Loading...
HomeMy WebLinkAbout05(F) - Resolution Authorizing the Receipt of Quotes and Award Contract for the 2023 Sidewalk Maintenance Project (2023-11) Report44 21 42 27 12 42 16 82 23 18 17 78 14 83 21 0 1 Mile 21 DakotaSt SE ArcadiaAveSEErieA v e SE W i l l o w B e a c h S t S W BayAveSWWillow Ln SWWillow Beach T r l S W This product is for informational purposes and is not suitable for legal, engineering, or surveying purposes. This product has been produced by the City of Prior Lake for the sole purpose of geographic reference. No warranty is made by the City of Prior Lake regarding specific accuracy or completeness. 2023 Sidewalk Maintenance Project 1 2 2 1 0 100 200 Feet K:\020144-000\Admin\Construction Admin\020144-000 LOR-020623.docx 540 GATEWAY BLVD | BURNSVILLE, MN | 55337 | 952.737. 4660 | WSBENG.COM February 3, 2023 Honorable Mayor and City Council City of Prior Lake 4646 Dakota Street SE Prior Lake, MN 55372 Re: 2023 Miscellaneous Sidewalk Improvements City of Prior Lake, MN WSB Project No. 020144-000 Dear Mayor and City Council: Bids were received for the above-referenced project on Friday, February 3, 2023, and were opened and read aloud. One bid was received. The bid was checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating McNamara Contracting, Inc., Rosemount, Minnesota, as the low bidder with a grand total bid amount of $115,893.25. The Engineer’s Estimate for the project was $134,410.00. We recommend that the City Council consider these bids and award a contract in the grand total bid amount of $115,893.25 to McNamara Contracting, Inc. based on the results of the bids received. If you have any questions, please call me at 952.737.4675. Sincerely, WSB Monica Heil,