Loading...
HomeMy WebLinkAbout05(F) - Approve Work Order for 2022-2023 Pond Maintenance Project (Pond 197) Report K:\018387-000\Admin\Docs\Cover Letter.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Memorandum To: Pete Young, City of Prior Lake From: Jake Newhall, PE Laura Cummings, PE Date: August 10, 2021 Re: 2021/2022 Pond Feasibility Analysis City of Prior Lake WSB Project No. 018387-000 At the request of the City, WSB & Associates, Inc. (WSB) completed a pond feasibility analysis for the following ponds: Pond 177, Pond 178, Pond 197, Pond 233, and Pond 333. This analysis identifies possible improvement options related to each pond. Summary of Recommended Pond Improvement Projects Pond Recommended Action Sediment Removal Cost* Possible Construction Year Pond 177 Excavate 1500 CY $30,300 2021/2022 Pond 178 Excavate 1200 CY $23,500 2021/2022 Pond 197 Excavate 1300 CY $26,600 2022/2023 Pond 233 Excavate 2000 CY $40,800 2023/2024 Pond 333 Excavate 1400 CY $28,600 2023/2024 *Cost estimates do not include indirect costs, contingencies, access/restoration costs, and other appurtenant work. Costs to consider contaminated sediments where present are included, and details are in the attached report. The improvements recommended for construction in 2021/2022 are estimated in detail in the attached Preliminary Cost Estimate. The Preliminary Cost Estimate includes contingencies, indirect costs, access/restoration costs, and other appurtenant work not included in the summary table above. Attachments 1. Pond Feasibility Analyses 2. Surveyed Pond Figures 3. Preliminary Cost Estimate 4. Sediment Sampling Results POND 178 Page 1 POND 177 AND 178 1.1. Introduction Pond 178 is located west of Eagle Creek Ave NE, and drains west int a large wetland complex, that is a subwatershed of Pike Lake. Pond 178 drains into Pond 177. 1.2. Survey and Inspection Observations Table 1 and Table 2 presents information gathered from the SWAMP and the field survey completed in July 2021. Pond 177 outlet is a 21-inch flared end section outlet has large erosion issues, and is starting to erode underneath the flared end section, see photo below. The outlet of the pond is at a higher elevation than the current water levels of the pond are. An infiltration basin was shown to discharge into the pond from the south. Because the drainage area to the infiltration is small (about 1 acre), it was assumed that negligible treatment was being provided and was not included in the water quality analysis. The drainage area for 178 consists of roadway runoff from Eagle Creek Ave NE with some runoff from residential areas. Pond 178 has one 27-inch invert coming from East Creek Ave NE. This pond drains west to Pond 177 through an outlet control structure. The wood weir structure outlet on the northeast corner of pond 178 is not functioning, causing an erosion channel that outlets the pond. The outlet for this pond is a 30-inch flared end section that goes into an overflow control structure that outlets to the west from a 30-inch flared end section at 887.40. Table 1. Pond Summary Drainage Area 21.25 acres NWL* 889.51 Area at NWL 0.28 acres 2021 SWAMP Score 24.09 Managed NURP Ratio 1 Managed Depth 5.90 ft Current Depth 1.42 ft Current Wet Volume 17,320 ft3 Downstream Waterbody Wetland Survey/Inspection Date July 2021 Surveyed Water Elevation 889.51 Outlet Elevation 892.78 Outlet Diameter 30” RCP Inlet Diameter 24” RCP Table 2. 178 Pond Summary Drainage Area 11.81 acres NWL* 889.9 Area at NWL 0.14 acres 2021 SWAMP Score 14.03 Managed NURP Ratio 1 Managed Depth 6.84 ft Current Depth 0.96 ft Current Wet Volume 5,855 ft3 Downstream Waterbody Wetland Survey/Inspection Date July 2021 Surveyed Water Elevation 889.9 POND 178 Page 2 Outlet Elevation 890.89 Outlet Diameter 30” RCP Inlet Diameter 27” RCP *NWL based on surveyed water elevation Major erosion underneath the outlet for the pond. During the field survey, it was found that the pond 177 was draining to the north via channels that have been eroded into the soil. It is possible the pipe designed to drain this pond to the north was washed out and the current channel runs it its place. At the time of surveyance, water was flowing in this channel, see the images below. Channel erosion north of pond. POND 178 Page 3 1.2.1. Sediment Sample Results Four sediment samples were tested in Pond 177 and Pond 178. There was no level 3 sediment found in pond 177. In Pond 178, one sample was assigned to Management Level 3 and the other to Management Level 1, therefore increased costs for approximately half of this pond are considered in the recommendation and cost estimates. Additional information on the sediment analysis completed can be found in the attached Sediment Analysis Memo and Results. 1.3. Recommendation An analysis was completed evaluating the existing and potential sediment removal options for the maintenance of Pond 177 (Table 3), and Pond 178 (Table 4). Additional sediment should be removed between ponds to create one large pond instead of two small ponds. This would remove an additional XX CY and would allow for more storage within the ponds. It is recommended that the ponds be maintained to an average depth of approximately 4.0 feet. This would also reduce mobilization costs and restoration costs for the project. Table 3. Water Quality Analysis Pond 177 Option Description TP Removal Efficiency (%) Annual TP Reduction (lbs/yr) TSS Removal Efficiency (%) Annual TSS Removal Efficiency (tons/yr) Estimated Sediment Removal Cost* Life-Cycle TP Cost Benefit ($/lb) 1 - Existing; Maintain Current Depth of 1.42 ft 37.01 6.71 64 1.76 - - 2 - Excavate to an Average Depth of 3.0 ft (926 CY) 49.76 9.02 81.00 2.23 $18,515 223.27 3 - Excavate to an Average Depth of 4.0 ft (1,512 CY) 54.47 9.88 91.5 2.51 $30,233 375.12 4 - Excavate to an Average Depth of 5.0 ft (2,098 CY) 57.99 10.52 93.00 2.56 $41,950 495.9 5 - Excavate to a Managed Depth of 5.9 ft (2,625 CY) 60.49 10.97 93.00 2.56 $52,496 487.74 *Cost estimates do not include indirect costs, contingencies, access/restoration costs, and other appurtenant work. Costs to consider contaminated sediments where present is included. Commented [LC1]: Need to attach. POND 178 Page 4 Table 4. Water Quality Analysis Pond 178 Option Description TP Removal Efficiency (%) Annual TP Reduction (lbs/yr) TSS Removal Efficiency (%) Annual TSS Removal Efficiency (tons/yr) Estimated Sediment Removal Cost* Life-Cycle TP Cost Benefit ($/lb) 1 - Existing; Maintain Current Depth of 1.42 ft 28.39 4.01 55.88 1.20 - - 2 - Excavate to an Average Depth of 2.0 ft (402 CY) 40.64 5.74 67.00 1.43 $8,047 151.05 3 - Excavate to an Average Depth of 3.0 ft (790 CY) 47.57 6.72 76.00 1.63 $15,785 291.36 4 - Excavate to an Average Depth of 4 ft (1176 CY) 52.36 7.40 87.50 1.87 $23,523 393.42 5 - Excavate to a Managed Depth of 5 ft (1,563 CY) 55.95 7.90 93.00 1.99 $31,260 375.2 *Cost estimates do not include indirect costs, contingencies, access/restoration costs, and other appurtenant work. Costs to consider contaminated sediments where present is included. POND 197 Page 1 POND 197 1.1. Introduction Pond 197 is located north and apartment complex on the norther side of Franklin Trail southeast. It is near the northeast intersection of Franklin Trail SE and County Highway 13. The pond drains private and right of way before discharging to a ditch in the northwest corner of the pond. The pond is part of the upper prior lake subwatershed. 1.2. Survey and Inspection Observations Table 1 presents information gathered from the SWAMP and the field survey completed in July 2021. Pond 197 is within a greater detention basin/wetland area that and provides pretreatment to runoff prior to discharging to the wetland within Timber Crest Park. The outlet of the pond is a 24-inch RCP that connects to a concrete outlet structure. 1.2.1. Sediment Sample Results Two sediment samples will be needed for Pond 197 to determine appropriate disposal methods. Table 1. Pond Summary Drainage Area 19.37 acres NWL* 946.45 Area at NWL 0.27 acres 2021 SWAMP Score 10.77 Managed NURP Ratio 0.39 Managed Depth 5.85 ft Current Depth 0.63 ft Current Wet Volume 7,410 ft3 Downstream Waterbody Upper Prior Lake Survey/Inspection Date July 2021 Surveyed Water Elevation 946.45 Outlet Elevation 846.75 Outlet Diameter 24” RCP Inlet Diameter 15” 2-18” and 24” RCP *NWL based on surveyed water elevation 1.3. Recommendation An analysis was completed evaluating the existing and potential sediment removal options for the maintenance of Pond 197 (Table 2). Based on the size of the current pond, it is recommended that Pond 197 be maintained to the managed depth of 5.9 feet (Option 6, Table 2). This average depth is consistent with the record drawing, and SWAMP would then be updated to show a Managed Depth of 5.9 feet for Pond 197. POND 197 Page 2 Table 2. Water Quality Analysis Pond 26-197 Option Description TP Removal Efficiency (%) Annual TP Reduction (lbs/yr) TSS Removal Efficiency (%) Annual TSS Removal Efficiency (tons/yr) Estimated Sediment Removal Cost* Life-Cycle TP Cost Benefit ($/lb) 1 - Existing; Maintain Current Depth of 0.63 ft 15.39 3.12 31.43 0.97 - - 2 - Excavate to an Average Depth of 2.0 ft (350 CY) 31.77 6.45 58.5 1.8 $6976 208.88 3- Excavate to an Average Depth of 3.0 ft (603 CY) 38.59 7.83 65 2 $12,068 179.71 4- Excavate to an Average Depth of 4.0 ft (858 CY) 43.53 8.83 69.33 2.13 $17,160 161.12 5- Excavate to an Average Depth of 5.0 ft (1113 CY) 47.33 9.6 75 2.34 $22,252 148.49 6 - Excavate to a Managed Depth of 5.9 ft (1330 CY) 49.96 10.14 81 2.49 $26,565.75 140.56 *Cost estimates do not include indirect costs, contingencies, access/restoration costs, and other appurtenant work. Costs to consider contaminated sediments where present is included. POND 233 Page 1 POND 233 1.1. Introduction Pond 233 is located in the southwest corner of 160th street southeast and Fish Point Road SE. The pond discharges to a wetland on the north side of Fish Point Road SE. 1.2. Survey and Inspection Observations Table 1 presents information gathered from the SWAMP and the field survey completed in July 2021. The outlet structure was not surveyed, however the outlet is a 24-inch flared end section that drains to a wetland on the east side of fish point road. The pond is within a city-owned parcel. The pond drains to the wetland and downstream to Markley Lake. Table 1. Pond Summary Drainage Area 38.18 acres NWL* 923.09 Area at NWL 0.73 acres 2021 SWAMP Score 10.88 Managed NURP Ratio 1.00 Managed Depth 6.43 ft Current Depth 0.70 ft Current Wet Volume 22,259 cf Downstream Waterbody Markley Lake Survey/Inspection Date July 2021 Surveyed Water Elevation 923.09 Outlet Elevation 82.63 Outlet Diameter 24” RCP Inlet Diameter 30” RCP *NWL based on surveyed water elevation ** Outlet elevation based on record plan 1.3. Recommendation An analysis was completed evaluating the existing and potential sediment removal options for the maintenance of Pond 233 (Table 2). This pond has good potential for pollutant removal due to its large drainage area, however the managed depth of 6.43 feet is double the excavation numbers as option 4 but only slightly increases the TP and TSS removal efficiency. It is recommended that Option 4 in Table 2 be completed to achieve an average depth of approximately 4.0 feet. SWAMP should then be updated to reflect this as the managed depth. Table 2. Water Quality Analysis Pond 233 Option Description TP Removal Efficiency (%) Annual TP Reduction (lbs/yr) TSS Removal Efficiency (%) Annual TSS Removal Efficiency (tons/yr) Estimated Sediment Removal Cost* Life-Cycle TP Cost Benefit ($/lb) 1 - Existing; Maintain Current Depth of 0.7 ft 24.98 7.44 61.25 18.24 - - POND 233 Page 2 2 - Excavate to an Average Depth of 2.0 ft (1,152 CY) 42.27 12.59 68.67 3.10 $23,036 97.5 3 - Excavate to an Average Depth of 3.0 ft (2,038 CY) 49.16 14.64 81 3.65 $40,756 133.75 4 - Excavate to an Average Depth of 4.0 ft (2,924 CY) 53.9 16.06 90 4.06 $58,476 178.46 5 - Excavate to a Managed Depth (NURP) of 6.43 ft (5,080 CY) 61.25 18.24 93 4.2 $101,605 275.36 *Cost estimates do not include indirect costs, contingencies, access/restoration costs, and other appurtenant work. Costs to consider contaminated sediments where present is included. POND 333 Page 1 POND 333 1.1. Introduction Pond 333 is located east of Fish Point Road SE. It is just east of Lower Prior Lake. 1.2. Survey and Inspection Observations Table 1 presents information gathered from the SWAMP and the field survey completed in July 2021. The pond discharges into another pond to the north, and then into Lower Prior Lake. The outlet was clogged with debris, causing the surveyed water surface to be 0.2 feet higher than the outlet elevation. The southeast inlet is a 12-inch RCP coming from Lost Horizon Circle Southeast and has a headwall as shown in the picture below. Outlet of Pond 333. POND 333 Page 2 Inlet from southeast corner of pond 333. Table 1. Pond Summary Drainage Area 75.92 acres NWL* 908.09 Area at NWL 0.34 acres 2021 SWAMP Score 29.22 Managed NURP Ratio 0.53 Managed Depth 9.00 ft Current Depth 2.63 ft Current Wet Volume 38,951 ft3 Downstream Waterbody Lower Prior Lake Survey/Inspection Date July 2021 Outlet Elevation 907.91 Outlet Diameter 12” PVC pipe Inlet Diameter 18” RCP *NWL based on surveyed water elevation 1.3. Recommendation An analysis was completed evaluating the existing and potential sediment removal options for the maintenance of Pond 333 (Table 2). The pond has a large drainage area which results in a large managed NURP depth, and the pond is undersized, which is shown by the low Managed NURP Ratio. It is recommended that the depth be increased to 5.0 feet. After construction, we recommend updating the managed depth in SWAMP to reflect the constructed average depth. POND 333 Page 3 Table 2. Water Quality Analysis Pond 333 Option Description TP Removal Efficiency (%) Annual TP Reduction (lbs/yr) TSS Removal Efficiency (%) Annual TSS Removal Efficiency (tons/yr) Estimated Sediment Removal Cost* Life-Cycle TP Cost Benefit ($/lb) 1 - Existing; Maintain Current Depth of 2.63 ft 35.73 19.16 62 5.04 - - 2 - Excavate to a Managed Depth of 4.0 ft (827 CY) 42.9 23.01 68.67 5.58 $16,529 116.25 3- Excavate to an average depth of 5.0 ft (1430 CY) 46.71 25.05 74 6.01 $28,594 89.66 4- Excavate to an average depth of 6.0 ft (2033 CY) 49.78 26.7 81 6.58 $40,659 85.6 5- Excavate to an average depth of 7.0 ft (2636 CY) 52.33 28.06 87.5 7.11 $52,724 86.51 6- Excavate to an average depth of 9.0 ft (3843 CY) 56.37 30.23 93 7.56 $76,860 121.37 *Cost estimates do not include indirect costs, contingencies, access/restoration costs, and other appurtenant work. Costs to consider contaminated sediments where present is included. """"""""""""""" !( #*NORTHWOOD RD NW 9 10938 936 934 932 930 908 916 918 914 920 912 922 928 924 926 910 906 90 8 1.7' 2.7' 2.3' 1.8' 1.7' 2.1'1.5' 1.7' 4' 4.5' 3'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P96 2 ft 10 ft Contours Storm Mains Max: 4.5 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 1.65 ft City Data Basin Area: 0.2 ac " " " " " " " " " " " " """"#* !( #* FOX TAIL TRL N W 934 9 34950 934942948944 9189 3 4950 916920948922 930 918 924 946 926928930932 932 9469389409369429449341.8' 1.9' 0.7' 2' 1.7' 1.1' 1.1' 2.2' 2.1' 1.2'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P135 2 ft 10 ft Contours Storm Mains Max: 2.2 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 0.82 ft City Data Basin Area: 0.16 ac """ " #* 864 872 866 868874870894872892890884886882888880 8768748 7 6 8781.6' 1.6' 1.1' 1.7' 0.8' 2.4' 3.7' 2.7'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 30 feet 0 30 Feet2022 Pond Maintenance City of Prior Lake Basin P154 2 ft 10 ft Contours Storm Mains Max: 3.7 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 1.25 ft City Data Basin Area: 0.05 ac """""""""" """ " """"#* #* ST A T I O N PL N W ENCLAVE CT NW880 8668648 62868886870866880868868862 864 8868788648768668848668748808788828728768748708728668708688680.8' 0.4' 1.1' 0.6' 1' 1.1' 0.3' 0.6' 0.9' 3.4' 3' 2.6' 3.3' 2.1' 2.5'2.8' 3.2'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P155 2 ft 10 ft Contours Storm Mains Max: 3.4 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 1.11 ft City Data Basin Area: 0.13 ac """""""""""""""""""""""""""""""""#* !( #* #* PRIORWO O D S T S E FIVE HAWKS AV SETRANQUILITY CT SE93 2920920932 936 932932934 926932 930 930916930918918920922924926 92 8 1.2' 1.3' 1' 0.9' 0.6'1.1' 0.7' 0.6' 0' 0.7' 0.5' 0.5' 0.8'0.5' 0.6' 2.7' 5.2'3.9' 5.9' 5.5'4.6' 5.2' 6.2' 5.8' 5.8' 4.5' 0'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P168 2 ft 10 ft Contours Storm Mains Max: 6.2 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 2.3 ft City Data Basin Area: 0.3 ac 13 13 " """"""""""" """" " " " " """"""""""""""""""""""" """"""#*CREEKSIDE CIR SEMUSHTOWN RD SEHWY 13 S MAPLEWOOD ST SEHWY 13 S VILLAGE LAKE DR SE 968 9 4 0 9 6 4 96 8 964948944 9 6 2956 9 409 66960958958 948970 960 9649 68 956970962 940954 964 962966 952 950940966 964 968 944954 956958962 950960 9429469529484' 6' 3.6' 4.1' 3.5' 3.4' 4.3' 2.6' 5.5' 3.3' 3' 1.9'2'2.1'1.4'1.5'0.6' 0.7'2.1' 0.8' 3.8' 6.1' 6' 5.9' 5.5' 6' 5.8' 5.3' 5.3'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 100 feet 0 100 Feet2022 Pond Maintenance City of Prior Lake Basin P169 2 ft 10 ft Contours Storm Mains Max: 6.1 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 2.67 ft City Data Basin Area: 1.22 ac """""""#* #* !( CATES ST SE 920922920 942 920922918 920 918940940 918920928 930 936 938 932 934 926924 9 2 2 1.3' 1.9' 2.2' 2.2' 1.6' 1' 4.1' 2' 4.4' 2.2' 2' 4.2' 1.4'3.1' 1.4'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P172 2 ft 10 ft Contours Storm Mains Max: 4.4 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 1.77 ft City Data Basin Area: 0.19 ac """"""""""""""""!( #* !( #*!( RASPB E R R Y R I D G E R D N W 892884 918 890926 890 896 918894 888924 888 886 884 892 922 906 908 910 904902 912 900898 914 9 1 6 918 920 890 890 ' 0.4'0.3'0.6' 0.3' 0.8' 1.7' 1' 0.9' 0.7' 1' 0.9' 0.7'0.6'0.5'0.5'0.4' 0.6'1.4' 1.2'1.3' 3.3' 4.1' 4' 4'4.4'3.2' 4.4'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P177 2 ft 10 ft Contours Storm Mains Max: 4.4 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 1.42 ft City Data Basin Area: 0.28 ac """""""""""""""""""""""""""""""""""""""""#* !( #*!( RASPBERRY RIDGE RD NW EAGLE CREEK AV NE88 6 912 890 888 884 910920890 886 888918 890 916914 910 912 886 888 8968 9 4 8 9 8 900902 9 0 4 906 908 892 1'1'1.1' 1.7' 2'0.1' 2.3'2.1' 0' 0.7' 1.5'1.6' 1.9' 2'1.4' 0.4' 0.4' 0.6'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P178 2 ft 10 ft Contours Storm Mains Max: 2.3 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 0.96 ft City Data Basin Area: 0.14 ac """""""""#* !(PONDS PKWY SE992976 978976990980988986984978 9 8 09821.2' 1.2' 1.1' 1.2'0.6' 0.9' 1.4' 1.4' 2' 1'1.5'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 30 feet 0 30 Feet2022 Pond Maintenance City of Prior Lake Basin P190 2 ft 10 ft Contours Storm Mains Max: 2 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 0.81 ft City Data Basin Area: 0.11 ac """""""""""""" """""""""""""#* !(960962 962946948 954 956 94 8958 960 954 9 5 8956 950 952 0.7'0.8' 0.7' 0.4' 0.5' 1.3' 1.2' 0.6' 1.7' 2.4' 2'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P197 2 ft 10 ft Contours Storm Mains Max: 2.4 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 0.63 ft City Data Basin Area: 0.27 ac " " """"""""""""""""""""""""""""KOP PKWY SE922950 948 946 92492494 4 932 9 4 2 922940938936934924926932926930928 0.8' 2.7' 2.6' 1.8'2.7' 2.2'2.7' 0.8' 2.7' 2' 1.6' 0.4' 1.1' 1.6'2.7' 2.5' 2.8' 2.6' 1.7' 0' 0.9'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 30 feet 0 30 Feet2022 Pond Maintenance City of Prior Lake Basin P204 2 ft 10 ft Contours Storm Mains Max: 2.8 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 1.39 ft City Data Basin Area: 0.07 ac """""""""""""" " " " " #* #* ") ") ") ") ")#* #* #* #* #*BEACH ST NE 926902900944 902942 904940 906908938 910936 904928 934 930 932 906908926 910924 9169189 2 0 9149229122.3' 1.9'2' 2.7' 1.8' 2.9'3.3' 3' 2.7' 1.5' 0.7'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps - updated Date Saved: 8/4/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P207 2 ft 10 ft Contours Storm Mains Max: 3.3 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 1.72 ft City Data Basin Area: 0.14 ac Water surface was surveyed at 899.69', NWL was taken to be 900.368' based on basin outlet """"""""""""""""""" """"" """ " """""""#* #* 160 ST SE C R O S S A N D R A S T S E 160 ST SE WREN CT SEFISH POINT RD SEFISH POINT RD SEFISH POINT RD SE93 8 9 3 0 934 936934952 940 9389309329329349 3 4 950 956 954 952 938 948 950 946 944 942 924940 926938 9289369369309349320.6' 0.6'0.6' 1.4' 2.5'1.3'1.4' 2.2'1.7' 2.4' 0.9' 0.9' 0.4'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 80 feet 0 80 Feet2022 Pond Maintenance City of Prior Lake Basin P233 2 ft 10 ft Contours Storm Mains Max: 2.5 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 0.7 ft City Data Basin Area: 0.73 ac #* #*99610049921022101 2 10161002994102010021018 1 0 0 0 998101610141014101210121002 1004100610001008101 02.2' 2' 0.9' 1.7' 3.1' 2.9' 2.1' 1.1' 1' 1.3' 6.9' 7.9' 8.8' 7.2' 7.6' 9.9'10.4'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P255 2 ft 10 ft Contours Storm Mains Max: 10.4 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 3.44 ft City Data Basin Area: 0.33 ac """"""""" " " """#* !( !( #* WATER S E D G E T R L N E BO U D I N S T N E 9 0 2908904 910906 908908902 902904 9089 049062.3' 2.1' 1.2' 1.1' 1.3'2.7' 2' 1.7' 1.8'6.4' 5.3' 5.8' 7.3' 7.4' 7.3' 7.3'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P259 2 ft 10 ft Contours Storm Mains Max: 7.4 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 3.48 ft City Data Basin Area: 0.29 ac """ """ """ " """""""""#* #*LANDAULN NECOACHMAN CT NE MANIT O U R D N E COAC H M A N L N N E 960 944 962932946 942 948 944 9349 4 8 946 950 9 6 2 960946946938 948 944942 9 1 8 940 946 938 944 936 958 910934 942 912914 916 956940 954938934 9 5 2 936 95 0 948 922 924 920 926 91 8 928930932 944942 940 938 8969 36 934932930928 926924 898922900920 918 9029469049069081.4' 1.5' 1' 1'1.7' 1.9' 1.2' 1' 0.8'0.8' 1.4'1.6' 1' 0.8' 2' 1.9'2.5' 2.2' 2.3'2.3' 2.7' 2.5'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 100 feet 0 100 Feet2022 Pond Maintenance City of Prior Lake Basin P299 2 ft 10 ft Contours Storm Mains Max: 2.7 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 1.22 ft City Data Basin Area: 1.27 ac " """""#* #*FISH PO INT RD SE 926926 9329 2 6 922 924 930906922 928920 926924918 926922916 920918914 908 910 908916912 9149249 2 2 9189 209169149109 1 2 6' 5.1' 3' 3.4' 3.1' 2.4' 0.1' 3' 3.7' 3' 5.7' 3.3' 3.5' 5.7'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin P333 2 ft 10 ft Contours Storm Mains Max: 6 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 2.63 ft City Data Basin Area: 0.34 ac """#* #* 946 944 936 942 940 938 936 904934 932 906926 928 924 930 922 920 918 9089 16 914 9 1 0912 908 9101.4' 2.5' 3' 3' 2.2' 2.1' 1.6' 3.2' 2.7'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 30 feet 0 30 Feet2022 Pond Maintenance City of Prior Lake Basin P145 2 ft 10 ft Contours Storm Mains Max: 3.2 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 1.2 ft City Data Basin Area: 0.07 ac !( #* #* !( #* 95 4 952 950 948 916946 9 4 4 9 4 2 9 4092 6 928 9 3 0 9 3 2 9 3 89 3 4 936920 918 922 924 0.9'4.1' 0.6' 0.7' 2.9' 4.3' 1' 3.4'4.6' 1.6' 1.8' 2'4.4' 2'0.9'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps - updated Date Saved: 8/4/2021¯ 1 inch = 30 feet 0 30 Feet2022 Pond Maintenance City of Prior Lake Basin SWP-6654N-04 2 ft 10 ft Contours Storm Mains Max: 4.4 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 1.77 ft City Data Basin Area: 0.09 ac Water surface was surveyed at 917.631', NWL was taken to be 918.173' based on basin outlet """"""""""""!( #* 140 ST NE 140 ST NE 838860 848 840 860858 85885285 6842 840854 856 844852846 852 8 5 4 850 850 85 0 848 84 8 840.7' 840.9' 840.4' 840.6' 840.1' 840.2' 840.2' 841.7' 842.1' 842.4' 841.8' 842.3' 839.9' 839.4' 839' 839.1' 843.7' 843.7' 843.7' 843.7'843.7' 843.7'843.7' 843.7'843.7'843.7'843.7'843.7' 843.7' 843.7' 843.7' 843.7'843.7' 843.7' 843.7' 843.7' 843.7'843.7' 843.7' 843.7' 843.7'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin SWW-6554N-09 2 ft 10 ft Contours Storm Mains Max: 839.0 ft Min: 843.7 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 842.0 ft City Data Basin Area: 1.03 ac " "" #* #* FISH POIN T RD S E 980984992 986990 98 8 980 958982980960986 962984 982 988 980964978976 962 976 96497896 6 9689709729741'0.5' 1.9' 1' 1.6'0.7' 2.2' 0.7' 0.5'1'1.1' 3.8' 5.3' 5.9' 6.1' 3.3' 6' 4.5' 6.3' 5.2' 3.9' 5.9'Document Path: K:\018387-000\GIS\Maps\2021 Pond Survey\Pond Maps Date Saved: 8/2/2021¯ 1 inch = 50 feet 0 50 Feet2022 Pond Maintenance City of Prior Lake Basin SWW-6852S-01 2 ft 10 ft Contours Storm Mains Max: 6.3 ft Min: 0 ft Basin Depth OCS!( FES#* Edge Point Depth Point Survey Data Avg: 2.28 ft City Data Basin Area: 0.44 ac Page 1 of 2 Public Works Consultant Pool Work Order (2022-2023 Pond Maintenance Project) WSB & ASSOCIATES, INCORPORATED, dba WSB This work order (“Work Order”) is issued on this 6th day of September 2022 by the City of Prior Lake (“City”) pursuant to the Public Works Consultant Pool – Master Agreement dated April 20, 2020 (“Contract”) between the City and WSB & Associates, Incorporated, dba WSB (“Consultant”). Based on the mutual promises and covenants set forth herein, the sufficiency of which are hereby acknowledged, the City and Consultant agree as follows: 1. Scope of Work Order. Consultant agrees to provide, perform and complete all the services requested by the City in this Work Order and attached Exhibit 1 (“Work”), which Work shall be subject to the terms and conditions of this Work Order and the Contract. 2. Term of Work Order. All Work requested by this Work Order shall be completed by December 31, 2023. 3. Compensation for Work Order. City agrees to pay the Consultant an hourly cost not-to- exceed $25,600.00 as full and complete payment for the Work requested by this Work Order. 4. Consultant Representative. Consultant has designated Jake Newhall to manage the Work Order subject to the supervision of Consultant’s representative. ISSUED BY CITY OF PRIOR LAKE ___________________________________ City Manager RECEIVED AND ACCEPTED BY CONSULTANT _____________________________________ By:_______________________________ Its:_______________________________ Page 2 of 2 Exhibit 1 – Scope of Work Order F R A N K L I N T R L S E BRUNSWICKAVESED U B L I N RD SE ERIN CI R SE TIMBER CRE S T DR SEBL UFFHEIGHTSTRLSEANNA TRL SE PARK NICOLLET AVE SEScott County GIS 16 27 12 83 42 44 17 82 18 78 14 21 ¯ This product is for informational purposes and is not suitable for legal, engineering, or surveying purposes. This product has been produced by the City of Prior Lake for the sole purpose of geographic reference. No warranty is made by the City of Prior Lake regarding specific accuracy or completeness. 0 200 400 500 700 Feet 2022-2023 Pond Maintenance Project (Pond 197) Council Item Location Map 9/9/2022