01(A) - TH13 Trail Planning Update Report
CITY COUNCIL AGENDA REPORT MEETING DATE: PREPARED BY: PRESENTED BY: AGENDA ITEM: BACKGROUND: February 27, 2023 Andy Brotzler, Public Works Director/City Engineer Andy Brotzler TH13 Trail Planning Update ITEM: IA From the 2018 Draft Parks and Trails Master Plan and subsequent Council discussions, the development of a continuous trail system along TH 13 from CH 42 to downtown has been identified as a priority. A planning analysis was authorized in 2022 to further review alignment options and estimated costs, and to evaluate potential funding sources for the future construction of this trail system. As outlined in the attached progress memorandum from WSB, two alignment options have been evaluated with updated cost estimates, and a proposed decision matrix has been developed. Staff and WSB will provide Council an update on the proposed alignments, estimated costs, and decision matrix. Following Council feedback on this information, next steps will include the evaluation and compilation of potential funding sources and public informational meetings as appropriate. City of Prior Lake I 4646 Dakota Street SE I Prior Lake MN 55372 K:\020127-000\Admin\Matrix Memo\020127-000_DRAFT Trunk HWY 13 Trail Design Matrix Memo.docx Memorandum To: Andy Brotzler, P.E., Public Works Director/City Engineer, City of Prior Lake From: Monica Heil, P.E., WSB Date: February 5, 2023 Re: City of Prior Lake – Trunk Highway 13 Trail Planning Analysis Update WSB Project No. 020127-000 1. Executive Summary In 2020, as a part of the City’s 2040 Park and Trail System Plan, the City evaluated the costs associated with extending a 10-foot bituminous trail along the west side of TH 13 from CSAH 42 to the City’s Downtown, at the terminus of the existing trail just north of CSAH 21 (Eagle Creek Avenue). The 2020 estimate assumed construction of the trail would take place within the existing TH 13 ROW and that all existing aerial utilities would remain in-place, necessitating grading and retaining wall construction in order to construct the trail. In 2020, the total project costs to construct this 2.9-mile segment of the TH 13 trail were estimated at $9.19 M. In 2022, the City began work on the Trunk Highway 13 Trail Planning Analysis. The purpose of the study was to: • Identify alternative trail alignment alternatives, and develop a decision matrix for reviewing the alignment options, and • To update construction cost estimates for revised and/or alternative alignments. As the original construction costs estimate for the roadside trail option along TH 13 were quite large, alternative alignments that could make use of existing local roadway sidewalks and on- street trails were to be evaluated as a part of this study. In addition, the City began discussions with MnDOT regarding the potential to partner with that agency to jointly deliver the project and coordinate utility relocation within the TH 13 right-of-way. Thus, two alignment alternatives are currently being evaluated – and construction costs have been updated for each of the alignment options. • Option 1 – Includes a Roadside Trail & Wetland Boardwalk o This option reflects a roadside trail between CASH 42 and CSAH 21 (Eagle Creek Avenue) within the TH 13 right-of-way. Between Boudin Street and Rustic Road, a boardwalk is included in the estimated project costs over the wetland areas adjacent to TH 13. • Option 2 – Includes a Roadside Trail, Wetland Boardwalk & Directed Route o This option also reflects a roadside trail between CASH 42 and CSAH 21 (Eagle Creek Avenue) along the majority of TH 13, except that between Fish Point Road and the entrance to Lakefront Park at CSAH 44 (160th Street), trail users will be directed to a series of on-street trails and existing sidewalks that would re-connect users to a trail system within the TH 13 right-of-way south of the entrance to Mr. Andy Brotzler February 5, 2023 Page 2 K:\020127-000\Admin\Matrix Memo\020127-000_DRAFT Trunk HWY 13 Trail Design Matrix Memo.docx Lakefront Park. Between Boudin Street and Rustic Road, a boardwalk is included in the estimated project costs over the wetland areas adjacent to TH 13. Both cost estimates have been updated from the original cost estimate prepared in 2020 to reflect coordination with MnDOT to relocate aerial utilities in-conflict with proposed trail improvements. This will allow for construction of the trail within the graded benches that parallel portions of TH 13 that are currently occupied by aerial utility poles. The two alternatives were evaluated by creating two proposed trail alignment s and assessing different feasibility criteria including cost, private property impacts, practicality, wayfinding, safety, retaining wall needs, Americans with Disabilities Act (ADA) compliance, easement needs, permitting and construction duration/constructability. These different criteria were placed into a decision matrix and compared side by side with the pros and cons of each alternative discussed within the matrix. A summary of the matrix scores and total project costs are shown below: Option Description Opinion of Probable Cost Decision Matrix Score Option 1 – Roadside Trail & Wetland Boardwalk Provides a 10-foot separated pedestrian trail that traverses down on the west side of Trunk Highway 13. A section of the trail exists as boardwalk through a wetland area. The entire trail meets all ADA requirements. $7.22 M 20 Option 2 – Roadside Trail, Wetland Boardwalk & Directed Route Provides a 10-foot separated pedestrian trail that traverses down on the west side of Trunk Highway 13. A section of the trail exists as boardwalk through a wetland area. Another section of the trail includes a directed route through existing sidewalks/streets. Portions of the trail do not meet ADA requirements. $4.47 M 35 *Note: A lower overall weighted total represents a more desirable option. Table 1.1: Trail Option Comparison The complete decision matrix can be found in Appendix A. The costs associated with easement acquisition (temporary or permanent) or right of entry documents are also not reported in this estimate. It should also be noted that the City is currently working with MnDOT to evaluate the feasibility of replacing the boardwalk component of the trail extension between Boudin Street and Rustic Road with a widened TH 13 pavement section through this portion of roadway. The City and MnDOT continue to evaluate each agency’s maintenance needs associated with a barrier separated trail to determine the total pavement section and grading impacts, and updated construction costs will be presented in the near future. Mr. Andy Brotzler February 5, 2023 Page 3 K:\020127-000\Admin\Matrix Memo\020127-000_DRAFT Trunk HWY 13 Trail Design Matrix Memo.docx Introduction Project location map is presented below in Figure 2.1. Figure 2.1: Aerial Project Location Map. Google, n.d. 2. Options The City’s goal is to provide a 10’-0” seperated pedestrian trail that connects existing trail segments at CSAH 42 and CSAH 21 (Eagle Creek Avenue). Two alternatives are currently being evaluated, and each alternative possesses its own unique benefits and challenges. Exhibits detailing the two allignment options are presented in Appendix B. An Opinion of Probable Cost for each alternative is presented in Appendix C. 3.1. Option 1 – Roadside & Wetland Boardwalk Option Option 1, consisting of well-structured trails within the TH 13 right-of-way, will run along the west side of TH 13 from CSAH 42 to the City’s Downtown. A wetland boardwalk is proposed along the northerly portion of the project between Boudin Street and Rustic Road. Beginning at Fish Point Road and continuing south to Dakota Street, retaining walls needed along sections of the trail. The southerly portion of the project proposes concrete sidewalk. Guard rail will be placed where the road sits higher than the trail for added safety. Impacts to private properties will be kept at a minimum with this option, as the trail is primarily located within MnDOT’s right-of-way. The proposed location for this trail is reasonable and will have well Mr. Andy Brotzler February 5, 2023 Page 4 K:\020127-000\Admin\Matrix Memo\020127-000_DRAFT Trunk HWY 13 Trail Design Matrix Memo.docx laid-out orientation cues for its users. The entire length of the trail and pedestrain ramps are ADA compliant. Option 1 Advantages: Impacts related to excavation and disturbance of land for the trail will be kept to a minimum. Practicality and wayfinding with this Option is reasonable and clear. The entire length of the trail is ADA compliant. Option 1 Disadvantages: The estimated cost for Option 1 is $2.75 million more than Option 2. Option 1 will also take longer to construct when compared to Option 2 due to the fact that more retaining walls and bituminous trails are proposed to be built. 3.2. Option 2 – Roadside, Wetland Boardwalk & Directed Route Option Option 2, consisting of well-structured trails on the northerly portion of the project, will run along the west side of Trunk Highway 13. A wetland board walk is proposed along the northerly portion of the project between Boudin Street and Rustic Road. Directed routes are proposed along residential streets beginning at Fish Point Road and continuing south to CSAH 44 (160th Street). Sections of the directed route will have bituminous trails and retaining walls. The southerly portion of the project proposes concrete sidewalk. Guard rail will be placed where the road sits higher than the trail for added safety. Impacts to private properties will be significant through this option. Sections of Option 2 will not be ADA compliant. Option 2 Advantages: The estimated project costs for Option 2 is $2.75 million less than Option 1. Option 2 will have have a slightly shorter construction duration when compared to Option 1 due to the fact that there are fewer proposed retaining walls and bituminous trails. Option 2 Disadvantages: Impacts to private properties will be significant through this option. A segment of the trail is routed through private properties, with retaining walls and bituminous trails proposed to be built through the private properties. Wayfinding via the structured trails, on-street trails and residential sidewalks will make it more difficult for its users to navigate. Large segments of the on-street trail will be shared between pedestrians/bikers and vehicles, making this option less desireable from a safety standpoint. Large portions of the existing sidewalks and on-street trail grades will not be ADA compliant. Work associated with the proposed trail, retaining walls, and boardwalk will require a right-of-way permit from MnDOT and temporary and permanent easements from private properties. K:\020127-000\Admin\Matrix Memo\020127-000_DRAFT Trunk HWY 13 Trail Design Matrix Memo.docx 3. Decision Matrix A detailed decision matrix that denotes details described above in a matrix format is presented in the Appendix A. 4. Next Steps Following comment from the City Council regarding these two options and further discussions with MnDOT regarding on-street barrier-separated trails in lieu of boardwalk alternatives between Boudin Street and Rustic Road, Staff and WSB will reconvene with the City Council to provide updated cost estimates, outline possible funding solutions and develop plans to seek public input regarding the two trail alignment options. K:\020127-000\Admin\Matrix Memo\020127-000_DRAFT Trunk HWY 13 Trail Design Matrix Memo.docx Appendix A Decision Matrix Score Description Score Description Estimated Cost 5 5 = more expensive 1 = less expensive 5 The estimated cost of this option is $7.22 million. This includes a 10% construction contingency and 28% indirect costs. 3 The estimated cost of this option is $4.47 million. This includes a 10% construction contingency and 28% indirect costs. Impacts to Private Properties 3 5 = more impacts 1 = fewer impacts 1 Impacts are related to the excavation and disturbance of land for the new trail. Impacts to private properties will be kept to a minimum through this option, as the trail is primarily located within MnDOT's right-of-way. 5 Impacts are related to the excavation and disturbance of land for the new trail. Impacts to private properties will be significant with this option. Segment 3 of the trail is mainly routed through private properties, with retaining walls and bituminous trails proposed to be built through private property. Practicality 4 5 = less practical 1 = more practical 1 The aspects of this trail fall within the definitions of practicality. This option is feasible and the proposed route location is reasonable. 5 Aspects from segment 3 of this option do not fall within the definitions of practicality. The proposed bituminous trails and retaining walls through the private properties are not feasible. Wayfinding 4 5 = harder navigation 1 = easier navigation 1 This option proposes well-structured paths with well laid out orientation cues for its users.5 This option proposes well structured paths in segments 1 and 2 along with well laid-out orientation cues for its users. Segment 3 of the trail will be routed through a residential neighborhood, with fair orientation cues. Nature of the combined structured paths and residential sidewalks makes it more difficult for its users to navigate. Safety 5 5 = less safe 1 = more safe 1 This option proposes a well structured trail. Guard rail will be placed on the sections where the road sits higher than the trail. This option is the safest for its users. 3 This option proposes structured trails on most, but not all segments of the project. Large segments of on-street trails are shared between pedestrians/bikers and vehicles. Guard rail will be placed on the sections where the road sits higher than the trail. This options is less safe for its users. Retaining Wall Needs 3 5 = more walls 1 = less walls 4 This option will have a significant retaining walls. Segment 3 has the majority of the proposed retaining walls. This option proposes 18,254 square feet of retaining wall. 2 Segmentx 1 and 2, proposes the same amount of retaining walls as Option 1. Segment 3 is routed through residential nehgborhoods, greatly reducing the need for retaining walls. This option proposes 4,475 square feet of retaining wall. ADA Compliance 5 5 = less compliant 1 = more compliant 1 This option proposes well -tructured trails and pedestrain ramps that are ADA compliant throughout the length of the trail.4 This option proposes segments 1 and 2 as ADA compliant. Segment 3 includes large portions of existing sidewalks and street grades that are not ADA compliant. ROW/Easement Needs 3 5 = more needs 1 = fewer needs 1 Work associated with the proposed trail, retaining walsl and boardwalk will require a right-of-way permit from MnDOT and some temporary easements from private properties for grading purposes. 4 Work associated with the proposed trail, retaining walls and boardwalk will require a right-of-way permit from MnDOT, as well as temporary and permanent easements from private properties. Construction Duration 1 5 = longer duration 1 = shorter duration 5 The construction associated with this option will have the longest duration when compared to Option 2 due to the fact that more retaining walls and bituminous trails are proposed to be built. 4 The construction associated with this option will have have a slightly shorter duration when compared to Option 1 due to the fact that there are less proposed retaining walls and bituminous trails. Note: A lower weighted total represents a more desirable option. Easement/ROW costs are not yet incorporated in the cost estimates. Weighted Totals 20 35 Prior Lake TH 13 Trail Planning Analysis - Decision Matrix Option 1 - Roadside & Wetland Boardwalk Option 2 - Roadside, Wetland Boardwalk & Directed Route Criteria Importance Scale Mr. Andy Brotzler February 5, 2023 Page 7 K:\020127-000\Admin\Matrix Memo\020127-000_DRAFT Trunk HWY 13 Trail Design Matrix Memo.docx Appendix B.1 Project Exhibits – Option 1 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS Timo th y AveBoudin DrRustic RdNatalie LaMaple TrLois AveDenese StM-614M-614MNTH 13MNTH 13K:\020127-000\Cad\Exhibits\020127-000-C-TRAL-EXHB-OPT 1.dwg 2/8/2023 3:00:49 PM WSB PROJECT NO.:020127-000TH 13 TRAIL ANALYSIS CITY OF PRIOR LAKE, MNSEGMENT 1OPTIONSFIGURE1NSCALE IN FEET0400200BITUMINOUS TRAILCONCRETE SIDEWALKRETAINING WALLBOARDWALKTH 13BOUDIN ST NEDUE TO WETLANDS AND MARSHAREAS ALONG THIS SECTION, ATYPICAL BITUMINOUS PATH WITHRETAINING WALL IS NOT FEASIBLEWITHOUT HIGHLY IMPACTFULWETLAND MITIGATION MEASURESRUSTIC RD SEOPTION 1BOARDWALKOPTION 2ON-ROAD WITH BARRIERS AND MARKINGSBOARDWALK EXAMPLEBOARDWALK NOTES:-MINIMAL IMPACTS TO WETLAND AREA-DISTANCED FROM TRAFFIC/ROADWAY-HIGHER COST-MAINTENANCE DIFFICULTIES--SPECIALTY EQUIPMENT REQUIREDEXAMPLE BOARDWALK TYPICAL SECTIONBICYCLE LANE WITH MARKINGS & BARRIER EXAMPLESOURCE: MINNESOTA DEPARTMENT OF TRANSPORTATION BICYCLE FACILITY DESIGN MANUALBICYCLE LANE WITH BARRIER - TYPICAL SECTIONSOURCE: MINNESOTA DEPARTMENT OF TRANSPORTATION BICYCLE FACILITY DESIGN MANUALFIELD PHOTO OF AREA FOR PROPOSED TRAILON-ROAD WITH BARRIERS AND MARKINGSFIELD PHOTOS OF APPROXIMATE SOUTHSTART FOR PROPOSED BOARDWALKBOARDWALK FOUNDATION EXAMPLE 137+00.00912914916918920922924926928930932912914916918920922924926928930932010203040500-10-20-30-40-50© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS Tim o thy A veBoudin DrRustic RdGlendale AveNata l ie LaOakland Beach AveMaple TrZinran AveLois AveM- 125 Comm e rce R d Kneafseys StDenese StSeven Acres StM-614Cove Ave RAMP 3754M-614MNTH 13MNTH 139109209309409509109209309409500.76%1.80%-0.56%2.47%-0.58%-3.19%-7.60%0.19%-0.49%-2.01%2.38% 4 . 7 6%0.32%2.89%0.47%9149169189209229249269289309329149169189209229249269289309320102030405060700-10-20-3093693894094294494694895095295495693693894094294494694895095295495601020300-10-20-30K:\020127-000\Cad\Exhibits\020127-000-C-TRAL-EXHB-OPT 1.dwg 2/8/2023 3:00:04 PM WSB PROJECT NO.:020127-000TH 13 TRAIL ANALYSIS CITY OF PRIOR LAKE, MNSEGMENT 1FIGURE1NSCALE IN FEET0400200BITUMINOUS TRAILCONCRETE SIDEWALKRETAINING WALLBOARDWALKTH 13BOUDIN ST NES PARK DREGAN DR (CR 42)RUSTIC RD SEEXISTINGGROUND3" BITUMINOUS TRAILCROSS SECTION A-ABITUMINOUS TRAILCROSS SECTION B-BBITUMINOUS TRAILCROSS SECTION C-CBITUMINOUS TRAILAABBCC3" BITUMINOUS TRAIL3" BITUMINOUS TRAILEXISTINGGROUNDEXISTINGGROUNDEDGE OF TH 13TH 13 CL EDGE OF TH 13 EDGE OF TH 13EXISTINGGROUNDPOTENTIALTRAILPROFILE 76+50.009549569589609629649669689709729749769549569589609629649669689709729749760102030400-10-20-30-40© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS MNTH 13Gre e n O a k s T r Marlen CirTimber TrLori RdEstate AveOmega Tr Shannon Tr Oak Ridge CirPrior CirForest CirLuther RdIndian Ridge CirGlasgow TrGlory CirForsythe Rd Forest CtCov e A v eFulbright CirFlandrau CirShannon Cir9409509609709809909409509609709809901.73%-0.55%4 . 1 6%-0.81%-2.82%-5.00%0.40%-5.00%-4.92%-1.26%-4.32%0.49%-1.68%1.72%966968970972974976978980982984986966968970972974976978980982984986010203040500-10-20-30-40-50100+00.00946948950952954956958960962964966968946948950952954956958960962964966968010203040500-10-20-30K:\020127-000\Cad\Exhibits\020127-000-C-TRAL-EXHB-OPT 1.dwg 2/8/2023 3:02:09 PM WSB PROJECT NO.:020127-000TH 13 TRAIL ANALYSIS CITY OF PRIOR LAKE, MNSEGMENT 2FIGURE2NSCALE IN FEET0400200BITUMINOUS TRAILCONCRETE SIDEWALKRETAINING WALLTH 13FISH POINT RDG R E E N O A K S T R S E 150TH ST SEEXISTINGGROUND3" BITUMINOUS TRAILCROSS SECTION D-DBITUMINOUS TRAILCROSS SECTION E-EBITUMINOUS TRAILCROSS SECTION F-FBITUMINOUS TRAILDDEEFF3" BITUMINOUS TRAIL3" BITUMINOUS TRAILEXISTINGGROUNDEXISTINGGROUNDEDGE OFTH 13TH 13CL EDGE OF TH 13 EDGE OF TH 13EXISTINGGROUNDPOTENTIALTRAILPROFILERETAINING WALLTH 13 CL 44+00.009089109129149169189209229249269289309329349369389089109129149169189209229249269289309329349369380102030400-10-20-30-40© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS Kop PkwyRidgemont Ave Candy Cove TrSaint Paul Ave Huron StJordan Ave Woodside RdTimber TrOm e g a T r Manor RdGateway StWil d w o o d C i r Mitchell CirOak StMemorial Tr Luther RdLemley CirGlory CirMillers CirCentennial StHill CirFor s y t h e R d Sant e e C i r Flagstaff CirRAMP 490Shannon CirWoodland CirLuther Rd9209309409509609709209309409509609700.67%2.60%-1.13%-0.57%2.32%-2.51%-1.00%-5.00%4.06%-3.73%0.66%-0.68%0.43%3 . 6 8%-5.00%5.00%2.00%0.78%9449469489509529549569589609629649669689449469489509529549569589609629649669680102030400-10-20-30-409409429449469489509529549569589609629649409429449469489509529549569589609629640102030400-10-20-30-40-50K:\020127-000\Cad\Exhibits\020127-000-C-TRAL-EXHB-OPT 1.dwg 2/8/2023 3:04:09 PM WSB PROJECT NO.:020127-000TH 13 TRAIL ANALYSIS CITY OF PRIOR LAKE, MNSEGMENT 3AFIGURE3NSCALE IN FEET0400200BITUMINOUS TRAILCONCRETE SIDEWALKRETAINING WALLTH 13CANDY COVE TR SEFISH POINT RDEXISTINGGROUND3" BITUMINOUS TRAILCROSS SECTION G-GBITUMINOUS TRAILCROSS SECTION H-HBITUMINOUS TRAILCROSS SECTION I-IBITUMINOUS TRAILGGHHII3" BITUMINOUS TRAIL3" BITUMINOUS TRAILEXISTINGGROUNDEXISTINGGROUNDEDGE OFTH 13TH 13CL EDGE OF TH 13 EDGE OF TH 13EXISTINGGROUNDPOTENTIALTRAILPROFILERETAINING WALLTH 13 CL TH 13 CL CAN D Y C O V E T R S E RIDGEMONT AVE SE160TH ST SE 9469489509529549569589609629469489509529549569589609620102030400-10-20-30-40© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS Main StRidgemo n t A ve Rutledge StSai n t Pau l Ave Jo r d an AveCondons StCredit River Rd SEEvanston AveBluff Heights TrGateway StMinnesota StMitch e l l C i rDakota StHope StOak StMemori a l T r Walker AveErie AveMain AveRAMP 490930940950960970930940950960970-1.05%-3.82%-0.51%-1.27%0.66%-0.68%928930932934936938940942944946948950952954956928930932934936938940942944946948950952954956010203040500-10-20-30-40K:\020127-000\Cad\Exhibits\020127-000-C-TRAL-EXHB-OPT 1.dwg 2/8/2023 3:05:41 PM WSB PROJECT NO.:020127-000TH 13 TRAIL ANALYSIS CITY OF PRIOR LAKE, MNSEGMENT 3BFIGURE4NSCALE IN FEET0400200BITUMINOUS TRAILCONCRETE SIDEWALKRETAINING WALLTH 13RIDGEMONT AVE SEEXISTINGGROUND4" CONCRETE WALKCROSS SECTION J-JBITUMINOUS TRAILCROSS SECTION K-KBITUMINOUS TRAILJJKKEXISTINGGROUNDEDGE OFTH 13 EXISTINGGROUNDPOTENTIALTRAILPROFILERETAINING WALLTH 13 CL4" CONCRETE WALKEDGE OF TH 13160TH ST SEEAGLE CREEK AVE SE Mr. Andy Brotzler February 5, 2023 Page 8 K:\020127-000\Admin\Matrix Memo\020127-000_DRAFT Trunk HWY 13 Trail Design Matrix Memo.docx Appendix B.2 Project Exhibits – Option 2 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS Timo th y AveBoudin DrRustic RdNatalie LaMaple TrLois AveDenese StM-614M-614MNTH 13MNTH 13K:\020127-000\Cad\Exhibits\020127-000-C-TRAL-EXHB-OPT 1.dwg 2/8/2023 3:00:49 PM WSB PROJECT NO.:020127-000TH 13 TRAIL ANALYSIS CITY OF PRIOR LAKE, MNSEGMENT 1OPTIONSFIGURE1NSCALE IN FEET0400200BITUMINOUS TRAILCONCRETE SIDEWALKRETAINING WALLBOARDWALKTH 13BOUDIN ST NEDUE TO WETLANDS AND MARSHAREAS ALONG THIS SECTION, ATYPICAL BITUMINOUS PATH WITHRETAINING WALL IS NOT FEASIBLEWITHOUT HIGHLY IMPACTFULWETLAND MITIGATION MEASURESRUSTIC RD SEOPTION 1BOARDWALKOPTION 2ON-ROAD WITH BARRIERS AND MARKINGSBOARDWALK EXAMPLEBOARDWALK NOTES:-MINIMAL IMPACTS TO WETLAND AREA-DISTANCED FROM TRAFFIC/ROADWAY-HIGHER COST-MAINTENANCE DIFFICULTIES--SPECIALTY EQUIPMENT REQUIREDEXAMPLE BOARDWALK TYPICAL SECTIONBICYCLE LANE WITH MARKINGS & BARRIER EXAMPLESOURCE: MINNESOTA DEPARTMENT OF TRANSPORTATION BICYCLE FACILITY DESIGN MANUALBICYCLE LANE WITH BARRIER - TYPICAL SECTIONSOURCE: MINNESOTA DEPARTMENT OF TRANSPORTATION BICYCLE FACILITY DESIGN MANUALFIELD PHOTO OF AREA FOR PROPOSED TRAILON-ROAD WITH BARRIERS AND MARKINGSFIELD PHOTOS OF APPROXIMATE SOUTHSTART FOR PROPOSED BOARDWALKBOARDWALK FOUNDATION EXAMPLE 137+00.00912914916918920922924926928930932912914916918920922924926928930932010203040500-10-20-30-40-50© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS Tim o thy A veBoudin DrRustic RdGlendale AveNata l ie LaOakland Beach AveMaple TrZinran AveLois AveM- 125 Comm e rce R d Kneafseys StDenese StSeven Acres StM-614Cove Ave RAMP 3754M-614MNTH 13MNTH 139109209309409509109209309409500.76%1.80%-0.56%2.47%-0.58%-3.19%-7.60%0.19%-0.49%-2.01%2.38% 4 . 7 6%0.32%2.89%0.47%9149169189209229249269289309329149169189209229249269289309320102030405060700-10-20-3093693894094294494694895095295495693693894094294494694895095295495601020300-10-20-30K:\020127-000\Cad\Exhibits\020127-000-C-TRAL-EXHB-OPT 1.dwg 2/8/2023 3:00:04 PM WSB PROJECT NO.:020127-000TH 13 TRAIL ANALYSIS CITY OF PRIOR LAKE, MNSEGMENT 1FIGURE1NSCALE IN FEET0400200BITUMINOUS TRAILCONCRETE SIDEWALKRETAINING WALLBOARDWALKTH 13BOUDIN ST NES PARK DREGAN DR (CR 42)RUSTIC RD SEEXISTINGGROUND3" BITUMINOUS TRAILCROSS SECTION A-ABITUMINOUS TRAILCROSS SECTION B-BBITUMINOUS TRAILCROSS SECTION C-CBITUMINOUS TRAILAABBCC3" BITUMINOUS TRAIL3" BITUMINOUS TRAILEXISTINGGROUNDEXISTINGGROUNDEDGE OF TH 13TH 13 CL EDGE OF TH 13 EDGE OF TH 13EXISTINGGROUNDPOTENTIALTRAILPROFILE 76+50.009549569589609629649669689709729749769549569589609629649669689709729749760102030400-10-20-30-40© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS MNTH 13Gre e n O a k s T r Marlen CirTimber TrLori RdEstate AveOmega Tr Shannon Tr Oak Ridge CirPrior CirForest CirLuther RdIndian Ridge CirGlasgow TrGlory CirForsythe Rd Forest CtCov e A v eFulbright CirFlandrau CirShannon Cir9409509609709809909409509609709809901.73%-0.55%4 . 1 6%-0.81%-2.82%-5.00%0.40%-5.00%-4.92%-1.26%-4.32%0.49%-1.68%1.72%966968970972974976978980982984986966968970972974976978980982984986010203040500-10-20-30-40-50100+00.00946948950952954956958960962964966968946948950952954956958960962964966968010203040500-10-20-30K:\020127-000\Cad\Exhibits\020127-000-C-TRAL-EXHB-OPT 1.dwg 2/8/2023 3:02:09 PM WSB PROJECT NO.:020127-000TH 13 TRAIL ANALYSIS CITY OF PRIOR LAKE, MNSEGMENT 2FIGURE2NSCALE IN FEET0400200BITUMINOUS TRAILCONCRETE SIDEWALKRETAINING WALLTH 13FISH POINT RDG R E E N O A K S T R S E 150TH ST SEEXISTINGGROUND3" BITUMINOUS TRAILCROSS SECTION D-DBITUMINOUS TRAILCROSS SECTION E-EBITUMINOUS TRAILCROSS SECTION F-FBITUMINOUS TRAILDDEEFF3" BITUMINOUS TRAIL3" BITUMINOUS TRAILEXISTINGGROUNDEXISTINGGROUNDEDGE OFTH 13TH 13CL EDGE OF TH 13 EDGE OF TH 13EXISTINGGROUNDPOTENTIALTRAILPROFILERETAINING WALLTH 13 CL Candy Cove TrManor RdLuther RdLemley CirHill CirSantee Cir Flagstaff Cir Woodland CirLuther RdK:\020127-000\Cad\Exhibits\020127-000-C-TRAL-EXHB-OPT 2.dwg 2/8/2023 3:13:14 PM WSB PROJECT NO.:020127-000TH 13 TRAIL ANALYSIS CITY OF PRIOR LAKE, MNOPTION 2SEGMENT 3AOPTIONSFIGURE5NSCALE IN FEET0400200BITUMINOUS TRAILCONCRETE SIDEWALKRETAINING WALLDIRECTED ROUTE(EXISTING SIDEWALK OR ONSTREET)DIRECTED ROUTE(>8.3%, NOT ADA COMPLIANT)TH 13CANDY COVE TR SEEXISTING SLOPE IS STEEP(~20%) CREATING MULTIPLEDESIGN CHALLENGES FORTHIS SECTIONRETAININGWALLOPTION 1DUAL RETAINING WALL2'10'2'DUAL RETAINING WALL NOTES:-MEETS ADA REQUIREMENTS-HIGHER COST-MAINTENANCE DIFFICULTIES DUE TOTIGHT CONSTRAINTS-REQUIRES PERMANENT EASEMENTS-HIGHLY IMPACTFUL TO PROPERTIESOPTION 2NATURAL SURFACE WALKING TRAILNATURAL SURFACE WALKING TRAIL NOTES:-DOES NOT MEET ADA REQUIREMENTS-LOWER COST-MAINTENANCE DIFFICULTIES DUE TO SLOPE ANDNATURAL SURFACE-REQUIRES PERMANENT EASEMENTS-IMPACTFUL TO PROPERTIES-MAY REQUIRE HANDRAILS AND TRAIL SIGNAGE-EROSION CONCERNS8'NATURAL SURFACE TRAIL - TYPICAL SECTIONFIELD PHOTO OF AREA FOR PROPOSED DUALRETAINING WALLDUAL RETAINING WALL - TYPICAL SECTIONFIELD PHOTO OF ROAD NEAR PROPOSEDDUAL RETAINING WALL THAT DOES NOT MEETADA REQUIREMENTSPROPOSED DUALRETAINING WALL AREAPROPOSED DUAL RETAININGWALL AREAPROPOSED ROUTE SHOWCASING STEEP GRADE © 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS Kop PkwyRidgemont Ave Candy Cove TrSaint Paul Ave Woodside RdTimber TrOm e g a T r Manor RdGateway StMitchell Cir Hope StFor e s t C i rLuther RdLemley CirGlory CirCentennial StHill CirFor s y t h e R d Sant e e C i r Flagstaff Cir Forest CtRAMP 490Shannon CirWoodland CirLuther Rd91491691892092292492692893093293493693891491691892092292492692893093293493693801020300-10-20-308. 0 0 %1.54%-1.44%-8.00%-1.55%9309409509609709309409509609708.00%4.23%1.86%95095295495695896096296496696897097295095295495695896096296496696897097201020300-10-20-30368+00.009169189209229249269289309329349369389409429449469489509529549569589609169189209229249269289309329349369389409429449469489509529549569589600102030405060700-10-20K:\020127-000\Cad\Exhibits\020127-000-C-TRAL-EXHB-OPT 2.dwg 2/8/2023 3:09:15 PM WSB PROJECT NO.:020127-000TH 13 TRAIL ANALYSIS CITY OF PRIOR LAKE, MNOPTION 2SEGMENT 3AFIGURE5NSCALE IN FEET0400200BITUMINOUS TRAILCONCRETE SIDEWALKRETAINING WALLDIRECTED ROUTE(EXISTING SIDEWALK OR ONSTREET)DIRECTED ROUTE(>8.3%, NOT ADA COMPLIANT)TH 13CANDY COVE TR SEHOPE ST SEEXISTINGGROUND3" BITUMINOUS TRAILCROSS SECTION G-GBITUMINOUS TRAILCROSS SECTION H-HBITUMINOUS TRAILCROSS SECTION I-IBITUMINOUS TRAILGGHHII3" BITUMINOUS TRAIL3" BITUMINOUS TRAILEXISTINGGROUNDEXISTINGGROUNDEDGE OF TH 13EXISTINGGROUNDPOTENTIALTRAILPROFILERETAINING WALLRIDGEMONT AVE SE RETAINING WALL 9469489509529549569589609629469489509529549569589609620102030400-10-20-30-40© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS Main StRidgemo n t A ve Rutledge StSai n t Pau l Ave Jo r d an AveCondons StCredit River Rd SEEvanston AveBluff Heights TrGateway StMinnesota StMitch e l l C i rDakota StHope StOak StMemori a l T r Walker AveErie AveMain AveRAMP 490930940950960970930940950960970-1.05%-3.82%-0.51%-1.27%0.66%-0.68%928930932934936938940942944946948950952954956928930932934936938940942944946948950952954956010203040500-10-20-30-40K:\020127-000\Cad\Exhibits\020127-000-C-TRAL-EXHB-OPT 1.dwg 2/8/2023 3:05:41 PM WSB PROJECT NO.:020127-000TH 13 TRAIL ANALYSIS CITY OF PRIOR LAKE, MNSEGMENT 3BFIGURE4NSCALE IN FEET0400200BITUMINOUS TRAILCONCRETE SIDEWALKRETAINING WALLTH 13RIDGEMONT AVE SEEXISTINGGROUND4" CONCRETE WALKCROSS SECTION J-JBITUMINOUS TRAILCROSS SECTION K-KBITUMINOUS TRAILJJKKEXISTINGGROUNDEDGE OFTH 13 EXISTINGGROUNDPOTENTIALTRAILPROFILERETAINING WALLTH 13 CL4" CONCRETE WALKEDGE OF TH 13160TH ST SEEAGLE CREEK AVE SE Mr. Andy Brotzler February 5, 2023 Page 9 K:\020127-000\Admin\Matrix Memo\020127-000_DRAFT Trunk HWY 13 Trail Design Matrix Memo.docx Appendix C.1 Opinion of Probable Cost – Option 1 WSB Project:Prior Lake TH 13 Trail Planning Analysis - Option 1 - Segment 1 Design By:JL Project Location:City of Prior Lake, MN Checked By: WSB Project No:020127-000 Date:10/20/2022 Item No. MnDOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 1 2021.501 MOBILIZATION LS 1 77,400.00$ 77,400.00$ 2 2101.505 CLEARING ACRE 1 5,000.00$ 5,000.00$ 3 2101.505 GRUBBING ACRE 1 5,000.00$ 5,000.00$ 4 2104.502 SALVAGE SIGN EACH 22 100.00$ 2,200.00$ 5 2104.503 SALVAGE GUARDRAIL L F 591 7.00$ 4,137.00$ 6 2104.503 REMOVE CURB & GUTTER L F 338 10.00$ 3,380.00$ 7 2106.507 EXCAVATION - COMMON C Y 961 40.00$ 38,440.00$ 8 2106.601 DEWATERING LS 1 40,000.00$ 40,000.00$ 9 2106.507 COMMON EMBANKMENT (CV)C Y 154 25.00$ 3,850.00$ 10 2106.507 GRANULAR EMBANKMENT (CV)C Y 1266 30.00$ 37,980.00$ 11 2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR 30 150.00$ 4,500.00$ 12 2403.603 TMBER BOARDWALK L F 730 600.00$ 438,000.00$ 13 2403.603 TIMBER RAILING L F 1533 100.00$ 153,300.00$ 14 2452.602 HELICAL PILE LOAD TEST EACH 5 6,700.00$ 33,500.00$ 15 2127.610 HELICAL PILE 10' LONG EACH 157 1,400.00$ 219,800.00$ 16 2128.610 ADDITIONAL HELICAL PILING LENGTH L F 500 65.00$ 32,500.00$ 17 2505.601 UTILITY COORDINATION LS 1 50,000.00$ 50,000.00$ 18 2521.518 6" CONCRETE WALK S F 840 15.00$ 12,600.00$ 19 2521.518 3" BITUMINOUS WALK S F 41327 5.00$ 206,635.00$ 20 2531.503 CONCRETE CURB & GUTTER DESIGN B618 L F 338 30.00$ 10,140.00$ 21 2531.601 ADA COMPLIANCE SUPERVISOR LS 1 1,000.00$ 1,000.00$ 22 2531.618 TRUNCATED DOMES S F 160 55.00$ 8,800.00$ 23 2554.603 INSTALL GUARDRAIL L F 1844 60.00$ 110,640.00$ 24 2563.601 TRAFFIC CONTROL LS 1 50,000.00$ 50,000.00$ 25 2564.502 INSTALL SIGN EACH 37 250.00$ 9,250.00$ 26 2573.501 STABILIZED CONSTRUCTION EXIT LS 1 1,000.00$ 1,000.00$ 27 2573.502 STORM DRAIN INLET PROTECTION EACH 14 250.00$ 3,500.00$ 28 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F 4133 7.00$ 28,931.00$ 29 2574.507 COMMON TOPSOIL BORROW C Y 167 30.00$ 5,010.00$ 30 2574.508 FERTILIZER TYPE 3 LB 101 5.00$ 505.00$ 31 2575.504 EROSION CONTROL BLAKNETS CATEGORY 3N S Y 3256 4.00$ 13,024.00$ 32 2575.505 SEEDING ACRE 1.0 2,000.00$ 2,000.00$ 33 2575.508 SEED MIXTURE 25-141 LB 40 15.00$ 600.00$ 34 2582.518 CROSSWALK MULTI COMP S F 1268 10.00$ 12,680.00$ CONSTRUCTION TOTAL 1,625,300.00$ CONTINGENCY TOTAL (10%)162,500.00$ SUBTOTAL 1,787,800.00$ INDIRECT COST TOTAL (28%)500,584.00$ TOTAL 2,288,384.00$ A. Trail Improvements PRELIMINARY COST ANALYSIS WSB Project:Prior Lake TH 13 Trail Planning Analysis - Option 1 - Segment 2 Design By:JL Project Location:City of Prior Lake, MN Checked By: WSB Project No:020127-000 Date:10/20/2022 Item No. MnDOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 1 2021.501 MOBILIZATION LS 1 28,700.00$ 28,700.00$ 2 2101.505 CLEARING ACRE 2.0 5,000.00$ 10,000.00$ 3 2101.505 GRUBBING ACRE 2.0 5,000.00$ 10,000.00$ 4 2104.502 SALVAGE SIGN EACH 12 100.00$ 1,200.00$ 5 2105.503 SALVAGE GUARDRAIL L F 325 7.00$ 2,275.00$ 6 2104.503 REMOVE CURB & GUTTER L F 240 10.00$ 2,400.00$ 7 2106.507 EXCAVATION - COMMON C Y 954 30.00$ 28,620.00$ 8 2106.601 DEWATERING LS 1 20,000.00$ 20,000.00$ 9 2106.507 COMMON EMBANKMENT (CV)C Y 153 25.00$ 3,825.00$ 10 2106.507 GRANULAR EMBANKMENT (CV)C Y 758 30.00$ 22,740.00$ 11 2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR 10 150.00$ 1,500.00$ 12 2411.618 MODULAR BLOCK RETAINING WALL S F 461 80.00$ 36,880.00$ 13 2505.601 UTILITY COORDINATION LS 1 25,000.00$ 25,000.00$ 14 2521.518 6" CONCRETE WALK S F 525 15.00$ 7,875.00$ 15 2521.518 3" BITUMINOUS WALK S F 40931 5.00$ 204,655.00$ 16 2531.503 CONCRETE CURB & GUTTER DESIGN B618 L F 240 30.00$ 7,200.00$ 17 2531.601 ADA COMPLIANCE SUPERVISOR LS 1 1,000.00$ 1,000.00$ 18 2531.618 TRUNCATED DOMES S F 100 55.00$ 5,500.00$ 19 2554.603 INSTALL GUARDRAIL L F 1425 60.00$ 85,500.00$ 20 2557.503 VINYL COATED FENCE L F 98 65.00$ 6,370.00$ 21 2563.601 TRAFFIC CONTROL LS 1 25,000.00$ 25,000.00$ 22 2564.502 INSTALL SIGN EACH 27 250.00$ 6,750.00$ 23 2573.501 STABILIZED CONSTRUCTION EXIT LS 1 1,000.00$ 1,000.00$ 24 2573.502 STORM DRAIN INLET PROTECTION EACH 2 250.00$ 500.00$ 25 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F 4105 7.00$ 28,735.00$ 26 2574.507 COMMON TOPSOIL BORROW C Y 166 30.00$ 4,980.00$ 27 2574.508 FERTILIZER TYPE 3 LB 218 5.00$ 1,090.00$ 28 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 3237 4.00$ 12,948.00$ 29 2575.505 SEEDING ACRE 2.0 2,000.00$ 4,000.00$ 30 2575.508 SEED MIXTURE 25-141 LB 86 15.00$ 1,290.00$ 31 2582.518 CROSSWALK MULTI COMP S F 586 10.00$ 5,860.00$ CONSTRUCTION TOTAL 603,400.00$ CONTINGENCY TOTAL (10%)60,300.00$ SUBTOTAL 663,700.00$ INDIRECT COST TOTAL (28%)185,836.00$ TOTAL 849,536.00$ PRELIMINARY COST ANALYSIS A. Trail Improvements WSB Project:Prior Lake TH 13 Trail Planning Analysis - Option 1 - Segment 3 Design By:JL Project Location:City of Prior Lake, MN Checked By: WSB Project No:020127-000 Date:10/20/2022 Item No. MnDOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 1 2021.501 MOBILIZATION LS 1 137,900.00$ 137,900.00$ 2 2101.505 CLEARING ACRE 2.0 5,000.00$ 10,000.00$ 3 2101.505 GRUBBING ACRE 2.0 5,000.00$ 10,000.00$ 4 2104.502 SALVAGE SIGN EACH 33 100.00$ 3,300.00$ 5 2104.503 SALVAGE GUARDRAIL L F 3303 7.00$ 23,121.00$ 6 2104.503 REMOVE CURB & GUTTER L F 172 10.00$ 1,720.00$ 7 2106.507 EXCAVATION - COMMON C Y 1520 30.00$ 45,600.00$ 8 2106.601 DEWATERING LS 1 20,000.00$ 20,000.00$ 9 2106.507 COMMON EMBANKMENT (CV)C Y 6251 25.00$ 156,275.00$ 10 2106.507 GRANULAR EMBANKMENT (CV)C Y 1203 30.00$ 36,090.00$ 11 2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR 10 150.00$ 1,500.00$ 12 2411.618 MODULAR BLOCK RETAINING WALL S F 17793 80.00$ 1,423,440.00$ 13 2505.601 UTILITY COORDINATION LS 1 25,000.00$ 25,000.00$ 14 2521.518 4" CONCRETE WALK S F 10259 12.00$ 123,108.00$ 15 2521.518 6" CONCRETE WALK S F 735 15.00$ 11,025.00$ 16 2521.518 3" BITUMINOUS WALK S F 54207 5.00$ 271,035.00$ 17 2531.503 CONCRETE CURB & GUTTER DESIGN B618 L F 172 30.00$ 5,160.00$ 18 2531.601 ADA COMPLIANCE SUPERVISOR LS 1 1,000.00$ 1,000.00$ 19 2531.618 TRUNCATED DOMES S F 140 55.00$ 7,700.00$ 20 2554.603 INSTALL GUARDRAIL L F 4272 60.00$ 256,320.00$ 21 2557.503 VINYL COATED FENCE L F 2955 65.00$ 192,075.00$ 22 2563.601 TRAFFIC CONTROL LS 1 25,000.00$ 25,000.00$ 23 2564.502 INSTALL SIGN EACH 48 250.00$ 12,000.00$ 24 2573.501 STABILIZED CONSTRUCTION EXIT LS 1 1,000.00$ 1,000.00$ 25 2573.502 STORM DRAIN INLET PROTECTION EACH 5 250.00$ 1,250.00$ 26 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F 6764 7.00$ 47,348.00$ 27 2574.507 COMMON TOPSOIL BORROW C Y 274 30.00$ 8,220.00$ 28 2574.508 FERTILIZER TYPE 3 LB 281 5.00$ 1,405.00$ 29 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 5010 4.00$ 20,040.00$ 30 2575.505 SEEDING ACRE 2.0 2,000.00$ 4,000.00$ 31 2575.508 SEED MIXTURE 25-141 LB 111 15.00$ 1,665.00$ 32 2582.518 CROSSWALK MULTI COMP S F 1289 10.00$ 12,890.00$ CONSTRUCTION TOTAL 2,896,200.00$ CONTINGENCY TOTAL (10%)289,600.00$ SUBTOTAL 3,185,800.00$ INDIRECT COST TOTAL (28%)892,024.00$ TOTAL 4,077,824.00$ PRELIMINARY COST ANALYSIS A. Trail Improvements WSB Project:Prior Lake TH 13 Trail Planning Analysis - Option 2 - Segment 1 Design By:JL Project Location:City of Prior Lake, MN Checked By: WSB Project No:020127-000 Date:10/20/2022 Item No. MnDOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 1 2021.501 MOBILIZATION LS 1 77,400.00$ 77,400.00$ 2 2101.505 CLEARING ACRE 1 5,000.00$ 5,000.00$ 3 2101.505 GRUBBING ACRE 1 5,000.00$ 5,000.00$ 4 2104.502 SALVAGE SIGN EACH 22 100.00$ 2,200.00$ 5 2104.503 SALVAGE GUARDRAIL L F 591 7.00$ 4,137.00$ 6 2104.503 REMOVE CURB & GUTTER L F 338 10.00$ 3,380.00$ 7 2106.507 EXCAVATION - COMMON C Y 961 40.00$ 38,440.00$ 8 2106.601 DEWATERING LS 1 40,000.00$ 40,000.00$ 9 2106.507 COMMON EMBANKMENT (CV)C Y 154 25.00$ 3,850.00$ 10 2106.507 GRANULAR EMBANKMENT (CV)C Y 1266 30.00$ 37,980.00$ 11 2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR 30 150.00$ 4,500.00$ 12 2403.603 TMBER BOARDWALK L F 730 600.00$ 438,000.00$ 13 2403.603 TIMBER RAILING L F 1533 100.00$ 153,300.00$ 14 2452.602 HELICAL PILE LOAD TEST EACH 5 6,700.00$ 33,500.00$ 15 2127.610 HELICAL PILE 10' LONG EACH 157 1,400.00$ 219,800.00$ 16 2128.610 ADDITIONAL HELICAL PILING LENGTH L F 500 65.00$ 32,500.00$ 17 2505.601 UTILITY COORDINATION LS 1 50,000.00$ 50,000.00$ 18 2521.518 6" CONCRETE WALK S F 840 15.00$ 12,600.00$ 19 2521.518 3" BITUMINOUS WALK S F 41327 5.00$ 206,635.00$ 20 2531.503 CONCRETE CURB & GUTTER DESIGN B618 L F 338 30.00$ 10,140.00$ 21 2531.601 ADA COMPLIANCE SUPERVISOR LS 1 1,000.00$ 1,000.00$ 22 2531.618 TRUNCATED DOMES S F 160 55.00$ 8,800.00$ 23 2554.603 INSTALL GUARDRAIL L F 1844 60.00$ 110,640.00$ 24 2563.601 TRAFFIC CONTROL LS 1 50,000.00$ 50,000.00$ 25 2564.502 INSTALL SIGN EACH 37 250.00$ 9,250.00$ 26 2573.501 STABILIZED CONSTRUCTION EXIT LS 1 1,000.00$ 1,000.00$ 27 2573.502 STORM DRAIN INLET PROTECTION EACH 14 250.00$ 3,500.00$ 28 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F 4133 7.00$ 28,931.00$ 29 2574.507 COMMON TOPSOIL BORROW C Y 167 30.00$ 5,010.00$ 30 2574.508 FERTILIZER TYPE 3 LB 101 5.00$ 505.00$ 31 2575.504 EROSION CONTROL BLAKNETS CATEGORY 3N S Y 3256 4.00$ 13,024.00$ 32 2575.505 SEEDING ACRE 1.0 2,000.00$ 2,000.00$ 33 2575.508 SEED MIXTURE 25-141 LB 40 15.00$ 600.00$ 34 2582.518 CROSSWALK MULTI COMP S F 1268 10.00$ 12,680.00$ CONSTRUCTION TOTAL 1,625,300.00$ CONTINGENCY TOTAL (10%)162,500.00$ SUBTOTAL 1,787,800.00$ INDIRECT COST TOTAL (28%)500,584.00$ TOTAL 2,288,384.00$ A. Trail Improvements PRELIMINARY COST ANALYSIS WSB Project:Prior Lake TH 13 Trail Planning Analysis - Option 2 - Segment 2 Design By:JL Project Location:City of Prior Lake, MN Checked By: WSB Project No:020127-000 Date:10/20/2022 Item No. MnDOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 1 2021.501 MOBILIZATION LS 1 28,700.00$ 28,700.00$ 2 2101.505 CLEARING ACRE 2.0 5,000.00$ 10,000.00$ 3 2101.505 GRUBBING ACRE 2.0 5,000.00$ 10,000.00$ 4 2104.502 SALVAGE SIGN EACH 12 100.00$ 1,200.00$ 5 2105.503 SALVAGE GUARDRAIL L F 325 7.00$ 2,275.00$ 6 2104.503 REMOVE CURB & GUTTER L F 240 10.00$ 2,400.00$ 7 2106.507 EXCAVATION - COMMON C Y 954 30.00$ 28,620.00$ 8 2106.601 DEWATERING LS 1 20,000.00$ 20,000.00$ 9 2106.507 COMMON EMBANKMENT (CV)C Y 153 25.00$ 3,825.00$ 10 2106.507 GRANULAR EMBANKMENT (CV)C Y 758 30.00$ 22,740.00$ 11 2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR 10 150.00$ 1,500.00$ 12 2411.618 MODULAR BLOCK RETAINING WALL S F 461 80.00$ 36,880.00$ 13 2505.601 UTILITY COORDINATION LS 1 25,000.00$ 25,000.00$ 14 2521.518 6" CONCRETE WALK S F 525 15.00$ 7,875.00$ 15 2521.518 3" BITUMINOUS WALK S F 40931 5.00$ 204,655.00$ 16 2531.503 CONCRETE CURB & GUTTER DESIGN B618 L F 240 30.00$ 7,200.00$ 17 2531.601 ADA COMPLIANCE SUPERVISOR LS 1 1,000.00$ 1,000.00$ 18 2531.618 TRUNCATED DOMES S F 100 55.00$ 5,500.00$ 19 2554.603 INSTALL GUARDRAIL L F 1425 60.00$ 85,500.00$ 20 2557.503 VINYL COATED FENCE L F 98 65.00$ 6,370.00$ 21 2563.601 TRAFFIC CONTROL LS 1 25,000.00$ 25,000.00$ 22 2564.502 INSTALL SIGN EACH 27 250.00$ 6,750.00$ 23 2573.501 STABILIZED CONSTRUCTION EXIT LS 1 1,000.00$ 1,000.00$ 24 2573.502 STORM DRAIN INLET PROTECTION EACH 2 250.00$ 500.00$ 25 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F 4105 7.00$ 28,735.00$ 26 2574.507 COMMON TOPSOIL BORROW C Y 166 30.00$ 4,980.00$ 27 2574.508 FERTILIZER TYPE 3 LB 218 5.00$ 1,090.00$ 28 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 3237 4.00$ 12,948.00$ 29 2575.505 SEEDING ACRE 2.0 2,000.00$ 4,000.00$ 30 2575.508 SEED MIXTURE 25-141 LB 86 15.00$ 1,290.00$ 31 2582.518 CROSSWALK MULTI COMP S F 586 10.00$ 5,860.00$ CONSTRUCTION TOTAL 603,400.00$ CONTINGENCY TOTAL (10%)60,300.00$ SUBTOTAL 663,700.00$ INDIRECT COST TOTAL (28%)185,836.00$ TOTAL 849,536.00$ PRELIMINARY COST ANALYSIS A. Trail Improvements WSB Project:Prior Lake TH 13 Trail Planning Analysis - Option 2 - Segment 3 Design By:JL Project Location:City of Prior Lake, MN Checked By: WSB Project No:020127-000 Date:10/20/2022 Item No. MnDOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 1 2021.501 MOBILIZATION LS 1 45,000.00$ 45,000.00$ 2 2101.505 CLEARING ACRE 1.0 5,000.00$ 5,000.00$ 3 2101.505 GRUBBING ACRE 1.0 5,000.00$ 5,000.00$ 4 2104.502 SALVAGE SIGN EACH 15 100.00$ 1,500.00$ 5 2104.503 SALVAGE GUARDRAIL L F 550 7.00$ 3,850.00$ 6 2104.503 REMOVE CURB & GUTTER L F 280 10.00$ 2,800.00$ 7 2106.507 EXCAVATION - COMMON C Y 1249 30.00$ 37,470.00$ 8 2106.601 DEWATERING LS 1 20,000.00$ 20,000.00$ 9 2106.507 COMMON EMBANKMENT (CV)C Y 778 25.00$ 19,450.00$ 10 2106.507 GRANULAR EMBANKMENT (CV)C Y 587 30.00$ 17,610.00$ 11 2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR 10 150.00$ 1,500.00$ 12 2411.618 MODULAR BLOCK RETAINING WALL S F 4014 80.00$ 321,120.00$ 13 2505.601 UTILITY COORDINATION LS 1 25,000.00$ 25,000.00$ 14 2521.518 4" CONCRETE WALK S F 10259 12.00$ 123,108.00$ 15 2521.518 6" CONCRETE WALK S F 735 15.00$ 11,025.00$ 16 2521.518 3" BITUMINOUS WALK S F 20939 5.00$ 104,695.00$ 17 2531.503 CONCRETE CURB & GUTTER DESIGN B618 L F 280 30.00$ 8,400.00$ 18 2531.601 ADA COMPLIANCE SUPERVISOR LS 1 1,000.00$ 1,000.00$ 19 2531.618 TRUNCATED DOMES S F 140 55.00$ 7,700.00$ 20 2554.603 INSTALL GUARDRAIL L F 756 60.00$ 45,360.00$ 21 2557.503 VINYL COATED FENCE L F 850 65.00$ 55,250.00$ 22 2563.601 TRAFFIC CONTROL LS 1 25,000.00$ 25,000.00$ 23 2564.502 INSTALL SIGN EACH 30 250.00$ 7,500.00$ 24 2573.501 STABILIZED CONSTRUCTION EXIT LS 1 1,000.00$ 1,000.00$ 25 2573.502 STORM DRAIN INLET PROTECTION EACH 8 250.00$ 2,000.00$ 26 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F 3445 7.00$ 24,115.00$ 27 2574.507 COMMON TOPSOIL BORROW C Y 140 30.00$ 4,200.00$ 28 2574.508 FERTILIZER TYPE 3 LB 111 5.00$ 555.00$ 29 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 2797 4.00$ 11,188.00$ 30 2575.505 SEEDING ACRE 1.0 2,000.00$ 2,000.00$ 31 2575.508 SEED MIXTURE 25-141 LB 44 15.00$ 660.00$ 32 2582.518 CROSSWALK MULTI COMP S F 586 10.00$ 5,860.00$ CONSTRUCTION TOTAL 945,900.00$ CONTINGENCY TOTAL (10%)94,600.00$ SUBTOTAL 1,040,500.00$ INDIRECT COST TOTAL (28%)291,340.00$ TOTAL 1,331,840.00$ PRELIMINARY COST ANALYSIS A. Trail Improvements Mr. Andy Brotzler February 5, 2023 Page 10 K:\020127-000\Admin\Matrix Memo\020127-000_DRAFT Trunk HWY 13 Trail Design Matrix Memo.docx Appendix C.2 Opinion of Probable Cost – Option 2