HomeMy WebLinkAbout05(E) - Resolution Authorizing Credit River Lift Station Pump Replacement Report21
21
23
44
Franklin
Credit
Deerfield
Ryan
Enclave
Scott County GIS
Credit River
Lift Station
Service Area
This product is for informational purposes and is not
suitable for legal, engineering, or surveying purposes.
This product has been produced by the City of Prior
Lake for the sole purpose of geographic reference. No
warranty is made by the City of Prior Lake regarding
specific accuracy or completeness.
0 1,000 2,000
Feet
Sewer Type
Gravity
Forcemain
Feb 2024
Quote
To: Brad From: Dan Shimota 612-616-6741
Company: City of Prior Lake Date: 2/22/2024
Fax: Pages: 1
Phone: CC:
SUBJECT: 40 Hp Hydromatic repair
Brad,
After tearing the pump down in our shop we have found the following items that need to be repaired
and replaced. Looking at the power cable, it looks as if there was a chemical attack as well as on the
discharge bracket. We suggest looking into what may possibly be being dumped in from possible
industry or homes in the area.
Stator to be rewound/ new seals and bearings/ all o rings/60’ of power cable and sensor
cable/discharge bracket and shaft repair where the lower bearing and upper seal sit. The Impeller on
this pump is bad but we would use the spare that we fixed for you last year.
Total for repair would be $10,901.00 plus freight lead time for all parts and repair would be 2-3 weeks
shop warranty is 90 days on all repaired parts
For your consideration a Complete new pump to replace this one would be $22,536.00 plus freight and
is 10-12 weeks out. This would have a 5 year pro rated warranty and we would suggest installing it in
place of the other original pump and use that one as your spare.
If you have any Questions please feel free to contact me on my cell phone 612*616*6741
Thank You,
W.W. Goetsch Associates, Inc.
Dan Shimota
5250 West 74th Street
Minneapolis, MN 55439-2226
Phone: 952-831-4340, ext. 171
Fax: 952-831-2357