HomeMy WebLinkAbout05(F) - Resolution Approving a Work Order for Fish Point Rd Phase 3 (Intersection) (CP 2023-03) ReportPage 1 of 2
Public Works Consultant Pool
Work Order (Reference Project Name)
WSB & ASSOCIATES, INCORPORATED, dba WSB
This work order (“Work Order”) is issued on this 21st day of November 2022 by the City of Prior
Lake (“City”) pursuant to the Public Works Consultant Pool – Master Agreement dated April 20,
2020 (“Contract”) between the City and WSB & Associates, Incorporated, dba WSB
(“Consultant”).
Based on the mutual promises and covenants set forth herein, the sufficiency of which are hereby
acknowledged, the City and Consultant agree as follows:
1. Scope of Work Order. Consultant agrees to provide, perform and complete all the services
requested by the City in this Work Order and attached Exhibit 1 (“Work”), which Work shall be
subject to the terms and conditions of this Work Order and the Contract.
2. Term of Work Order. All Work requested by this Work Order shall be completed by
December 31, 2024.
3. Compensation for Work Order. City agrees to pay the Consultant an hourly rate not to
exceed $101,932 for the Work requested by this Work Order.
4. Consultant Representative. Consultant has designated Monica Heil to manage the Work
Order subject to the supervision of Consultant’s representative.
ISSUED BY CITY OF PRIOR LAKE
___________________________________
Mayor
___________________________________
City Manager
RECEIVED AND ACCEPTED BY WSB &
ASSOCIATES, INC.
By:__________________________________
Its:__________________________________
Page 2 of 2
Exhibit 1 – Scope of Work Order
K:\013977-000\Admin\Contract\Budget Amendment_TH 13 Intersection Improvements and FT CO Services\LTR_ABROTZLER_Fish Point Road Phase III
Amendment.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM October 31, 2022
Mr. Andy Brotzler, PE
Public Works Director/City Engineer
City of Prior Lake
4646 Dakota Street SE
Prior Lake, MN 55372
Re: Agreement to Provide Professional Engineering Services for the
Fish Point Road Phase III Intersection Improvements
Dear Andy:
On behalf of WSB, we are pleased to submit this proposal to provide professional engineering
services associated with intersection improvements at TH 13/Fish Point Road , which will be
considered Phase III of the overall Fish Point Road Improvement Project. We anticipate beginning
the Phase III design work immediately upon receiving staff approval.
We expect to provide the following services to the City based on our discussion with you and
MnDOT:
•Complete the design for replacement of the entire signal system at the intersection of TH 13
and Fish Point Road. Replacement of the signal system at this intersection is proposed to
include the addition of flashing yellow left-turn arrows.
1.After reviewing the impacts to the curb lines along the south leg of Fish Point Road at
the intersection proposed with the Phase II improvements, it was determined that ½ of
the existing signal system would be impacted by the Fish Point Road improvements
planned for 2023. While MnDOT did not have replacement of this signal system
identified within their Capital Improvement Plan until FY 2027, MnDOT has stated that
through a Cooperative Agreement, the City can advance fund the replacement of
signal and repay for its 50% share of the signal replacement costs at the start of FY
2027.
2.City and MnDOT Staff have met to discuss the timing of the Phase II roadway
improvements relative to the time needed to design the signal system improvements,
and are recommending:
▪The Fish Point Road Phase II roadway improvements and the Phase III
Intersection Improvements will be bid as two separate projects. This will allow
the City to bid the roadway improvements in January 2023 and the intersection
improvements in March/April 2023. Construction work for both projects is
expected to be completed by November 2023.
▪The intersection improvements will be designed by WSB in coordination with
MnDOT’s Signal Group to ensure the project can be bid in March/April 2023.
▪MnDOT has also identified ADA improvements needed at this intersection,
which will be incorporated into the plan set. MnDOT has stated that they will
reimburse the City for the costs associated with the ADA improvements.
▪MnDOT and the City will enter into a Cooperative Agreement to ex ecute the
intersection improvements work.
EXHIBIT 1
Mr. Andy Brotzler
October 31,2022
Page 2
K:\013977-000\Admin\Contract\Budget Amendment_TH 13 Intersection Improvements and FT CO Services\LTR_ABROTZLER_Fish Point Road Phase III
Amendment.docx
Scope of Services
Based on our familiarity with the project and conversations with City and MnDOT Staff, we are
proposing to complete the following scope of services:
• Additional topographic survey collection for all legs of the intersection at TH 13 and Fish Point
Road, including signal loops and hand holes along TH 13 at the start of all turn lanes.
• Preparation of plans and specifications for the intersection improvements
• Coordination with MnDOT’s signal group for the signal system design
• Coordination with MnDOT’s Layout Committee for review and approval of the intersection
layout improvements
1. Complete replacement of the signal system within the TH 13 ROW will require MnDOT
functional group review, and additional layout submittal requirements beyond what had
been originally anticipated with the Fish Point Road project.
• Development of an Intersection Control Evaluation (ICE) for the signal system improvements
• Estimate of costs
• Preparation of contract documents
• Coordination of all approvals from City, MnDOT, and Watershed
• Bidding Administration
• Construction Administration for the intersection improvements
• Construction Observation for the intersection improvements
• Field Staking for the intersection
• As-Builts for the intersection improvements
• Project Closeout for the intersection improvements
Basis of Compensation
We propose to complete the work on an hourly basis for an estimated fee of $101,932.00. The
City will only be billed for actual hours needed to complete the aforementioned tasks.
Start Date
We propose to have this contract begin immediately upon Staff authorization to best support the
City. We understand the City will generate a Work Order for the work in accordance with our Master
Service Agreement dated April 2020. If you have any questions or concerns, please contact me at
952-737-4675. Thank you for the opportunity to continue to serve the City of Prior Lake.
Sincerely,
WSB
Monica Heil, PE
Vice President of Municipal Services
Task Description
1
1.1 Utility Location (New GSOC and updates)3 3 $474.00
1.2 Topographic Features (Intersection & TH 13 Signal Loops)10 5 15 $2,930.00
Task 1 Total Estimated Hours and Fee 3 10 5 18 $3,404.00
2
2.1 4 28 6 24 4 8 24 60 158 $25,868.00
2.2 12 8 8 28 $4,144.00
2.3 4 8 2 8 22 $3,014.00
2.4 4 4 2 4 14 $2,320.00
2.5 Coordination with MnDOT - Signal Group 6 2 8 $1,340.00
2.6 Coordination with MnDOT - Layout Review Update 4 6 40 2 52 $8,774.00
2.7 Opinion of Probable Cost 2 8 4 6 20 $2,978.00
Task 2 Total Estimated Hours and Fee 16 40 26 30 26 40 26 28 8 62 302 $48,438.00
3
3.1 Prepare Ads for Bid and Submit to Publications 4 2 6 $784.00
3.2 Distribute Plans Sets 2 2 $152.00
3.3 Answer Bidders' Questions 4 4 8 $1,512.00
3.4 Issue Addenda (if required)2 2 2 2 8 $1,224.00
3.5 Bid Opening and Tabulation 4 2 4 10 $1,444.00
3.6 Prepare Letter of Award Recommendation 2 2 4 $564.00
Task 3 Total Estimated Hours and Fee 12 6 8 12 38 $5,680.00
4
4.1 Construction Administration - Intersection Improv.8 6 4 8 10 40 76 $12,104.00
4.2 Construction Observation - Intersection Improvements 120 20 140 $18,920.00
4.3 Field Staking - Intersection Improvements 16 8 20 44 $7,768.00
Task 4 Total Estimated Hours and Fee 8 6 4 8 10 16 8 120 40 40 260 $38,792.00
5
5.1 Project Closeout Documentation 4 4 4 12 $2,280.00
5.2 Prepare Final Letter of Acceptance 1 2 3 $358.00
5.3 Obtain Record Information 2 4 6 $960.00
5.4 Prepare the Record Drawings (Intersection)2 2 8 12 $2,020.00
Task 5 Total Estimated Hours and Fee 7 8 8 4 2 4 33 $5,618.00
Total Estimated Hours 43 60 34 34 41 40 26 36 32 26 13 120 106 40 651
Average Hourly Billing Rate 206.00 172.00 158.00 192.00 158.00 162.00 123.00 159.00 76.00 207.00 172.00 132.00 154.00 169.00
Subtotal Base Fee by Labor Classification $8,858.00 $10,320.00 $5,372.00 $6,528.00 $6,478.00 $6,480.00 $3,198.00 $5,724.00 $2,432.00 $5,382.00 $2,236.00 $15,840.00 $16,324.00 $6,760.00 $101,932.00
TOTAL PROJECT COST TASKS $101,932.00
Gina DullingerErik Seiberlich
Estimate of Cost
City of Prior Lake, Minnesota
Professional Engineering Services
Budget Amendment No. 3 - Fish Point Road Reconstruction Project Phase III Intersection Improvements
Construction
Administrator
Pete Helder
Topographic Survey
Design
Senior Project
Manager Utility Engineer Transportation
Engineer AdministrativeADA Compliance
EngineerTraffic Engineer Engineering Field
Technician (Signal)
Monica Heil Tabitha WalshLaura Pietila
Engineering
Specialist
Chuck Kockmann Gus Perron
Two Person
Survey Crew
Survey
Coordinator
Water Resources
Engineer
Construction
Observer CostTotal
Hours
Mary Schwartz
Final Design Plans and Specs - Local Street and Utilities
Project Engineer
Adam Gadbois
Project Closeout
Nic Hentges
Prepare Contract Documents
Construction Services
Submit to City & MnDOT for Review and Approval
Final Design Plans and Specs - Signal & ADA Improvements
Bidding Administration