Loading...
HomeMy WebLinkAbout05(F) - Resolution Authorizing Well 3 Pump Replacement City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372 CITY COUNCIL AGENDA REPORT ITEM: 5F MEETING DATE: February 27, 2024 PREPARED BY: Nick Monserud, Assistant Public Works Director PRESENTED BY: Andy Brotzler, Public Works Director / City Engineer AGENDA ITEM: Resolution Authorizing Well 3 Pump Replacement RECOMMENDED ACTION: Adopt a resolution authorizing the pump replacement at Well 3. BACKGROUND: The city operates seven production wells to provide potable water to the community. Each year, the above-ground components are visually inspected. More thorough inspections are completed every 6-8 years. These inspections include pulling the pump from the well, opening the pump and testing the electrical components, televising the drop pipe and well bowl, and identifying necessary repairs. These repairs can range from routine pump maintenance, to well casing replacement, to full rehabilitation. Earlier this year, staff solicited quotes from Traut Companies and Bergerson Caswell to perform the initial inspection and televising of Well 3, which was built in 1973 and last rehabilitated in 2017. Bergerson Caswell was selected for the inspection and televising phase of the project. Based on their evaluation, they have provided a quote for recommended maintenance in the amount of $26,550. The scope of work includes: • Replacing 6 pieces of drop pipe • Replacing 14 line shaft bearings • Replacing head shaft • Rebuilding of the discharge head • Rebuilding of pump bowl assembly • Reconditioning motor and replacing oil • Epoxy coating on pipe • Shop labor Bergerson Caswell has been the contractor on previous well rehabilitation projects for the city and is familiar with the critical components of our water delivery system. Staff is recommending the execution of the city standard contract with Bergerson Caswell in the amount of $26,550 to complete the recommended maintenance on Well 3. FINANCIAL IMPACT: Money is budgeted every year for this type of annual well maintenance. The 2024 CIP includes $55,000 for this project (601-49400.00-55530.00 Infrastructure). Item 5F Page | 2 ALTERNATIVES: 1. Motion and second as part of the consent agenda to adopt a resolution authorizing the pump replacement at Well 3. 2. Motion and second to remove this item for the consent agenda for further discussion. ATTACHMENTS: 1. Resolution Error! Hyperlink reference not valid. 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 24- A RESOLUTION AUTHORIZING THE PUMP REPLACEMENT AT WELL 3 Motion By: Second By: WHEREAS, routine maintenance of the city’s production wells is a critical action for providing clean and safe drinking water for the community; and WHEREAS, Well 3 was installed in 1973 and last rehabilitated in 2017; and WHEREAS, Bergerson Caswell, a reputable contractor in the industry, provided a quote in the amount of $26,550 for recommended service based on their inspection in February 2023; and WHEREAS, the 2024 CIP includes $55,000 for this project. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The Mayor and City Manager are authorized to execute the city standard contract with Bergerson Caswell in the amount of $26,550 for the Well 3 rehabilitation project. 3. Funding for this project shall come from the CIP fund 601-49400.00-55530.00. Passed and adopted by the Prior Lake City Council this 27th day of Feburary 2024. VOTE Briggs Braid Burkart Churchill Lake Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Jason Wedel, City Manager