HomeMy WebLinkAbout05(E) - Resolution Authorizing the Receipt of Quote and Award Contract for Well 5 Rehabilitation Project Report
ITEM: 5E
CITY COUNCIL AGENDA REPORT
MEETING DATE: May 1, 2023
PREPARED BY: Christine Watson, Public Works Coordinator
PRESENTED BY: Andy Brotzler, Public Works Director / City Engineer
AGENDA ITEM: Resolution Authorizing the Receipt of Quote and Award Contract
for Well 5 Rehabilitation Project
RECOMMENDED ACTION:
Adopt a resolution receiving the quote and awarding the contract for the Well 5 rehabilitation
project.
BACKGROUND:
The city operates seven production wells to provide potable water to the community. Each year,
the above-ground components are visually inspected. More thorough inspections are completed
every 6-8 years. These inspections include pulling the pump from the well, opening the pump
and testing the electrical components, televising the drop pipe and well bowl, and identifying
necessary repairs. These repairs can range from routine pump maintenance, to well casing
replacement, to full rehabilitation.
Earlier this year, staff solicited quotes from Traut Companies and Bergerson Caswell to perform
the initial inspection and televising of Well 5, which was built in 1988 and last rehabilitated in 2016.
Bergerson Caswell was selected for the inspection and televising phase of the project. Based on
their evaluation, they have provided a quote for recommended maintenance in the amount of
$26,105. The scope of work includes:
• Replacing 7 pieces of drop pipe
• Replacing 14 line shaft bearings
• Replacing head shaft
• Rebuilding of the discharge head
• Rebuilding of pump bowl assembly
• Reconditioning motor and replacing oil
• Epoxy coating on pipe
• Shop labor
Bergerson Caswell has been the contractor on previous well rehabilitation projects for the city and
is familiar with the critical components of our water delivery system. Staff is recommending the
execution of the city standard contract with Bergerson Caswell in the amount of $26,105 to
complete the recommended maintenance on Well 5.
FINANCIAL IMPACT:
Money is budgeted every year for this type of annual well maintenance. The 2023 Water CIP
includes $52,500 for this project (601-49400.00-55530.00 Infrastructure).
City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372
Item 5E
Page | 2
ALTERNATIVES:
1. Motion and second to adopt a resolution receiving the quote and awarding the contract
for the Well 5 rehabilitation project.
ATTACHMENTS:
1. Resolution - Receive quote and award contract for Well 5 rehabilitation project
2. 20230413 Quote from Bergerson-Caswell
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 23-XXX
A RESOLUTION RECEIVING THE QUOTE AND AWARDING THE CONTRACT FOR THE
WELL 5 REHABILITATION PROJECT
Motion By: Second By:
WHEREAS, routine maintenance of the city’s production wells is a critical action for
providing clean and safe drinking water for the community; and
WHEREAS, Well 5 was installed in 1988 and last rehabilitated in 2016; and
WHEREAS, Bergerson Caswell, a reputable contractor in the industry, provided a quote in
the amount of $26,105 for recommended service based on their inspection in
March 2023; and
WHEREAS, the 2023 Water CIP includes $52,500 for this project.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The Mayor and City Manager are authorized to execute the city standard contract with
Bergerson Caswell in the amount of $26,105 for the Well 5 rehabilitation project.
3. Funding for this project shall come from the Water CIP fund 601-49400.00-55530.00.
st
Passed and adopted by the Prior Lake City Council this 1 day of May 2023.
VOTE Briggs Braid Burkart Churchill Lake
Aye
☐ ☐ ☐ ☐ ☐
Nay
☐ ☐ ☐ ☐ ☐
Abstain
☐ ☐ ☐ ☐ ☐
Absent
☐ ☐ ☐ ☐ ☐
______________________________
Jason Wedel, City Manager
Error! Hyperlink reference not valid.
Bergerson - Caswell Inc.
5115 Industrial Street • Maple Plain, MN 55359
Telephone: 763 - 479 - 3121 Fax: 763 - 479 – 2183 E-Mail: info@BergersonCaswell.com
Equal Opportunity Employer/Contractor
Bergerson - Caswell Inc.
5115 Industrial Street
Maple Plain, MN 55359
(763) 479 -3121 Fax: (763) 479 -2183
April 13, 2023
CITY OF PRIOR LAKE
Attn: Mr. Jake Theisen cell(952) 484-6847
17073 Adelmann Street SE ph(952) 447-4054
Prior Lake, MN 55372 fax(952) 440-9678
RE MAINTENANCE INSPECTION REPORT FOR WELL #5, With REPAIR PARTS PRICING
Dear Mr. Theisen;
Bergerson-Caswell Inc. appreciates the opportunity to assist you with your well & pump needs. As requested we are supplying a
quote to perform the requested repairs/reconditioning to well pump #5. This pump currently is due for maintenance and was
Removed a couple of weeks ago, we have disassembled and inspected all of the components in this pump installation and
recommend the following repairs be performed to the different components.
Overall the pump and well are in fairly good condition the bottom depth was same as when we reconditioned it in 2016, so no
additional fill has built up since the last inspection. The pump does show normal signs of wear such that the bearing have .015
wear and the impeller skirts are worn to .048, according to the manufacture these values would indicate replacing the all
bearing and having the impellers machined and wear rings reinstalled. These two repairs will bring the pump bowl back to as
new condition and continue to operate as efficiently as designed. The other recommended repairs are the normal bearing
replacement in the spider assemblies, straightening the line shafts, and reconditioning the discharge head packing gland, and
replacing 65’ of column pipe. There are 75’ of pipe that we are reusing but 55’ is pipe that is above the SWL. The well was
tested and video investigated, and everything appears normal I have included the results from the performance test, the
installation data sheet, as well as the video investigation report along with this write up.
One item I am not 100% sure about is epoxy coating. The last inspection we epoxy coated your pipe in anticipation that it would
last through two maintenance cycles, but as it stands we are still replacing 65’. Now the epoxy coating has held up on all the
pipe but the one we recommending replacing are corroded and the sealing surfaces (end of pipe with no epoxy)is where it is
bad. The remaining areas of the pipe is still full thickness and in decent shape. I have offered a price for the epoxy coating the
replaced pipe, and to rough up the surface on the ones that would get reused and recoat them $300/ 10’ section new and
$120/ 10’ on the reused. I have included this below.
PROJECT BID Materials and Services recommended to be performed at Well #5:
6 each 10"x 10' T & C drop pipe @ 1,350.00/ea $ 8,100.00
1 each 10”x 5’ T & C drop pipe @ $975.00/ea $ 975.00
Replace 14 Line shaft Bearings @ 35.00/ea $ 490.00
Replace Head shaft $ 750.00
Shop Labor to repair equipment; clean & straighten shafting, clean reused pipe, change
Bearings in the spiders, repair pump; 30 Hrs @ $115.00/hr $ 3,450.00
Rebuild discharge head $ 550.00
Rebuild Pump Bowl Assembly (American Turbine 12-H-100 -4 stage)
Set of bowl bearings $ 950.00
Machine impeller & install wear rings 4 each @ $750.00/ea $ 3,000.00
Drill and tap an additional hole in discharge for Stilling tube access (we are limited to location and size ) $ 500.00
Install 1” poly line for obtaining water levels 280’ @3.00/ft $ 840.00
4) Replace Oil & grease in VLT motor $ 500.00
The installation had a bit of a vibration going on, and I feel this motor should get reconditioned
Recondition the 75 Hp VHS motor Estimate $3,150.00
Epoxy Coating/Re-Coating the column pipe $300/10’section on new, & $120/10’ reused $2,850.00
TOTAL MATERIALS & SERVICE COST $26,105.00
If you have any questions pertaining to the cost update/ inspection report, would like to schedule a meeting at our facility to go
over your Well pump #5 installation and the disassembled components, or would like for us to perform these repairs, please do
not hesitate to contact us at (763) 479-3121 or my cell (612) 369-3652 . We will wait to perform any additional services to this
equipment until we hear back from you.
Sincerely;
BERGERSON CASWELL INC. Tim Berquam Project Manager