Loading...
HomeMy WebLinkAbout10 17 2022 Lakefront Park Master Plan update PRESENTATIONCITY COUNCIL UPDATE October 17, 2022 LAKEFRONT PARK MASTER PLAN • Process Overview • Review DRAFT Master Plan • Review Phase 2 Public Input • Discussion • Next Steps City Council update - Oct 17, 2022 INTRODUCTIONS & AGENDA OVERVIEW SEP OCT NOV DEC 2022 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT Pop Up meetings Adv. Comm. Mtg 1 Adv. Comm. Mtg 2 Adv. Comm. online review of draft concept City Council update Public Open House Adv. Comm. Mtg 3 City Council update Online Engagement Phase 1 Online Engagement Phase 2 Lakefront Park Master Plan | City of Prior Lake | HKGi  2 | Page    o Alternative 1: Maintain Pavilion as is. Restrooms are only available to those who rent the pavilion for meetings or events. Construct a new restroom/changing room building near the splash pad and playground. o Alternative 2: Modify the existing pavilion to add on publicly accessible restrooms from the outside of the building that will serve the playground, splash pad, and other general park users. Skate Park and Basketball  Develop a new skate park (9) with bowl and high level features permanently located centrally in the park  Develop new basketball courts (10) centrally located in the park, one full court and two half courts  New road access (11) from the central area of the park to the east, with connection to Ridgemont Ave SE. Parallel parking is added along a portion of the road.  A new stormwater detention basin (12) is located between the parking lots in order to manage stormwater from the new road.  The southern most parking lot, centrally located in the park would be expanded (13) with a second drive aisle and two rows of parking stalls, which would more than double the parking stalls in that lot.  The existing baseball diamond will be removed and replaced with lawn open space that may be used for events or potentially a future amphitheater (14) or performance space.  Remove the existing picnic shelter near the baseball diamond. East Park / Winter Use Area  A new park building will be constructed along Ridgemont Ave SE, which will provide an outdoor patio space (15) to be used for both winter and summer gatherings with firepits and seating, and an indoor warming house (16) to support the sledding and ice skating/hockey uses at the park. This building could be used for the general public in the winter and rented out for events in the summer time.  The parking lot along Ridgemont Ave SE will be relocated to the north and expanded (17) to serve a larger recreation program.  Ice skating / hockey (18): o Alternative 1: A new ice skating ribbon will be constructed in place of the tennis courts and parking lot to provide a formal pleasure skating feature. o Alternative 2: One or two hockey rinks will be relocated from the bottom of the sledding hill to the top  The sledding hill will remain in place with a slight modification to the slope and direction of the hill due to the new road and slightly rerouted trails. Woodlands and Trails  Add a disc golf course along the edge of the woods  Trails through the woods: Include one main paved trail loop or spine through the woods, and transform the rest to natural surface. The natural surface trails would not be plowed. Consider winter trail uses -- cross country skiing, snowshoeing, etc. Lak e f r o n t  Par k  Ma s t e r  Pla n  | City  of Prio r  Lak e  | HK G i   8 | Pa g e     Ska t e p a r k Sta i r w a y t h r o u g h w o o d s LAKEFRONT PARK CONCEPT 1 2 5 4 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 7 8 9 10 1112 13 14 18 20 19 17 16 153 LEGEND ALT 2: HOCKEY RINK Enhanced beach amenities (restroom building, beach canopies, picnic tables, fire pit) New road with drop off near beach Handicap parking Stairway connection to beach area Tennis courts Playground Splash pad Existing pavilion (possible exterior bathroom expansion) Skate park Basketball courts New road with parallel street parking Detention basin Expanded parking lot Possible amphitheater location Warming house patio Warming house Relocated, expanded parking lot Skating ribbon Disc golf Bridge with fishing pier/overlook Rutledge St SE Hope St SE AmphitheaterAmphitheater Sledding HillSledding Hill Community Community GardenGarden MemorialMemorial Kop BuildingKop Building VolleyballVolleyball Park ShelterPark Shelter Mitchell Cir SELakeview Cir SERidgemont Ave SEFranklin Trail SEFranklin Trail SEBounty St SE Crossandra St SE Gateway St SE 160th St SE Jordan Ave SEMemorial Trail SESt Paul AveOak St SE Minnesota S t S E Dakota St SE Dakota St SE Dak o t a S t S ECambridge Cir SEEagle Creek Av e S E Eagle Cre e k A v e S E Grainwood Cir N E Grainwood Ci r N EEau Claire Trail NECalmut Ave NEEau Claire Trail NE Colorado St SE Duluth Ave SEArcadia AveWest Ave SEWest Ave SEWest Ave SE Sunfish Trail SEQuincy St SE Bass St SE Birch Ave SELakeside Ave SELakeside Ave SEEvanstone Ave SEKop Pkwy Main Ave SEErie Ave SEArcadia AveHsatings Ave SEBreezy Point Rd SEStefan Cir SERed Oaks Rd SE13 13 Kop Pkwy Camb ridge Cir SE16 17 Lakefr o n t  Park Maste r  Plan | City of Prior Lake | HKGi  7 | Pag e     Adve n t u r e p l a y - z i p l i n e Shad e s t r u c t u r e s a n d p i c n i c t a b l e s Lakefront Park Master Plan | City of Prior Lake | HKGi  6 | Page    Nature theme d p l a y e q u i p m e n t Nature them e d p l a y e q u i p m e n t Lakefront Park Master Plan | City of Prior Lake | HKGi  5 | Page    Picnic plaza and small splash pad Slides built into the slope Lakefront Park Master Plan | City of Prior Lake | HKGi  4 | Page    Precedent Images Splash Pad – Rosemount example ~3,800 SF Maple Grove Central Park Splashpad ~2,200 SF Lakefront Park Master Plan | City of Prior Lake | HKGi  3 | Page      Update the boardwalk across Lower Prior , p o t e n t i a l l y e nhance to a bridge r a t h e r t h a n a floating boardwalk . A d d o v e r l o o k i n t h e m i d d l e o f the bridge, to be u s e d a s a f i s h i n g / o v e r l o o k area. Next Steps  Please provide your f e e d b a c k b y J a n . 2 4 .  We will make revision s t o t h e c o n c e p t b a s e d on Advisory Commi t t e e f e e d b a c k a n d p r e s e n t t h e draft concept to the C i t y C o u n c i l o n F e b . 7 th  The second phase o n p u b l i c e n g a g e m e n t w i l l b e h e ld in February and M a r c h t o s o l i c i t i n p u t o n priorities for implem e n t a t i o n .  The Advisory Comm i t t e e w i l l m e e t o n e m o r e t i m e , i n April, to review fee d back to the concept plan and the draft M a s t e r P l a n d o c u m e n t .   Lakefront  Park  Master  Plan  | City  of  Prior  Lake  | HKGi  1  | Page   MEMO Wednesd a y, J a n. 1 9, 2 0 2 2 TO: L a k efr o n t P a r k A d vi s o r y C o m mit t e e FROM: G a b ri e ll e G ri n d e, H K Gi RE: L a k e f r o n t P ar k D R A F T M a s t e r Pl a n C o n c e p t Please re vi e w t h e a tt a c h e d L a k ef r o n t P ar k Dr a f t C o ncept Pla n. T hi s c o n c e p t w a s d e v el o p e d f ol l o w i n g public en g a g e m e n t i n p ut, t w o m e eti n g s wi t h t h e Adviso r y C o m mit t e e, a n d c i t y s t aff i n p ut. T h e following el e m e nt s a n d f e a t u r e s a r e i n cl u d e d i n the conc e p t. T h e hi g hli g ht e d n u m b e r s c o r r e s p o n d with the l e g e n d o n t h e c o n c e p t gr a p hi c. Watzl’s Be a c h ( 1 )  Public da y sli p s are being b r o u g h t b a c k t o t h e n o r t h si d e of t h e b e a c h ( 6 sli p s)  A fishing pi e r is shown a t t h e e n d of t h e n e w b o at d a y sli p s  A new small res t r o o m b u i l di n g is shown o n t h e b e a c h, v e n di n g m a c hi n e s w ill b e i n cl u d e d  There is s p a c e t o a c c o m m o d a t e a food tru c k at the be a c h d u ri n g p e a k u s e ti m e s, wit h i n cl u d e d electrical a c c e s s; t h e f o o d t r u c k s w o ul d access th e b e a c h al o n g t h e w al ki n g t r ai l s  A new ro a d ( 2) a n d A D A p a r ki n g s t all s ( 3 ) will provi d e b e t t er a c c e s s t o t h e b e a c h.  A new stairway (4) will p r o v i d e dir e c t a c c e s s f r o m t h e u p p er p a r k i n g l o t t o t h e b e a c h North Par ki n g A r e a / T e n ni s c o ur t s  2 new Tennis co u r t s (5) are pla c e d a t t h e t o p o f t h e hi ll adjacent t o t h e u p p e r p a r ki n g l ot (location o f c u r r e nt s k a t e p a r k ); t h e n e w c o u r t s wi ll be shelte r e d f r o m wi n d b y t h e s u r r o u n di n g trees  The existi n g tr ail c o n n e c ti o n f r o m t h e n o r t h p a r k i ng lot to R u tl e d g e S tr e e t S E wi ll b e wi d e n e d for emer g e n c y v e hi c l e a c c e s s  Convert l ar g e a r e a s of t u rf g r a s s/l a w n t o p r ai rie grass e s, pri m a ril y o n sl o p e s t h at a r e n ot conduciv e t o ot h e r u s e s. Playgroun d / S pl a s h P a d  Replace e xi s ti n g p l a y g r o u n d wit h n e w adventu r e pl a y g r o u n d (6) built i n t o t h e s l o p e  Remove g a z e b o t o all o w r o o m f o r s pl a s h p a d  Construc t a n e w splash p a d (7), which i s c u r r e n tl y s h o w n o n t h e s m al l si z e f o r a s p l a s h p a d; w e will includ e p r e c e d e n t i m a g e s o f different s i z e s of s p l a s h p a d s  Seating a n d s h a d e for parent s a n d c a r e g i v e r s a r o u n d the splas h p a d a n d p l a y g r o u n d. A d d a new picni c s h elt e r b e t w e e n t h e playgro u n d a n d s pl a s h p a d.  Pavilion (8) modi fi c a ti o n s: City Council update - Oct 17, 2022 PROCESS TO DATE OVERVIEW OF DRAFT MASTER PLAN City Council update - Oct 17, 2022 CONTENTS City Council update - Oct 17, 2022 INTRO & PROCESS OVERVIEW City Council update - Oct 17, 2022 BACKGROUND INFORMATION City Council update - Oct 17, 2022 BACKGROUND INFORMATION DETAILED COMMENTS AND RESPONSES ARE INCLUDED IN THE APPENDIX City Council update - Oct 17, 2022 SUMMARY OF PHASE 1 INPUT City Council update - Oct 17, 2022 CONCEPT EXPLORATION CITY COUNCIL UPDATE IN FEBRUARY City Council update - Oct 17, 2022 FEBRUARY COUNCIL UPDATE PHASE 2 PUBLIC INPUT SUMMARY • MARCH - MAY, 2022 • ONLINE + IN-PERSON • StoryMap • Social Pinpoint map to review concept graphic • Survey questions • Open House City Council update - Oct 17, 2022 PHASE 2 PUBLIC INPUT • Video description of concept • Project timeline • Background info • Previous engagement summary • Precedent images • Link to give feedback City Council update - Oct 17, 2022 STORYMAP City Council update - Oct 17, 2022 PUBLIC CONCEPT DRAFT • Like the splashpad and playground • Concerns about removing hockey rinks • Like the new pavilion/warming house • Mixed desire for new amenities and concern about lakefront development and over development of the park in general City Council update - Oct 17, 2022 SOCIAL PINPOINT INPUT City Council update - Oct 17, 2022 SURVEY INPUT • Support for splash pad and new playground • Excitement for overlooks • Interest in more parking • Request for pickleball courts • Concern about loss of hockey rinks • Noise concerns about additional stage area on lake • Desire to preserve trees/nature in the park • Support for access to pavilion and permanent restrooms year round City Council update - Oct 17, 2022 OPEN HOUSE INPUT • Questions about use of tennis courts and interest in disc golf • Concerns about impacts to the woodland with new development • Concerns regarding Music Fest and loss of open field space • Questions about location of skate park--could it go somewhere else in Lakefront or in another park? • Beach amenities identified as high priority/short term project City Council update - Oct 17, 2022 ADVISORY COMMITTEE INPUT CHANGES MADE BASED ON COUNCIL + PUBLIC INPUT • Added lakefront programming space and boardwalk • Added overlooks • Added hockey rinks in the base plan -- skating ribbon is the alternative concept • Decreased prominence of lakefront programming space due to public input • Added pickleball courts • Flipped basketball courts and skate park • Kept lower picnic shelter City Council update - Oct 17, 2022 PREFERRED CONCEPT City Council update - Oct 17, 2022 PREFERRED CONCEPT City Council update - Oct 17, 2022 LAKEFRONT AREA City Council update - Oct 17, 2022 LAKEFRONT AREA City Council update - Oct 17, 2022 WATZL’S BEACH WATZL’S BEACH City Council update - Oct 17, 2022 NORTH PLAY AREA City Council update - Oct 17, 2022 NORTH PLAY AREA PLAYGROUND SPLASH PAD City Council update - Oct 17, 2022 SOUTH PLAY AREA SOUTH PLAY AREA SKATE PARK City Council update - Oct 17, 2022 EAST PARK / WINTER USE AREA SUMMER PAVILION & PATIO SUMMER PATIO WINTER HOCKEY RINKS Rutledge St SE Hope St SEAmphitheaterAmphitheater Sledding HillSledding Hill Community Community GardenGarden Park Park ShelterShelter Kop BuildingKop Building VolleyballVolleyballLower Prior LakeLower Prior Lake Little Prior LakeLittle Prior Lake Park ShelterPark ShelterSeasonal Slip Seasonal Slip RentalRental Mitchell Cir SELakeview Cir SERidgemont Ave SEFranklin Trail SEFranklin Trail SEBounty St SE Crossandra St SE Gateway St SE 160th St SE Jordan Ave SESt Paul AveOak St S E Minne s o t a S t S E Dakota S t S E Dakota S t S E D a k o t a S t S ECambridge Cir SEEagle Cr e e k A v e S E Eagle C r e e k A v e S E Grainwood Cir NEGrainwood Cir NEEau Claire Trail NECalmut Ave NEEau Claire Trail NE Colorado St SE Duluth Ave SEArcadia AveWest Ave SEWest Ave SEWest Ave SE Sunfish Trail SEQuincy St SE Bass St SE Birch Ave SELakeside Ave SELakeside Ave SEEvanstone Ave SEKop P k w y Main Ave SEErie Ave SEArcadia AveHsatings Ave SEBreezy Point Rd SEStefan Cir SERed Oaks Rd SE13 13 K o p P k wy C a m bridge Cir SE78 6 109 12 13 14 15 17 16 2 2 2 2 2 23 22 21 27 26 25 24 4 4 11 11 11 11 1 3 19 20 185 AmphitheaterAmphitheater Sledding HillSledding Hill Little Prior LakeLittle Prior Lake Kop BuildingKop Building VolleyballVolleyball Park ShelterPark Shelter Kop Pkwy Kop Pkwy KEY MAP 30 PRIOR LAKE, MINNESOTA DRAFT WOODLAND AND TRAILS • The southernmost parking lot, centrally located in the park would be expanded with a second drive aisle and two rows of parking stalls, which would more than double the parking stalls in that lot. • The existing baseball diamond will be removed and replaced with lawn open space that may be used for events or potentially a future amphitheater or performance space. The large lawn will continue to be programmed for youth soccer. • Consider removal of the existing picnic shelter near the baseball diamond. • Add a disc golf course along the edge of the woods • Trails through the woods: Include one main paved trail loop or spine through the woods, and transform the rest to natural surface. The natural surface trails would not be plowed. Consider winter trail uses (cross country skiing, snowshoeing, etc.) • Update the boardwalk across Little Prior Lake, potentially enhance to a bridge rather than a floating boardwalk. Add overlook in the middle of the bridge, to be used as a fishing/overlook area (shown as number 27 on overall map on page 19) Disc Golf Parallel Parking Bridge with Fishing Pier / Overlook 2 22 23 24 25 26 Stormwater basin Possible band shell location for large events Relocated, expanded parking lot Additional parking near fishing pier Disc golf Trail converted to natural surface LEGEND City Council update - Oct 17, 2022 WOODLAND AND TRAILS • Desire to have more open field space for Music Fest • Shifted new entry road to the north • Moved skate park to current band shell location • Added band shell where baseball backstop is currently • Expanded central parking lot CONCEPT CHANGES BASED ON ROTARY INPUT City Council update - Oct 17, 2022 IMPLEMENTATION CHAPTER City Council update - Oct 17, 2022 PROJECT AREAS • High level planning costs • 2022 dollars • Includes »15% construction contingency »5% mobilization »15% design and engineering • Overall project estimated total: $23.9m »Circulation Improvements: $3.4m »Lakeshore: $4.2m »Watzl’s Beach: $1.7m »North Play Area: $3.3m »South Play Area: $2.2m »East Park/Winter Use: $6.3m »Central Park: $2.9m City Council update - Oct 17, 2022 ESTIMATED COSTS City Council update - Oct 17, 2022 LAKE SHORELINE AREA City Council update - Oct 17, 2022 WATZL’S BEACH City Council update - Oct 17, 2022 NORTH AND SOUTH PLAY AREAS City Council update - Oct 17, 2022 EAST PARK / WINTER USE AREA City Council update - Oct 17, 2022 CENTRAL PARK AND WOODLAND City Council update - Oct 17, 2022 COST ALTERNATIVES City Council update - Oct 17, 2022 FUNDING QUESTIONS + COMMENTS • Make edits to the plan document based on discussion • Finalize Master Plan THANK YOU! City Council update - Oct 17, 2022 NEXT STEPS