in the Joint Storm Water Education Plan.
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City or Prior Lake
Sturm \Vatcr Pollutiun Pr('ventioll Prugram
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: i-PUBLIC EDUCA nON AND OUTREACH
Unique BMP Identification Number: Ic-6
BMP Title: Education Program: Pollution Prevention / Good Housekeeping for Municipal
Operations
Audience(s) Involved: (V.G.1.c)
General public and focused groups such as, development community, contractors, students, land
owners, and City staff.
Educational Goals for Each Audience:
Increase public awareness and understanding of storm water issues within the community. Inform
and educate the public about the impacts and storm water runoff on water quality.
Activities Used to Reach Educational Goals:
A variety of activities are detailed in the Joint Storm Water Education Plan.
Activity Implementation Plan:
An implementation schedule is given in the Joint Storm Water Education Plan.
Performance Measures:
A schedule of outcomes is described in the Joint Storm Water Education Plan.
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Enginee~ng
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City or Prior Lake
Storm Water Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: I-PUBLIC EDUCATION AND OUTREACH
Unique BMP Identification Number: ld-l
BMP Title: Coordination of Education Program
BMP Description: (V.G.1.d)
By its nature, the Joint Storm Water Education Plan is coordinated with other entities as required by
V.G.1.d, since it is based on the premise of shared educational resources and joint venture.
Detailed information for MCM 1 can be found in the Joint Storm Water Education Plan (Part V,
Reference Documents)
Measurable Goals:
Include summary of efforts taken to strengthen partnerships in annual report.
TimelinelImplementation Schedule:
This activity will begin in 2006 and continue annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831d
E-mail: rbintner@cityofpriorlake.com
City of Prior lake
Storm Water Pollution Prelention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: I-PUBLIC EDUCA nON AND OUTREACH
Unique BMP Identification Number: le-l
BMP Title: Annual Public Meeting / Annual Report
BMP Description: (V.G.1.e)
The City will conduct a public meeting on the City's Storm Water Pollution Prevention Program;
solicit public opinion on the plan, and consider written and oral input into the SWPPP. Annual
public meeting will include a summary of the Annual Report
Annual Report will be submitted to the MPCA as required under permit section V.C, and VI.D
All information is included on this summary sheet.
Measurable Goals:
Hold the public meeting, record attendance, keep minutes, record statements and written comments
and document changes made to the SWPPP.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City or Prior Lake
Storm \\/ater Pollution PrevcnlilHl Prog)"{j11l
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 2-PUBLIC ParticipationlInvolvement
Unique BMP Identification Number: 2a-l
BMP Title: Comply With Public Notice Requirements
BMP Description: (V.G.2.a)
The City will issue a notice of the public informational meeting (detailed in 1 e-l) in the Prior
Lake American at least 30 days prior to the meeting.
The notice will contain a reference to the SWPPP, the date, time, and location ofthe public
informational meeting; a concise description of the manner in which the public informational
meeting will be conducted; and shall indicate the location where a copy of the SWPPP is
available for public review. The City will make available a copy of the notice to all who have
requested that they be informed of public meetings for the SWPPP.
Measurable Goals:
Advertise the public informational meeting so that persons interested in participating or attending
receive adequate notice of the meeting in compliance with applicable state rules.
Include public notice and other methods used to advertise the SWPPP and annual meeting in annual
report.
TimelinelImplementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of Prior lake
Storm Water Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 2-PUBLIC ParticipationlInvolvement
Unique BMP Identification Number: 2b-l
BMP Title: Solicit Public Input and Opinion on the Adequacy of the SWPPP
BMP Description: (V.G.2.b)
The City will provide opportunity for interested persons to make oral statements or provide written
comments on the SWPPP at public meeting detailed in 1 e-l. A reasonable amount of time will be
made available at the meeting for questions and comments. Persons not able to attend the meeting
may submit written comments on the SWPPP within the time identified in the public notice for the
meeting.
The City will also solicit public input and provide opportunity for comment on the SWPPP at any
time through the City's website. Comments will be recorded and presented at the next annual
meeting.
Measurable Goals:
Track the number of attendees at the annual public meeting on the SWPPP.
Track the number of oral and written comments received on the SWPPP.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of Prior Lake
Storm \Valer Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 2-PUBLlC Participation/Involvement
Unique BMP Identification Number: 2c-1
BMP Title: Consider Public Input
BMP Description: (V.G.2.c)
The City will review all input provided on the SWPPP.
The City will revise the SWPPP, as appropriate, based on input received.
Measurable Goals:
Log input received, and keep with SWPPP.
Make Record of Decision on all input.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of Prior Lake
Storm Water PollutilJn Prevention Pwgram
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 3- Illicit Discharge Detection and Elimination
Unique BMP Identification Number: 3a-1
BMP Title: Storm Sewer System Map
BMP Description: (V.G.3.a)
City will develop a map showing ponds, streams, lakes, wetlands, structural pollution control
systems, outfalls, and all pipes greater than 24" by June 30, 2008.
Once Complete, the City will update the map annually to include changes to the storm sewer system
throughout the City including but not limited to, new development, street improvements, water
quality projects, wetland mitigation projects and any changes to the storage or conveyance of storm
water within the City.
Measurable Goals:
Include summary of progress and changes made to keep map current in annual report.
Timeline/Implementation Schedule:
The City will conduct annual reviews of this activity (2003-2008).
2006: Begin mapping system
2007: Continue mapping system
2008: Complete mapping system
2009-11: Update system annually
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of Prior Lake
Storm \\';ltl?f Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 3- Illicit Discharge Detection and Elimination
Unique BMP Identification Number: 3b-l
BMP Title: Regulatory Control Program
BMP Description: (V.G.3.b)
The City will develop an ordinance, which will address the issue of non-storm water discharges in
the City's storm sewer system. Elements of this ordinance will include but are not limited to
defming allowable discharges, setting policy as it pertains to violations and penalties and mitigation
requirements.
Regulatory control structure will be established in accordance with fmdings from Nondegradation
Analysis and Loading Assessment and will be used as a tool in the IDD&E Program detailed in 3c-l.
Measurable Goals:
2007: Progress summary.
2008: Progress summary.
2009: Progress summary and final version of ordinance.
2009-11: Performance will be measured through implementation associated with 3c-l.
Timeline/Implementation Schedule:
2007: Research controls used in nearby Cities.
2008: Draft ordinance.
2009: Consider ordinance for adoption.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City DC Prior Lake
Slurm \Vater Pollution Prc\\:l1!iOll Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 3- Illicit Discharge Detection and Elimination
Unique BMP Identification Number: 3c-l
BMP Title: Illicit Discharge Detection and Elimination Program
BMP Description: (V.G.3.c)
City will develop and implement a program to detect and address non-storm water discharges to the
MS4 storm water system.
IDD&E program will be established in accordance with findings from Nondegradation Analysis and
Loading Assessment.
Measurable Goals:
2009: Include summary of progress in annual report.
2010: Include summary of progress in annual report.
2011: BMP Performance measurable goals to be determined by the program.
Timeline/Implementation Schedule:
2009: Structure program and define policy.
20 I 0: Train key staff on implementation of program.
2011: Begin full scale implementation of program.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of Prior lake
Storm Water Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 3- Illicit Discharge Detection and Elimination
Unique BMP Identification Number: 3d-l
BMP Title: Public and Employee Illicit Discharge Information Program
BMP Description: (V.G.3.d)
City will inform employees, businesses, and public of the hazards associated with illegal discharges
and improper disposal of waste as part of its Education Program
Measurable Goals:
Include summary of information provided in annual report.
Timeline/Implementation Schedule:
This BMP will begin in 2006 and continue annually until 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of Prior Lake
Storm Water Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 3- Illicit Discharge Detection and Elimination
Unique BMP Identification Number: 3e-1
BMP Title: Identification of Non Storm Water Discharges and Flows
BMP Description: (V.G.3.e)
IDD&E program will be established in accordance with findings from Nondegradation Analysis and
Loading Assessment. If non-Storm Water discharges are identified as significant contributors of
pollution, they will be addressed through the creation of BMPs during the reporting cycle.
Measurable Goals:
Determination of significance through study.
Timeline/Implementation Schedule:
This BMP will be implemented if significance is established.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior lake
Storm \Vatcr Pollution Prc\'elltion Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 4-Construction Site Storm Water Runoff Control
Unique BMP Identification Number: 4a-1
BMP Title: Ordinance or Other Regulatory Mechanism
BMP Description: (V.G.4.a)
The City will evaluate its Ordinance for adequacy and, if appropriate, revise the Ordinance within
six months after extension of coverage under this permit.
Measurable Goals:
Summary of evaluation
New Ordinance, if applicable.
Timeline/Implementation Schedule:
Within six months after extension of coverage under this permit, this BMP will take place.
Maintenance of Ordinance for duration of permit.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior Lake
Storm \Valer Pollution Pre\'~lllioll Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 4-Construction Site Storm Water Runoff Control
Unique BMP Identification Number: 4b-1
BMP Title: Construction Site Implementation of Erosion and Sediment Control BMPs
BMP Description: (V.G.4.b)
The City will perform spot checks on active construction to monitor NPDES construction site permit
compliance.
Measurable Goals:
Sample or summary of inspection reports will be included in annual report.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 20 II.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorIake.com
City oC Prior Lake
Storm \Vater Pul!utioll Prevention Program
CITY OF PR10R LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 4-Construction Site Storm Water Runoff Control
Unique BMP Identification Number: 4c-1
BMP Title: Waste Controls for Construction Site Operators
BMP Description: (V.G.4.c)
The City will perform spot checks on active construction to monitor NPDES construction site permit
compliance.
Measurable Goals:
Sample or summary of inspection reports.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior Lake
Storm \Vater Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 4-Construction Site Storm Water Runoff Control
Unique BMP Identification Number: 4d-1
BMP Title: Procedure of Site Plan Review
BMP Description: (V.G.4.d)
The City will review development plans with consideration to potential water quality impacts.
Measurable Goals:
Continued review.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Priur lake
Storm \Vatcr Pollution Prevention Pn,)gralll
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 4-Construction Site Storm Water Runoff Control
Unique BMP Identification Number: 4e-1
BMP Title: Establishment of Procedures for the Receipt and Consideration of Reports of
Storm Water Noncompliance
BMP Description: (V.GA.e)
Reports of noncompliance received through website or hotline will be tracked. Each report of
noncompliance will be followed up on and a record of the consideration give will be made.
Measurable Goals:
Summary of reports will be included in annual report.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 20 II.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of Prior Lake
Storm \Vatcr Pollution Prc\'elltioll Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 4-Construction Site Storm Water Runoff Control
Unique BMP Identification Number: 4f-l
BMP Title: Establishment of Procedures for Site Inspections and Enforcement
BMP Description: (V.GA.f)
When City is signatory to a NPDES construction site permit, site inspections will be complete as
required. Deficiencies found during construction site inspection will be corrected to the terms
spelled out in the permit.
Measurable Goals:
A summary of active construction site permit status will be included in annual report..
Timeline/Implementation Schedule:
This activity will continue from 2006 through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior lake
Storm Water Po!!ulilJll Preve11lioll Pl"llgr"m
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 5-Post Construction Storm Water Management
Unique BMP Identification Number: 5a-l
BMP Title: Development and Implementation of Structural and/or Non-structural BMPs
BMP Description: (V.G.5.a)
The City will use its Local Surface Water Management Plan and associated rules as a guide for the
management of post construction storm water management.
Measurable Goals:
Track the performance of downstream drainage systems from recent development by spot checking
at least 1 development per year.
Summarize results and lessons learned in annual report.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior lake
Sturm \Valer Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 5-Post Construction Storm Water Management
Unique BMP Identification Number: 5b-l
BMP Title: Regulatory Mechanisms to Address Post Construction Runoff from New
Development and Redevelopment
BMP Description: (V.a.5.b)
The City sets design standards detailed in its Public Works Design Manual that give criteria for rate,
volume, and sediment / nutrient loads.
Measurable Goals:
Continued compliance with design standards.
Periodic reevaluation of rules to determine adequacy.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 20 II.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City 01' Prior lake
Storm \\/aler Pollution Prevention Pn)gram
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 5-Post Construction Storm Water Management
Unique BMP Identification Number: 5c-1
BMP Title: Long-term Operation and Maintenance of BMPs
BMP Description: (V.G.5.c)
The City has a process in place for the operation and maintenance of its storm water system.
Measurable Goals:
Compliance with BMP 6b-2 and 6b-3 will be used to measure the compliance of this BMP.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-44 7 -9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior Lake
Storm \Vatc.:r Pollutiun Prevention Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 6-Pollution Prevention / Good Housekeeping
Unique BMP Identification Number: 6a-1
BMP Title: Municipal Operations and Maintenance Program
BMP Description: (V.G.6.a)
Training of maintenance staff will occur on an annual basis with a wide variety of topics with the
ultimate goal of reducing pollutant runoff from operations. Topics could include: Salt application,
erosion problem identification and reporting, street sweeping, outfall maintenance, stockpile and
handling area protocols, construction site erosion control, and others.
Measurable Goals:
Number of training sessions held.
Number of attendees at each session.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of PrilJr lake
Storlll Water Pollution Prevenli'lIl Progr:lIl1
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 6-Pollution Prevention / Good Housekeeping
Unique BMP Identification Number: 6a-2
BMP Title: Street Sweeping
BMP Description:
The City has an extensive program of street sweeping and is continually experimenting with
methods and techniques to improve its results in preventing sediment from entering its wetlands and
lakes.
This BMP is not specifically required by the MS4 permit.
Measurable Goals:
N/A
Timeline/Implementation Schedule:
N/A
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior Lake
Storm \ValeT Pollution Prevenlion Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 6-Pollution Prevention / Good Housekeeping
Unique BMP Identification Number: 6b-2
BMP Title: Annual Inspection of All Structural Pollution Control Devices
BMP Description: (V.G.6.b.2)
All structural pollution control devices such as trap manholes, grit chambers, sumps, floatable
skimmer, separators, small settling and filtering devices will be inspected annually.
Measurable Goals:
Compliance with 6b-6 will be used to measure compliance with this BMP.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of Prior Lake
Storm Water Pollution Prevention Pro!!ram
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 6-Pollution Prevention / Good Housekeeping
Unique BMP Identification Number: 6b-3
BMP Title: Inspection of a Minimum of 20 percent of the MS4 Outfalls, Sediment Basins
and Ponds Each Year on a Rotating Basis
BMP Description: (V.G.6.b.3)
A minimum of 20% of all MS4 outfalls, sediment basin and ponds will be inspected on a rotating
basis.
Measurable Goals:
Compliance with 6b-6 will be used to measure compliance with this BMP.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 20 II.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior Lake
Storm \Vater Pollutiun Prcv~nlion Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 6-Pollution Prevention / Good Housekeeping
Unique BMP Identification Number: 6b-4
BMP Title: Annual Inspection of All Exposed Stockpile, Storage and Material Handling Areas.
BMP Description: (V.G.6.b.4)
All exposed stockpiles, storage and material handling areas will be inspected at least once annually.
Measurable Goals:
Compliance with 6b-6 will be used to measure compliance with this BMP.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City of Prior lake
Storm \Vater Pollution Pr('v~ntion Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 6-Pollution Prevention I Good Housekeeping
Unique BMP Identification Number: 6b-5
BMP Title:
Inspection Follow-up Including the Determination of Whether Repair,
Replacement, or Maintenance Measures are Necessary and the Implementation of
Corrective Measures
BMP Description: (V.G.6.b.5)
All inspections associated with 6b-2, 6b-3, and 6b-4, will include an assessment of whether repair,
replacement, or maintenance measures are necessary.
All necessary repair, replacement, and maintenance measures required will be complete within the
same year as the inspection.
If measures cannot be compete within the same year as inspection, a record and schedule for
completion will be included in the annual report.
Measurable Goals:
Compliance with 6b-6 will be used to measure compliance with this BMP.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 20 II.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior Lake
Storm \Vakr Pollulion Prc\'clllioll Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 6-Pollution Prevention / Good Housekeeping
Unique BMP Identification Number: 6b-6
BMP Title: Record Reporting and Retention
BMP Description: (V.G.6.b.6)
Results of all inspections required under 6b-2, 6b-3, and 6b-4 and the follow up measures required
under 6b-5 will be summarized in the Annual Report. Detailed records that form the basis for the
summary will be kept with the SWPPP.
SWPPP, annual reports (Ie-I), inspection reports (6b-6), follow up measures (6b-6), public input
(2b-l), record of consideration (2b-2), and all other data used or created as a requirement of this
SWPPP will be kept until June 2014 (3 years after permit expiration) as required under permit
section III.E.
Measurable Goals:
Summary included in annual report.
Detailed inspection records kept with SWPPP.
Timeline/Implementation Schedule:
This activity will continue from 2006 through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior lake
Sturm Water Pullutiun Preventiun Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: 6-Pollution Prevention / Good Housekeeping
Unique BMP Identification Number: 6b-7
BMP Title: Evaluation of Inspection Frequency
BMP Description: (V.G.6.b.7)
Records kept as part of 6b-6 will be analyzed to determine appropriateness of inspection and
maintenance frequency.
If an increased frequency is needed, 2 inspections per year will be used.
If a decreased frequency is warranted, 1 inspection every 2 years will be used.
Measurable Goals:
Changes to inspection frequency will be summarized in annual report.
Timeline/Implementation Schedule:
This activity will continue from 2006 annually through 2011.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City uC Prim Lake
Storm Water Pollution Pre\ention Prugr,"n
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: N/ A
Unique BMP Identification Number: Part IV - D
BMP Title: Total Maximum Daily Load
BMP Description: (IV.D)
After a USEPA approved TMDL has been complete for an Impaired Waters within the City, the City
will review the adequacy of, and revise its SWPPP, within 18 months of the waste load allocation
approval, in accordance with permit section IV.D.
If the Impaired Water is outside of the City, and the waste load allocation affects the City, The City
will respond similarly only if it was consulted during the development of the TMDL or waste load
allocation.
Location(s) in SWPPP of detailed information relating to this BMP:
All information included in summary sheet.
Measurable Goals:
Summarize progress on TMDL assessments within City in annual report.
Summarize changes made, and time line given in annual report.
New BMPs added, if necessary.
Timeline/Implementation Schedule:
TMDL assessment will dictate changes.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior lake
Sturm \Vat~r Pollution Prcv.:Jllion Program
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: N/ A
Unique BMP Identification Number: Part IX - H
BMP Title: Source Water Protection
BMP Description: (IX-H)
The City will complete its Phase II assessment as required by the Minnesota Department of Health.
Upon completion of the Phase II wellhead protection plan, the City will assess its official controls for
compliance with the recommendations of the plan, within the time line of the plan.
The City will add or modify BMPs as appropriate.
Location(s) in SWPPP of detailed information relating to this BMP:
All information included in summary sheet.
Measurable Goals:
Summarize progress on completion of Phase II assessment in annual report.
Summarize changes made, and timeline given in annual report.
New BMPs added, if necessary.
Timeline/Implementation Schedule:
Timeline of Phase II assessment will dictate changes.
Specific Components and Notes:
Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City oC Prior lake
Storm Water Pollution Prevention Progr'll11
CITY OF PRIOR LAKE SWPPP
BMP Summary Sheet
MS4 Name: City of Prior Lake
Minimum Control Measure: N/ A
Unique BMP Identification Number: Part X
*BMP Title: Nondegradation for Selected MS4s
*BMP Description:
The City will prepare a Loading Assessment and Nondegradation Report as per Part X. Appendix D.
Sections B & C of the MS4 General Permit. The City will follow the public participation process as
per Part X. Appendix D. Section D of the MS4 General Permit. After consideration of the input
received during the public participation process, the City will prepare and submit the materials
required in Part X. Appendix D. Section E of the MS4 General Permit.
During the MPCA review, notice, and preliminary determination processes, the City will work with
the MPCA, if appropriate, to respond to comments and/or revise the submittal materials to prepare
them for fmal approval.
After final determination by the MPCA, the City will modify the SWPPP as per the approved
submittal materials and as needed to meet the nondegradation requirements.
Location(s) in SWPPP of detailed information relating to this BMP:
All information included in summary sheet.
*Measurable Goals:
I. The City will prepare and submit materials to meet the requirements listed above.
2. The City will respond to and coordinate with the MPCA, as appropriate, during the MPCA review,
notice, and preliminary determination processes.
3. Modify the SWPPP as per the approved modifications and as needed to meet the nondegradation
requirements.
*Timeline/Implementation Schedule:
Listed numbers below correspond to the Measurable Goals listed above
I. The City will prepare and submit the required materials listed above by 18 months after the
effective date of the Permit (December 1,2007).
2. The City will respond to and coordinate with the MPCA, as appropriate, during the MPCA review,
notice, and preliminary determination processes.
3. After the submittal materials are approved by the MPCA, the City will modify the SWPPP, as per
the approved modifications and as needed to meet the nondegradation requirements, in a timely
manner.
Specific Components and Notes:
*Responsible Party for this BMP:
Name: Ross Bintner - Water Resources Engineer
Department: Public Works / Engineering
Phone: 952-447-9831
E-mail: rbintner@cityofpriorlake.com
City lJC Prior Lake
Storm Water PollutilJn Prevention Program
CITY OF PRIOR LAKE SWPPP
II.K Background
The following was developed for the 2003 - 2008 permit cycle and is included as a
reference.
MCM 1.0
PUBLIC EDUCATION AND OUTREACH
The public education program has been developed to distribute educational
materials to the community or conduct equivalent outreach activities. The BMPs
identified will focus on the impact of storm water discharges on streams, rivers,
and wetlands, and the steps that the public can take to reduce pollutants in storm
water runoff.
These activities have been prepared to individually address each of the six
minimum control measures. For each minimum control measure, the education
program identifies the audience or audiences involved, educational goals for each
audience, activities used to reach educational goals for each audience, activity
implementation plans, including responsible persons in charge, entities
responsible for given activities, and schedules and performance measures that can
be used to determine success in reaching educational goals.
The public education and outreach BMPs that will be undertaken include:
I) Produce and distribute information on illicit discharges, erosion control,
shoreline management, composting and pollution prevention and other
applicable BMPs utilized in the SWPPP. This information may be
distributed through City mailings, newsletters, bill stuffing, and on the
City website.
2) Incorporate public information on the SWPPP issues into a separate page
on the City's website. The web page would specifically describe the
SWPPP, each minimum control measure, the goals and actions planned by
the City, provide links to BMPs, articles on each control measure, and
collect feedback from site visitors.
3) Provide training opportunities for City staff including erosion control,
BMPs, good housekeeping, and pollution prevention. Training topics
could include, but are not limited to:
a) MnlDOT Erosion Control Certification (or other)
b) Storm Water Pollution Prevention Program Workshops
c) Best Management Practices Workshops
d) Brochures and publications distributed to staff
City of Prior Lake
Storm \Vater PollUlioll Prevention Program
CITY OF PRIOR LAKE SWPPP
MCM 2.0
PUBLIC PARTICIPATION AND INVOLVEMENT
This minimum control measure requires that the City provide measures to receive
public input and opinion on the adequacy of the SWPPP. This input can be
received from public meetings, oral testimony, and written correspondence. To
reach this goal, the City anticipates implementing the following BMPs:
I) Conduct an annual public meeting on the City's Storm Water Pollution
Prevention Program and solicit opinion on the plan and consider written
and oral input on the adequacy of the SWPPP.
2) The City intends to incorporate public information on SWPPP issues into
a separate page on the City's website. The web page would specifically
describe the SWPPP, each minimum control measure, the goals and
actions planned by the City, provide links to BMPs, articles on each
control measure, and collect feedback from site visitors.
MCM 3.0
ILLICIT DISCHARGE DETECTION AND ELIMINATION
A number of BMPs have been developed to implement and enforce a program to
detect and eliminate illicit discharges into the municipal separate storm sewer
system. These BMPs include:
I) Review the current storm water ordinance to evaluate its effectiveness
toward illicit discharges.
2) Continue to support County recycling program to discourage illegal
dumping by offering alternative uses for unwanted materials and drop-offs
for household hazardous waste.
3) Identify all City-owned storm sewer conveyances 24 inches or greater on a
storm sewer map. This will also identify all outfalls and discharge points
leaving the City. This map would be updated yearly to reflect changes or
additions to the storm sewer system.
MCM 4.0
CONSTRUCTION SITE, STORM WATER RUNOFF CONTROL
A number ofBMPs have been developed and will be implemented and enforced
to reduce pollutants and storm water runoff from construction activities with land
disturbances equal to or greater than one acre. These BMPs include:
1) Review current erosion control ordinance and revise the City's building
permit to include construction site erosion and sediment control as part of
City or Prior Lake
Storm Water Pollution Prevention Progr'"11
CITY OF PRIOR LAKE SWPPP
the permit conditions. This erosion control ordinance will also include
sanctions to determine non-compliance with the permit and ordinances.
2) Provide City Public Work staff with training and proper location,
inspection, and installation of erosion control BMPs.
3) Incorporate construction site inspection and enforcement into the activities
of building inspectors. This will be part of the effort to reduce pollutants
discharged from small construction sites.
MCM 5.0
POST CONSTRUCTION STORM WATER MANAGEMENT FOR NEW
DEVELOPMENT AND REDEVELOPMENT
A program of BMPs has been prepared to address storm water runoff from new
development and redevelopment projects that disturb equal to or greater than one
acre. This program insures that controls are in place that would prevent or
minimize water quality impacts from development activities. These BMPs
include:
I) Implement the storm water runoff control program that is currently used to
minimize the effect of storm water runoff on water quality within the City.
This program will utilize appropriate BMPs, selected by the City to
minimize storm water runoff from new developments and redevelopments.
2) Revise current comprehensive storm water management plan. Currently
the City is in the process of getting the storm water plan revised.
MCM 6.0
POLLUTION PREVENTION/GOOD HOUSEKEEPING FOR
MUNICIPAL OPERATIONS
To meet the requirements of the pollution prevention and good housekeeping for
municipal operations, a number of BMPs have been prepared. These BMPs
include:
I) Annual inspection of the outfalls, sediment basis, and ponds within the
city's storm sewer system. During the summer of 2000, the City of Prior
Lake conducted an extensive, comprehensive inspection of all the City's
outfalls, sediment basins, and ponds. As part of this BMP the City will
use the report andrecommendations from this inspection to maintain these
areas.
2) The City will incorporate BMPs for handling of equipment and hazardous
materials used by City staff.
City oCPrior Lake
Storm \Vakr POlluli011 Prevention Program
CITY OF PRIOR LAKE SWPPP
3) The City will annually evaluate landscaping and lawn-care practices,
which may include the use of fertilizers, pesticides, herbicides, lawn
mowing, grass clipping collection, mulching and composting, and develop
BMPs to reduce storm water pollution.
4) The City will annually review practice and policies of road salt
applications. The City will consider alternative products, calibration of
equipment, inspection of vehicles and staff training to reduce pollutants
from road deicing activities.
5) The City will continue with the current street sweeping program, identify
improvements, and implement changes to reduce storm water pollutants.
6) The City will evaluate its maintenance facility and apply for a General
Storm Water Permit for Industrial Activities in accordance to the NPDES
requirements.
III. BEST MANAGEMENT PRACTICES IMPLEMENTATION PLAN
A summary ofBMPs are provided in Table 1.
Detailed descriptions of each of the BMPs contained within the SWPPP
are provided in the Summary Sheets.
City of Prior Lake
Sturm \V;Jt~r Pollution Prc\'ellliOll Program
CITY OF PRIOR LAKE SWPPP
Table 1
BMP IMPLEMENTATION PROGRAM
Ik..,t "alla:.!.l'lIIl'lIt I'rartil'l'''' B\II' Ik..,lTiptioll 01 (,oal
'\ II III hlT Sdll'd II Ie
MCMl
Public Education and Outreach
Produce and distribute literature on
Distribute Educational Materials (la-I) illicit discharges, erosion control,
shoreline management, and other Annually 2006 - 20 II
MBP practices.
Coordinate, implement and
Implement an Educational Program ( I b-l ) participate in educational activities. Annually 2006 - 20 II
Implement activities to inform and
Education Program: Public ( I c-l) educate the public about the effects of Schedule in Part V
Education and Outreach storm water runoff on water quality.
(More information in Part V)
Implement activities to inform and
Public Participation (lc-2) educate the public about the effects of Schedule in Part V
storm water runoff on water quality.
(More information in Part V)
Education Program: Illicit Implement activities to inform and
educate the public about the effects of
Discharge Detection and (lc-3) storm water runoff on water quality. Schedule in Part V
Elimination (More information in Part V)
Implement activities to inform and
Education Program: Construction ( I c-4 ) educate the public about the effects of Schedule in Part V
Site Runoff Control storm water runoff on water quality.
(More information in Part V)
Education Program: Post- Implement activities to inform and
Construction Storm Water (lc-5) educate the public about the effects of Schedule in Part V
Management in New Development storm water runoff on water quality.
and Redevelopment (More information in Part V)
Education Program: Pollution Implement activities to inform and
Prevention/Good Housekeeping for ( I c-6) educate the public about the effects of Schedule in Part V
storm water runoff on water quality.
Municipal Operations (More information in Part V)
Coordinate the Joint Storm Water
Coordination of Education Program ( I d-l ) Education Plan with other Annually 2006 - 20 II
organizations.
Annual Public Meeting (I e-l) Hold a Public Meeting on SWPPP Annually 2006 - 2011
Cityof' Prior Lake
Storm Water PollutilJn PrC\entiLlIl Program
CITY OF PRIOR LAKE SWPPP
Be...' "alla~ellll'lIt Pral'lin.... B'Il' Ik...rriplioll ot (;oal Sdll'd II k
\lIllIhn
MCM2
Public Participation and
Involvement
Post Notice for SWPPP Annual 2a-l Advertise the meeting in advance so
Public Meeting interested persons may attend. Annually 2006 - 20 II
Provide time during SWPPP meeting
Solicit Public Opinion on the 2b-l (I e-l) for questions and comments.
Adequacy of SWPPP Provide a form for public opinion on Annually 2006 - 20 II
the City's website.
Consider Public Input 2c-l Review feedback on SWPPP and
revise the program if necessary. 2006 - 2011
MCM3
Illicit Discharge Detection and
Elimination
2006: Begin mapping
Develop and update storm sewer 2007: Continue mapping
Storm Sewer System Map 3a-l system map, as needed. June 2008: Complete
mappmg
2006-11: Update map
annually
2007: Research controls
Develop an ordinance addressing used in nearby Cities
Regulatory Control Program 3b-l non-storm water discharge in the 2008: Draft Ordinance
storm sewer system. 2009: Consider ordinance
for adoption
2009: Structure program
and define policy
Illicit Discharge Detection and Develop program to detect and 20 I 0: Train key staff on
Elimination Program 3c-l address non-storm water discharges. implementation of
program
20 II: Begin full-scale
implementation
Inform employees, businesses and
Public and Employee Illicit public about the hazards of illegal
3d-l discharges and improper waste
Discharge Information Program disposal within the Education Annually 2006 - 20 II
Program.
A BMP will be created to address Only if non-Storm Water
Identification of Non-Storm Water 3e-l non-storm water discharges which are discharges are identified a
Discharges and Flows significant contributors to
a significant contributor to pollution. pollution
City oC Prior lake
Storm \Vakr Pollution Prevention Prugralll
CITY OF PRIOR LAKE SWPPP
Iho,1 \ I:t II a ~e lIIe II t I' ra l'I in', B\II' Ik,criplioll 01 <.oal
'\ 1I1111H' r Schedllk
MCM4
Construction Site Storm Water
Runoff Control
Begin 6 months after
Ordinance or Other Regulatory Evaluate City Ordinance and revise, if extension of coverage
Mechanism 4a-l appropriate. under this permit and
continue for the duration
of permit.
Construction Site Implementation Perform spot checks on active
of Erosion and Sediment Control 4b-l construction to monitor NPDES Annually 2006 - 20 II
BMPs permit compliance.
Waste Controls for Construction Perform spot checks on active
Site Operators 4c-l construction to monitor NPDES Annually 2006 - 20 II
permit compliance.
Procedure of Site Plan Review 4d-l Review development plans for 2006-2011
potential water quality impact.
Establishment of Procedures for the
Receipt and Consideration of 4e-l Record and follow-up on reports of Annually 2006 - 20 II
Reports of Storm Water noncompliance.
Noncompliance
Complete required inspection of
Establishment of Procedures for 4f-l construction sites with NPDES 2006-2011
Site Inspections and Enforcement permits. Deficiencies found will be
corrected.
MCMS
Post Construction Storm Water
Mana2ement Measures
Development and Implementation Use Local Surface Water
Management Plan to guide post-
of Structural and lor Non-structural 5a-l construction storm water Annually 2006 - 20 II
BMPs management.
Regulatory Mechanism to Address 5b-l Set design standards for rate, volume 2006-2011
Post Construction Runoff and sediment/nutrient loads.
Long-term Operation and Continue current process for
Maintenance of BMPs 5c-l operation and maintenance of the Annually 2006-2011
storm water system.
City of Prior Lake
Storm Water Pollution Pre\ enlillll Program
CITY OF PRIOR LAKE SWPPP
Be... t 'Ia II a:.:e lIIe III P ra ct il'l'''' B\lP Ik...niptioll 01 (.oal
'\ II III her Schelllllt'
MCM6
Pollution Prevention and Good
lIousekeepin2Measures
Municipal Operations and 6a-l Train maintenance staff in reducing Annually 2006-2011
Maintenance Program pollutant runoff from operations.
Street Sweeping 6a-2 Operate and continue to improve the Not specifically required.
City's street sweeping program
Annual Inspection of All Structural 6b-2 Inspection of all pollution control Annually 2006-20 II
Pollution Control Devices devices.
Inspection of a Minimum of 20
Percent of the MS4 Outfalls, 6b-3 Inspection of 20 percent of all MS4 Annually 2006-20 II,
Sediment Basins and Ponds Each outfalls, sediment basins and ponds. on a rotating basis.
Year on Rotating Basis
Annual Inspection of All Exposed Inspection of all exposed stockpiles,
Stockpile, Storage and Material 6b-4 Annually 2006-2011
Handling Areas storage and material handling areas.
Inspection Follow-up Including the Inspections in 6b-2, 6b-3 and 6b-4 Annually 2006-20 II
Determination of Whether Repair,
Replacement or Maintenance will asses for repair or replacement. If it cannot be completed
Measures Are Necessary and the 6b-5 Repairs, maintenance or replacements within the year, record and
Implementation ofthe Corrective noted will take place that year if schedule for completion in
Measures possible. annual report.
Keep all records, annual reports, and
Record Reporting and Retention 6b-6 supporting documentation as Annually 2006-2011
required.
Review records in 6b-6 to determine
if the frequency of inspection is Begin in 2008, continue
Evaluation of Inspection Frequency 6b-7 adequate. Ifnecessary, increase to annually to 20 II.
two inspections per year, or decease
to one inspection every two Years.
TMDLs See Summary Sheet See Summary Sheet
Source Water Protection See Summary Sheet See Summary Sheet
Nondegradation D-X See Summary Sheet See Summary Sheet
City oC Prior lake
Sturm Water Pollution Prevention Program
CITY OF PRIOR LAKE SWPPP
IV. ANNUAL REPORT
An annual report will be prepared and submitted to the MPCA prior to June 30 of
each year from 2006 through 2011. This annual report will summarize the
following:
A. Status of Compliance With Permit Conditions
The annual report will contain an assessment of the appropriateness of the
BMPs and progress toward achieving the identified measurable goals for
each of the minimum control measures. This assessment will be based on
results collected and analyzed, inspection findings, and public input
received during the reporting period. Summaries, inspection data and
analysis, examples of educational initiatives will be included in the annual
report as spelled out on each BMP sheet.
B. Modifications to the SWPPP
The armual report will identify changes to BMPs or measurable goals for
any of the minimum control measures.
C. Notice of Coordinated Activities
A notice will be included in the armual report for any portions of the
permit for which a government entity or organization outside of the MS4
is being utilized to fulfill any BMP contained in the SWPPP.
V. REFERENCE DOCUMENTS
A. Joint Stormwater Education Plan
City of Prior Lake
Storm \Vakr Pollution Prevenlion Program