Loading...
HomeMy WebLinkAbout05(D) - Resolution Approving a Work Order for Professional Engineering Services for the 2023-2024 Stormwater Pond Maintenance Project (CP 2023-18) ReportPage 1 of 2 Public Works Consultant Pool Work Order 2023-2024 Stormwater Pond Maintenance Project WSB & ASSOCIATES, INCORPORATED, dba WSB This work order (“Work Order”) is issued on this 7th day of August, 2023 by the City of Prior Lake (“City”) pursuant to the Public Works Consultant Pool – Master Agreement dated April 20, 2020 (“Contract”) between the City and WSB & Associates, Incorporated, dba WSB (“Consultant”). Based on the mutual promises and covenants set forth herein, the sufficiency of which are hereby acknowledged, the City and Consultant agree as follows: 1.Scope of Work Order. Consultant agrees to provide, perform and complete all the services requested by the City in this Work Order and attached Exhibit 1 (“Work”), which Work shall be subject to the terms and conditions of this Work Order and the Contract. 2.Term of Work Order. All Work requested by this Work Order shall be completed in accordance with the project schedule established by the City Engineer. 3.Compensation for Work Order. City agrees to pay the Consultant an hourly sum not-to- exceed $35,900 as full and complete payment for the Work requested by this Work Order. 4.Consultant Representative. Consultant has designated Jake Newhall, PE, to manage the Work Order subject to the supervision of Consultant’s representative. ISSUED BY CITY OF PRIOR LAKE ___________________________________ Mayor ___________________________________ City Manager RECEIVED AND ACCEPTED BY WSB & ASSOCIATES, INC. _____________________________________ Signature ____________________________________ Title Page 2 of 2 Exhibit 1 – Scope of Work Order \\wsbgvfiles01.wsbeng.local\resources\GROUP DATA\WATER RESOURCES\WR Proposal Folder\Prior Lake\LTR PROP-n monserud-2023-2024 Pond Maintenance.docx 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 5 5 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M June 26, 2023 Mr. Nick Monserud, PE Assistant Public Works Director City of Prior Lake 4646 Dakota Street SE Prior Lake, MN 55372 Re: Proposal to Provide Surveys, Final Design, and Construction Management for the 2023- 2024 Stormwater Pond Maintenance Project City of Prior Lake, MN Dear Mr. Monserud: Attached for your review and approval is our proposed scope of services, fee, and schedule for providing professional engineering services to complete the surveys, final design, and construction management for the 2023-2024 Stormwater Pond Maintenance Project. Table 1 describes our recommended approach for pond maintenance over the next two years, focused on ponds that were previously recommended for maintenance or that drain to Upper Prior Lake, which is impaired and has a TMDL. It also includes surveying those ponds that were identified in the Ten-Year Stormwater Pond Management Plan (September 2021) as survey priority ponds that have not yet been surveyed. Estimated construction costs are $176,000 in 2023 and $209,000 in 2024. Table 1: Pond Maintenance Recommendations Basin ID Survey Date Total Construction Cost Estimate Recommended Action 233 2021 $166,000 2023 Pond Maintenance 98 2020 $10,000 2023 Pond Maintenance 167 2014 $123,000 2024 Pond Maintenance 168 2021 $50,000 2024 Pond Maintenance 172 2021 $36,000 2024 Pond Maintenance Multiple 2014 or N/A N/A 2023 Pond Surveys: Ponds 95, 127, 128, 144, 161, 167 We are excited to work with you on this project. If you are in agreement with this proposal, please sign where indicated below. This proposal is being offered as a supplemental agreement to our master services agreement for professional engineering services with the City of Prior Lake. Please do not hesitate to contact Jake at 612-990-3576 with any questions. Sincerely, WSB Jake Newhall, PE Laura Rescorla, PE Director of Water Resources Project Engineer Attachment Mr. Nick Monserud June 26, 2023 Page 2 ACCEPTED BY: City of Prior Lake, MN Name Title Date Mr. Nick Monserud June 26, 2023 Page 2 SCOPE OF ENGINEERING SERVICES FOR 2023-2024 STORMWATER POND MAINTENANCE PROJECT FOR THE CITY OF PRIOR LAKE SCOPE OF ENGINEERING SERVICES This work plan consists of the surveys, final design, and construction management for the 2023- 2024 Stormwater Pond Maintenance Project for the City of Prior Lake. The following are the tasks that will be included: Task 1 – Project Management ($2,700) Project management will be performed throughout the course of the project. The following subtasks are included as part of Project Management: 1.1 Attend project update meetings with City staff to discuss draft plans, final plans, cost estimates, bidding, and other project variables. This will include developing agendas, preparing handouts and graphics, and attending meetings. 1.2 Work with project team and the City to coordinate project deliverables, schedule, and budget. Deliverables: Two (2) meetings with City staff to review draft plans and final plans. Task 2 – Permit Coordination ($2,500) This task consists of coordinating and obtaining the required permits for the proposed pond maintenance activities. It is anticipated that US Army Corps of Engineers permitting will be required based on experience with similar projects. WSB will coordinate the necessary Wetland Conservation Act (WCA) no-loss applications. 2.1 US Army Corps of Engineers approval for the excavated ponds. 2.2 WCA no-loss applications. Deliverables: Necessary permitting documentation for the US Army Corps of Engineers and WCA. This task does not include any necessary permit application fees; these will be passed on to the City if applicable. Task 3 – Sediment Testing ($2,500) This task includes sediment sampling and analysis to determine the appropriate sediment disposal methods (consistent with the MPCA’s Managing Stormwater Sediment: Best Management Practice Guidance) for Ponds 98 and 233. Deliverables: Sediment Testing Spreadsheet. This task includes lab fees which are anticipated to be approximately $300 per sample. Task 4 – Pond Surveys and Memos ($7,100) This task consists of inspecting/surveying six ponds: 95, 127, 128, 144, 161, 167. Findings from the inspections will be used in developing the pond review memos and maintenance recommendations. SWAMP will be updated to reflect the inspection results. Deliverables: Bathymetric maps and memos (6) and updated SWAMP based on pond inspections. Mr. Nick Monserud June 26, 2023 Page 3 Task 5 – Construction Documents ($10,400) This task consists of completing construction plans, specifications, and bidding documents for the 2023-2024 Stormwater Pond Maintenance Project to clean out ponds 98 and 233. Plans are anticipated to include cover sheet, grading plan, erosion control/restoration, and details. An updated cost estimate will be developed to verify consistency between the proposed improvements and the City project budget. This scope assumes answering questions during the bid process to help facilitate the understanding of construction expectations. 5.1 Prepare draft construction plans, specification, and updated cost estimate. 5.2 Finalize construction plans, specification, and bidding documents based on feedback from City staff. Deliverables: Final Plans, Specifications, and Bid Documents. Task 6 – Construction Management ($10,700) Construction management will be performed throughout the course of construction. This will include attending the pre-construction meeting as well as weekly progress meetings throughout the project, and other necessary construction coordination. This task will include part-time observation (approximately 10-20 hours per week). This will include inspection of all critical construction components as well as regular check-ins with the contractor and the City. WSB will also perform the necessary construction staking and survey work. This includes any necessary survey for record drawings. 6.1 Attend weekly construction meetings. 6.2 Part-time construction observation. 6.3 Review and approve pay vouchers. 6.4 Construction staking and record drawings. Deliverables: Construction Meetings, Construction Observation, Construction Staking, Record Drawings. TOTAL ESTIMATED ENGINEERING FEE The cost to provide the scope of services outlined in this proposal will be billed hourly, based on our current hourly rates. We are proposing to complete the 2023-2024 Stormwater Pond Maintenance Project for an hourly not-to-exceed fee of $35,900. TIME SCHEDULE Based on the current project schedule, WSB proposes to complete the construction documents by October of 2023 to allow for bidding and construction in the winter of 2023-2024. 170TH ST E SUNRAY BLVD S W JEFFE R SPASS NW LAKESIDE A V E S E F R A N K L I N T R L S E G R A I N W O O D C I R N E WE S T A V E S E C REEKSIDE CIR SE FIVE HA W K S AVE S E C A R D I N A L R I D G E TRL SE CROSSANDRA ST SE VI C T O R I A C U R V S E TURN E R DR SW BOBCAT TRL NW FOXTAIL TRL NW FREMONTA VE N W L O R D S S T N E WILDS PKWY NW W I L D E R NESS T R L S E FISH POINT RD SE MAIN AV E S E PERSHING ST S W GLYNW A T E R T R LNW N O R T H W O O D R D N W RASP B E R RYRI DGE R D NE R ASPBERR Y R I D GE RD NW G R EEN OAKSTRLSE M U S H T O W N R D SE REDOAKSRDSE VILLAGE LAKE DR SE INGUADONA BEA C H CIRSW D E E R F I E L D D R S E B A LSAM ST SW C A N D Y C O V E TRL SE ISLANDVIE W RDN W L I L A C L N S E L Y O N S AVE S E W O O D S I D E R D SE SUNSET TRL SW OAK RIDGE CIR SE T O RONTO AV E S E W O ODDUCK T R L N W CATES ST SE PLEASANT ST SE RI D G E M O N T A V E S E PARK V I EW DR S E W I L L O W W OOD S T S W FA I RLAWN SHORES TRLSE RI D GEWOOD CTSE S P R UCET R L S W IT A S C A A V E S E AD E L M A N N S T S E CRE D I T R I V E R R D S E VALE CIR SW SYCAMORE TRL S W C A L M U T A V E N E FAWN M EADO W CURVSE B L I N D LAKE TRLSE W I L L O W W O O D S T S E DAKOT A S T S E MAVES TRL SE HURON ST SE HAWK RI D G E R D NW BROOKS CIR SE PRIORWOODSTSE E AU C L AI R E T RL NE RUTLE D G E S T S E FA I R WAYHEIGHTS RD NW REVEREWAY W I L L O W B E A C H S T S W WIND S O R LN SE BOUNTY ST SE M A R K L E Y L A K E D R S E SHAN N O N TRL SE SNELL CT SE D U L U T H AVESE B R U N S W ICK AVE S E EV A N S T O N A V E SE BASSWOOD CIR S W C E N T E R R D S W SA I N T P A U L A V E S E WHITE DRSU E AN N L N RIVER B I R CHPL S E BLUF F H E I G H T S TRLSE WH I T E W O O D A V E JO R D A N A V E S E L O S T H O R I Z O N CIR SE H I G HLAND A V E N W S O U T H S H ORE DR 152ND ST W WILLO W B E A C H TRL S W GRIGG S S T S W SKY L I N E AVENW HOP E STSE COLORADO ST SE EL M AV E S W CO UNTRY D R F L A G AVE S G R E E N H E I G H T S T R L S W WILLOW LN S W T OWER ST SE H ORIZON TRLSE PO N D S P K W Y SE ANNA TRL SE W I LDHOR S E P A SS NW MARLE N C I R S E SU E L LN A RCT I C C I R N W MOUNT C U R V E BLVD S E T I M B E R C R E S T D R S E MANITOURD NE FR A N K L I N CI R S E EAST O A K POINT D R S E C A T E S L A K E D R WILDERN E S SRIDGE RD N W K N O L L R IDGE D R NW P A R K N I COLLET A V E SE PO N D S E D G E LN S E WESTWOOD DR SE WELCOME AVE SE W S I D E D R COTTON W OODLNSE B R E E Z Y P T R D SE PONDVIE W T RL SE ISL A N D V I E W C I R NW SUNR A Y CIR S W K O PPK W Y SE STO N EBRIAR C IR SW 83 12 21 44 23 82 167172 98 233 168 This product is for informational purposes and is not suitable for legal, engineering, or surveying purposes. This product has been produced by the City of Prior Lake for the sole purpose of geographic reference. No warranty is made by the City of Prior Lake regarding specific accuracy or completeness. 2023-2034 Stormwater Pond Maintenance Project (CP 2024-18) 8/7/2023 0 0.5 1 Miles