HomeMy WebLinkAbout4B Residences at Crest Woods PUD-PrePlat PC Report
4646 Dakota Street SE
Prior Lake, MN 55372
PLANNING COMMISSION AGENDA REPORT
MEETING DATE: December 9, 2024
AGENDA #: 4B
PREPARED BY:
PRESENTED BY:
Paul Moretto, Planner
Paul Moretto
AGENDA ITEM: Consider a Preliminary Plat and Preliminary Planned Unit Development Plan for
a development to be know as Residences at Crest Woods at 13855 and 13755
Crest Avenue SE
DISCUSSION: Introduction
Prior Lake Development LLC has applied for approval of a Preliminary Plat and Pre-
liminary Planned Unit Development (PUD) Plan to be known as The Residences at
Crest Woods. The application proposes 70 villa lots in a low-density residential devel-
opment at 13855 and 13755 Crest Avenue SE near the intersection of Crest Avenue
SE and County Road (CSAH) 42.
The purpose of this public hearing is to consider a request for a Preliminary Plat and
Preliminary PUD Plan for the subdivision of 70 single-family detached residential lots
on approximately 25.40 acres of developable land at 13855 and 13755 Crest Avenue
SE.
History
In March 2020, the Planning Commission reviewed and recommended denial of a re-
quest to amend the Comprehensive Plan to change the land use guidance from Urban
Low Density to Urban Medium Density and a related rezoning request to change the
zoning of the subject property from A. Agricultural to R-2, Medium Density Residential
to allow development of the property as a medium density residential subdivision. The
agenda item did not include an application for Preliminary Plat and Preliminary Planned
Unit Development Plan; however, a concept plan with 92 total units; 67 attached row
home lots and 27 single family detached lots was included in the packet. The request
was withdrawn prior to City Council consideration.
In July 2021, the Planning Commission recommended approval of a request from Prior
Lake Development, LLC to rezone the subject property from A. Agricultural to R-1, Low
Density Residential and a preliminary plat and PUD Overlay District for a 61-lot low
density residential subdivision to be known as The Villas at Crest Woods, which was
approved by the City Council in September 2021.
Developers have 12 months to submit a final plat application after preliminary plat ap-
proval. The City Council approved a request for a six-month extension to the deadline
for submitting The Villas at Crest Woods final plat application in September 2022 and
again in March 2023. The developer did not submit the final plat application by Sep-
tember 7, 2023 so the preliminary plat approval expired.
In November 2023, the City Council approved an ordinance to remove the PUD Over-
lay District on the subject property.
2
On September 23, 2024 the Planning Commission held a hearing on the proposed
development, which was known as The Villas at Crest Woods and included 98 units
consisting of single-family detached, villa, and attached rowhomes. The commission
reviewed the plan and took public comment. A motion and a second was made to table
the item so that staff and the developer could consider the public comment and revise
the plans to address the issues raised in the hearing.
Staff met with the developer and reiterated the comments and concerns of the public
and the developer discussed ideas and changes that could be made. A resubmittal
was made on October 8th removing eight units, increasing vegetation throughout the
development and adding parking and circulation in the rowhome street network.
On October 14, 2024 the Planning Commission recommended denial of the applica-
tion. Following the Planning Commission’s recommendation of denial, t he developer
withdrew their plan for the 90-lot mixed unit plan and asked the Community Develop-
ment Department to review and comment on an updated plan that contains only villa-
style homes on single-family detached lots.
On November 18, 2024 the developer formally submitted an updated plan for a villa
home project. This proposal significantly reduces the number of units and simplifies the
project to just villa lots.
In addition to the reduction of units, the project plans to provide a number of public
benefits such as trials, increased right-of-way dedication to Scott County, and the con-
struction of 138th Street NE and several other street connections to enhance the traffic
flow in the immediate area.
PRELIMINARY PLAT AND PRELIMINARY PLANNED UNIT DEVELOPMENT PLAN
The subject parcel is 29.14 acres with 25.40 acres developable for residential homes.
Topography, wetland locations, and the alignment of 138th Street NE, a collector road,
require lot size variations that are not conducive to standard Low-Density R-1 lots.
Therefore, a Planned Unit Development is proposed for this development to both min-
imize development impact while maintaining a minimum density of 2.5 units per acre.
PHYSICAL SITE CHARACTERISTICS:
Total Site Area: The total development site area is approximately 29.14 acres. Net
acreage for development is approximately 25.40 acres.
Topography: The area includes upland around 1000’ MSL elevation with moderate
undulation with a high point near 1025’ MSL. There are lower wetlands near 980’ MSL.
Wetlands: There are wetlands located throughout the property. The unique lot design,
layout and unit types take this fact into consideration. The developer proposes mini-
mizing impact on the wetland through design. These designs are evaluated under the
regulations of the Weland Conservation Act.
Access: The primary access to this site is at the intersection Crest Avenue SE and a
private drive. Additional access includes 138th Street NE, Wildflower Way NE, Jackson
Street NE, Meridian Way NE, Apex Way NE, and Lupine Trail NE. A strategic goal of
the city is the connection of 138th Street NE to Crest Avenue SE. The function of 138th
3
Street NE as a collector street requires minimizing access to driveways. The proposal
seeks to place 14 units of villa-style homes on 138th Street NE; city staff is recommend-
ing the applicant decrease the number of units from 14 to 12 along 138th to provide a
wider lot area and decrease the number of access points on 138th Street; the applicant
has indicated support for this recommendation, which would reduce the total lot count
to 68. The thought behind eliminating two lots is it would increase the average lot width
from 49 ft. to 58 ft. which would allow future property owners to install a small hammer-
head on their driveway and allow them to enter 138th Street forward, as opposed to in
reverse, if safety concerns arise.
2040 Comprehensive Plan: This property is guided for Residential Low Density in the
Comprehensive Plan and the development proposal matches this designation.
Zoning: The subject parcel is zoned R-1, Low Density Residential. The density pro-
posed by this development matches the requirements of the R-1 zoning.
PROPOSED PLAN
Lots: The development plan calls for 69 new residential lots in addition to creating a
new lot around an existing home, for a total of 70 lots.; however, based on staff’s rec-
ommended condition to eliminate two lots on 138th Street, a total of 68 lots would be
provided
Villa Lot Single-Family Units
The villa lots will range from 5,712 to 13,000+ square feet. Front yard setbacks will be
25 feet with side yard setbacks of 6.5 feet. Minimum rear yards will be 20 feet.
Density: Density of the development is based on the net area of the site, which is
approximately 25.40 acres. Provided staff’s recommendation to reduce the number of
lots along 138th Street is accepted by the Planning Commission and City Council, there
will be a total of 68 units for a net density of 2.68 units per acre. This is consistent with
R-1 zoning and LD-R land use standards which have a minimum 2.5 unit per acre
requirement. This density is substantially less than the adjacent subdivisions: Haven
Ridge to the north is 3.72 units per acre and Summit Preserve (R-2 zoning) to the east
and south is 4.32 units per acre.
Building Setbacks: The developer is proposing the following standards as part of the
R-1, Low Density Residential Planned Unit Development:
Setbacks R-1 Villa Lots
Front 25’ 25’
Side 10’ 6.5’
Rear 25’ 20’
Side yard (abutting street) 25’ 25’
Min. Lot Width 86’ 49’
Min. Lot Depth 140’ 120’
Min. Lot Size 12,000 sf 5,712 sf
Sidewalk/Trails: Five-foot sidewalks are planned for the southside of 138th Street NE
to Jackson Street NE and then an eight-foot bituminous path connecting to a trail on
Crest Avenue NE. A sidewalk on the southside of Wildflower Way NE will connect to
Jackson Street NE. A sidewalk on the northside of Meridian Way NE will connect to the
eastside of Lupine Trail NE traveling north to 138th Street NE.
4
Tree Replacement: There are significant trees onsite and will require tree replace-
ment. The tree survey identifies 15,757 inches of total trees. The applicant will be re-
quired to submit a revised landscaping and tree replacement plan that conforms to city
standards and replacement ordinances before an application for Final Plat can be ap-
proved.
Streets: The proposed project will have local public streets that will be 32’ back of curb
to back of curb within a 66’ Right-of-Way (ROW). All public streets will be constructed
to the City of Prior Lake Engineering and Public Works Standards.
The main connection through the subdivision will be 138th Street NE which will function
as a collector going east to west. The Lupine Trail NE becomes Jackson Street NE at
138th Street NE and is the primary north/south connection. Wildflower Way NE and the
small connecting streets servicing the northern villas homes will connect to Jackson
Street NE. Meridian Way NE and Apex Way NE will connect to Lupine Trail NE south
of 138th Street NE. 138th Street NE will have direct access including 12 villa homes,
Sanitary Sewer / Water Mains: Sanitary sewer and watermains will be extended
through 138th Street NE.
Grading / Storm Water: The site features modest changes in grading. The proposal
is to grade the development in one phase to take place in Spring 2025. The site will be
graded so that storm water drainage will be directed to one storm water basin in the
north and one on the southwest portion of the site. This will hold volume until water is
discharged to the wetland.
Fees and Assessments: Development fees will be subject to the standards of the city
as required by the fee schedule. Additional fees or escrows may be collected for de-
velopment related activities.
PLANNED UNIT DEVELOPMENT:
Exceptions: The site provides pivotal street connections within the city. The connec-
tion of 138th Street NE provides a collector connection for the subdivisions to the east
to the controlled intersection of Crest Avenue and CSAH 42. The alignment of 138th
Street NE and the site’s location within existing developments requires unique design
and housing clusters. Density is generally dispersed throughout the development and
is greatly minimized from the previous iterations. Lot size reductions, setback reduction
and lot width reductions are requested by the developer.
Public Benefit: The project, as proposed, will provide for continued protection of sen-
sitive wetlands and conservation of wildlife in addition to the improvement of trails,
roads, and the dedication of needed right-of-way. When the Planning Commission rec-
ommended denial of a comprehensive land use plan map amendment and rezoning
request to R-2, medium density residential in 2020, there was discussion among the
commissioners about the need for additional townhouse units in the community. Alt-
hough townhomes are not proposed for this development currently, a more suitable
villa-style product is proposed that meets the needs of increased affordability with a
reduction in proposed density that more adequality complements the existing neigh-
borhood.
5
Conclusion
City staff and the developer met and communicated on several occasions as the de-
veloper has worked through multiple plan revisions based on city, Prior Lake -Spring
Lake Watershed District (PLSLWD), Scott County, and Planning Commission com-
ments. Staff and the developer met following the public hearing to discuss comments
received and potential plan modifications to address those concerns, which have been
incorporated in the revised plans. City staff will continue to work with the developer to
refine engineering comments and requirements that will be necessary prior to final plat
submittal.
City staff is recommending approval of the preliminary plat and preliminary PUD plan
requests, subject to a condition that the developer revise plans to address all City,
PLSLWD, and Scott County comments included in the Community Development / Pub-
lic Works Memorandum dated December 5, 2024 prior to submittal of a final plat appli-
cation.
ALTERNATIVES: 1. Motion and second to recommend City Council approval of the requests for a
Preliminary Plat and Preliminary Planned Unit Development Plan for a
development ot be know as The Residences and Crest Woods at 13755 and 13855
Crest Avenue NE.
2. Motion and second to recommend City Council deny the requests for a Preliminary
Plat and Preliminary Planned Unit Development Plan for a development ot be know
as The Residences and Crest Woods at 13755 and 13855 Crest Avenue NE.
3. Provide direction to staff and the applicant and table this item to a future meeting.
RECOMMENDED
MOTION:
Alternative No. 1.
ATTACHMENTS:
1. Location Map
2. Narrative
3. Preliminary Plat
4. Development Plans – November 18, 2024
5. 2021 Traffic Study
6. Community Development / Public Works Memorandum – 12.5.2024
7. Community Development / Public Works Memorandum – 8.29.2024
8. Scott County Memorandum – 8.29.2024
9. Prior Lake Spring Lake Watershed Memorandum – 9.17.2024
NHH PROPERTIES
7455 France Ave S :: Suite 351 :: Edina, MN :: 55435
NHHPROPERTIES.COM
November 22, 2024
To: Casey McCabe
City of Prior Lake
4646 Dakota Street SE
Prior Lake, MN 55372
From: Adam Seraphine
NHH Properties &
Prior Lake Development, LLC
7455 France Ave S, Suite 3531
Edina, MN 55435
Re: Revised PUD and Preliminary Plat Application for 13755 & 13855 Crest Ave NE
Dear Mr. McCabe:
Thank for taking the time to work with the development team and myself over the last 10
months to help provide input and insight into a new application for a PUD and Preliminary
plat for 13755 & 13855 Crest Ave NE. Attached to this cover letter, you will find the
necessary application and supporting documentation for our proposed residential
development.
Site History
The current owner and developer, Prior Lake Development, LLC, purchased the land in
October of 2021. At that time, the site was zoned agricultural. A subsequent land use
application was submitted for the development and construction of 62 single-family home
and villa lots. Unfortunately, due to the significant costs related to the required
infrastructure and road connections, combined with unprecedented cost increases in the
marketplace, the original design was not feasible to construct and bring to the
marketplace. At the time of the original land use application, the subject property was re-
zoned from agricultural to R-1 low density residential. We believe the current zoning is
consistent with this proposed development plan and application.
Over the past year and a half, the development team worked with staff and yourself to
create a plan that was economically viable, integrates into the surrounding community
AND achieves the primary objectives of completing the remaining road connections,
wetland preservation, creating the desired bike and sidewalk connections and closing out
infrastructure upgrades necessary to serve the subject property and the surrounding
neighborhood.
During the creation of the plan there was belief that city policy makers would support
increased density by way of increased unit count and the inclusion of a medium-density
rowhome design. The plan was submitted to the Community Development staff and
subsequently presented to the City of Prior Lake Planning Commission for review during
the public hearing on September 23rd and again on October 14th. During both meetings,
NHH PROPERTIES
7455 France Ave S :: Suite 351 :: Edina, MN :: 55435
NHHPROPERTIES.COM
there was strong opposition from the policy makers and the community towards the
components of the plan that included the rowhome product. Additionally, there was more
than one comment that indicated that there would be very little overall support for a plan
that deviates significantly in product type and unit count from the plan that was submitted
and approved in 2021.
Proposed Redevelopment
The proposed, revised residential development consists of single-family lots only, along
with the required infrastructure updates, pedestrian throughfares/bike paths and road
connections to allow this new development to seamlessly integrate into the surrounding
community.
The entire project area is 29.14 acres, of which 25.40 acres is developable. The remaining
3.74 acres is wetland area and county ROW. The site is currently 2 parcels, with one
single-family home on each parcel. The home and barn on the northern parcel will be
demolished in conjunction with the proposed development. The home on the southern
parcel will remain on a newly plated lot.
The current PUD and preliminary plat application consists of 69 single-family lots and the
exiting home located at 13855 Crest Avenue, totaling 70 homesites. The proposed density
is 2.76 units per acre.
City Code Section 1132
The proposed PUD will meet the stated purposes and objectives of City Code 1132 by
way of providing an all-encompassing development plan that provides multiple floorplans
and option packages. This community is preserving wetlands, extending community
space via the bike path that will connect 138th Street with the park to the east and continue
the bike path from north to south along Crest Avenue. Additional pedestrian sidewalks
are being constructed within the site to provide additional connectivity. Finally, the
proposed development was designed and created to allow the construction and
installation of 138th Street, a primary artery connecting Crest Avenue from the west to the
existing neighborhood to the east, to be completed during the early stages of the project.
Project Specifics
Gross Site Area: 29.14 AC
County ROW: 1.77 AC
Wetland Area: 1.97 AC
Net Developable Area: 25.40 AC
Single-Family Lots: 70 (incl existing SFR)
Total Units: 70
R-1 Density: 2-4 Units/Acre
Proposed Density: 2.76 Units/Acre
Single-Family Lots
There are 70 single-family lots in the proposed development. The majority of the lots are
approximately 50x120. Due to road connections and road curvatures, there are
approximately 16 lots that are significantly bigger. The lots sizes and layouts are similar
to what was approved within the original Villas at Crest Woods PUD in 2021.
NHH PROPERTIES
7455 France Ave S :: Suite 351 :: Edina, MN :: 55435
NHHPROPERTIES.COM
The existing single-family home at 13855 Crest Avenue
This home was completely remodeled in late 2023. The site design accommodates the
relocation of the driveway to 138th St and the installation of stormwater facilities and public
infrastructure that conforms to the Staff Memo dated 12/22/2023.
Financial Feasibility
In October of 2023 an application was submitted which, upon approval, effectively
eliminated the 2021 approved PUD and preliminary plat for the original Villas at Crest
Woods development. As previously mentioned, due to the significant costs related to the
required infrastructure and road connections, combined with unprecedented cost
increases in the marketplace, the original design was not feasible to construct and bring
to the marketplace.
While the new proposed site plan is similar to the 2021 plan that was deemed to be
financially unfeasible, the development team is able to make this latest revision work due
to the following:
• The streamlined design of one building type vs 2 or 3 allows for additional
economies of scale in design and the purchasing of supplies.
• A single building type can be constructed at a much fast rate, therefore reducing
overall project costs and allows homes to be sold sooner.
• The single building type plan allows for a significantly reduced overall project cost,
reducing risk, soft costs and interest expense.
• Additional equity will be brought into the project to significantly reduce the loan
costs and interest expense.
• Current market trends and projections are positive for projects of this nature.
It should be noted that while the development team is able to significantly reduce project
costs due to a streamlined process and additional economies of scale, the overall quality
and fit and finish of the homes remains the same as contemplated within the previous
applications.
I appreciate your consideration of my proposed site plan. Please let me know if you have
any questions.
Thanks,
Adam M Seraphine
NHH Properties
8"
PV
C
8
"P
V
C
1
5
"
R
C
P
24" RCP
6"
HDPE
18
"
R
C
P
18
"
R
C
P
15"
RCP
15"
RCP
15"
RCP
15"
RCP
15
"
RC
P
8"
P
V
C
8"
PVC
8"
PVC
8"
PV
C
4"
HDPE
15"
RCP
15"
RCP
24
"
R
C
P
24
"
RC
P
15
"
RC
P
24"
RCP
8"
PVC
8"
PVC
8"
PV
C
21"
RCP
24
"
R
C
P
8"PVC
8"
P
V
C
NO BUILDINGS
8"
PVC
15" RCP
4" HDPE
15
"
R
C
P
4"
HD
P
E
15" RCP
WETLAND
(Not Deliniated)
WETLAND
W
E
T
L
A
N
D
WETLAND
WETLAND
Ed
g
e
o
f
Wa
t
e
r
Ed
g
e
o
f
W
a
t
e
r
W
E
T
L
A
N
D
W
E
T
L
A
N
D
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8" PVC Stub (Per Rec)
Inv=999.22 (Rec)
S Line of the N 2030.00 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
N Line of the S 537.76 Feet of
the N 2030.00 Feet of the
W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
W Line of the E 500.00 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
S Line of the N 1500.00 Feet
of the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
S Line of the N 1000.00 Feet of the of the W 1/2 of
the SE 1/4 of Sec. 24, Twp. 115, Rng. 22
N Line of the S 220.00 Feet of the
N 1000.00 Feet of the W 1/2 of
the SE 1/4 of Sec. 24, Twp. 115, Rng. 22
S Line of the N 1492.24 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
W
L
i
n
e
o
f
t
h
e
7
9
2
.
0
0
F
e
e
t
o
f
t
h
e
W
1
/
2
o
f
t
h
e
S
E
1
/
4
o
f
Se
c
.
2
4
,
T
w
p
.
1
1
5
,
R
n
g
.
2
2
E
L
i
n
e
o
f
t
h
e
W
1
/
2
o
f
t
h
e
S
E
1
/
4
o
f
Se
c
.
2
4
,
T
w
p
.
1
1
5
,
R
n
g
.
2
2
S89°23'51"E 526.82
N0
0
°
1
9
'
1
1
"
E
2
2
0
.
0
0
S89°23'51"E 792.01
S0
0
°
1
9
'
1
1
"
W
7
2
0
.
0
1
N89°23'51"W 500.01
S0
0
°
1
9
'
1
1
"
W
5
3
0
.
0
1
N89°23'51"W 822.46
N0
0
°
3
1
'
2
0
"
E
1
0
3
0
.
0
0
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(
C
R
E
S
T
A
V
E
N
U
E
)
W
L
i
n
e
o
f
t
h
e
S
E
1
/
4
o
f
Se
c
.
2
4
,
T
w
p
.
1
1
5
,
R
n
g
.
2
2
P.O.B.
SW of the N 1492.24 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
7.76
N0
0
°
3
1
'
2
0
"
E
3
6
3
6
.
0
6
S0
0
°
3
1
'
2
0
"
W
61
5
.
1
3
S 1/4 Corner
Sec. 24, Twp. 115, Rng. 22
N 1/4 Corner
Sec. 24, Twp. 115, Rng. 22
N Line of the W 1/2 of
SE 1/4 of Sec. 24, Twp. 115, Rng. 22
WET
L
A
N
D
WET
L
A
N
D
WET
L
A
N
D
WET LAND
WET L
A
N
D
75.00
75.00
S0
0
°
3
1
'
2
0
"
W
1
0
3
0
.
0
0
56
5
.
2
5
N25°
4
0
'
5
5
"
W
15.73
3
1
.
3
8
Δ
=
2
5
°
4
0
'
5
5
"
R
=
7
0
.
0
0
N0
0
°
0
0
'
0
0
"
E
11
5
.
7
7
38
.
8
9
Δ=
2
9
°
4
2
'
2
3
"
R=
7
5
.
0
0
12.57
N29°42
'
2
3
"
E
N89
°
2
3
'
5
6
"
W
12.
0
3
41.95
Δ=18°5
1
'
1
1
"
R=127.
5
0
18
6
.
0
0
46
4
.
7
5
52.
3
9
S42
°
5
5
'
4
8
"
E
N0
0
°
0
0
'
0
0
"
E
11
5
.
7
7
127.27
Δ=21°53'5
5
"
R=333.00
N89°28'40"W 331.74S86°32'59"W
101.04
N89°28'40"W
100.71
46
4
.
7
5
451.82
18
6
.
0
0
34
4
.
0
0
747.46
56
5
.
2
5
VICINITY MAP
PR
O
J
E
C
T
PROJECT NO.: 20302
COPYRIGHT 2021 CIVIL SITE GROUP INC.c
REVISION SUMMARY
DATE DESCRIPTION
V2.0
PRELIMINARY PLAT
..
..
..
..
..
..
N
44565
RORY L. SYNSTELIEN
LICENSE NO.DATE
I HEREBY CERTIFY THAT THIS SURVEY,
PLAN, OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND
THAT I AM A DULY LICENSED LAND
SURVEYOR UNDER THE LAWS OF THE
STATE OF MINNESOTA.
11-19-2024
N
CL
I
E
N
T
Civil Engineering Surveying Landscape Architecture
4931 W. 35th Street, Suite 200
St. Louis Park, MN 55416
civilsitegroup.com 612-615-0060
QA/QC
FIELD CREW
DRAWN BY
REVIEWED BY
UPDATED BY
.
CJ
RS
.
PRELIMINARY PLAT GENERAL NOTES
PROPERTY DESCRIPTION:
That part of the South 537.76 feet of the North 2030 feet of the West Half of the Southeast Quarter of Section
24, Township 115, Range 22, Scott County, Minnesota, lying West of the East 500 feet of said West Half of the
Southeast Quarter, according to the United States Government Survey thereof.
AND
That part of the South 500.00 feet of the North 1500.00 feet of the West Half of the Southeast Quarter of
Section 24, Township 115, Range 22, Scott County, Minnesota, lying North and East of the following described
line:
Beginning at the Southwest corner of the North 1492.24 feet of said West Half of the Southeast Quarter,
thence Easterly along the South line of said North 1492.24 feet to the West line of the East 500.00 feet
of said West Half of the Southeast Quarter; thence Southerly along said West line of the East 500.00
feet, 7.76 feet to the South line of said North 1500.00 feet; thence East along said South line of the
North 1500.00 feet to the East line of said West Half of the Southeast Quarter and there terminating.
Together with the South 220.00 feet of the East 792.00 feet of the North 1000.00 feet of the West Half of the
Southeast Quarter of Section 24, Township 115, Range 22, Scott County, Minnesota.
Please note the preliminary plat has been prepared without the benefit of a commitment for title insurance. The description
above may not be the latest description of record. There may be easements or other matters of record we are unaware of and
are thus not shown hereon.
DATE OF PREPARATION:
11-19-2024
Please note that the background survey information is per a survey by us dated 3-18-2021.
APPLICANT:
Prior Lake Development LLC
7455 France Ave S, Suite 351
Edina, MN 55435
Contact: Adam Seraphine
adam@nhhproperties.com
AREAS:
Please see Proposed Site Plan for Proposed Lot Areas
Total Property Area = 1,269,505 Sq. Ft. +/- or 29.144 Acres +/-
FLOOD ZONE:
This property is contained in Zone X (area determined to be outside the 0.2% annual chance floodplain) per Flood
Insurance Rate Map, Community Panel Nos. 27139C0043E, 27139C0044E, 27139C0156E, and 27139C0157E,
effective date of February 12, 2021.
________________________________________________________
Rory L. Synstelien Minnesota License No. 44565
rory@civilsitegroup.com
PRELIMINARY PLAT:
THE RESIDENCES AT
CREST WOODS
OVERHEAD UTILITIES
GASMAIN
SANITARY SEWER
STORM SEWER
FIBER/COMM. LINE
ELECTRIC LINE (RECORD)
WATERMAIN
ELECTRIC LINE
GASMAIN (RECORD)
CHAINLINK FENCELINE
Linetype & Symbol Legend
CONCRETE SURFACE
PAVER SURFACE
BITUMINOUS SURFACE
GRAVEL/LANDSCAPE
SURFACE
WOODEN FENCELINE
GUARDRAIL
WATERMAIN (RECORD)
SANITARY SEWER (RECORD)
STORM SEWER (RECORD)
FIBER/COMM. LINE (RECORD)
TELEPHONE LINE (RECORD)
TELEPHONE LINE
SIGN
SANITARY MANHOLE
STORM MANHOLE
CABLE TV BOX
TELEPHONE MANHOLE
ELECTRIC TRANSFORMER
TELEPHONE BOX
TRAFFIC SIGNAL
GAS METER
ELECTRICAL METER
WATER MANHOLE
WATER VALVE
AIR CONDITIONER
BOLLARD
CATCH BASIN
ELECTRIC MANHOLE
GAS VALVE
FLAG POLE
HANDICAP SYMBOL
FOUND IRON MONUMENT
HYDRANT CAST IRON MONUMENT
SET IRON MONUMENT
FLARED END SECTION
POWER POLE
UTILITY MANHOLE
GUY WIRE
CONIFEROUS TREE
DECIDUOUS TREE
ROOF DRAIN
SEWER CLEAN OUT
FIRE CONNECTION
WELL
UTILITY VAULT
POST INDICATOR VALVE
GAS MANHOLE
HAND HOLE
FIBER/COMM. MANHOLE
MAIL BOX
FUEL TANK
ELECTRICAL OUTLET
SB SOIL BORING
LIGHT POLE
INSET A
(SEE SHEET 2 OF 3 SHEETS)
INSET B
(SEE SHEET 3 OF 3 SHEETS)
160408004080
SCALE IN FEET
Th
e
R
e
s
i
d
e
n
c
e
s
a
t
C
r
e
s
t
W
o
o
d
s
Pr
i
o
r
L
a
k
e
,
S
c
o
t
t
C
o
u
n
t
y
,
M
i
n
n
e
s
o
t
a
74
5
5
F
r
a
n
c
e
A
v
e
n
u
e
S
o
u
t
h
,
S
u
i
t
e
3
5
1
,
E
d
i
n
a
,
M
N
5
5
4
3
5
Pr
i
o
r
L
a
k
e
D
e
v
e
l
o
p
m
e
n
t
L
L
C
8"
PV
C
24" RCP
6"
HDPE
18
"
R
C
P
18
"
R
C
P
15"
RCP
15"
RCP
15"
RCP
15"
RCP
21"
RCP
8"PVC
NO BUILDINGS
15" RCP
4" HDPE
15
"
R
C
P
WETLAND
W
E
T
L
A
N
D
WETLAND
WETLAND
Ed
g
e
o
f
Wa
t
e
r
Ed
g
e
o
f
W
a
t
e
r
W
E
T
L
A
N
D
W
E
T
L
A
N
D
8" WM
(Per Rec.)
OUTLOT B
N89°28'40"W 100.71
N0
0
°
3
1
'
2
0
"
E
4
6
4
.
7
5
S89°23'51"E 451.82
N0
0
°
1
9
'
1
1
"
E
2
2
0
.
0
0
S89°23'51"E 792.01
S0
0
°
1
9
'
1
1
"
W
7
2
0
.
0
1
N86°32'59"E 101.04
S89°28'40"E 533.25 277.07
R=3
0
0
.
0
0
Δ=5
2
°
5
4
'
5
7
"
N
2
5
°
4
0
'
5
5
"
W
9
5
.
8
6
4
2
.
5
8
Δ
=
2
5
°
4
0
'
5
5
"
R
=
9
5
.
0
0
N0
0
°
0
0
'
0
0
"
E
1
1
5
.
7
7
51
.
8
5
Δ=
2
9
°
4
2
'
2
3
"
R=
1
0
0
.
0
0
N2
9
°
4
2
'
2
3
"
E
20
.
3
9
S6
0
°
1
7
'
3
7
"
E
2.3
1
50.8
0
Δ=2
9
°
0
6
'
1
9
"
R=1
0
0
.
0
0
S89°23'56"E
11.90
496
.
7
6
N89°23'51"W 500.01
40
.
0
0
40
.
0
0
N37
°
3
6
'
2
2
"
E
4
9
6
.
7
6
211
.
5
9
Δ=3
6
°
2
0
'
4
7
"
R=3
3
3
.
5
4
2
2
8
.
6
7
Δ
=
2
6
°
1
2
'
1
5
"
R
=
5
0
0
.
0
0
N0
0
°
3
1
'
2
0
"
E
3
4
9
.
1
6
S89°23'51"E 275.87
117
.
8
1
Δ=
9
0
°
0
0
'
0
0
"
R=
7
5
.
0
0
N0
0
°
3
6
'
0
9
"
E
7
7
.
1
0
30.0025.00
331.74 127.27
Δ=21°53'5
5
"
15.73
3
1
.
3
8
Δ
=
2
5
°
4
0
'
5
5
"
11
5
.
7
7
Δ=
2
9
°
4
2
'
2
3
"
38
.
8
9
12
.
5
7
12.03
S0
0
°
1
9
'
1
1
"
W
1
8
6
.
0
0
138TH
ST
R
E
E
T
NE
J
A
C
K
S
O
N
ST
R
E
E
T
NE
WILDFLOWER
WA
Y
NE
LU
P
I
N
E
TR
A
I
L
N
E
41.95
Δ=18°5
1
'
1
1
"
5
2
.
3
9
S
4
2
°
5
5
'
4
8
"
E
Drainage & Utility Easement
OUTLOT A
1
OUTLOT C
Drainage & Utility Easement Over All of OUTLOT A
Drainage & Utility Easement
Over All of OUTLOT C
30.01
S79°39'29
"
W
37.50
Δ=14°19'23"
R=150.00N86°01'08"W 332.63
S68
°
3
1
'
0
8
"
E
9
1
.
7
7
S76°28'5
2
"
W
9
1
.
7
7
S85°30'19"E 101.0
4
S89°28'40"E 100.40
N
1
3
°
3
1
'
0
8
"
W
6
0
.
0
0
S2
1
°
2
8
'
5
2
"
W
60
.
0
0
22
5
.
1
5
Δ=
2
1
5
°
0
0
'
0
0
"
R=
6
0
.
0
0
9.0466.80
34
.
5
6
12
4
.
8
6
S0
0
°
1
9
'
1
1
"
W
8
5
.
3
6
N89°17'00"W
49.00
N78°34
'
4
0
"
W
49.93
N68
°
3
6
'
1
5
"
W
52.
5
1
N70
°
0
8
'
5
8
"
W
51.
9
9
N81°56'40
"
W
49.45
S78°10'1
6
"
W
1
0
5
.
7
5
S57
°
0
9
'
0
4
"
W
1
2
4
.
0
9
S
3
1
°
0
9
'
0
1
"
E
1
3
3
.
0
6
Δ=
3
3
°
1
3
'
2
3
"
34.
7
9
N6
4
°
2
2
'
2
4
"
W
1
6
6
.
3
8
S0
0
°
1
9
'
1
1
"
W
1
2
6
.
9
7
Δ=33°5
6
'
5
8
"
35.55
S0
0
°
1
9
'
1
1
"
W
1
3
5
.
8
9
32.
1
0
Δ=
1
8
°
4
0
'
5
5
"
19
.
5
6
S0
0
°
1
9
'
1
1
"
W
1
3
7
.
4
8
52.
5
4
12
.
6
7
Δ=17°
3
0
'
0
0
"
30.54
7.
1
2
S0
0
°
1
9
'
1
1
"
W
1
2
2
.
0
4
49.10
N0
0
°
1
9
'
1
1
"
E
1
2
8
.
5
2
S0
0
°
1
9
'
1
1
"
W
1
2
4
.
8
3
49.10
S89°23'51"E 115.99
Δ
=
7
°
3
0
'
1
6
"
6
8
.
7
6
5
.
1
8
Δ=14°19'23"
31.25
86.13
66
.
3
7
S89°23'51"E 115.96
34
.
3
8
Δ=
1
°
3
5
'
4
4
"
14
.
6
2
49
.
0
0
S89°23'51"E 116.13
49
.
0
0
49
.
0
0
S89°23'51"E 116.30
49
.
0
0
49
.
0
0
S89°23'51"E 116.48
49
.
0
0
49
.
0
0
S89°23'51"E 116.65
49
.
0
0
49
.
0
0
S89°23'51"E 116.82
49
.
0
0
49
.
0
0
117.07
69
.
8
2
69
.
8
2
67.64
S0
0
°
3
6
'
0
9
"
W
1
2
7
.
1
0
67.46
12
7
.
1
0
49.00
S0
0
°
3
6
'
0
9
"
W
1
2
7
.
1
0
49.00
49.00
S0
0
°
3
6
'
0
9
"
W
1
2
7
.
1
0
49.00
49.00
S0
0
°
3
6
'
0
9
"
W
1
2
7
.
1
0
49.00
86.44
Δ=9
0
°
0
0
'
0
0
"
78.
5
4
36.44
77
.
1
0
123.04
S0
0
°
3
6
'
0
9
"
W
52
.
8
0
Δ=
1
1
°
4
7
'
5
0
"
75.
4
7
81.
7
2N52
°
2
3
'
3
8
"
W
54.
7
4
67
.
8
1
Δ=
3
7
°
0
0
'
1
3
"
77
.
1
0
79.02
Δ=1
4
°
5
3
'
5
0
"
95.3
0
31.15 97.12
Δ=52
°
5
9
'
4
7
"
161
.
3
5
61.61
N0
0
°
3
6
'
0
9
"
E
1
2
0
.
0
0
49.00
49.00
N0
0
°
3
6
'
0
9
"
E
1
2
0
.
0
0
49.00
49.00
N0
0
°
3
6
'
0
9
"
E
1
2
0
.
0
0
49.00
49.00
N0
0
°
3
6
'
0
9
"
E
1
2
0
.
0
0
67.67
67.50
12
0
.
0
0
S89°23'51"E 276.11
74.
9
5
S87°22'22"W 230.56
Δ=3°08'58"
25.83
47
.
0
2
59.
3
5
S76°47'0
8
"
W
1
8
8
.
5
9
Δ
=
9
°
4
7
'
4
1
"
8
0
.
3
5
119
.
4
0
Δ=2
0
°
1
5
'
3
7
"
94.
4
1
1
3
.
3
8
Δ
=
1
3
°
1
5
'
3
6
"
1
0
8
.
7
7
124.
0
2
Δ=2
3
°
3
8
'
3
7
"
14
4
.
6
1
24.
4
5
N
4
1
°
3
2
'
5
1
"
W
1
3
7
.
5
2
1
0
.
1
0
56.
8
9
Δ=
1
0
°
5
0
'
4
6
"
40.
7
8
N
5
2
°
2
3
'
3
8
"
W
1
4
0
.
4
3
49.
0
0
49.
0
0
N
5
2
°
2
3
'
3
8
"
W
1
4
0
.
4
3
49.
0
0
49.
0
0
N
5
2
°
2
3
'
3
8
"
W
1
4
0
.
4
3
49.
0
0
49.
0
0
N
5
2
°
2
3
'
3
8
"
W
1
4
0
.
4
3
49.
0
0
49.
0
0
N
5
2
°
2
3
'
3
8
"
W
1
4
0
.
4
3
49.
0
0
49.
0
0
N
5
2
°
2
3
'
3
8
"
W
1
4
0
.
4
3
49.
0
0
49.
0
0
N
5
2
°
2
3
'
3
8
"
W
1
4
0
.
4
3
49.
0
0
N
5
2
°
2
3
'
3
8
"
W
1
2
0
.
0
0
49.
0
0
N
5
2
°
2
3
'
3
8
"
W
1
2
0
.
0
0
49.
0
0
N
5
2
°
2
3
'
3
8
"
W
1
4
0
.
4
3
Δ
=
0
°
3
2
'
2
1
"
3.
1
3
45.
6
5
50.
1
1
N
5
1
°
5
1
'
1
6
"
W
1
4
0
.
4
6
45.
5
9
Δ=
7
°
5
0
'
4
1
"
65.
3
2
76.4
8
Δ=1
3
°
0
9
'
3
2
"
S
4
4
°
0
0
'
3
5
"
E
1
4
5
.
5
5
25.
4
6
8.
4
2
Δ
=
2
5
°
4
0
'
5
5
"
5
6
.
0
3
1
6
.
1
5
14
6
.
0
1
S89°23'51"E 126.85
N37
°
3
6
'
2
2
"
E
1
4
0
.
8
9
53
.
0
9
N1
4
°
5
8
'
0
6
"
E
49.
0
0
N37
°
3
6
'
2
2
"
E
53.0
9
N60°
1
4
'
3
8
"
E
N37
°
3
6
'
2
2
"
E
3
5
9
.
2
3
53
1
.
8
0
13
1
.
0
0
18.06
Δ=
3
3
°
1
3
'
2
3
"
34
.
7
9
S82°24'13"W
1
4
7
.
0
7
12
5
.
2
9
3
4
.
7
9
Δ
=
3
3
°
1
3
'
2
3
"
S49
°
1
0
'
5
0
"
W
1
8
8
.
0
4
18.77
N0
0
°
3
1
'
2
0
"
E
1
3
4
.
6
0
3
4
.
4
1
Δ
=
3
2
°
5
1
'
3
1
"
S1
6
°
1
9
'
2
0
"
W
1
1
4
.
4
0
57.2581.63
31
.
2
5
Δ=
2
9
°
5
0
'
2
7
"
11.24
S0
0
°
3
6
'
0
9
"
W
1
1
5
.
3
6
29.1043.79
50.53
S0
0
°
3
6
'
0
9
"
W
1
2
7
.
6
2
49.00
30.00
20.16
Δ=11°32'58"
S0
0
°
3
6
'
0
9
"
W
1
3
7
.
7
9
49.00
38.69
S0
0
°
3
6
'
0
9
"
W
1
3
5
.
3
7
49.00
10
.
3
9
Δ=
5
°
5
7
'
0
2
"
49.09
S0
0
°
3
6
'
0
9
"
W
1
3
2
.
4
1
49.00
49.09
S0
0
°
3
6
'
0
9
"
W
1
2
9
.
4
5
49.00
49.09
S0
0
°
3
6
'
0
9
"
W
1
2
6
.
4
9
49.00
11
.
0
6
43.75
Δ=14°19'23"
6
.
0
1
1
0
6
.
7
0
Δ
=
1
1
°
3
7
'
1
5
"
1
3
.
9
0
Δ=20°49'5
4
"
97.088.95
1
2
3
4
5 6
7
8
910
11
12
1314
15
16
17
18
19 20 21 22 23 24 25 26
2
1 2 3 4 5
3
1
2345
6
7
8
9
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
25.00 25.00
VICINITY MAP
Th
e
R
e
s
i
d
e
n
c
e
s
a
t
C
r
e
s
t
W
o
o
d
s
Pr
i
o
r
L
a
k
e
,
S
c
o
t
t
C
o
u
n
t
y
,
M
i
n
n
e
s
o
t
a
74
5
5
F
r
a
n
c
e
A
v
e
n
u
e
S
o
u
t
h
,
S
u
i
t
e
3
5
1
,
E
d
i
n
a
,
M
N
5
5
4
3
5
Pr
i
o
r
L
a
k
e
D
e
v
e
l
o
p
m
e
n
t
L
L
C
PR
O
J
E
C
T
PROJECT NO.: 20302
COPYRIGHT 2021 CIVIL SITE GROUP INC.c
REVISION SUMMARY
DATE DESCRIPTION
V2.1
PRELIMINARY PLAT
INSET A
..
..
..
..
..
..
N
44565
RORY L. SYNSTELIEN
LICENSE NO.DATE
I HEREBY CERTIFY THAT THIS SURVEY,
PLAN, OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND
THAT I AM A DULY LICENSED LAND
SURVEYOR UNDER THE LAWS OF THE
STATE OF MINNESOTA.
11-19-2024
N
CL
I
E
N
T
Civil Engineering Surveying Landscape Architecture
4931 W. 35th Street, Suite 200
St. Louis Park, MN 55416
civilsitegroup.com 612-615-0060
QA/QC
FIELD CREW
DRAWN BY
REVIEWED BY
UPDATED BY
.
CJ
RS
.
PRELIMINARY PLAT: THE RESIDENCES AT CREST WOODS
OVERHEAD UTILITIES
GASMAIN
SANITARY SEWER
STORM SEWER
FIBER/COMM. LINE
ELECTRIC LINE (RECORD)
WATERMAIN
ELECTRIC LINE
GASMAIN (RECORD)
CHAINLINK FENCELINE
Linetype & Symbol Legend
CONCRETE SURFACE
PAVER SURFACE
BITUMINOUS SURFACE
GRAVEL/LANDSCAPE
SURFACE
WOODEN FENCELINE
GUARDRAIL
WATERMAIN (RECORD)
SANITARY SEWER (RECORD)
STORM SEWER (RECORD)
FIBER/COMM. LINE (RECORD)
TELEPHONE LINE (RECORD)
TELEPHONE LINE
SIGN
SANITARY MANHOLE
STORM MANHOLE
CABLE TV BOX
TELEPHONE MANHOLE
ELECTRIC TRANSFORMER
TELEPHONE BOX
TRAFFIC SIGNAL
GAS METER
ELECTRICAL METER
WATER MANHOLE
WATER VALVE
AIR CONDITIONER
BOLLARD
CATCH BASIN
ELECTRIC MANHOLE
GAS VALVE
FLAG POLE
HANDICAP SYMBOL
FOUND IRON MONUMENT
HYDRANT CAST IRON MONUMENT
SET IRON MONUMENT
FLARED END SECTION
POWER POLE
UTILITY MANHOLE
GUY WIRE
CONIFEROUS TREE
DECIDUOUS TREE
ROOF DRAIN
SEWER CLEAN OUT
FIRE CONNECTION
WELL
UTILITY VAULT
POST INDICATOR VALVE
GAS MANHOLE
HAND HOLE
FIBER/COMM. MANHOLE
MAIL BOX
FUEL TANK
ELECTRICAL OUTLET
SB SOIL BORING
LIGHT POLE
100255002550
SCALE IN FEET
15"
RCP
15"
RCP
15
"
RC
P
8"
P
V
C
24
"
R
C
P
24
"
RC
P
15
"
RC
P
24"
RCP
8"
PVC
8"
PV
C
21"
RCP
24
"
R
C
P
8"PVC
8"
P
V
C
15" RCP
4" HDPE
4"
HD
P
E
15" RCP
WETLAND
(Not Deliniated)
WETLAND
W
E
T
L
A
N
D
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" PVC Stub (Per Rec)
Inv=999.22 (Rec)
N0
0
°
3
1
'
2
0
"
E
5
6
5
.
2
5
N89°23'51"W 747.46
S0
0
°
1
9
'
1
1
"
W
3
4
4
.
0
0
S89°23'56"E
12.03
41.95
Δ=18°5
1
'
1
1
"
R=127.5
0
3
1
.
3
8
Δ
=
2
5
°
4
0
'
5
5
"
R
=
7
0
.
0
0
N86°32'59"E 101.04S89°28'40"E 100.71
38
.
8
9
Δ=
2
9
°
4
2
'
2
3
"
R=
7
5
.
0
0
N2
9
°
4
2
'
2
3
"
E
1
6
1
.
3
9
34
.
5
3
Δ=
7
°
5
4
'
4
6
"
R=
2
5
0
.
0
0
N37
°
3
7
'
0
9
"
E
1
0
0
.
3
6
37.47
N52°22'51"W
1
3
.
8
1
Δ
=
7
°
5
4
'
4
6
"
R
=
1
0
0
.
0
0
N6
0
°
1
7
'
3
7
"
W
1
1
1
.
6
3
50.80
Δ=29
°
0
6
'
1
9
"
R=10
0
.
0
0
N89°23'56"W
16.5713
0
.
6
9
Δ=
2
9
°
5
7
'
0
9
"
R=
2
5
0
.
0
0
25
.
0
0
25
.
0
0
25.21
2
6
.
1
9
2
6
.
1
9
AP
E
X
W
A
Y
N
E
LU
P
I
N
E
TR
A
I
L
N
E
S89°28'40"E 331.74
127.27
Δ=21°53'5
5
"
R=333.00
S25°
4
0
'
5
5
"
E
15.73
S0
0
°
0
0
'
0
0
"
E
1
1
5
.
7
7
25.17
56.
8
5
109.12
Δ=18°46
'
3
3
"
43
.
6
4
N90°00'00"W 120.00
65
.
5
9
72
.
1
3
Δ=13°3
9
'
4
0
"
17.88
N78°43
'
1
3
"
W
1
2
3
.
4
1
6.3
4
60
.
2
0
21.0
0
Δ=1
6
°
0
2
'
4
3
"
70
.
7
0
N6
0
°
1
7
'
3
7
"
W
1
2
0
.
0
0
52
.
4
2
49
.
0
0
N6
0
°
1
7
'
3
7
"
W
1
2
0
.
0
0
49
.
0
0
30
4
.
4
7
18.15
Δ=3°07'22"
S0
0
°
0
0
'
0
0
"
E
12
5
.
7
9
S2
9
°
4
2
'
2
3
"
W
1
5
6
.
9
8
S3
6
°
4
8
'
0
9
"
W
1
4
8
.
5
0
S77°10'2
8
"
W
1
8
7
.
1
4
N6
0
°
3
4
'
1
1
"
W
2
3
5
.
3
6
49
.
2
1
N6
0
°
1
7
'
3
7
"
W
1
2
0
.
0
0
49
.
2
1
12
.
5
7
12
.
8
7
Δ=
7
°
5
4
'
4
6
"
31
.
0
7
1
8
.
2
0
N
5
2
°
2
2
'
5
1
"
W
1
2
2
.
1
5
45.
4
1
49.
0
0
N
5
2
°
2
2
'
5
1
"
W
1
2
1
.
4
8
49.
0
0
33.
1
6
Δ
=
3
°
0
1
'
3
4
"
1
4
.
5
2
N
5
5
°
2
4
'
2
5
"
W
1
2
1
.
2
1
54
.
0
8
Δ=
9
°
2
1
'
4
5
"
44
.
9
4
N6
4
°
4
6
'
1
0
"
W
1
2
9
.
0
6
N3
6
°
4
4
'
3
8
"
E
65
.
7
8
N1
5
°
1
7
'
1
1
"
E
1
4
2
.
2
8
312.99
26
0
.
7
8
Δ=
9
°
2
1
'
4
5
"
44
.
9
4
N74°
0
7
'
5
6
"
W
1
2
3
.
0
1
65
.
7
4
Δ=
8
°
5
0
'
4
6
"
42
.
4
6
130.09
76
.
5
5
13
6
.
0
9
N89°40'27"W
44.32
N6
0
°
1
7
'
3
7
"
W
78
.
0
0
12
0
.
4
1
S2
9
°
4
2
'
2
3
"
W
1
0
5
.
0
0
62
.
3
3
Δ=7°54'4
6
"
10.36
12.
4
8
31.
8
5
Δ=
7
°
5
4
'
4
6
"
37
.
9
8
33
.
1
7
12
5
.
4
1
16.45
Δ=29
°
0
6
'
1
9
"
38.10
49
.
3
1
1
2
.
4
7
1
7
.
2
6
Δ
=
7
°
5
4
'
4
6
"
11
1
.
6
3
Δ=29
°
0
6
'
1
9
"
63.50
16.69
32.50
253.99
11
4
.
5
2
Δ=
2
9
°
0
9
'
4
6
"
18.
5
1
OUTLOT D
Drainage & Utility Easement
Over All of OUTLOT D
5
6
7
2
1
3
4
5
6
7
8
9
10
11
12
2
1
3
1
Drainage & Utility Easement
40
.
0
6
S6
6
°
4
2
'
3
0
"
E
1
3
2
.
0
0
N65°
0
6
'
1
0
"
E
40.85
N1
8
°
2
4
'
5
2
"
E
67
.
8
4
N36
°
5
5
'
5
6
"
E
9
7
.
5
1
N68°0
8
'
1
2
"
E
41.45
31.34
S80°39'3
2
"
E
N75°19'
1
8
"
E
16.44
N54
°
2
8
'
4
4
"
E
46.3
7
N67°3
4
'
4
6
"
E
75.98
N63°
0
3
'
1
1
"
E
76.2
4
N0
6
°
3
6
'
0
1
"
E
37
.
5
4
17
7
.
5
7
VICINITY MAP
PR
O
J
E
C
T
PROJECT NO.: 20302
COPYRIGHT 2021 CIVIL SITE GROUP INC.c
REVISION SUMMARY
DATE DESCRIPTION
V2.2
PRELIMINARY PLAT
INSET B
..
..
..
..
..
..
N
44565
RORY L. SYNSTELIEN
LICENSE NO.DATE
I HEREBY CERTIFY THAT THIS SURVEY,
PLAN, OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND
THAT I AM A DULY LICENSED LAND
SURVEYOR UNDER THE LAWS OF THE
STATE OF MINNESOTA.
11-19-2024
CL
I
E
N
T
Civil Engineering Surveying Landscape Architecture
4931 W. 35th Street, Suite 200
St. Louis Park, MN 55416
civilsitegroup.com 612-615-0060
QA/QC
FIELD CREW
DRAWN BY
REVIEWED BY
UPDATED BY
.
CJ
RS
.
N
100255002550
SCALE IN FEET
PRELIMINARY PLAT: THE RESIDENCES AT CREST WOODS
Th
e
R
e
s
i
d
e
n
c
e
s
a
t
C
r
e
s
t
W
o
o
d
s
Pr
i
o
r
L
a
k
e
,
S
c
o
t
t
C
o
u
n
t
y
,
M
i
n
n
e
s
o
t
a
74
5
5
F
r
a
n
c
e
A
v
e
n
u
e
S
o
u
t
h
,
S
u
i
t
e
3
5
1
,
E
d
i
n
a
,
M
N
5
5
4
3
5
Pr
i
o
r
L
a
k
e
D
e
v
e
l
o
p
m
e
n
t
L
L
C
OVERHEAD UTILITIES
GASMAIN
SANITARY SEWER
STORM SEWER
FIBER/COMM. LINE
ELECTRIC LINE (RECORD)
WATERMAIN
ELECTRIC LINE
GASMAIN (RECORD)
CHAINLINK FENCELINE
Linetype & Symbol Legend
CONCRETE SURFACE
PAVER SURFACE
BITUMINOUS SURFACE
GRAVEL/LANDSCAPE
SURFACE
WOODEN FENCELINE
GUARDRAIL
WATERMAIN (RECORD)
SANITARY SEWER (RECORD)
STORM SEWER (RECORD)
FIBER/COMM. LINE (RECORD)
TELEPHONE LINE (RECORD)
TELEPHONE LINE
SIGN
SANITARY MANHOLE
STORM MANHOLE
CABLE TV BOX
TELEPHONE MANHOLE
ELECTRIC TRANSFORMER
TELEPHONE BOX
TRAFFIC SIGNAL
GAS METER
ELECTRICAL METER
WATER MANHOLE
WATER VALVE
AIR CONDITIONER
BOLLARD
CATCH BASIN
ELECTRIC MANHOLE
GAS VALVE
FLAG POLE
HANDICAP SYMBOL
FOUND IRON MONUMENT
HYDRANT CAST IRON MONUMENT
SET IRON MONUMENT
FLARED END SECTION
POWER POLE
UTILITY MANHOLE
GUY WIRE
CONIFEROUS TREE
DECIDUOUS TREE
ROOF DRAIN
SEWER CLEAN OUT
FIRE CONNECTION
WELL
UTILITY VAULT
POST INDICATOR VALVE
GAS MANHOLE
HAND HOLE
FIBER/COMM. MANHOLE
MAIL BOX
FUEL TANK
ELECTRICAL OUTLET
SB SOIL BORING
LIGHT POLE
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C0.0
TITLE SHEET
CREST WOODS
PRIOR LAKE, MINNESOTA
SITE LOCATIONSITE LOCATION MAP N
ISSUED FOR: CITY SUBMITTAL
Know what's below.
before you dig.Call
R
ALL EXISTING UTILITY LOCATIONS SHOWN ARE
APPROXIMATE. CONTACT "GOPHER STATE ONE
CALL" (651-454-0002 OR 800-252-1166) FOR
UTILITY LOCATIONS, 48 HOURS PRIOR TO
CONSTRUCTION. THE CONTRACTOR SHALL
REPAIR OR REPLACE ANY UTILITIES THAT ARE
DAMAGED DURING CONSTRUCTION AT NO COST
TO THE OWNER.
SHEET INDEX
SHEET NUMBER SHEET TITLE
C0.0 TITLE SHEET
C1.0 REMOVALS PLAN-OVERALL
C1.1 REMOVALS PLAN-NORTH
C1.2 REMOVALS PLAN-SOUTH
C1.3 TREE PRESERVATION PLAN-OVERALL
C1.4 TREE PRESERVATION PLAN-NORTH
C1.5 TREE PRESERVATION PLAN-SOUTH
C1.6 TREE PRESERVATION PLAN CALCULATIONS
C2.0 SITE PLAN-OVERALL
C2.1 SITE PLAN-NORTH
C2.2 SITE PLAN-SOUTH
W1.0 WETLAND MITIGATION PLAN
C3.0 GRADING PLAN
C3.1 GRADING PLAN-NORTH
C3.2 GRADING PLAN-SOUTH
C4.0 UTILITY PLAN-OVERALL
C4.1 UTILITY PLAN-SAN & WATER NORTH
C4.2 UTILITY PLAN-SAN & WATER SOUTH
C4.3 UTILITY PLAN-STORM NORTH
C4.4 UTILITY PLAN-STORM SOUTH
C5.0 CIVIL DETAILS
C5.1 CIVIL DETAILS
C5.2 CIVIL DETAILS
C5.3 CIVIL DETAILS
C5.4 CIVIL DETAILS
C5.5 CIVIL DETAILS
L1.0 LANDSCAPE PLAN-OVERALL
L1.1 LANDSCAPE PLAN-NORTH
L1.2 LANDSCAPE PLAN-SOUTH & DETAILS
SW1.0 SWPPP - EXISTING CONDITIONS OVERALL
SW1.1 SWPPP - EXISTING CONDITIONS NORTH
SW1.2 SWPPP - EXISTING CONDITIONS SOUTH
SW1.3 SWPPP - PROPOSED CONDITIONS OVERALL
SW1.4 SWPPP - PROPOSED CONDITIONS NORTH
SW1.5 SWPPP - PROPOSED CONDITIONS SOUTH
SW1.6 SWPPP - DETAILS
SW1.7 SWPPP - NARRATIVE
SW1.8 SWPPP - ATTACHMENTS
SW1.9 SWPPP - ATTACHMENTS
PROJECT CONTACTS
NAME & ADDRESS CONTACT
CIVIL ENGINEER
CIVIL SITE GROUP
5000 GLENWOOD AVE
GOLDEN VALLEY, MN 55422
MATT PAVEK
612-615-0060
MPAVEK@CIVILSITEGROUP.COM
LANDSCAPE ARCHITECT
CIVIL SITE GROUP
5000 GLENWOOD AVE
GOLDEN VALLEY, MN 55422
ROB BINDER
612-615-0060
RBINDER@CIVILSITEGROUP.COM
PROPERTY
OWNER/DEVELOPER
SURVEYOR
CIVIL SITE GROUP
5000 GLENWOOD AVE
GOLDEN VALLEY, MN 55422
RORY SYNSTELIEN
612-615-0060 X 712
RORY@CIVILSITEGROUP.COM
SURVEYOR
JAMES R. HILL, INC.
2999 COUNTY ROAD 42 W, SUITE 100
BURNSVILLE, MN 55306
MARCUS HAMPTON
952-890-6044
WEBMASTER@JRHINC.COM
GEOTECHNICAL
ENGINEER
BRAUN INTERTEC CORPORATION
11001 HAMPSHIRE AVENUE S.
MINNEAPOLIS, MN 55438
612-688-4132
REVISION SUMMARY
DATE DESCRIPTION
PRIOR LAKE DEVELOPMENT, LLC
7455 FRANE AVENUE, SUITE 351
EDINA, MN 55435
ADAM SERAPHINE
612-616-5801
ADAM@ADAMSERAPHINE.COM
10
"
P
V
C
1
0
"
P
V
C
1
5
"
R
C
P
24" RCP6" HDPE
18
"
R
C
P
18
"
R
C
P
15" RCP
15" RCP 15" RCP
15
"
R
C
P
8"
P
V
C
10" PVC10" PVC
10
"
P
V
C
4" HDPE
15" RCP15" RCP
21
"
R
C
P
24
"
R
C
P
12
"
RC
P
24" RCP
8" PVC 8" PVC
8"
P
V
C
18" RCP
21
"
R
C
P
8" PVC
8"
P
V
C
N0
0
°
3
1
'
2
0
"
E
1
0
3
0
.
0
0
S89°23'51"E 526.82
N0
0
°
1
9
'
1
1
"
E
2
2
0
.
0
0
S89°23'51"E 792.01
S0
0
°
1
9
'
1
1
"
W
7
2
0
.
0
1
500.01
N89°23'51"W
S0
0
°
1
9
'
1
1
"
W
5
3
0
.
0
1
N89°23'51"W 822.46
S Line of the N 2030.00 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
N Line of the S 537.76 Feet of
the N 2030.00 Feet of the
W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
W Line of the E 500.00 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
S Line of the N 1500.00 Feet
of the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
S Line of the N 1000.00
Feet of the of the W 1/2 of
the SE 1/4 of Sec. 24, Twp.
115, Rng. 22
N Line of the S 220.00 Feet of the
N 1000.00 Feet of the W 1/2 of
the SE 1/4 of Sec. 24, Twp. 115, Rng. 22
S Line of the N 1492.24 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
W Line of the 792.00 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
E Line of the W 1/2
of the SE 1/4 of
Sec. 24, Twp. 115,
Rng. 22
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
W Line of the
SE 1/4 of
Sec. 24, Twp.
115, Rng. 22
P.O.B.
SW of the N
1492.24 Feet
of the W 1/2 of
the SE 1/4 of
Sec. 24, Twp.
115, Rng. 22
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
138T
H
S
T
N
E
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
1
0
56
6
8
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
A
N
D
E
R
S
O
N
J
O
D
I
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
2
0
56
8
2
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
3
0
56
9
6
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
4
0
57
1
0
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
C
H
M
I
T
Z
S
A
M
U
E
L
J
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
5
0
57
2
4
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
6
0
57
3
8
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
B
L
E
G
E
N
S
C
O
T
T
A
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
7
0
57
5
2
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
E
N
G
L
E
B
R
I
D
G
E
T
A
N
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
2
7
0
8
4
0
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Property ID - 255341050
Owner: SUMMIT PRESERVE
TOWNHOME HOMEOWNERS ASSOC
Property ID - 255341010
Owner: US HOME CORPORATION
Property ID - 255340900
Owner: SUMMIT PRESERVE
TOWNHOME HOMEOWNERS
ASSOCIATION
Property ID - 255270850
Owner: CITY OF PRIOR LAKE
Property ID -
255360330
Owner: CITY OF
PRIOR LAKE
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
3
0
56
2
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
B
L
O
O
M
T
R
U
S
T
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
2
0
56
1
3
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
A
R
N
E
R
J
E
N
N
I
F
E
R
L
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
4
0
56
3
7
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
T
E
N
S
R
U
D
E
M
A
R
K
A
L
A
N
&
CA
T
H
E
R
I
N
E
A
N
N
E
R
E
V
O
C
A
B
L
E
T
R
U
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
5
0
56
4
5
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
A
S
H
I
N
G
T
O
N
A
L
P
H
O
N
S
O
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
6
0
56
5
3
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
H
I
T
E
E
D
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
7
0
56
6
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
A
Y
R
E
S
P
A
U
L
L
E
R
O
Y
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
8
0
56
7
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
P
R
I
N
G
E
R
S
T
E
V
E
N
Property ID - 255360320
13693 WILDFLOWER WAY NE
Prior Lake, MN 55372
Owner: PLEWACKI JAMES
Property ID - 255360350
Owner: BJW DEVELOPMENT CO LLC
Property ID - 255490010
5779 138TH ST NE
Prior Lake, MN 55372
Owner: GUNSTAD JACALYN
Property ID - 255490290
Owner: CITY OF PRIOR LAKE
Property ID - 255340890
Owner: CITY OF PRIOR LAKE
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
(A Pub
l
i
c
R
/
W
)
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
10" PVC
15" RCP
4" HDPE
15
"
R
C
P
4"
H
D
P
E
15" RCP
N0
0
°
3
1
'
2
0
"
E
1
0
3
0
.
0
0
WETLAND
WETLAND
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
REMOVALS PLAN LEGEND:
TREE PROTECTION
REMOVAL OF PAVEMENT AND ALL BASE
MATERIAL, INCLUDING BIT., CONC., AND
GRAVEL PVMTS.
REMOVAL OF STRUCTURE
INCLUDING ALL FOOTINGS AND
FOUNDATIONS.
TREE REMOVAL - INCLUDING
ROOTS AND STUMPS
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C1.0
REMOVALS PLAN
- OVERALL
Know what's below.
before you dig.Call
R
REMOVE CURB AND GUTTER. IF IN
RIGHT-OF-WAY, COORDINATE WITH LOCAL
GOVERNING UNIT.
REMOVAL NOTES:
CITY OF PRIOR LAKE REMOVAL NOTES:
1.RESERVED FOR CITY SPECIFIC REMOVAL NOTES.
1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48
HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO
THE OWNER.
2.SEE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) PLAN FOR CONSTRUCTION STORM WATER MANAGEMENT PLAN.
3.REMOVAL OF MATERIALS NOTED ON THE DRAWINGS SHALL BE IN ACCORDANCE WITH MNDOT, STATE AND LOCAL REGULATIONS.
4.REMOVAL OF PRIVATE UTILITIES SHALL BE COORDINATED WITH UTILITY OWNER PRIOR TO CONSTRUCTION ACTIVITIES.
5.EXISTING PAVEMENTS SHALL BE SAWCUT IN LOCATIONS AS SHOWN ON THE DRAWINGS OR THE NEAREST JOINT FOR PROPOSED PAVEMENT CONNECTIONS.
6.REMOVED MATERIALS SHALL BE DISPOSED OF TO A LEGAL OFF-SITE LOCATION AND IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS.
7.ABANDON, REMOVAL, CONNECTION, AND PROTECTION NOTES SHOWN ON THE DRAWINGS ARE APPROXIMATE. COORDINATE WITH PROPOSED PLANS.
8.EXISTING ON-SITE FEATURES NOT NOTED FOR REMOVAL SHALL BE PROTECTED THROUGHOUT THE DURATION OF THE CONTRACT.
9.PROPERTY LINES SHALL BE CONSIDERED GENERAL CONSTRUCTION LIMITS UNLESS OTHERWISE NOTED ON THE DRAWINGS. WORK WITHIN THE GENERAL
CONSTRUCTION LIMITS SHALL INCLUDE STAGING, DEMOLITION AND CLEAN-UP OPERATIONS AS WELL AS CONSTRUCTION SHOWN ON THE DRAWINGS.
10.MINOR WORK OUTSIDE OF THE GENERAL CONSTRUCTION LIMITS SHALL BE ALLOWED AS SHOWN ON THE PLAN AND PER CITY REQUIREMENTS. FOR ANY WORK ON
ADJACENT PRIVATE PROPERTY, THE CONTRACTOR SHALL OBTAIN WRITTEN PERMISSION FROM THE ADJACENT PROPERTY OWNER PRIOR TO ANY WORK.
11.DAMAGE BEYOND THE PROPERTY LIMITS CAUSED BY CONSTRUCTION ACTIVITY SHALL BE REPAIRED IN A MANNER APPROVED BY THE ENGINEER/LANDSCAPE
ARCHITECT OR IN ACCORDANCE WITH THE CITY.
12.PROPOSED WORK (BUILDING AND CIVIL) SHALL NOT DISTURB EXISTING UTILITIES UNLESS OTHERWISE SHOWN ON THE DRAWINGS AND APPROVED BY THE CITY
PRIOR TO CONSTRUCTION.
13.SITE SECURITY MAY BE NECESSARY AND PROVIDED IN A MANNER TO PROHIBIT VANDALISM, AND THEFT, DURING AND AFTER NORMAL WORK HOURS,
THROUGHOUT THE DURATION OF THE CONTRACT. SECURITY MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY.
14.VEHICULAR ACCESS TO THE SITE SHALL BE MAINTAINED FOR DELIVERY AND INSPECTION ACCESS DURING NORMAL OPERATING HOURS. AT NO POINT
THROUGHOUT THE DURATION OF THE CONTRACT SHALL CIRCULATION OF ADJACENT STREETS BE BLOCKED WITHOUT APPROVAL BY THE CITY PRIOR TO
CONSTRUCTION ACTIVITIES.
15.ALL TRAFFIC CONTROLS SHALL BE PROVIDED AND ESTABLISHED PER THE REQUIREMENTS OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(MMUTCD) AND THE CITY. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, SIGNAGE, BARRICADES, FLASHERS, AND FLAGGERS AS NEEDED. ALL PUBLIC STREETS
SHALL REMAIN OPEN TO TRAFFIC AT ALL TIMES. NO ROAD CLOSURES SHALL BE PERMITTED WITHOUT APPROVAL BY THE CITY.
16.SHORING FOR BUILDING EXCAVATION MAY BE USED AT THE DISCRETION OF THE CONTRACTOR AND AS APPROVED BY THE OWNERS REPRESENTATIVE AND THE
CITY PRIOR TO CONSTRUCTION ACTIVITIES.
17.STAGING, DEMOLITION, AND CLEAN-UP AREAS SHALL BE WITHIN THE PROPERTY LIMITS AS SHOWN ON THE DRAWINGS AND MAINTAINED IN A MANNER AS
REQUIRED BY THE CITY.
18.ALL EXISTING SITE TRAFFIC/REGULATORY SIGNAGE TO BE INVENTORIED AND IF REMOVED FOR CONSTRUCTION SHALL BE RETURNED TO LGU.
19.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48
HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO
THE OWNER.
SEE SWPPP ON SHEETS SW1.0 - SW1.9
EROSION CONTROL NOTES:
CONSTRUCTION LIMITS
REVISION SUMMARY
DATE DESCRIPTION
PROPERTY LINE
0
1" = 100'-0"
100'-0"50'-0"
N
OWNER INFORMATION
PRIOR LAKE DEVELOPMENT, LLC
7455 FRANE AVENUE, SUITE 351
EDINA, MN 55435
ADAM SERAPHINE
612-616-5801
ADAM@ADAMSERAPHINE.COM
TREE PROTECTION
N T S
25'
DL
DRIPLINE WIDTH
FURNISH A AND INSTALL TEMPORARY FENCE AT THE TREE'S DRIP LINE OR
CONSTRUCTION LIMITS AS SHOWN ON PLAN, PRIOR TO ANY CONSTRUCTION. WHERE
POSSIBLE PLACE FENCE 25' BEYOND DRIP LINE. PLACE TREE PROTECTION SIGN ON
POSTS, ONE PER INDIVIDUAL TREE (FACING CONSTRUCTION ACTIVITY), OR ONE EVERY
100' LF ALONG A GROVE OR MULTI-TREE PROTECTION AREA.
POSTS AND FENCING
EXTEND FENCE 25'
BEYOND DRIPLINE
WHERE POSSIBLE
TREE PROTECTION SIGN, TYP.
TREE DRIPLINE, OR
CONSTRUCTION LIMITS
1
10
"
P
V
C
1
0
"
P
V
C
1
5
"
R
C
P
24" RCP6" HDPE
18
"
R
C
P
18
"
R
C
P
15" RCP
10" PVC10" PVC
10
"
P
V
C
4" HDPE
15" RCP15" RCP
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
15
"
R
C
P
WETLAND
WETLAND
8" WM
(Per Rec.)
8" WM
(Per Rec.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
REMOVE EXISTING
PAVEMENT AND BASE
MATERIAL, TYP.
REMOVE EX BUILDING, STRUCTURES,
FOUNDATIONS, FOOTINGS & BASE
MATERIALS, PER LOCAL STATE & FEDERAL
STANDARDS. REMOVE/DISCONNECT ALL
SERVICES & UTILITIES PER UTILITY
COMPANY AND/OR L.G.U. STANDARDS
EXIST. POWER
POLE AND POWER
LINES TO BE
RELOCATED,
COORD. WITH
UTILITY CO., TYP.
PROTECT
EXISTING CURB
AND GUTTER, TYP.
REMOVE EXISTING
PAVEMENT AND BASE
MATERIAL, TYP.
REMOVE EXISTING
GARDEN
REMOVE EXISTING
WETLAND. SEE WETLAND
MITIGATION PLAN W1.0
REMOVE EXISTING
WETLAND. SEE WETLAND
MITIGATION PLAN W1.0
REMOVE EX BUILDING, STRUCTURES,
FOUNDATIONS, FOOTINGS & BASE
MATERIALS, PER LOCAL STATE & FEDERAL
STANDARDS. REMOVE/DISCONNECT ALL
SERVICES & UTILITIES PER UTILITY
COMPANY AND/OR L.G.U. STANDARDS
REMOVE EXISTING
CURB AND
GUTTER, TYP.
REMOVE EXISTING
GAZEBO
REMOVE EXISTING
DECK
REMOVE EXISTING
RETAINING WALL
EXISTING WETLAND TO REMAIN.
PROTECT FROM DAMAGE AND
SEDIMENTATION. SEE
DELINEATION BY LENNAR
CORPORATION
EXISTING WETLAND TO REMAIN.
PROTECT FROM DAMAGE AND
SEDIMENTATION. SEE
DELINEATION BY LENNAR
CORPORATION DATED 08/14/2019
REMOVE EXISTING
SHED
REMOVE AND SALVAGE EXISTING
SIGN. SEE SITE PLAN FOR
PROPOSED LOCATION
REMOVE AND
SALVAGE EXISTING
MAILBOX. RETURN TO
OWNER.
PROTECT EXISTING
CATCH BASIN
REMOVE EXISTING UTILITY.
COORD. W/ UTILITY COMPANY
PROTECT EXISTING
SANITARY SEWER
PROTECT EXISTING
BIT. PVMT.
PROTECT
EXISTING CURB
AND GUTTER, TYP.
PROTECT EXISTING
SANITARY SEWER
PROTECT EXISTING
BIT. PVMT.
PROTECT EXISTING
HYDRANT
PROTECT
EXISTING CURB
AND GUTTER, TYP.
PROTECT EXISTING
SANITARY SEWER
PROTECT EXISTING
BIT. PVMT.
PROTECT EXISTING
HYDRANT
PROTECT
EXISTING
WATERMAIN
PROTECT EXISTING
WATERMAIN
PROTECT EXISTING
WATERMAIN
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C1.1
REMOVALS PLAN-
NORTH
Know what's below.
before you dig.Call
R
REVISION SUMMARY
DATE DESCRIPTION
0
1" = 50'-0"
50'-0"25'-0"
N
15" RCP 15" RCP
15
"
R
C
P
8"
P
V
C
21
"
R
C
P
24
"
R
C
P
12
"
RC
P
24" RCP
8" PVC 8" PVC
8"
P
V
C
18" RCP
21
"
R
C
P
8" PVC
8"
P
V
C
N0
0
°
3
1
'
2
0
"
E
1
0
3
0
.
0
0
500.01
N89°23'51"W
S0
0
°
1
9
'
1
1
"
W
5
3
0
.
0
1
N89°23'51"W 822.46
S Line of the N 2030.00 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
N Line of the S 537.76 Feet of
the N 2030.00 Feet of the
W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
W Line of the E 500.00 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
S Line of the N 1500.00 Feet
of the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
S Line of the N 1492.24 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
E Line of the W 1/2
of the SE 1/4 of
Sec. 24, Twp. 115,
Rng. 22
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
Sec. 24, Twp.
115, Rng. 22
P.O.B.
SW of the N
1492.24 Feet
of the W 1/2 of
the SE 1/4 of
Sec. 24, Twp.
115, Rng. 22
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)15" RCP
4" HDPE
4"
H
D
P
E
15" RCP
N0
0
°
3
1
'
2
0
"
E
1
0
3
0
.
0
0
WETLAND
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
REMOVE EXISTING
CURB AND
GUTTER, TYP.
REMOVE EXISTING CURB
AND GUTTER, TYP.
EXISTING HOUSE TO REMAIN. PROTECT
FOOTINGS AND FOUNDATIONS.
EXISTING WETLAND TO REMAIN.
PROTECT FROM DAMAGE AND
SEDIMENTATION. SEE
DELINEATION BY LENNAR
CORPORATION
PROTECT EXISTING
CURB AND GUTTER, TYP.
REMOVE EXISTING
PAVEMENT AND BASE
MATERIAL, TYP.
PROTECT EXISTING
SHED
PROTECT EXISTING
PAVEMENT AND BASE
MATERIAL
PROTECT EXISTING
DECK AND FOOTINGS
REMOVE EXISTING
WETLAND. SEE WETLAND
MITIGATION PLAN W1.0
REMOVE EXISTING
CURB AND
GUTTER, TYP.
REMOVE EXISTING
CURB AND
GUTTER, TYP.
REMOVE EXISTING
GAZEBO
REMOVE EXISTING
DECK
EXISTING WETLAND TO REMAIN.
PROTECT FROM DAMAGE AND
SEDIMENTATION. SEE
DELINEATION BY LENNAR
CORPORATION
REMOVE EXISTING
SHED
PROTECT
EXISTING CATCH
BASIN.
PROTECT
EXISTING CATCH
BASIN.
PROTECT
EXISTING
SANITARY MH
PROTECT
EXISTING CATCH
BASIN AND STORM
SEWER
PROTECT
EXISTING
SANITARY SEWER
REMOVE AND
SALVAGE EXISTING
SIGN. SEE SITE PLAN
FOR PROPOSED
LOCATION
REMOVE AND
SALVAGE EXISTING
SIGN. SEE SITE PLAN
FOR PROPOSED
LOCATION
PROTECT EXISTING
BIT. TRAIL.
REMOVE EXISTING
UTILITY. COORD. W/
UTILITY COMPANY
REMOVE EXISTING
UTILITY. COORD. W/
UTILITY COMPANY
PROTECT
EXISTING CATCH
BASIN
PROTECT EXISTING
LIGHT POLE
REMOVE AND
SALVAGE EXISTING
MAILBOX. RETURN
TO OWNER.
PROTECT EXISTING
CATCH BASIN
REMOVE EXISTING
PAVEMENT AND BASE
MATERIAL, TYP.
PROTECT EXISTING
CATCH BASIN
REMOVE EXISTING
CURB AND
GUTTER, TYP.
PROTECT EXISTING
SANITARY MH
PROTECT EXISTING
HYDRANT
PROTECT EXISTING
SIGN
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C1.2
REMOVALS PLAN-
SOUTH
Know what's below.
before you dig.Call
R
REVISION SUMMARY
DATE DESCRIPTION
0
1" = 50'-0"
50'-0"25'-0"
N
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
138T
H
S
T
N
E
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
(A Pub
l
i
c
R
/
W
)
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
(Not Deliniated)
WETLAND
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
WETLAND
WETLAND
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
TREE PRESERVATION PLAN LEGEND:
TREE PROTECTION
TREE REMOVAL - INCLUDING
ROOTS AND STUMPS
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C1.3
TREE PRESERVATION
PLAN - OVERALL
CONSTRUCTION LIMITS
REVISION SUMMARY
DATE DESCRIPTION
PROPERTY LINE
Know what's below.
before you dig.Call
R
0
1" = 100'-0"
100'-0"50'-0"
N
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
WETLAND
WETLAND
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
EXISTING TREES TO REMAIN,
PROVIDE TREE PROTECTION
FENCING, TYP.
EXISTING TREES TO
REMAIN, PROVIDE TREE
PROTECTION FENCING,
TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C1.4
TREE PRESERVATION
PLAN - NORTH
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
WETLAND
(Not Deliniated)
WETLAND
WETLAND
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
EXISTING TREES TO
REMAIN, PROVIDE TREE
PROTECTION FENCING,
TYP.
EXISTING TREES TO REMAIN,
PROVIDE TREE PROTECTION
FENCING, TYP.
EXISTING TREES TO REMAIN,
PROVIDE TREE PROTECTION
FENCING, TYP.
EXISTING TREES TO
REMAIN, PROVIDE
TREE PROTECTION
FENCING, TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
REMOVE EXISTING TREE
AND BALL ROOT, TYP.
AND BALL ROOT, TYP.
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C1.5
TREE PRESERVATION
PLAN - SOUTH
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C1.6
TREE PRESERVATION
PLAN CALCULATIONS
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
138T
H
S
T
N
E
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
1
0
56
6
8
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
A
N
D
E
R
S
O
N
J
O
D
I
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
2
0
56
8
2
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
3
0
56
9
6
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
4
0
57
1
0
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
C
H
M
I
T
Z
S
A
M
U
E
L
J
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
5
0
57
2
4
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
6
0
57
3
8
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
B
L
E
G
E
N
S
C
O
T
T
A
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
7
0
57
5
2
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
E
N
G
L
E
B
R
I
D
G
E
T
A
N
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
2
7
0
8
4
0
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Property ID - 255341050
Owner: SUMMIT PRESERVE
TOWNHOME HOMEOWNERS ASSOC
Property ID - 255341010
Owner: US HOME CORPORATION
Property ID - 255340900
Owner: SUMMIT PRESERVE
TOWNHOME HOMEOWNERS
ASSOCIATION
Property ID - 255270850
Owner: CITY OF PRIOR LAKE
Property ID -
255360330
Owner: CITY OF
PRIOR LAKE
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
3
0
56
2
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
B
L
O
O
M
T
R
U
S
T
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
2
0
56
1
3
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
A
R
N
E
R
J
E
N
N
I
F
E
R
L
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
4
0
56
3
7
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
T
E
N
S
R
U
D
E
M
A
R
K
A
L
A
N
&
CA
T
H
E
R
I
N
E
A
N
N
E
R
E
V
O
C
A
B
L
E
T
R
U
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
5
0
56
4
5
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
A
S
H
I
N
G
T
O
N
A
L
P
H
O
N
S
O
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
6
0
56
5
3
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
H
I
T
E
E
D
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
7
0
56
6
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
A
Y
R
E
S
P
A
U
L
L
E
R
O
Y
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
8
0
56
7
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
P
R
I
N
G
E
R
S
T
E
V
E
N
Property ID - 255360320
13693 WILDFLOWER WAY NE
Prior Lake, MN 55372
Owner: PLEWACKI JAMES
Property ID - 255360350
Owner: BJW DEVELOPMENT CO LLC
Property ID - 255490010
5779 138TH ST NE
Prior Lake, MN 55372
Owner: GUNSTAD JACALYN
Property ID - 255490290
Owner: CITY OF PRIOR LAKE
Property ID - 255340890
Owner: CITY OF PRIOR LAKE
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
(A Pub
l
i
c
R
/
W
)
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
(Not Deliniated)
WETLAND
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
Wi
l
d
f
l
o
w
e
r
W
a
y
N
E
138th
S
t
.
N
E
Meridian Way NE
Ap
e
x
W
a
y
Lu
p
i
n
e
T
r
a
i
l
N
E
138th St. NE
Ja
c
k
s
o
n
S
t
r
e
e
t
N
E
Street "C"
GHOST PLAT
FUTURE ROAD
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
Exist.
Lu
p
i
n
e
T
r
a
i
l
N
E
70
WETLAND 3
WETLAND 4
WETLAND 2
WETLAND 1
WETLAND 7
OUTLOT B
OUTLOT A
OUTLOT C
OUTLOT D
36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
1 2 3 4 5
6
7 8 9 10 11
12
1
3
1
4
15
16
17
18
19
20
21
22
2324
25
26
2728
29
30
3
1
32 33
34
35
36 37 38 39 40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
POND /
INFILTRATION
BASIN
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
44263
Matthew R. Pavek
LICENSE NO.DATE
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF
MINNESOTA.
11/18/24
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
SITE LAYOUT NOTES:
SITE PLAN LEGEND:
TRAFFIC DIRECTIONAL ARROW PAVEMENT
MARKINGS
SIGN AND POST ASSEMBLY. SHOP DRAWINGS
REQUIRED.
HC = ACCESSIBLE SIGN
NP = NO PARKING FIRE LANE
ST = STOP
CP = COMPACT CAR PARKING ONLY
PROPERTY LINE
CURB AND GUTTER-SEE NOTES (T.O.) TIP OUT
GUTTER WHERE APPLICABLE-SEE PLAN
LIGHT DUTY BITUMINOUS PAVEMENT (IF
APPLICABLE). SEE GEOTECHNICAL REPORT
FOR AGGREGATE BASE & WEAR COURSE
DEPTH, SEE DETAIL.
CONSTRUCTION LIMITS
TO
CITY OF PRIOR LAKE SITE SPECIFIC NOTES:
1.RESERVED FOR CITY SPECIFIC SITE NOTES.
ACCESSIBILITY ROUTE ARROW (IF
APPLICABLE) DO NOT PAINT.
1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48
HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE
OWNER.
2.CONTRACTOR SHALL VERIFY LOCATIONS AND LAYOUT OF ALL SITE ELEMENTS PRIOR TO BEGINNING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO, LOCATIONS OF
EXISTING AND PROPOSED PROPERTY LINES, EASEMENTS, SETBACKS, UTILITIES, BUILDINGS AND PAVEMENTS. CONTRACTOR IS RESPONSIBLE FOR FINAL LOCATIONS
OF ALL ELEMENTS FOR THE SITE. ANY REVISIONS REQUIRED AFTER COMMENCEMENT OF CONSTRUCTION, DUE TO LOCATIONAL ADJUSTMENTS SHALL BE CORRECTED
AT NO ADDITIONAL COST TO OWNER. ADJUSTMENTS TO THE LAYOUT SHALL BE APPROVED BY THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION OF
MATERIALS. STAKE LAYOUT FOR APPROVAL.
3.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, INCLUDING A RIGHT-OF-WAY AND STREET OPENING PERMIT.
4.THE CONTRACTOR SHALL VERIFY RECOMMENDATIONS NOTED IN THE GEO TECHNICAL REPORT PRIOR TO INSTALLATION OF SITE IMPROVEMENT MATERIALS.
5.CONTRACTOR SHALL FIELD VERIFY COORDINATES AND LOCATION DIMENSIONS & ELEVATIONS OF THE BUILDING AND STAKE FOR REVIEW AND APPROVAL BY THE
OWNERS REPRESENTATIVE PRIOR TO INSTALLATION OF FOOTING MATERIALS.
6.LOCATIONS OF STRUCTURES, ROADWAY PAVEMENTS, CURBS AND GUTTERS, BOLLARDS, AND WALKS ARE APPROXIMATE AND SHALL BE STAKED IN THE FIELD, PRIOR
TO INSTALLATION, FOR REVIEW AND APPROVAL BY THE ENGINEER/LANDSCAPE ARCHITECT.
7.CURB DIMENSIONS SHOWN ARE TO FACE OF CURB. BUILDING DIMENSIONS ARE TO FACE OF CONCRETE FOUNDATION. LOCATION OF BUILDING IS TO BUILDING
FOUNDATION AND SHALL BE AS SHOWN ON THE DRAWINGS.
8.THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OR SAMPLES AS SPECIFIED FOR REVIEW AND APPROVAL BY THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO
FABRICATION FOR ALL PREFABRICATED SITE IMPROVEMENT MATERIALS SUCH AS, BUT NOT LIMITED TO THE FOLLOWING, FURNISHINGS, PAVEMENTS, WALLS,
RAILINGS, BENCHES, FLAGPOLES, LANDING PADS FOR CURB RAMPS, AND LIGHT AND POLES. THE OWNER RESERVES THE RIGHT TO REJECT INSTALLED MATERIALS
NOT PREVIOUSLY APPROVED.
9.PEDESTRIAN CURB RAMPS SHALL BE CONSTRUCTED WITH TRUNCATED DOME LANDING AREAS IN ACCORDANCE WITH A.D.A. REQUIREMENTS-SEE DETAIL.
10.CROSSWALK STRIPING SHALL BE 24" WIDE WHITE PAINTED LINE, SPACED 48" ON CENTER PERPENDICULAR TO THE FLOW OF TRAFFIC. WIDTH OF CROSSWALK SHALL BE
5' WIDE. ALL OTHER PAVEMENT MARKINGS SHALL BE WHITE IN COLOR UNLESS OTHERWISE NOTED OR REQUIRED BY ADA OR LOCAL GOVERNING BODIES.
11.SEE SITE PLAN FOR CURB AND GUTTER TYPE. TAPER BETWEEN CURB TYPES-SEE DETAIL.
12.CONTRACTOR SHALL REFER TO FINAL PLAT FOR LOT BOUNDARIES, NUMBERS, AREAS AND DIMENSIONS PRIOR TO SITE IMPROVEMENTS.
13.FIELD VERIFY ALL EXISTING SITE CONDITIONS, DIMENSIONS.
14.PARKING IS TO BE SET PARALLEL OR PERPENDICULAR TO EXISTING BUILDING UNLESS NOTED OTHERWISE.
15.ALL PARKING LOT PAINT STRIPING TO BE WHITE, 4" WIDE TYP.
16.ALL TREES THAT ARE TO REMAIN ARE TO BE PROTECTED FROM DAMAGE WITH A CONSTRUCTION FENCE AT THE DRIP LINE. SEE LANDSCAPE DOCUMENTS.
17.CONTRACTOR IS RESPONSIBLE TO INSTALL ANY SIDEWALK AND CURBING PER DESIGN PLAN. CONTRACTOR TO VERIFY ALL CURBS AND SIDEWALKS WILL DRAIN
PROPERLY IN FIELD CONDITIONS. CONTRACTOR MUST CONTACT THE CIVIL ENGINEER 24-HOURS PRIOR TO ANY CURB AND/OR SIDEWALK INSTALLATION TO REVIEW
AND INSPECT CURB STAKES. CONTRACTOR IS RESPONSIBLE FOR ANY CURB OR SIDEWALK REPLACEMENT IF THIS PROCEDURE IS NOT FOLLOWED.
CONCRETE PAVEMENT (IF APPLICABLE) AS
SPECIFIED (PAD OR WALK) SEE
GEOTECHNICAL REPORT FOR AGGREGATE
BASE & CONCRETE DEPTHS, WITHIN ROW
SEE CITY DETAIL, WITHIN PRIVATE
PROPERTY SEE CSG DETAIL
REVISION SUMMARY
DATE DESCRIPTION
C2.0
SITE PLAN - OVERALL
Know what's below.
before you dig.Call
R
0
1" = 100'-0"
100'-0"50'-0"
N
OWNER INFORMATION
PRIOR LAKE DEVELOPMENT, LLC
7455 FRANCE AVENUE, SUITE 351
EDINA, MN 55435
ADAM SERAPHINE
612-616-5801
ADAM@ADAMSERAPHINE.COM
SINGLE-FAMILY SETBACKS
R-1 LOW DENSITY
RESIDENTIAL
PLANNED UNIT
DEVELOPMENT
COMPLIANT OR
FLEXIBILITY
FRONT 25 FEET 25 FEET COMPLIANT
REAR 25 FEET 20 FEET FLEXIBILITY
SIDE 10 FEET 6.5 FEET FLEXIBILITY
MIN. LOT WIDTH 86 FEET 49 FEET FLEXIBILITY
MIN. LOT DEPTH 140 FEET 120 FEET FLEXIBILITY
MIN. LOT SIZE 12,000 SF 5,712 SF FLEXIBILITY
ZONING
CURRENT R-1 LOW DENSITY
RESIDENTIAL
PROPOSED PUD
SITE DATA
GROSS SITE AREA 29.14 AC
EX COUNTY ROW 1.77 AC
WETLAND AREA
(WETLANDS 1, 2, 3, 4, 7)1.97 AC
NET DEVELOPABLE
AREA
(LOTS, LOCAL ROADS,
PONDS)
25.40 AC
SINGLE FAMILY
LOTS 70*
R-1 DENSITY 2-4 UNITS/ACRE
PROP. DENSITY 2.76 UNITS/ACRE
*INCLUDING EXISTING SINGLE FAMILY HOME
S Line of the N 1000.00
Feet of the of the W 1/2 of
the SE 1/4 of Sec. 24, Twp.
115, Rng. 22
N Line of the S 220.00 Feet of the
N 1000.00 Feet of the W 1/2 of
the SE 1/4 of Sec. 24, Twp. 115, Rng. 22
S Line of the N 1492.24 Feet of
W Line of the 792.00 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
W Line of the
SE 1/4 of
Sec. 24, Twp.
115, Rng. 22
P.O.B.
SW of the N
1492.24 Feet
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
Property ID -
255360330
Owner: CITY OF
PRIOR LAKE
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
3
0
56
2
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
B
L
O
O
M
T
R
U
S
T
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
2
0
56
1
3
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
A
R
N
E
R
J
E
N
N
I
F
E
R
L
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
4
0
56
3
7
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
T
E
N
S
R
U
D
E
M
A
R
K
A
L
A
N
&
CA
T
H
E
R
I
N
E
A
N
N
E
R
E
V
O
C
A
B
L
E
T
R
U
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
5
0
56
4
5
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
A
S
H
I
N
G
T
O
N
A
L
P
H
O
N
S
O
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
6
0
56
5
3
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
H
I
T
E
E
D
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
7
0
56
6
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
A
Y
R
E
S
P
A
U
L
L
E
R
O
Y
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
8
0
56
7
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
P
R
I
N
G
E
R
S
T
E
V
E
N
Property ID - 255360320
13693 WILDFLOWER WAY NE
Prior Lake, MN 55372
Owner: PLEWACKI JAMES
Property ID - 255360350
Owner: BJW DEVELOPMENT CO LLC
Property ID - 255490010
5779 138TH ST NE
Prior Lake, MN 55372
Owner: GUNSTAD JACALYN
Property ID - 255490290
Owner: CITY OF PRIOR LAKE
Property ID - 255340890
Owner: CITY OF PRIOR LAKE
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
8" WM
(Per Rec.)
8" WM
(Per Rec.)
Wi
l
d
f
l
o
w
e
r
W
a
y
N
E
138th
S
t
.
N
E
138th St. NE
Ja
c
k
s
o
n
S
t
r
e
e
t
N
E
R
3
3
3
.
5
4
'
Street "C"
R
2
0
'
R
3
0
0
'
R
2
0
'
R20
'
GHOST PLAT
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
R500'
R40'
WETLAND 2
WETLAND 1
WETLAND 7
55
'
80
'
66
'
66
'
32
'
B-
B
50'
32'
B-B
12
'
12
'
12
'
14
'
36
'
B-
B
55'
30
0
'
18
0
'
14.17'
2
5
.
0
OUTLOT B
OUTLOT A
OUTLOT C36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
2
5
.
0
25
.
0
2
5
.
0
6.5 6.5
25.0
25.0
25
.
0
20.0
25.020.0
25
.
0
25.0
6.56.5
25
.
0
25.0
6.5 6.5
25
.
0
2
5
.
0
2
5
.
0
25
.
0
6.
5
6
.
5
25.0
2
5
.
0
2
5
.
0
2
5
.
0
6.5
25.0
25.0 25.06.
5
2
5
.
0
6.5
6.5
6.5
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'
x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
1 2 3 4 5
6
7 8 9 10 11
12
1
3
1
4
15
16
17
18
19
20
21
22
2324
25
26
2728
29
30
3
1
32 33
34
35
36 37 38 39 40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
6.5
25.0
6.5 6.5
RRRRR
R
RR
R
R
R
LO
WO WO
WO
WO
WO WO
R/
W
O
WO
WO
LO
LO
LO
LO
LO
R R R R R
R R R R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
25
.
0
2
5
.
0
2
5
.
0
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
44263
Matthew R. Pavek
LICENSE NO.DATE
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF
MINNESOTA.
11/18/24
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
C2.1
SITE PLAN - NORTH
S Line of the N 2030.00 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
N Line of the S 537.76 Feet of
the N 2030.00 Feet of the
W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
W Line of the E 500.00 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
S Line of the N 1500.00 Feet
of the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
S Line of the N 1492.24 Feet of
the W 1/2 of the SE 1/4 of
Sec. 24, Twp. 115, Rng. 22
E Line of the W 1/2
of the SE 1/4 of
Sec. 24, Twp. 115,
Rng. 22
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
W Line of the
SE 1/4 of
Sec. 24, Twp.
115, Rng. 22
P.O.B.
SW of the N
1492.24 Feet
of the W 1/2 of
the SE 1/4 of
Sec. 24, Twp.
115, Rng. 22
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
1
0
56
6
8
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
A
N
D
E
R
S
O
N
J
O
D
I
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
2
0
56
8
2
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
3
0
56
9
6
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
4
0
57
1
0
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
C
H
M
I
T
Z
S
A
M
U
E
L
J
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
5
0
57
2
4
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
6
0
57
3
8
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
B
L
E
G
E
N
S
C
O
T
T
A
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
7
0
57
5
2
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
E
N
G
L
E
B
R
I
D
G
E
T
A
N
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
2
7
0
8
4
0
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Property ID - 255341050
Owner: SUMMIT PRESERVE
TOWNHOME HOMEOWNERS ASSOC
Property ID - 255341010
Owner: US HOME CORPORATION
Property ID - 255340900
Owner: SUMMIT PRESERVE
TOWNHOME HOMEOWNERS
ASSOCIATION
Property ID - 255270850
Owner: CITY OF PRIOR LAKE
Property ID - 255340890
Owner: CITY OF PRIOR LAKE
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
WETLAND
(Not Deliniated)
WETLAND
WETLAND
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
Meridian Way NE
Ap
e
x
W
a
y
Lu
p
i
n
e
T
r
a
i
l
N
E
138th St. NE
R10
0
'
R
2
0
'
R1
0
0
'
R1
0
0
'
R
3
0
0
'
R
2
0
'
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
Exist.
R20'
R100'
R95'
R500'
Lu
p
i
n
e
T
r
a
i
l
N
E
R45'
R40'
R
2
0
'
R1
0
0
'
R1
0
0
'
R100'
R25
0
'
70
WETLAND 3
WETLAND 4
WETLAND 2
50'
50
'
32
'
B-B
80
'
66
'
32'
B-
B
12
'
12
'
12
'
14
'
55'
32'
B-B
36
'
B-
B
25'
31
9
.
6
'
20
9
.
7
5
'
30
0
'
14.17'
75'75'
14.17'
25
.
0
25
.
0
6.5
25
.
0
13
.
0
2
5
.
0
25.0
25
.
0
25
.
0
25
.
0
6.5
25
.
0
2
5
.
0
25
.
0
OUTLOT C
OUTLOT D
36'x60'
PAD
36'x65'
PAD
2
5
.
0
25
.
0
25.0
2
5
.
0
25
.
0
2
5
.
0
25
.
0
25.0
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
3
1
32 33
34
35
36 37 38 39 40
41
42
43
44
45
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
6.5 6.5
6.
5
POND /
INFILTRATION
BASIN
6.
5
25.0
25
.
0
2
5
.
0
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
44263
Matthew R. Pavek
LICENSE NO.DATE
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF
MINNESOTA.
11/18/24
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
C2.2
SITE PLAN - SOUTH
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
138T
H
S
T
N
E
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
1
0
56
6
8
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
A
N
D
E
R
S
O
N
J
O
D
I
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
2
0
56
8
2
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
3
0
56
9
6
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
4
0
57
1
0
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
C
H
M
I
T
Z
S
A
M
U
E
L
J
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
5
0
57
2
4
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
6
0
57
3
8
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
B
L
E
G
E
N
S
C
O
T
T
A
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
4
0
0
7
0
57
5
2
M
E
R
I
D
I
A
N
W
A
Y
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
E
N
G
L
E
B
R
I
D
G
E
T
A
N
N
Pr
o
p
e
r
t
y
I
D
-
2
5
5
2
7
0
8
4
0
Ow
n
e
r
:
U
S
H
O
M
E
C
O
R
P
O
R
A
T
I
O
N
Property ID - 255341050
Owner: SUMMIT PRESERVE
TOWNHOME HOMEOWNERS ASSOC
Property ID - 255341010
Owner: US HOME CORPORATION
Property ID - 255340900
Owner: SUMMIT PRESERVE
TOWNHOME HOMEOWNERS
ASSOCIATION
Property ID - 255270850
Owner: CITY OF PRIOR LAKE
Property ID -
255360330
Owner: CITY OF
PRIOR LAKE
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
3
0
56
2
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
B
L
O
O
M
T
R
U
S
T
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
2
0
56
1
3
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
A
R
N
E
R
J
E
N
N
I
F
E
R
L
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
4
0
56
3
7
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
T
E
N
S
R
U
D
E
M
A
R
K
A
L
A
N
&
CA
T
H
E
R
I
N
E
A
N
N
E
R
E
V
O
C
A
B
L
E
T
R
U
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
5
0
56
4
5
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
A
S
H
I
N
G
T
O
N
A
L
P
H
O
N
S
O
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
6
0
56
5
3
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
W
H
I
T
E
E
D
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
7
0
56
6
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
A
Y
R
E
S
P
A
U
L
L
E
R
O
Y
Pr
o
p
e
r
t
y
I
D
-
2
5
5
3
6
0
2
8
0
56
7
1
J
A
R
E
T
T
C
T
N
E
Pr
i
o
r
L
a
k
e
,
M
N
5
5
3
7
2
Ow
n
e
r
:
S
P
R
I
N
G
E
R
S
T
E
V
E
N
Property ID - 255360320
13693 WILDFLOWER WAY NE
Prior Lake, MN 55372
Owner: PLEWACKI JAMES
Property ID - 255360350
Owner: BJW DEVELOPMENT CO LLC
Property ID - 255490010
5779 138TH ST NE
Prior Lake, MN 55372
Owner: GUNSTAD JACALYN
Property ID - 255490290
Owner: CITY OF PRIOR LAKE
Property ID - 255340890
Owner: CITY OF PRIOR LAKE
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
(A Pub
l
i
c
R
/
W
)
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
(Not Deliniated)
WETLAND
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
Wi
l
d
f
l
o
w
e
r
W
a
y
N
E
138th
S
t
.
N
E
Meridian Way NE
Ap
e
x
W
a
y
Lu
p
i
n
e
T
r
a
i
l
N
E
138th St. NE
Ja
c
k
s
o
n
S
t
r
e
e
t
N
E
Street "C"
GHOST PLAT
FUTURE ROAD
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
Lu
p
i
n
e
T
r
a
i
l
N
E
WETLAND 5
LEAST/LOW
OHWL=994.00
EX 100-YR HWL=995.05
EX EOF=994.35
MNRAM: MANAGE 2
WETLAND 6
LEAST/LOW
OHWL=994.00
EX 100-YR HWL=995.05
EX EOF=994.35
MNRAM: MANAGE 2
WETLAND 3
WETLAND 4
WETLAND 2
WETLAND 1
WETLAND 7
R
R
R
R
30
'
3
0
'
3
0
'
WETLAND 3
LEAST/LOW
OHWL=996.00
EX 100-YR HWL=998.87
PR 100-YR HWL=998.94
EX EOF=1000.35
PR EOF=1000.35
MNRAM: MANAGE 1
WETLAND 1
LEAST/LOW
OHWL=1012.50
EX 100-YR HWL=1014.71
PR 100-YR HWL=1014.32
EX EOF=1019.50
PR EOF=1015.00
MNRAM: MANAGE 1
WETLAND 2
LEAST/LOW
OHWL=1013.00
EX 100-YR HWL=1014.91
PR 100-YR HWL=1014.53
EX EOF=1019.50
PR EOF=1015.00
MNRAM: MANAGE 2
WETLAND 4
LEAST/LOW
OHWL=1002.00
EX 100-YR HWL=1002.65
PR 100-YR HWL=1002.59
EX EOF=1002.00
PR EOF=1002.00
MNRAM: MANAGE 1
WETLAND 7
LEAST/LOW
OHWL=979.20
EX 100-YR HWL=985.08
PR 100-YR HWL=985.63
EOF=990.60
MNRAM: MANAGE 1
10
.
0
50.0
2
0
.
0
50.0
4
0
.
0
40
.
0
20.
0
20.
0
40.0
5
0
.
0
BUFFER 30'
AVE./ 20' MIN
(TYP.)
WET.
BOUNDARY
SIGN (TYP.)
WET.
BOUNDARY
SIGN (TYP.)
WET.
BOUNDARY
SIGN (TYP.)
WET.
BOUNDARY
SIGN (TYP.)
WET.
BOUNDARY
SIGN (TYP.)
WET. BUFFER 30' AVE./ 20' MIN
(TYP.) & CONSERVATION ESMT.
LINE
WET. BUFFER 30'
AVE./ 20' MIN
(TYP.) &
CONSERVATION
ESMT. LINE
WET. BUFFER 30'
AVE./ 20' MIN (TYP.)
& CONSERVATION
ESMT. LINE
WET. BUFFER 30'
AVE./ 20' MIN
(TYP.) &
CONSERVATION
ESMT. LINE
WET. BUFFER 30' AVE./
20' MIN (TYP.) &
CONSERVATION ESMT.
LINE
WETLAND 6
TO BE
REMOVED
433 SF
WETLAND 5
TO BE REMOVED
1,421 SF
36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
RRRRR
R
RR
R
R
R
LO
WO WO
WO
WO
WO WO
R/
W
O
WO
WO
LO
LO
LO
LO
LO
R R R R R
R R R R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
WO
WO
WO
WO
WO
WO
WO
WO
WO
WO
WO
POND /
INFILTRATION
BASIN
FILTRATION BASIN
HAVEN RIDGE SOUTH
INF EL=981.50
OUTLET=982.32
EX 100-YR HWL=986.61
PR 100-YR HWL=986.93
EOF=986.60
BMP2
INF EL=996.50
OUTLET=998.10
100-YR HWL=999.44
EOF=1003.00
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
44263
Matthew R. Pavek
LICENSE NO.DATE
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF
MINNESOTA.
11/18/24
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 100'-0"
100'-0"50'-0"
N
W1.0
WETLAND MITIGATION
PLAN
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
138T
H
S
T
N
E
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
(A Pub
l
i
c
R
/
W
)
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
(Not Deliniated)
WETLAND
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
ST-1 ST-3
ST-2
ST-7
ST-6
ST-8
ST-4
ST-5
ST-9
ST-10
EL=994.0
CL, SP-SM
EL=1008.2
OL, CL,
SP-SM
EL=1003.9
OL, CL,
SM
EL=993.4
CL, SM
EL=1019.6
SM,
EL=1007.9
CL, SP,
SM
EL=1004.2
CL, SP
EL=1017.4
CL, SP-SM
SC-SM
EL=1002.1
CL, SP
EL=1007.5
CL, SM
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
EOF
1002.00
EOF
1015.00
EOF
1015.33
EOF
994.47
EOF
986.60
EOF
990.60
MA
I
N
T
E
N
A
N
C
E
A
C
C
E
S
S
MA
I
N
T
E
N
A
N
C
E
A
C
C
E
S
S
EOF
998.80
EOF
1001.23
EO
F
10
1
4
.
0
6
EOF
998.40
EOF
998.70
EOF
101
2
.
2
9
WETLAND 3
WETLAND 4
WETLAND 2
WETLAND 1
WETLAND 7
36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
POND /
INFILTRATION
BASIN
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C3.0
GRADING PLAN-
OVERALL
GENERAL GRADING NOTES:
1.0' CONTOUR ELEVATION INTERVAL
GRADING PLAN LEGEND:
SPOT GRADE ELEVATION GUTTER
SPOT GRADE ELEVATION TOP OF CURB
SPOT GRADE ELEVATION BOTTOM OF
STAIRS/TOP OF STAIRS
CITY OF PRIOR LAKE GRADING NOTES:
1.RESERVED FOR CITY SPECIFIC GRADING NOTES.
EX. 1' CONTOUR ELEVATION INTERVAL
SPOT GRADE ELEVATION (GUTTER/FLOW
LINE UNLESS OTHERWISE NOTED)
CURB AND GUTTER (T.O = TIP OUT)
EMERGENCY OVERFLOW
41.26
1125
891.00 G
891.00 TC
891.00 BS/TS
1137
EOF=1135.52
TO
SPOT GRADE ELEVATION MATCH EXISTING891.00 ME
GB GRADE BREAK - HIGH POINTS
1.CONTRACTOR SHALL VERIFY ALL BUILDING ELEVATIONS, (FFE, LFE, GFE), PRIOR TO CONSTRUCTION BY CROSS CHECKING
WITH ARCHITECTURAL, STRUCTURAL AND CIVIL ELEVATIONS FOR EQUIVALENT "100" ELEVATIONS. THIS MUST BE DONE PRIOR
TO EXCAVATION AND INSTALLATION OF ANY FOOTING MATERIALS. VERIFICATION OF THIS COORDINATION SHALL BE
CONFIRMED IN WRITING BY CIVIL, SURVEYOR, ARCHITECTURAL, STRUCTURAL AND CONTRACTOR PRIOR TO CONSTRUCTION.
2.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR
800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE
ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.
3.SEE SITE PLAN FOR HORIZONTAL LAYOUT & GENERAL GRADING NOTES.
4.THE CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION (INCLUDING BUT NOT LIMITED TO SITE PREPARATION,
SOIL CORRECTION, EXCAVATION, EMBANKMENT, ETC.) IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S SOILS
ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER.
5.ANY ELEMENTS OF AN EARTH RETENTION SYSTEM AND RELATED EXCAVATIONS THAT FALL WITHIN THE PUBLIC RIGHT OF WAY
WILL REQUIRE A “RIGHT OF WAY EXCAVATION PERMIT”. CONTRACTOR IS RESPONSIBLE FOR AQUIRING THIS PERMIT PRIOR TO
CONSTRUCTION IF APPLICABLE
6.GRADING AND EXCAVATION ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH THE NATIONAL POLLUTION DISCHARGE
ELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS & PERMIT REQUIREMENTS OF THE CITY.
7.PROPOSED SPOT GRADES ARE FLOW-LINE FINISHED GRADE ELEVATIONS, UNLESS OTHERWISE NOTED.
8.GRADES OF WALKS SHALL BE INSTALLED WITH 5% MAX. LONGITUDINAL SLOPE AND 1% MIN. AND 2% MAX. CROSS SLOPE,
UNLESS OTHERWISE NOTED.
9.PROPOSED SLOPES SHALL NOT EXCEED 3:1 UNLESS INDICATED OTHERWISE ON THE DRAWINGS. MAXIMUM SLOPES IN
MAINTAINED AREAS IS 4:1.
10.PROPOSED RETAINING WALLS, FREESTANDING WALLS, OR COMBINATION OF WALL TYPES GREATER THAN 4' IN HEIGHT SHALL
BE DESIGNED AND ENGINEERED BY A REGISTERED RETAINING WALL ENGINEER. DESIGN DRAWINGS SHALL BE SUBMITTED FOR
REVIEW AND APPROVAL PRIOR TO CONSTRUCTION.
11.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF GRADE STAKES THROUGHOUT THE DURATION OF
CONSTRUCTION TO ESTABLISH PROPER GRADES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR A FINAL FIELD CHECK
OF FINISHED GRADES ACCEPTABLE TO THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO TOPSOIL AND SODDING ACTIVITIES.
12.IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, THE CONTRACTOR SHALL TRANSPORT ALL EXCESS SOIL MATERIAL OFF
THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE.
13.EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE
SITE. THE CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL
SHALL BE PLACED IN EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. THE CONTRACTOR
SHALL SUBCUT CUT AREAS, WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 6 INCHES. RESPREAD TOPSOIL IN AREAS
WHERE TURF IS TO BE ESTABLISHED TO A MINIMUM DEPTH OF 6 INCHES.
14.FINISHED GRADING SHALL BE COMPLETED. THE CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING,
INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH
UNIFORM LEVELS OR SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING
GRADES. AREAS THAT HAVE BEEN FINISH GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATIONS,
TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME RUTTED BY TRAFFIC OR ERODED BY WATER OR HAS SETTLED
BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR
BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF THE NEW WORK.
15.PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL WILL BE REQUIRED ON THE STREET AND/OR PARKING AREA
SUBGRADE. THE CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST
ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE
SOILS ENGINEER. THE SOILS ENGINEER SHALL DETERMINE WHICH SECTIONS OF THE STREET OR PARKING AREA ARE
UNSTABLE. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE
SOILS ENGINEER. NO TEST ROLL SHALL OCCUR WITHIN 10' OF ANY UNDERGROUND STORM RETENTION/DETENTION SYSTEMS.
16.TOLERANCES
16.1.THE BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.30 FOOT ABOVE, OR 0.30 FOOT
BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE.
16.2.THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT
ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT IS MADE.
16.3.AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE REQUIRED
ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER.
16.4.TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS.
17.MAINTENANCE
17.1.THE CONTRACTOR SHALL PROTECT NEWLY GRADED AREAS FROM TRAFFIC AND EROSION, AND KEEP AREA FREE OF TRASH
AND DEBRIS.
17.2.CONTRACTOR SHALL REPAIR AND REESTABLISH GRADES IN SETTLED, ERODED AND RUTTED AREAS TO SPECIFIED
TOLERANCES. DURING THE CONSTRUCTION, IF REQUIRED, AND DURING THE WARRANTY PERIOD, ERODED AREAS WHERE
TURF IS TO BE ESTABLISHED SHALL BE RESEEDED AND MULCHED.
17.3.WHERE COMPLETED COMPACTED AREAS ARE DISTURBED BY SUBSEQUENT CONSTRUCTION OPERATIONS OR ADVERSE
WEATHER, CONTRACTOR SHALL SCARIFY, SURFACE, RESHAPE, AND COMPACT TO REQUIRED DENSITY PRIOR TO FURTHER
CONSTRUCTION.
SEE SWPPP ON SHEETS SW1.0 - SW1.9
EROSION CONTROL NOTES:
CONSTRUCTION LIMITS
GROUNDWATER ELEVATION PER
BORING
BORING GROUND WATER
ELEVATION
ST-1 NA
ST-2 NA
ST-3 NA
ST-4 NA
ST-5 NA
ST-6 NA
ST-7 NA
ST-8 NA
ST-9 NA
ST-10 NA
PER GEOTECHNICAL REPORT COMPLETED BY BRAUN
INTERTEC, INC. ON 08/30/19.
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 100'-0"
100'-0"50'-0"
N
10
"
P
V
C
1
0
"
P
V
C
1
5
"
R
C
P
24" RCP6" HDPE
18
"
R
C
P
18
"
R
C
P
15" RCP
10" PVC10" PVC
10
"
P
V
C
4" HDPE
15" RCP15" RCP
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
15
"
R
C
P
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
8" WM
(Per Rec.)
8" WM
(Per Rec.)
ST-1 ST-3
ST-2
ST-7
ST-6
ST-8
ST-4
ST-5
EL=994.0
CL, SP-SM
EL=1008.2
OL, CL,
SP-SM
EL=1003.9
OL, CL,
SM
EL=993.4
CL, SM
EL=1019.6
SM,
EL=1007.9
CL, SP,
SM
EL=1017.4
CL, SP-SM
SC-SM
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
EOF
1015.33
EOF
994.47
EOF
986.60
EOF
990.60
MA
I
N
T
E
N
A
N
C
E
A
C
C
E
S
S
EOF
1001.23
EOF
998.40
WETLAND 2
WETLAND 1
WETLAND 7
36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'
x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C3.1
GRADING PLAN-
NORTH
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
15" RCP 15" RCP
15
"
R
C
P
8"
P
V
C
21
"
R
C
P
24
"
R
C
P
12
"
RC
P
24" RCP
8" PVC 8" PVC
8"
P
V
C
18" RCP
21
"
R
C
P
8" PVC
8"
P
V
C
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)15" RCP
4" HDPE
4"
H
D
P
E
15" RCP
WETLAND
(Not Deliniated)
WETLAND
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
ST-8
ST-5
ST-9
ST-10
EL=1019.6
SM,
EL=1007.9
CL, SP,
SM
EL=1004.2
CL, SP
EL=1002.1
CL, SP
EL=1007.5
CL, SM
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
EOF
1002.00
EOF
1015.00
MA
I
N
T
E
N
A
N
C
E
A
C
C
E
S
S
EOF
998.80
EO
F
10
1
4
.
0
6
EOF
998.70
EOF
101
2
.
2
9
WETLAND 3
WETLAND 4
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
PA
D
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C3.2
GRADING PLAN-
SOUTH
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
138T
H
S
T
N
E
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
(A Pub
l
i
c
R
/
W
)
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
GHOST PLAT
FUTURE ROAD
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
Exist.
70
WETLAND 3
WETLAND 4
WETLAND 2
WETLAND 1
WETLAND 7
OUTLOT B
OUTLOT A
OUTLOT C
OUTLOT D
36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
1 2 3 4 5
6
7 8 9 10 11
12
1
3
1
4
15
16
17
18
19
20
21
22
2324
25
26
2728
29
30
3
1
32 33
34
35
36 37 38 39 40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
POND /
INFILTRATION
BASIN
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
GENERAL UTILITY NOTES:
UTILITY PLAN LEGEND:
CITY OF PRIOR LAKE UTILITY NOTES:
1.RESERVED FOR CITY SPECIFIC UTILITY NOTES.
CATCH BASIN
GATE VALVE AND VALVE BOX
SANITARY SEWER
STORM SEWER
WATER MAIN
PROPOSED FIRE HYDRANT
MANHOLE
FES AND RIP RAP
1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL"
(651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE
CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO
COST TO THE OWNER.
2.SEE SITE PLAN FOR HORIZONTAL DIMENSIONS AND LAYOUT.
3.CONTRACTOR SHALL FIELD VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES AND TOPOGRAPHIC
FEATURES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF
DISCREPANCIES OR VARIATIONS FROM THE PLANS.
4.UTILITY INSTALLATION SHALL CONFORM TO THE CURRENT EDITION OF "STANDARD SPECIFICATIONS FOR WATER
MAIN AND SERVICE LINE INSTALLATION" AND "SANITARY SEWER AND STORM SEWER INSTALLATION" AS
PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), AND SHALL CONFORM WITH THE
REQUIREMENTS OF THE CITY AND THE PROJECT SPECIFICATIONS.
5.CASTINGS SHALL BE SALVAGED FROM STRUCTURE REMOVALS AND RE-USED OR PLACED AT THE DIRECTION OF
THE OWNER.
6.ALL WATER PIPE SHALL BE CLASS 52 DUCTILE IRON PIPE (DIP) AWWA C151, ASME B16.4, AWWA C110, AWWA C153
UNLESS OTHERWISE NOTED.
7.ALL SANITARY SEWER SHALL BE SDR 26 POLYVINYL CHLORIDE (PVC) ASTM D3034 & F679, OR SCH 40 ASTM D1785,
2665, ASTM F794, 1866) UNLESS OTHERWISE NOTED.
8.ALL STORM SEWER PIPE SHALL BE HDPE ASTM F714 OR F2306 WITH ASTM D3212 SPEC FITTINGS UNLESS
OTHERWISE NOTED.
9.PIPE LENGTHS SHOWN ARE FROM CENTER TO CENTER OF STRUCTURE OR TO END OF FLARED END SECTION.
10.UTILITIES ON THE PLAN ARE SHOWN TO WITHIN 5' OF THE BUILDING FOOTPRINT. THE CONTRACTOR IS
ULTIMATELY RESPONSIBLE FOR THE FINAL CONNECTION TO BUILDING LINES. COORDINATE WITH
ARCHITECTURAL AND MECHANICAL PLANS.
11.CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE SUMPED 0.04 FEET. ALL CATCH BASINS IN GUTTERS
SHALL BE SUMPED 0.15 FEET PER DETAILS. RIM ELEVATIONS SHOWN ON THIS PLAN DO NOT REFLECT SUMPED
ELEVATIONS.
12.ALL FIRE HYDRANTS SHALL BE LOCATED 5 FEET BEHIND BACK OF CURB UNLESS OTHERWISE NOTED.
13.HYDRANT TYPE, VALVE, AND CONNECTION SHALL BE IN ACCORDANCE WITH CITY REQUIREMENTS. HYDRANT
EXTENSIONS ARE INCIDENTAL.
14.A MINIMUM OF 8 FEET OF COVER IS REQUIRED OVER ALL WATERMAIN, UNLESS OTHERWISE NOTED. EXTRA
DEPTH MAY BE REQUIRED TO MAINTAIN A MINIMUM OF 18" VERTICAL SEPARATION TO SANITARY OR STORM
SEWER LINES. EXTRA DEPTH WATERMAIN IS INCIDENTAL.
15.A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION IS REQUIRED
FOR ALL UTILITIES, UNLESS OTHERWISE NOTED.
16.ALL CONNECTIONS TO EXISTING UTILITIES SHALL BE IN ACCORDANCE WITH CITY STANDARDS AND COORDINATED
WITH THE CITY PRIOR TO CONSTRUCTION.
17.CONNECTIONS TO EXISTING STRUCTURES SHALL BE CORE-DRILLED.
18.COORDINATE LOCATIONS AND SIZES OF SERVICE CONNECTIONS WITH THE MECHANICAL DRAWINGS.
19.COORDINATE INSTALLATION AND SCHEDULING OF THE INSTALLATION OF UTILITIES WITH ADJACENT
CONTRACTORS AND CITY STAFF.
20.ALL STREET REPAIRS AND PATCHING SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CITY. ALL
PAVEMENT CONNECTIONS SHALL BE SAWCUT. ALL TRAFFIC CONTROLS SHALL BE PROVIDED BY THE
CONTRACTOR AND SHALL BE ESTABLISHED PER THE REQUIREMENTS OF THE MINNESOTA MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES (MMUTCD) AND THE CITY. THIS SHALL INCLUDE BUT NOT BE LIMITED TO SIGNAGE,
BARRICADES, FLASHERS, AND FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL BE OPEN TO TRAFFIC AT ALL
TIMES. NO ROAD CLOSURES SHALL BE PERMITTED WITHOUT APPROVAL BY THE CITY.
21.ALL STRUCTURES, PUBLIC AND PRIVATE, SHALL BE ADJUSTED TO PROPOSED GRADES WHERE REQUIRED. THE
REQUIREMENTS OF ALL OWNERS MUST BE COMPLIED WITH. STRUCTURES BEING RESET TO PAVED AREAS MUST
MEET OWNERS REQUIREMENTS FOR TRAFFIC LOADING.
22.2CONTRACTOR SHALL COORDINATE ALL WORK WITH PRIVATE UTILITY COMPANIES.
23.CONTRACTOR SHALL COORDINATE CONNECTION OF IRRIGATION SERVICE TO UTILITIES. COORDINATE THE
INSTALLATION OF IRRIGATION SLEEVES NECESSARY AS TO NOT IMPACT INSTALLATION OF UTILITIES.
24.CONTRACTOR SHALL MAINTAIN AS-BUILT PLANS THROUGHOUT CONSTRUCTION AND SUBMIT THESE PLANS TO
ENGINEER UPON COMPLETION OF WORK.
25.ALL JOINTS AND CONNECTIONS IN STORM SEWER SYSTEM SHALL BE GASTIGHT OR WATERTIGHT. APPROVED
RESILIENT RUBBER JOINTS MUST BE USED TO MAKE WATERTIGHT CONNECTIONS TO MANHOLES, CATCHBASINS,
OR OTHER STRUCTURES.
26.ALL PORTIONS OF THE STORM SEWER SYSTEM LOCATED WITHIN 10 FEET OF THE BUILDING OR WATER SERVICE
LINE MUST BE TESTED IN ACCORDANCE WITH MN RULES, CHAPTER 4714, SECTION 1109.0.
27.FOR ALL SITES LOCATED IN CLAY SOIL AREAS, DRAIN TILE MUST BE INSTALLED AT ALL LOW POINT CATCH BASINS
25' IN EACH DIRECTION. SEE PLAN AND DETAIL. INSTALL LOW POINT DRAIN TILE PER PLANS AND GEOTECHNICAL
REPORT RECOMMENDATIONS AND REQUIREMENTS.
CONSTRUCTION LIMITS
DRAINTILE
REVISION SUMMARY
DATE DESCRIPTION
C4.0
UTILITY PLAN -
OVERALL
Know what's below.
before you dig.Call
R
0
1" = 100'-0"
100'-0"50'-0"
N
10
"
P
V
C
1
0
"
P
V
C
10" PVC10" PVC
10
"
P
V
C
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
8" WM
(Per Rec.)
8" WM
(Per Rec.)
GHOST PLAT
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
EOF
1015.33
EOF
994.47
EOF
986.60
EOF
990.60
MA
I
N
T
E
N
A
N
C
E
A
C
C
E
S
S
EOF
1001.23
EOF
998.40
WETLAND 2
WETLAND 1
WETLAND 7
36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'
x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
SAN MH 1
RE=995.36
IE(E)=982.70
IE(S)=982.70
IE(N)=982.60
SAN MH 2
RE=1006.23
IE(W)=985.82
IE(S)=985.43
IE(N)=985.33
SAN MH 20
RE=1008.31
IE=996.25
SAN MH 21
RE=1015.69
IE=1004.40
SAN MH 30
RE=1000.78
IE=987.98
SAN MH 40
RE=1012.40
IE(NE)=997.85
IE(SW)=997.75
SAN MH 41
RE=1017.37
IE(NE)=1003.90
IE(SW)=1003.80
SAN MH 42
RE=1021.86
IE(NE)=1009.60
IE(SW)=1009.50
SAN MH 43
RE=1024.20
IE=1012.30
SAN MH 50
RE=1008.45
IE(W)=987.46
IE(E)=987.36
300 LF 8"
PVC SDR26
SAN @ 0.88%
162 LF 8"
PVC SDR35
SAN @ 0.44%
281 LF 8"
PVC SDR35
SAN @ 4.82%
49 LF 8"
PVC SDR35
SAN @ 0.45%
433 LF 8"
PVC SDR26
SAN @ 0.50%
284 LF 8"
PVC SDR35
SAN @ 2.10%
261 LF 8"
PVC SDR35
SAN @ 2.15%
131 LF 8"
PVC SDR35
SAN @ 2.06%
91 LF 8"
PVC SDR26
SAN @ 2.09%
341 LF 8"
PVC SDR26
SAN @ 0.60%
133 LF 8"
PVC SDR26
SAN @ 0.60%
172 LF 8"
PVC SDR26
SAN @ 0.60%
PROPOSED GATE
VALVE AND VALVE BOX
PROPOSED GATE VALVE
AND VALVE BOX
PROPOSED GATE
VALVE AND VALVE BOX
8" C900
WATERMAIN
8" C900
WATERMAIN
8" C900
WATERMAIN
8" C900
WATERMAIN
8" C900
WATERMAIN
HYD & GV, TYP.
8" TO 6" REDUCER
8" TO 6" REDUCER
HYD & GV, TYP.
CONNECT TO EXIST.
SAN SEWER STUB,
EXIST. IE =981.88 (AB),
CONTRACTOR TO
VERIFY PRIOR TO
CONSTRUCTION
CONNECT TO EXIST.
SAN SEWER STUB,
EXIST. IE =1004.18 (AB),
CONTRACTOR TO
VERIFY PRIOR TO
CONSTRUCTION CONNECT TO EXIST.
WATER STUB/ NEW
GATE VALVE
CONNECT TO EXIST.
WATER STUB/ NEW
GATE VALVE
CONNECT TO EXIST.
WATER STUB/ NEW
GATE VALVE
8" TO 6"
REDUCER
4" SCH 40 PVC
SANITARY SERVICE
(TYP.)
1" COPPER WATER
SERVICE (TYP.)
4" SCH 40 PVC
SANITARY SERVICE
(TYP.)
1" COPPER WATER
SERVICE (TYP.)
4" SCH 40 PVC
SANITARY SERVICE
(TYP.)
1" COPPER WATER
SERVICE (TYP.)
8" TO 6" REDUCER
HYD & GV, TYP.
8" TO 6"
REDUCER
HYD & GV, TYP.
HYD & GV, TYP.
8" TO 6" REDUCER
8" TO 6" REDUCER
HYD & GV, TYP.
11.25° BEND
8"X8"X8" TEE
PROPOSED GATE
VALVE AND VALVE BOX
11.25° BEND
8"X8"X8" TEE
8"X8"X8" TEE
11.25° BEND
22.5°
BEND
8"X8"X8" TEE
22.5° BEND
8"X8"X8" TEE
11.25° BEND
8"X8"X8" TEE
11.25° BEND
8"X8"X8" TEE
8"X8"X8" TEE
22.5° BEND
22.5° BEND
8"X8"X8" TEE
8"X8"X8" TEE
8"X8"X8" TEE
45° BEND
45° BEND
WATERMAIN
TO BE CASED
(16")END CASED
WATERMAIN
PROVIDE MINIMUM 18"
OF SEPARATION
BETWEEN
WATERMAIN AND
STORMSEWER
PROVIDE MINIMUM 18"
OF SEPARATION
BETWEEN
WATERMAIN AND
STORMSEWER
PROVIDE MINIMUM 18"
OF SEPARATION
BETWEEN
WATERMAIN AND
STORMSEWER
SAN MH 51
RE=1002.19
IE(E)=989.69
SAN MH 3
RE=1010.61
IE(W)=986.56
IE(E)=986.56
IE(N)=986.46
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
REVISION SUMMARY
DATE DESCRIPTION
C4.1
UTILITY PLAN -
SAN & WATER
NORTH
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
8"
P
V
C
8" PVC 8" PVC
8"
P
V
C
8" PVC
8"
P
V
C
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
WETLAND
(Not Deliniated)
WETLAND
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
EOF
1002.00
EOF
1015.00
MA
I
N
T
E
N
A
N
C
E
A
C
C
E
S
S
EOF
998.80
EO
F
10
1
4
.
0
6
EOF
998.70
EOF
101
2
.
2
9
WETLAND 3
WETLAND 4
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
PA
D
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
POND /
INFILTRATION
BASIN
SAN MH 4
RE=1011.70
IE(S)=1002.14
IE(N)=1002.24
SAN MH 5
RE=1014.34
IE(N)=1001.54
IE(S)=1001.44
SAN MH 6
RE=1011.91
IE(SE)=1000.26
IE(SW)=1000.36
IE(NE)=1000.36
SAN MH 7
RE=1016.60
IE(N)=1000.99
SAN MH 50
RE=1008.45
IE(W)=987.46
IE(E)=987.36
91 LF 8"
PVC SDR26
SAN @ 2.09%
341 LF 8"
PVC SDR26
SAN @ 0.60%
133 LF 8"
PVC SDR26
SAN @ 0.60%
151 LF 8"
PVC SDR35
SAN @ 0.40%
270 LF 8"
PVC SDR35
SAN @ 0.40%
165 LF 8"
PVC SDR35
SAN @ 0.40%
156 LF 8"
PVC SDR35
SAN @ 0.40%SAN MH 60
RE=1014.10
IE(NW)=999.60
IE(E)=999.50
PROPOSED GATE
VALVE AND VALVE BOX
PROPOSED GATE
VALVE AND VALVE
BOX
VALVE AND VALVE BOX
PROPOSED GATE
VALVE AND VALVE BOX
8" C900
WATERMAIN
8" C900
WATERMAIN
8" C900
WATERMAIN
CONNECT TO EXIST.
WATER STUB, REMOVE
EXIST. TEMP HYDRANT
AND LEAD
CONNECT TO EXIST.
WATER STUB/ NEW
GATE VALVE
CONNECT TO EXIST.
WATER STUB/ NEW
GATE VALVE
8" TO 6"
REDUCER
HYD & GV, TYP.
4" SCH 40 PVC
SANITARY SERVICE
(TYP.)
1" COPPER WATER
SERVICE (TYP.)
8" TO 6" REDUCER
HYD & GV, TYP.
8" TO 6"
REDUCER
HYD & GV, TYP.
8" TO 6" REDUCER
HYD & GV, TYP.
22.5° BEND
8"X8"X8" TEE
22.5° BEND &
11.25° BEND
SCH 40 PVC
8"X8"X8" TEE
22.5° BEND &
11.25° BEND22.5° BEND
8"X8"X8" TEE
22.5° BEND
11.25° BEND
8"X8"X8" TEE
PROPOSED GATE
VALVE AND VALVE BOX
8"X8"X8" TEE
22.5° BEND
8"X8"X8" TEE
11.25° BEND
8"X8"X8" TEE
11.25° BEND
CAP WATERMAIN
AND START
CASED
WATERMAIN
WATERMAIN
TO BE CASED
(16")END CASED
WATERMAIN
PROVIDE MINIMUM 18"
OF SEPARATION
BETWEEN
WATERMAIN AND
STORMSEWER
PROVIDE MINIMUM 18"
OF SEPARATION
BETWEEN
WATERMAIN AND
STORMSEWER
PROVIDE MINIMUM 18"
OF SEPARATION
BETWEEN
WATERMAIN AND
STORMSEWER
SAN MH 51
RE=1002.19
IE(E)=989.69
81 LF 8"
PVC SDR35
SAN @ 0.40%
CONNECT TO
EXISTING MH AT
IE=999.18
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
REVISION SUMMARY
DATE DESCRIPTION
C4.2
UTILITY PLAN -
SAN & WATER
SOUTH
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
1
5
"
R
C
P
24" RCP6" HDPE
18
"
R
C
P
18
"
R
C
P
15" RCP
4" HDPE
15" RCP15" RCP
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
15
"
R
C
P
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
GHOST PLAT
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
WETLAND 2
WETLAND 1
WETLAND 7
36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'
x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
FES 23
IE=982.00
FES 20
IE=982.32
FES 8
IE=982.32
CBMH 2
RE=993.54
IE (N/W)=989.15
IE (SE)=988.95
77 LF 18" RCP
STORM @ 0.50%
CBMH 6
RE=998.44
IE(N/W)=987.55
IE(S/SE)=988.14
30 LF 15" RCP
STORM @ 0.50%
CB 1
RE=993.54
IE=989.30
CBMH 4
RE=994.13
IE(N)=988.22
IE(SW)=988.02
CBMH 18
RE=999.55
IE=987.80
CBMH 17
RE=999.67
IE=989.16 CBMH 33
RE=1011.30
IE=1003.44
CBMH 35
RE=1006.62
IE=1003.11
CBMH 34
RE=1011.09
IE=1003.27
CB 31
RE=1017.45
IE=1010.83
CBMH 32
RE=1017.45
IE=1010.66
CBMH 22
RE=988.55
IE=983.83
SUMP=980.83
CB 21
RE=995.58
IE=990.61
30 LF 21" RCP
STORM @ 0.50%
59 LF 24" RCP
STORM @ 0.50%
156 LF 24" RCP
STORM @ 2.00%
122 LF 21" RCP
STORM @ 4.00%
39 LF 21" RCP
STORM @ 3.50%
61 LF 15" RCP
STORM @ 3.00%
226 LF 15" RCP
STORM @ 3.00%
54 LF 21" RCP
STORM @ 0.50%
222 LF 24" RCP
STORM @ 0.50%
32 LF 21" RCP
STORM @ 0.50%
34 LF 18" RCP
STORM @ 0.50%
361 LF 15" RCP
STORM @ 2.00%
34 LF 15" RCP
STORM @ 0.50%
121 LF 6" PVC
STORM @ 6.07%FES 35D
IE=1011.90CBMH 39
RE=1005.65
IE=1001.52
27 LF 24" RCP
STORM @ 7.80%
STMH 7
RE=989.56
IE=984.43
SUMP=981.43
148 LF 6" PVC
STORM @ 0.20%
(EQUALIZER)
FES 82
IE=1011.90
FES 81
IE=1012.204" FINGER DRAIN
W/ SOCK, TYP.
4" FINGER DRAIN
W/ SOCK, TYP.
4"
FINGER
DRAIN W/
SOCK,
TYP.
CBMH 5
RE=996.23
IE=987.85
34 LF 24" RCP
STORM @ 0.50%
69 LF 15" RCP
STORM @ 0.60%
STMH 19
RE=998.89
IE=982.92
SUMP=979.92
18 LF 21" RCP
STORM @ 3.30%
CBMH 6C
RE=1007.17
IE=997.47
CBMH 6D
RE=1007.17
IE=998.52
30 LF 15" RCP
STORM @ 3.50%
CBMH 13
RE=996.63
IE=992.86
34 LF 24" RCP
CBMH 38
RE=1009.71
IE=1002.63
34 LF 24" RCP
STORM @ 0.50%
31 LF 21" RCP
STORM @ 0.50%
CBMH 6B
RE=1003.34
IE=993.51
99 LF 15" RCP
STORM @ 4.00%
83 LF 15" RCP
STORM @ 4.00%
CBMH 3
RE=994.13
IE(NW)=988.57
IE(S)=988.37
CBMH 16
RE=1000.00
IE=989.98
56 LF 21" RCP
STORM @ 1.46%
CBMH 2B
RE=992.36
IE (W)=989.5453 LF 15" RCP
STORM @ 0.50%
RECONSTRUCT EXISTING
WETLAND OCS
RIM=987.00 (RAISE)
IE (NW)=979.11 (SAME)
4" ORIFICE=979.20 (SAME)
WEIR WALL=986.10 (RAISE)
RECONSTRUCT
EXISTING STRUCTURE
TO ALLOW FOR DOUBLE
INLET CB DEVICE
CBMH 2A
RE=993.99
IE=989.42
25 LF 15" RCP
STORM @ 0.50%
CBMH 15
RE=1002.00
IE=990.91
132 LF 21" RCP
STORM @ 0.70%
CB 6E
RE=997.27
IE(N/W)=992.79
65 LF 15" RCP
STORM @ 4.00%
51 LF 15" RCP
STORM @ 4.00%
CBMH 6A
RE=1000.36
IE=990.19
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
REVISION SUMMARY
DATE DESCRIPTION
C4.3
UTILITY PLAN -
STORM NORTH
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
15" RCP 15" RCP
15
"
R
C
P
21
"
R
C
P
24
"
R
C
P
12
"
RC
P
24" RCP
18" RCP
21
"
R
C
P
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)15" RCP
4" HDPE
4"
H
D
P
E
15" RCP
WETLAND
(Not Deliniated)
WETLAND
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
EOF
1002.00
EOF
1015.00
MA
I
N
T
E
N
A
N
C
E
A
C
C
E
S
S
EOF
998.80
EO
F
10
1
4
.
0
6
EOF
998.70
EOF
101
2
.
2
9
WETLAND 3
WETLAND 4
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
PA
D
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
POND /
INFILTRATION
BASIN
FES 43
IE=998.10
FES 58
IE=998.10
CBMH 35
RE=1006.62
IE=1003.11
CBMH 34
RE=1011.09
IE=1003.27
CBMH 36
RE=1009.62
IE=1002.96
CBMH 55
RE=1011.25
IE(NE)=1005.34
IE(NW/SE)=1005.14
CBMH 56
RE=1011.25
IE=1004.84
CB 55B
RE=1010.70
IE=1005.44
CBMH 55A
RE=1010.70
IE=1005.29
CBMH 57
RE=1014.75
IE=1001.46
SUMP=998.46
IE=990.61
CBMH 12
RE=996.63
IE(SE)=993.33
IE(N)=993.13
STMH 42
RE=1003.00
IE=998.69
SUMP=995.69
CBMH 35A
RE=1011.54
IE=1003.53
CBMH 35C
RE=1007.64
IE=1004.61
54 LF 21" RCP
STORM @ 0.50%
168 LF 18" RCP
STORM @ 2.00%
169 LF 18" RCP
STORM @ 2.00%
30 LF 18" RCP
STORM @ 1.00%
31 LF 18" RCP
STORM @ 0.50%
30 LF 15" RCP
STORM @ 0.50%
222 LF 24" RCP
STORM @ 0.50%
38 LF 15" RCP
STORM @ 0.60%
142 LF 15" RCP
STORM @ 0.60%
32 LF 21" RCP
STORM @ 0.50%
34 LF 18" RCP
STORM @ 0.50%
30 LF 24" RCP
STORM @ 0.50%
312 LF 15" RCP
STORM @ 0.50%
121 LF 6" PVC
STORM @ 6.07%FES 35D
IE=1011.90
72 LF 27" RCP
STORM @ 0.82%
CBMH 40
RE=1005.65
IE=1001.35
CBMH 39
RE=1005.65
IE=1001.52
CB 61
RE=1002.00
IE=998.57
FES 62
IE=998.10
47 LF 15"
RCP@ 1.00%
171 LF 15" RCP
STORM @ 1.36%
FES 11
IE=994.02
138 LF 18" RCP
STORM @ 0.50%
4" FINGER
DRAIN W/
SOCK, TYP.
CBMH 54
RE=1012.24
IE=1006.21
CB 54A
RE=1011.17
IE=1006.84
STMH 53
RE=1013.88
IE=1007.35
CBMH 52
RE=1012.31
IE=1008.61
CB 51
RE=1012.31
IE=1009.17
87 LF 15" RCP
STORM @ 1.00%
126 LF 12" RCP
STORM @ 0.50%
114 LF 15" RCP
STORM @ 1.00%
63 LF 15" RCP
STORM @ 2.00%
28 LF 15" RCP
STORM @ 2.00%
MH 35B
RE=1009.55
IE=1004.38
69 LF 15" RCP
STORM @ 0.60%
TIE INTO
EXISTING
STRUCTURE
AT 997.20
272 LF 15"
RCP@ 0.33%
MH 72
RE=1002.00
IE=998.10
9" ORIFICE=998.10
WEIR WALL=1000.20
FES 71
IE=998.10
STMH 41
RE=1006.00
IE=1000.59
380 LF 27" RCP
STORM @ 0.50%
152 LF 27" RCP
STORM @ 0.50%
34 LF 24" RCP
STORM @ 0.50%
CBMH 38
RE=1009.71
IE=1002.63
34 LF 24" RCP
STORM @ 0.50%
CBMH 37
RE=1010.00
IE=1002.80
33 LF 24" RCP
STORM @ 0.50%
360 LF 21" RCP
STORM @ 0.50%
CBMH 14
RE=1004.95
IE=991.06
31 LF 21" RCP
STORM @ 0.50%
29 LF 15"
RCP@ 0.00%
CB 91
RE=1000.46
IE(W)=994.81
12 LF 15" RCP
STORM @ 0.50%
CORE DRILL FOR
PROPOSED 15" RCP
IE(E)=994.75
IE=990.91
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
REVISION SUMMARY
DATE DESCRIPTION
C4.4
UTILITY PLAN -
STORM SOUTH
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C5.0
CIVIL DETAILS
REVISION SUMMARY
DATE DESCRIPTION
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C5.1
CIVIL DETAILS
REVISION SUMMARY
DATE DESCRIPTION
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C5.2
CIVIL DETAILS
REVISION SUMMARY
DATE DESCRIPTION
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C5.3
CIVIL DETAILS
REVISION SUMMARY
DATE DESCRIPTION
D
12"
3H:1L MAX.
BIO-FILTRATION BASIN (RAIN GARDEN - TYP.)
N T S
TYPICAL SECTION VIEW
1.INSTALL SILT FENCE AND/OR OR OTHER APPROPRIATE TEMPORARY EROSION CONTROL DEVICES TO
PREVENT SEDIMENT FROM LEAVING OR ENTERING THE PRACTICE DURING CONSTRUCTION.
2.ALL DOWN-GRADIENT PERIMETER SEDIMENT CONTROL BMP'S MUST BE IN PLACE BEFORE ANY UP GRADIENT
LAND DISTURBING ACTIVITY BEGINS.
3.PERFORM CONTINUOUS INSPECTIONS OF EROSION CONTROL PRACTICES.
4.INSTALL UTILITIES (WATER, SANITARY SEWER, ELECTRIC, PHONE, FIBER OPTIC, ETC) PRIOR TO SETTING FINAL
GRADE OF BIORETENTION DEVICE.
5.ROUGH GRADE THE SITE. IF BIORETENTION AREAS ARE BEING USED AS TEMPORARY SEDIMENT BASINS
LEAVE A MINIMUM OF 3 FEET OF COVER OVER THE PRACTICE TO PROTECT THE UNDERLYING SOILS FROM
CLOGGING.
6.PERFORM ALL OTHER SITE IMPROVEMENTS.
7.PLANT ALL AREAS AFTER DISTURBANCE.
8.CONSTRUCT BIORETENTION DEVICE UPON STABILIZATION OF CONTRIBUTING DRAINAGE AREA.
9.IMPLEMENT TEMPORARY AND PERMANENT EROSION CONTROL PRACTICES.
10.PLANT AND/OR ROCK MULCH BIORETENTION DEVICE.
11.REMOVE TEMPORARY EROSION CONTROL DEVICES AFTER THE CONTRIBUTING DRAINAGE AREA IS
ADEQUATELY VEGETATED.
GENERAL NOTES
1.IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE BMP DURING OR IMMEDIATELY FOLLOWING
EXCAVATION, THIS MATERIAL SHALL BE REMOVED FROM THE PRACTICE PRIOR TO CONTINUING
CONSTRUCTION.
2.GRADING OF BIORETENTION DEVICES SHALL BE ACCOMPLISHED USING LOW-COMPACTION EARTH-MOVING
EQUIPMENT TO PREVENT COMPACTION OF UNDERLYING SOILS.
3.ALL SUB MATERIALS BELOW THE SPECIFIED BIORETENTION DEPTH (ELEVATION) SHALL BE UNDISTURBED,
UNLESS OTHERWISE NOTED.
CONSTRUCTION SEQUENCING
RIBBON CURB OR CURB CUT, SEE
SITE AND GRADING PLANS
GRASS PRE-TREATMENT STRIP OR
PRE-TREATMENT STRUCTURE, SEE
UTILITY AND LANDSCAPE PLANS
UNDISTURBED, UNCOMPACTED INSITU SOIL
NET LESS EROSION BLANKET IN BOTTOM OF
BASIN. SLIT BLANKET TO ALLOW PLANT
MATERIAL SURFACE IF PLUG PLANTING IS TO
BE USED, SEE GRADING AND LANDSCAPE
PLANS
MIN.PLANTING MEDIUM DEPTH 24"
WITH A WELL BLENDED MIXTURE (BY VOLUME):
70% HOMOGENOUS CONSTRUCTION SAND
30% ORGANIC COMPOST
SEE GRADING PLAN FOR DEPTH
PLANT MATERIAL, SEE LANDSCAPE PLAN
SIDE SLOPE TREATMENTS, SEE GRADING OR LANDSCAPE PLANS
6"
4"
1.5'
UNDERDRAIN GRAVEL BLANKET
1-1.5" DOUBLE WASHED STONE
(NON LIMESTONE OR CONCRETE MATERIAL)
NON-WOVEN GEOTEXTILE (MnDOT 3733, TYPE 1 - HIGH FLOW RATE)
AROUND GRAVEL BLANKET - EXTENDING 1.5'
FROM UNDERDRAIN PIPE SIDES
PERFORATED UNDERDRAIN OUTLET PIPE
6" DIAMETER RIGID, PERFORRATED PVC.
SEE UTILITY PLAN
1
D
12"
3H:1L MAX.
BIO-INFILTRATION BASIN (RAIN GARDEN - TYP.)
N T S
TYPICAL SECTION VIEW
1.INSTALL SILT FENCE AND/OR OR OTHER APPROPRIATE TEMPORARY EROSION CONTROL DEVICES TO
PREVENT SEDIMENT FROM LEAVING OR ENTERING THE PRACTICE DURING CONSTRUCTION.
2.ALL DOWN-GRADIENT PERIMETER SEDIMENT CONTROL BMP'S MUST BE IN PLACE BEFORE ANY UP GRADIENT
LAND DISTURBING ACTIVITY BEGINS.
3.PERFORM CONTINUOUS INSPECTIONS OF EROSION CONTROL PRACTICES.
4.INSTALL UTILITIES (WATER, SANITARY SEWER, ELECTRIC, PHONE, FIBER OPTIC, ETC) PRIOR TO SETTING FINAL
GRADE OF BIORETENTION DEVICE.
5.ROUGH GRADE THE SITE. IF BIORETENTION AREAS ARE BEING USED AS TEMPORARY SEDIMENT BASINS
LEAVE A MINIMUM OF 3 FEET OF COVER OVER THE PRACTICE TO PROTECT THE UNDERLYING SOILS FROM
CLOGGING.
6.PERFORM ALL OTHER SITE IMPROVEMENTS.
7.PLANT ALL AREAS AFTER DISTURBANCE.
8.CONSTRUCT BIORETENTION DEVICE UPON STABILIZATION OF CONTRIBUTING DRAINAGE AREA.
9.IMPLEMENT TEMPORARY AND PERMANENT EROSION CONTROL PRACTICES.
10.PLANT AND/OR ROCK MULCH BIORETENTION DEVICE.
11.REMOVE TEMPORARY EROSION CONTROL DEVICES AFTER THE CONTRIBUTING DRAINAGE AREA IS
ADEQUATELY VEGETATED.
GENERAL NOTES
1.IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE BMP DURING OR IMMEDIATELY FOLLOWING
EXCAVATION, THIS MATERIAL SHALL BE REMOVED FROM THE PRACTICE PRIOR TO CONTINUING
CONSTRUCTION.
2.GRADING OF BIORETENTION DEVICES SHALL BE ACCOMPLISHED USING LOW-COMPACTION EARTH-MOVING
EQUIPMENT TO PREVENT COMPACTION OF UNDERLYING SOILS.
3.ALL SUB MATERIALS BELOW THE SPECIFIED BIORETENTION DEPTH (ELEVATION) SHALL BE UNDISTURBED,
UNLESS OTHERWISE NOTED.
CONSTRUCTION SEQUENCING
ADJACENT CURB, SEE SITE AND
GRADING PLANS
GRASS PRE-TREATMENT STRIP OR
PRE-TREATMENT STRUCTURE, SEE
UTILITY AND LANDSCAPE PLANS
UNDISTURBED, UNCOMPACTED INSITU SOIL
NET LESS EROSION BLANKET IN BOTTOM OF
BASIN. SLIT BLANKET TO ALLOW PLANT
MATERIAL SURFACE IF PLUG PLANTING IS TO
BE USED, SEE GRADING AND LANDSCAPE
PLANS
MIN.PLANTING MEDIUM DEPTH 24"
WITH A WELL BLENDED MIXTURE (BY VOLUME):
70% HOMOGENOUS CONSTRUCTION SAND
30% ORGANIC COMPOST
SEE GRADING PLAN FOR DEPTH
PLANT MATERIAL, SEE LANDSCAPE PLAN
SIDE SLOPE TREATMENTS, SEE GRADING OR LANDSCAPE PLANS
6-8" CRUSHED ANGULAR RIP RAP IN BOTTOM OF BASIN
CONSTRUCTION SAND
(UNDER ROCK WINDOW ONLY)
MUST OVER EXCAVATE DOWN
TO SUITABLE SOILS. FIELD
VERIFY WITH SOILS ENGINEER
2
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C5.4
CIVIL DETAILS
REVISION SUMMARY
DATE DESCRIPTION
8"8"
TYP.
3 SECTIONS OF FENCING BETWEEN
PIERS SPACED 6' O.C. MAX.
5'
-
0
"
T
Y
P
.
8"
5'
-
0
"
TY
P
.
8"
ALUMINUM FENCE - 4' HT.
N T S
1
4" THICK EXP.
JOINT (TYP.)
ALUMINUM POST
GROUTED IN PLACE
8" CONCRETE POST FOOTING
CLASS V AGGREGATE SUBBASE
3-RAIL FLAT TOP (#1230) 48" HT, WITH HEAVY DUTY
POSTS, 6' O.C. BY COURTYARD ALUMINUM FENCE
SYSTEMS
1
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
C5.5
CIVIL DETAILS
REVISION SUMMARY
DATE DESCRIPTION
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
138T
H
S
T
N
E
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
(A Pub
l
i
c
R
/
W
)
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
(Not Deliniated)
WETLAND
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
GHOST PLAT
FUTURE ROAD
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
Exist.
70
WETLAND 3
WETLAND 4
WETLAND 2
WETLAND 1
WETLAND 7
R
R
R
R
OUTLOT B
OUTLOT A
OUTLOT C
OUTLOT D
36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
1 2 3 4 5
6
7 8 9 10 11
12
1
3
1
4
15
16
17
18
19
20
21
22
2324
25
26
2728
29
30
3
1
32 33
34
35
36 37 38 39 40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
RRRRR
R
RR
R
R
R
LO
WO WO
WO
WO
WO WO
R/
W
O
WO
WO
LO
LO
LO
LO
LO
R R R R R
R R R R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
WO
WO
WO
WO
WO
WO
WO
WO
WO
WO
WO
POND /
INFILTRATION
BASIN
L1.0
LANDSCAPE PLAN-
OVERALL
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
1.THE CONTRACTOR SHALL PROVIDE ONLY PLANT MATERIAL FREE OF NEONICOTINOID BASED
INSECTICIDES AND/OR TREATMENTS OF ANY KIND, INCLUDING BY NOT LIMITED TO
IMIDACLOPRID (CONFIDOR, ADMIRE, GAUCHO, ADVOCATE), THIAMETHOXAM (ACTARA,
PLATINUM, CRUISER), CLOTHIANIDIN (PONCHO, DANTOSU, DANTOP), ACETAMIPRID (MOSPILAN,
ASSAIL, CHIPCOTRISTAR), THIACLOPRID (CALYPSO), DINOTEFURAN (STARKLE, SAFARI,
VENOM), AND NITENPYRAM (CAPSTAR, GUARDIAN).
2.CONTRACTOR SHALL CERTIFY, THROUGH SUPPLIERS POLICY STATEMENT OR AFFIDAVIT,
THAT NO NEONICOTINOID BASED INSECTICIDES HAVE BEEN USED ON SITE OR DIRECTLY
ADJACENT TO THE GROWING OR STORAGE PLOTS OF THE SUPPLIED PLANT MATERIAL,
INCLUDING THE PLANTING OF AGRICULTURAL (OR OTHER) SEED TREATED WITH NEONICS.
POLLINATOR SAFE PLANT MATERIAL:
LANDSCAPE NOTES:
PROPOSED PERENNIAL PLANT SYMBOLS - SEE PLANT
SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES
PROPOSED DECIDUOUS AND EVERGREEN SHRUB SYMBOLS - SEE
PLANT SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES
PROPOSED ORNAMENTAL TREE SYMBOLS - SEE PLANT
SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES
PROPOSED EVERGREEN TREE SYMBOLS - SEE PLANT
SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES
PROPOSED CANOPY TREE SYMBOLS - SEE
PLANT SCHEDULE AND PLAN FOR SPECIES
AND PLANTING SIZES
LANDSCAPE PLAN LEGEND:
EDGING - SHALL BE COMMERCIAL GRADE, 4" DEPTH ALUMINUM,
BLACK OR DARK GREEN IN COLOR, INCLUDE ALL CONNECTORS,
STAKES, & ALL APPURTENANCES PER MANUF. INSTALL PER MANUF.
INSTRUC./SPECS.
1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT
"GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY
LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL
REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING
CONSTRUCTION AT NO COST TO THE OWNER.
2.REFERENCE MULCH SCHEDULE FOR MULCH MATERIALS AND LOCATIONS.
3.ALL TREES SHALL BE MULCHED PER MULCH SCHEDULE TO OUTER EDGE OF
SAUCER OR TO EDGE OF PLANTING BED, IF APPLICABLE. ALL MULCH SHALL BE
KEPT WITHIN A MINIMUM OF 2" FROM TREE TRUNK.
4.IF SHOWN ON PLAN, RANDOM SIZED LIMESTONE BOULDERS COLOR AND SIZE TO
COMPLIMENT NEW LANDSCAPING. OWNER TO APPROVE BOULDER SAMPLES
PRIOR TO INSTALLATION.
5.PLANT MATERIALS SHALL CONFORM WITH THE AMERICAN ASSOCIATION OF
NURSERYMEN STANDARDS AND SHALL BE OF HARDY STOCK, FREE FROM
DISEASE, DAMAGE AND DISFIGURATION. CONTRACTOR IS RESPONSIBLE FOR
MAINTAINING PLUMPNESS OF PLANT MATERIAL FOR DURATION OF ACCEPTANCE
PERIOD.
6.UPON DISCOVERY OF A DISCREPANCY BETWEEN THE QUANTITY OF PLANTS
SHOWN ON THE SCHEDULE AND THE QUANTITY SHOWN ON THE PLAN, THE PLAN
SHALL GOVERN.
7.CONDITION OF VEGETATION SHALL BE MONITORED BY THE LANDSCAPE
ARCHITECT THROUGHOUT THE DURATION OF THE CONTRACT. LANDSCAPE
MATERIALS PART OF THE CONTRACT SHALL BE WARRANTED FOR TWO (2) FULL
GROWING SEASONS FROM SUBSTANTIAL COMPLETION DATE.
8.ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL RECEIVE 6" LAYER
TOPSOIL AND SOD AS SPECIFIED UNLESS OTHERWISE NOTED ON THE
DRAWINGS.
9.COORDINATE LOCATION OF VEGETATION WITH UNDERGROUND AND OVERHEAD
UTILITIES, LIGHTING FIXTURES, DOORS AND WINDOWS. CONTRACTOR SHALL
STAKE IN THE FIELD FINAL LOCATION OF TREES AND SHRUBS FOR REVIEW AND
APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
10.ALL PLANT MATERIALS SHALL BE WATERED AND MAINTAINED UNTIL
ACCEPTANCE.
11.REPAIR AT NO COST TO OWNER ALL DAMAGE RESULTING FROM LANDSCAPE
CONTRACTOR'S ACTIVITIES.
12.SWEEP AND MAINTAIN ALL PAVED SURFACES FREE OF DEBRIS GENERATED
FROM LANDSCAPE CONTRACTOR'S ACTIVITIES.
13.PROVIDE WATERING BAGS FOR ALL PROPOSED TREES - SEE DETAILS. MAINTAIN
(FILL) BAGS UNTIL OWNER AND CITY ACCEPTANCE IS FINALIZED
PLANTING SEASON SCHEDULE
SEASON CONIFEROUS DECIDUOUS REMARKS
SPRING PLANTING APRIL 15 - JUNE 15 APRIL 15 - JUNE 15
FALL PLANTING AUGUST 21 - SEPTEMBER 30 AUGUST 15 - NOVEMBER 15
NOTE: ADJUSTMENTS TO PLANTING DATES MUST BE APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT.
CONSTRUCTION LIMITS
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 100'-0"
100'-0"50'-0"
N
MULCH SCHEDULE
AREA MULCH TYPE EDGING FABRIC REMARKS
TREE RINGS 4" DEPTH, SHREDDED CEDAR YES NO SEE DETAIL SHT. L1.1
NATIVE SEED AREAS STRAW NO NO
INSTALL PUNCHED STRAW PER
SUPPLIER/MANUF. AND/OR MNDOT
SEEDING MANUAL
NOTE: COORDINATE ALL MULCH AND PLANTING BED MATERIAL PRIOR TO INSTALLATION, PROVIDE SAMPLES AND SHOP DRAWINGS/PHOTOS/DATA SHEETS
OF ALL MATERIALS
REQUIRED LANDSCAPE CALCULATIONS:
SEE SHEETS L1.1 & L1.2 FOR LANDSCAPE
PLAN ENLARGEMENTS & DETAILS
TREES PER LOT (SINGLE FAMILY & VILLA LOTS)
REQ.: 2 TREES PER LOT
TOTAL LOTS:29
REQUIRED TREES:58
TREES PER LOT (TOWNHOME LOTS)
REQ.: 1 TREES PER LOT
TOTAL LOTS:69
REQUIRED TREES:69
BUFFER TREES REQUIRED (SEE CALCS. BELOW)16
REPLACEMENT TREES REQ. (SEE SHEET C1.6 FOR CALCS.):108
TOTAL TREES REQ.:251
TOTAL TREES PROVIDED:251
BUFFER ORNAMENTAL TREES REQUIRED (SEE CALCS.
BELOW)31
TOTAL ORNAMENTAL TREES PROVIDED:31
BUFFER SHRUBS REQUIRED (SEE CALCS. BELOW)45
TOTAL SHRUBS PROVIDED:45
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
8" WM
(Per Rec.)
8" WM
(Per Rec.)
GHOST PLAT
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
WETLAND 2
WETLAND 1
WETLAND 7
OUTLOT B
OUTLOT A
OUTLOT C36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'
x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
1 2 3 4 5
6
7 8 9 10 11
12
1
3
1
4
15
16
17
18
19
20
21
22
2324
25
26
2728
29
30
3
1
32 33
34
35
36 37 38 39 40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
RRRRR
R
RR
R
R
R
LO
WO WO
WO
WO
WO WO
R/
W
O
WO
WO
LO
LO
LO
LO
LO
R R R R R
R R R R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
SEED TYPE 1 (TYP.)
SEED TYPE 3 (TYP.)
SEED TYPE 1 (TYP.)
SEED TYPE 1 (TYP.)
SEED TYPE 3 (TYP.)
SEED TYPE 3 (TYP.)
SEED TYPE 2 (TYP.)
SEED TYPE 2 (TYP.)
SEED TYPE 3 (TYP.)
SEED TYPE 3 (TYP.)
8 - RP
5 - RP
4 - WP
6 - BS
9 - RP
9 - WP
5 - NS
5 - CS
5 - BS
2 - NS
20 - RO
14 - RO
14 - RO
10- SM
10 - SM
11 - SM
20 - SO
19 - RM
4 - HA
3 - HA
7 - BA
4 - BA
8 - BA
1 - BA
3 - BA
L1.1
LANDSCAPE PLAN-
NORTH
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
SEE SHEET L1.0 FOR OVERALL LANDSCAPE
PLAN, NOTES, SCHEDULES, AND
CALCULATIONS
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
WETLAND
(Not Deliniated)
WETLAND
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
Exist.
70
WETLAND 3
WETLAND 4
R
R
R
R
OUTLOT D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
PA
D
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
41
42
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
R
R
R
WO
WO
WO
WO
WO
WO
WO
WO
WO
WO
WO
POND /
INFILTRATION
BASIN
SEED TYPE 1 (TYP.)
SEED TYPE 1 (TYP.)
SEED TYPE 3 (TYP.)
SEED TYPE 3 (TYP.)
SEED TYPE 3 (TYP.)
SEED TYPE 2 (TYP.)
SEED TYPE 3 (TYP.)
SEED TYPE 2 (TYP.)
SEED TYPE 3 (TYP.)
SEED TYPE 3 (TYP.)
SEED TYPE 3 (TYP.)
3 - CS
3 - BS
6 - WP
4 - WP
3 - CS
2 - NS
5 - CS
5 - BS
4 - BS
3 - HA
20 - RO
14 - RO
14 - RO
10- SM
10 - SM
7 - SM
11 - SM
4 - BA
9 - CO
9 - CO
5 - CO
5 - CO
8 - RM
2 - RM
14 - RM
SEED TYPE 2 (TYP.)
SEED TYPE 2 (TYP.)
SEED TYPE 2 (TYP.)
SEED TYPE 2 (TYP.)
SEED TYPE 3 (TYP.)
L1.2
LANDSCAPE PLAN-
SOUTH & DETAILS
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
THREE TIMES WIDTH
OF ROOTBALL
DRAWN @ ? size
DECIDUOUS & CONIFEROUS TREE PLANTING
N T S
PRUNE AS FIELD DIRECTED BY THE LANDSCAPE ARCHITECT TO IMPROVE
APPEARANCE (RETAIN NORMAL TREE SHAPE)
STAKING REQUIRED: THREE 2"X4"X8' WOODEN STAKES, STAINED
BROWN WITH TWO STRANDS OF WIRE TWISTED TOGETHER. STAKES
SHALL BE PLACED AT 120° TO ONE ANOTHER. WIRE SHALL BE
THREADED THROUGH NYLON STRAPPING WITH GROMMETS.
TRUNK FLARE JUNCTION: PLANT TREE 1"-2" ABOVE
EXISTING GRADE
MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF
PLANTING BED, IF APPLICABLE. ROCK OR ORGANIC MULCH,
SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR
MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT TRUNK
EXISTING GRADE
CUT AND REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. IF
NON-BIODEGRADABLE, REMOVE COMPLETELY
SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF
PLANTING BED
BACKFILL AS SPECIFIED
COMPACT BOTTOM OF PIT, TYP.
RULE OF THUMB - MODIFY EXCAVATION BASED ON
LOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR
OVERALL PLANT PLACEMENT
SLOW RELEASE WATERING BAG REQUIRED: INSTALL PER
MANU. SPECS./INSTRUCTIONS
1
SEE SHEET L1.0 FOR OVERALL LANDSCAPE
PLAN, NOTES, SCHEDULES, AND
CALCULATIONS
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
138T
H
S
T
N
E
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
(A Pub
l
i
c
R
/
W
)
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
WETLAND
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
WETLAND 3
WETLAND 4
WETLAND 2
WETLAND 1
WETLAND 7
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
SW1.0
SWPPP - EXISTING
CONDITIONS OVERALL
1. RESERVED FOR CITY SPECIFIC EROSION CONTROL NOTES.
CITY OF PRIOR LAKE EROSION CONTROL NOTES:
SWPPP LEGEND:
EX. 1' CONTOUR ELEVATION INTERVAL
INLET PROTECTION
STABILIZED CONSTRUCTION ENTRANCE
DRAINAGE ARROW
SILT FENCE / BIOROLL - GRADING LIMIT
1125
ALL SPECIFIED EROSION AND SEDIMENT CONTROL
PRACTICES, AND MEASURES CONTAINED IN THIS
SWPPP ARE THE MINIMUM REQUIREMENTS.
ADDITIONAL PRACTICES MAY BE REQUIRED DURING
THE COURSE OF CONSTRUCTION.
REVISION SUMMARY
DATE DESCRIPTION
1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE
APPROXIMATE. CONTACT "GOPHER STATE ONE CALL"
(651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48
HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL
REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
2.THIS PROJECT IS GREATER THAN ONE ACRE AND WILL
REQUIRE AN MPCA NPDES PERMIT. CONTRACTOR IS
RESPONSIBLE FOR OBTAINING ANY EROSION CONTROL
PERMITS REQUIRED BY THE CITY.
3.SEE SHEETS SW1.0 - SW1.9 FOR ALL EROSION CONTROL
NOTES, DESCRIPTIONS, AND PRACTICES.
4.SEE GRADING PLAN FOR ADDITIONAL GRADING AND EROSION
CONTROL NOTES.
5.CONTRACTOR IS RESPONSIBLE FOR SWPPP
IMPLEMENTATION, INSPECTIONS, AND COMPLIANCE WITH
NPDES PERMIT.
SWPPP NOTES:
Know what's below.
before you dig.Call
R
0
1" = 100'-0"
100'-0"50'-0"
N
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
WETLAND
8" WM
(Per Rec.)
8" WM
(Per Rec.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
WETLAND 2
WETLAND 1
WETLAND 7
PERIMETER EROSION
CONTROL AT CONSTRUCTION
LIMITS, TYP.
PERIMETER EROSION
CONTROL AT CONSTRUCTION
LIMITS, TYP.
PERIMETER EROSION
CONTROL AT CONSTRUCTION
LIMITS, TYP.
CONTRACTOR TO PROVIDE
INLET PROTECTION AT ALL
DOWNSTREAM CATCH
BASINS.
CONTRACTOR TO PROVIDE
INLET PROTECTION AT ALL
DOWNSTREAM CATCH
BASINS.
INLET PROTECTION AT
CATCH BASINS, TYP
PLACE DOUBLE EROSION
CONTROL DEVICE AROUND
WETLAND
PLACE DOUBLE EROSION
CONTROL DEVICE AROUND
WETLAND
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
SW1.1
SWPPP - EXISTING
CONDITIONS NORTH
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
WETLAND
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
WETLAND 3
WETLAND 4
PERIMETER EROSION
CONTROL AT CONSTRUCTION
LIMITS, TYP.
CONTRACTOR TO PROVIDE
INLET PROTECTION AT ALL
DOWNSTREAM CATCH
BASINS.
BASINS.
CONTRACTOR TO PROVIDE
INLET PROTECTION AT ALL
DOWNSTREAM CATCH
BASINS.
INLET PROTECTION AT
CATCH BASINS, TYP
INLET PROTECTION AT
CATCH BASINS, TYP
PERIMETER
EROSION CONTROL
AT CONSTRUCTION
LIMITS, TYP.
PLACE DOUBLE EROSION
CONTROL DEVICE AROUND
WETLAND
PLACE DOUBLE EROSION
CONTROL DEVICE AROUND
WETLAND
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
SW1.2
SWPPP - EXISTING
CONDITIONS SOUTH
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
138T
H
S
T
N
E
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
(A Pub
l
i
c
R
/
W
)
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
(Not Deliniated)
WETLAND
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
GHOST PLAT
FUTURE ROAD
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
EOF
1002.00
EOF
1015.00
EOF
1015.33
EOF
994.47
EOF
986.60
EOF
990.60
MA
I
N
T
E
N
A
N
C
E
A
C
C
E
S
S
MA
I
N
T
E
N
A
N
C
E
A
C
C
E
S
S
EOF
998.80
EOF
1001.23
EO
F
10
1
4
.
0
6
EOF
998.40
EOF
998.70
EOF
101
2
.
2
9
WETLAND 3
WETLAND 4
WETLAND 2
WETLAND 1
WETLAND 7
36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
POND /
INFILTRATION
BASIN
INLET PROTECTION AT
CATCH BASINS, TYP
INLET PROTECTION AT
CATCH BASINS, TYP
INLET PROTECTION AT
CATCH BASINS, TYP
INLET PROTECTION AT
CATCH BASINS, TYP
INLET PROTECTION AT
CATCH BASINS, TYPINLET PROTECTION AT
CATCH BASINS, TYP
PLACE DOUBLE EROSION
CONTROL DEVICE AROUND
WETLAND
PLACE EROSION
CONTROL BLANKET
ON ALL SLOPES 4:1 OR
STEEPER, TYP.
(MNDOT CATEGORY 3)
PLACE EROSION CONTROL
BLANKET ON ALL SLOPES 4:1
OR STEEPER, TYP. (MNDOT
CATEGORY 3)
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
SW1.3
SWPPP - PROPOSED
CONDITIONS OVERALL
1. RESERVED FOR CITY SPECIFIC EROSION CONTROL NOTES.
CITY OF PRIOR LAKE EROSION CONTROL NOTES:
SWPPP LEGEND:
INLET PROTECTION
STABILIZED CONSTRUCTION ENTRANCE
DRAINAGE ARROW
1.0' CONTOUR ELEVATION INTERVAL
SILT FENCE / BIOROLL - GRADING LIMIT
EROSION CONTROL BLANKET
1137
REVISION SUMMARY
DATE DESCRIPTION
1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE
APPROXIMATE. CONTACT "GOPHER STATE ONE CALL"
(651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48
HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL
REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
2.THIS PROJECT IS GREATER THAN ONE ACRE AND WILL
REQUIRE AN MPCA NPDES PERMIT. CONTRACTOR IS
RESPONSIBLE FOR OBTAINING ANY EROSION CONTROL
PERMITS REQUIRED BY THE CITY.
3.SEE SHEETS SW1.0 - SW1.9 FOR ALL EROSION CONTROL
NOTES, DESCRIPTIONS, AND PRACTICES.
4.SEE GRADING PLAN FOR ADDITIONAL GRADING AND EROSION
CONTROL NOTES.
5.CONTRACTOR IS RESPONSIBLE FOR SWPPP
IMPLEMENTATION, INSPECTIONS, AND COMPLIANCE WITH
NPDES PERMIT.
SWPPP NOTES:ALL SPECIFIED EROSION AND SEDIMENT CONTROL
PRACTICES, AND MEASURES CONTAINED IN THIS
SWPPP ARE THE MINIMUM REQUIREMENTS.
ADDITIONAL PRACTICES MAY BE REQUIRED DURING
THE COURSE OF CONSTRUCTION.
EX. 1' CONTOUR ELEVATION INTERVAL1125
Know what's below.
before you dig.Call
R
0
1" = 100'-0"
100'-0"50'-0"
N
JA
C
K
S
O
N
S
T
N
E
WILDFLOWER
WAY NE
(A Public R/W)
(A
P
u
b
l
i
c
R
/
W
)
WETLAND
WETLAND
WETLAND
EDGE OF
WATER
Edge of Water
8" WM
(Per Rec.)
8" WM
(Per Rec.)
GHOST PLAT
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
EOF
1015.33
EOF
994.47
EOF
986.60
EOF
990.60
MA
I
N
T
E
N
A
N
C
E
A
C
C
E
S
S
EOF
1001.23
EOF
998.40
WETLAND 2
WETLAND 1
WETLAND 7
36'x60'
PAD
36'x65'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD 36'x70'
PAD 36'x70'
PAD
36'
x
7
0
'
PAD
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
36
'
x
7
0
'
P
A
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36'x70'
PAD
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
3
6
'
x
7
0
'
P
A
D
3
6
'
x
7
0
'
P
A
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PAD
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'x
7
0
'
PAD
PERIMETER EROSION
CONTROL AT CONSTRUCTION
LIMITS, TYP.
PERIMETER EROSION
CONTROL AT CONSTRUCTION
LIMITS, TYP.
PERIMETER EROSION
CONTROL AT CONSTRUCTION
LIMITS, TYP.
CONTRACTOR TO PROVIDE
INLET PROTECTION AT ALL
DOWNSTREAM CATCH
BASINS.
CONTRACTOR TO PROVIDE
INLET PROTECTION AT ALL
DOWNSTREAM CATCH
BASINS.
INLET PROTECTION AT
CATCH BASINS, TYP
INLET PROTECTION AT
CATCH BASINS, TYP
PLACE DOUBLE EROSION
CONTROL DEVICE AROUND
WETLAND
PLACE DOUBLE EROSION
CONTROL DEVICE AROUND
WETLAND
PLACE EROSION
CONTROL BLANKET
ON ALL SLOPES 4:1 OR
STEEPER, TYP.
(MNDOT CATEGORY 3)
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
SW1.4
SWPPP - PROPOSED
CONDITIONS NORTH
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
CO
U
N
T
Y
R
O
A
D
N
O
.
1
8
(C
R
E
S
T
A
V
E
N
U
E
)
MERIDIAN WAY NE
APEX WAY NE
CA
P
I
T
A
L
C
O
U
R
T
N
E
LU
P
I
N
E
T
R
A
I
L
N
E
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A
P
u
b
l
i
c
R
/
W
)
(A Public R/W)
(A Public R/W)
WETLAND
(Not Deliniated)
WETLAND
8"
W
M
(P
e
r
R
e
c
.
)
8" WM
(Per Rec.)
8" WM
(Per Rec.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
CONSTRUCTION
LIMITS (TYP.)
EOF
1002.00
EOF
1015.00
MA
I
N
T
E
N
A
N
C
E
A
C
C
E
S
S
EOF
998.80
EO
F
10
1
4
.
0
6
EOF
998.70
EOF
101
2
.
2
9
WETLAND 3
WETLAND 4
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36
'
x
7
0
'
PA
D
36'x
7
0
'
PAD
36'x
7
0
'
PAD
PA
D
50
'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'
x
5
5
'
PA
D
45'x55'
PAD
POND /
INFILTRATION
BASIN
PERIMETER EROSION
CONTROL AT CONSTRUCTION
LIMITS, TYP.
CONTRACTOR TO PROVIDE
INLET PROTECTION AT ALL
DOWNSTREAM CATCH
BASINS.
BASINS.
CONTRACTOR TO PROVIDE
INLET PROTECTION AT ALL
DOWNSTREAM CATCH
BASINS.
INLET PROTECTION AT
CATCH BASINS, TYPINLET PROTECTION AT
CATCH BASINS, TYP
INLET PROTECTION AT
CATCH BASINS, TYPINLET PROTECTION AT
CATCH BASINS, TYP
PERIMETER
EROSION CONTROL
AT CONSTRUCTION
LIMITS, TYP.
PLACE DOUBLE EROSION
CONTROL DEVICE AROUND
WETLAND
PLACE DOUBLE EROSION
CONTROL DEVICE AROUND
WETLAND
PLACE DOUBLE EROSION
CONTROL DEVICE AROUND
WETLAND
PLACE EROSION CONTROL
BLANKET ON ALL SLOPES 4:1
OR STEEPER, TYP. (MNDOT
CATEGORY 3)
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
SW1.5
SWPPP - PROPOSED
CONDITIONS SOUTH
REVISION SUMMARY
DATE DESCRIPTION
Know what's below.
before you dig.Call
R
0
1" = 50'-0"
50'-0"25'-0"
N
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
SW1.6
SWPPP - DETAILS
REVISION SUMMARY
DATE DESCRIPTION
NOTES:
1. REPLACE INLET GRATE UPON COMPLETE INSTALLATION OF INLET PROTECTION FABRIC.
2. CONTRACTOR SHALL REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM THE SURFACE OF THE SYSTEM AFTER EACH
STORM EVENT AND AT THE COMPLETION OF THE CONTRACT.
3. CONTRACTOR SHALL USE DANDY SACK OR APPROVED EQUIVALENT FOR STRUCTURES WITHOUT CURBING.
CURB INLET SACK
N T S
OVERFLOW IS 12 OF THE CURB BOX HEIGHT
OVERFLOW AT TOP OF FILTER ASSEMBLY
EXISTING CURB, PLATE, BOX,
AND GRATE
DANDY CURB SACK OR
APPROVED EQUIVALENT
HIGH-FLOW FABRIC
1
DIRECTION OF FLOW
SEDIMENT BIO-ROLL / COMPOST FILTER LOG
N T S
NOTE:
1. COMPOST FILTER LOGS (BIO ROLLS) SHALL BE FILTREXX EROSION CONTROL SOXX OR
APPROVED EQUAL.
2. COMPOST FILLER TO BE MADE FROM A COMPOST BLEND 30%-40% GRADE 2 (SPEC 3890)
AND 60%-70% PARTIALLY DECOMPOSED WOOD CHIPS, PER MNDOT SPEC 3897.
3. FILTER FABRIC SHALL BE GEOTEXTILE KNITTED MATERIAL WITH MAX. OPENINGS OF 3/8".
4. IF MULTIPLE ROLLS NEEDED, OVERLAP BY MIN. 12" AT ENDS AND STAKE.
5. SILT SHALL BE REMOVED ONCE IT REACHES 80% OF THE HEIGHT OF THE ROLL OR AS
DEEMED NECESSARY BY SITE CONTRACTOR TO MAINTAIN PROPER FUNCTION.
8"
M
I
N
.
EXISTING GROUND SURFACE
WOODEN STAKES 1/2"X2"X16" MIN. PLACED 10' O.C. WHEN
INSTALLED ON GROUND. IF INSTALLED ON PVMT. PROVIDE
SANDBAGS BEHIND AND ON TOP AT MIN. 10' O.C.
FILTER FABRIC AS SPECIFIED
FILLER AS SPECIFIED
FILL UPSTREAM BASE EDGE
WITH 2" OF DIRT OR COMPOST
TO EMBED ROLL.
2
= DIRECTION OF SURFACE FLOW
PLAN
INLET PROTECTION ROCK FILTER
N T S
PROPOSED FUTURE CURB
AGGREGATE
BASE
1 1
2" WASHED
GRAVEL FILTER
AGGREGATE BACKFILL
STEEL PLATE
IN PLACE
CATCHBASIN
8-12" MINIMUM
DEPTH
3
SW1.7
SWPPP - NARRATIVE
OWNER INFORMATIONTRAINING SECTION 21
PARTY RESPONSIBLE FOR LONG TERM OPERATION AND MAINTENANCE OF
PERMANENT STORM WATER MANAGEMENT SYSTEM
PERMANENT STORMWATER MANAGEMENT IS REQUIRED AS PART OF THIS PROJECT TO MEET NPDES PERMIT
REQUIREMENTS. THE PROPERTY OWNER IS RESPONSIBLE FOR THE LONG TERM OPERATION AND MAINTENANCE OF THE
PROPOSED STORMWATER SYSTEM.
AREAS AND QUANTITIES:
SWPPP CONTACT PERSON
CONTRACTOR:SWPPP INSPECTOR TRAINING:
ALL SWPPP INSPECTIONS MUST BE PERFORMED BY A
PERSON THAT MEETS THE TRAINING REQUIREMENTS
OF THE NPDES CONSTRUCTION SITE PERMIT.
TRAINING CREDENTIALS SHALL BE PROVIDED BY THE
CONTRACTOR AND KEPT ON SITE WITH THE SWPPP
NOTE: QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL DETERMINE FOR
THEMSELVES THE EXACT QUANTITIES FOR BIDDING AND CONSTRUCTION.
SUPPLEMENTARY SITE SPECIFIC EROSION CONTROL NOTES:
THESE NOTES SUPERCEDE ANY GENERAL SWPPP NOTES.
THIS PROJECT IS GREATER THAN 1.0 ACRES SO AN NPDES PERMIT IS REQUIRED AND NEEDS TO BE SUBMITTED TO THE
MPCA. THE CONTRACTOR IS REQUIRED TO FOLLOW THE GUIDELINES IN THE NPDES PERMIT THROUGHOUT
CONSTRUCTION.
SWPPP ATTACHMENTS (ONLY APPLICABLE IF SITE IS 1 ACRE OR GREATER):
CONTRACTOR SHALL OBTAIN A COPY OF THE FOLLOWING SWPPP ATTACHMENTS WHICH ARE A PART OF THE OVERALL
SWPPP PACKAGE:
ATTACHMENT A. CONSTRUCTION SWPPP TEMPLATE - SITE SPECIFIC SWPPP DOCUMENT
ATTACHMENT B. CONSTRUCTION STORMWATER INSPECTION CHECKLIST
ATTACHMENT C. MAINTENANCE PLAN FOR PERMANENT STORM WATER TREATMENT SYSTEMS
ATTACHMENT D: STORMWATER MANAGEMENT REPORT - ON FILE AT THE OFFICE OF PROJECT ENGINEER. AVAILABLE UPON REQUEST.
ATTACHMENT E: GEOTECHNICAL EVALUATION REPORT - ON FILE AT THE OFFICE OF PROJECT ENGINEER. AVAILABLE UPON REQUEST.
THE CONTRACTOR AND ALL SUBCONTRACTORS INVOLVED WITH A CONSTRUCTION ACTIVITY THAT DISTURBS
SITE SOIL OR WHO IMPLEMENT A POLLUTANT CONTROL MEASURE IDENTIFIED IN THE STORM WATER
POLLUTION PREVENTION PLAN (SWPPP) MUST COMPLY WITH THE REQUIREMENTS OF THE NATIONAL
POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT (DATED AUGUST 1, 2018 #
MNR100001) AND ANY LOCAL GOVERNING AGENCY HAVING JURISDICTION CONCERNING EROSION AND
SEDIMENTATION CONTROL.
STORMWATER DISCHARGE DESIGN REQUIREMENTS
SWPPP
THE NATURE OF THIS PROJECT WILL BE CONSISTENT WITH WHAT IS REPRESENTED IN THIS SET OF
CONSTRUCTION PLANS AND SPECIFICATIONS. SEE THE SWPPP PLAN SHEETS AND SWPPP NARRATIVE
(ATTACHMENT A: CONSTRUCTION SWPPP TEMPLATE) FOR ADDITIONAL SITE SPECIFIC SWPPP INFORMATION.
THE PLANS SHOW LOCATIONS AND TYPES OF ALL TEMPORARY AND PERMANENT EROSION PREVENTION AND
SEDIMENT CONTROL BMP'S. STANDARD DETAILS ARE ATTACHED TO THIS SWPPP DOCUMENT.
THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES IS AS FOLLOWS:
1. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE
2. INSTALLATION OF SILT FENCE AROUND SITE
3. INSTALL ORANGE CONSTRUCTION FENCING AROUND INFILTRATION AREAS
4. INSTALL INLET PROTECTION AT ALL ADJACENT AND DOWNSTREAM CATCH BASINS
5. CLEAR AND GRUB FOR TEMPORARY SEDIMENT BASIN / POND INSTALL
6. CONSTRUCT TEMPORARY SEDIMENT BASIN / POND (SECTION 14)
7. CLEAR AND GRUB REMAINDER OF SITE
8. STRIP AND STOCKPILE TOPSOIL
9. ROUGH GRADING OF SITE
10. STABILIZE DENUDED AREAS AND STOCKPILES
11. INSTALL SANITARY SEWER, WATER MAIN STORM SEWER AND SERVICES
12. INSTALL SILT FENCE / INLET PROTECTION AROUND CB'S
13. INSTALL STREET SECTION
14. INSTALL CURB AND GUTTER
15. BITUMINOUS ON STREETS
16. FINAL GRADE BOULEVARD, INSTALL SEED AND MULCH
17. REMOVE ACCUMULATED SEDIMENT FROM BASIN / POND
18. FINAL GRADE POND / INFILTRATION BASINS (DO NOT COMPACT SOILS IN INFILTRATION AREAS.)
19. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR
SOD/LANDSCAPING, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL.
RECORDS RETENTION:
THE SWPPP (ORIGINAL OR COPIES) INCLUDING, ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE
RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION BY THE PERMITTEE WHO HAS OPERATIONAL
CONTROL OF THAT PORTION OF THE SITE. THE SWPPP CAN BE KEPT IN EITHER THE FIELD OFFICE OR IN AN ON
SITE VEHICLE DURING NORMAL WORKING HOURS.
ALL OWNER(S) MUST KEEP THE SWPPP, ALONG WITH THE FOLLOWING ADDITIONAL RECORDS, ON FILE FOR
THREE (3) YEARS AFTER SUBMITTAL OF THE NOT AS OUTLINED IN SECTION 4. THIS DOES NOT INCLUDE ANY
RECORDS AFTER SUBMITTAL OF THE NOT.
1.THE FINAL SWPPP;
2.ANY OTHER STORMWATER RELATED PERMITS REQUIRED FOR THE PROJECT;
3.RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION (SEE SECTION 11,
INSPECTIONS AND MAINTENANCE);
4.ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED,
INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS
REGARDING PERPETUAL MAINTENANCE; AND
5.ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORMWATER
MANAGEMENT SYSTEMS.
SWPPP IMPLEMENTATION RESPONSIBILITIES:
1.THE OWNER AND CONTRACTOR ARE PERMITTEE(S) AS IDENTIFIED BY THE NPDES PERMIT.
2.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ON-SITE IMPLEMENTATION OF THE SWPPP, INCLUDING
THE ACTIVITIES OF ALL OF THE CONTRACTOR'S SUBCONTRACTORS.
3.CONTRACTOR SHALL PROVIDE A PERSON(S) KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION
OF EROSION PREVENTION AND SEDIMENT CONTROL BMPS TO OVERSEE ALL INSTALLATION AND
MAINTENANCE OF BMPS AND IMPLEMENTATION OF THE SWPPP.
4.CONTRACTOR SHALL PROVIDE PERSON(S) MEETING THE TRAINING REQUIREMENTS OF THE NPDES
PERMIT TO CONDUCT INSPECTION AND MAINTENANCE OF ALL EROSION PREVENTION AND SEDIMENT
CONTROL BMPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE PERMIT. ONE OF THESE
INDIVIDUAL(S) MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY
MPCA. CONTRACTOR SHALL PROVIDE TRAINING DOCUMENTATION FOR THESE INDIVIDUAL(S) AS
REQUIRED BY THE NPDES PERMIT. THIS TRAINING DOCUMENTATION SHALL BE RECORDED IN OR WITH
THE SWPPP BEFORE THE START OF CONSTRUCTION OR AS SOON AS THE PERSONNEL FOR THE PROJECT
HAVE BEEN DETERMINED. DOCUMENTATION SHALL INCLUDE:
4.1.NAMES OF THE PERSONNEL ASSOCIATED WITH THE PROJECT THAT ARE REQUIRED TO BE TRAINED
PER SECTION 21 OF THE PERMIT.
4.2.DATES OF TRAINING AND NAME OF INSTRUCTOR AND ENTITY PROVIDING TRAINING.
4.3.CONTENT OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER OF HOURS OF TRAINING.
5.FOLLOWING FINAL STABILIZATION AND THE TERMINATION OF COVERAGE FOR THE NPDES PERMIT, THE
OWNER IS EXPECTED TO FURNISH LONG TERM OPERATION AND MAINTENANCE (O & M) OF THE
PERMANENT STORM WATER MANAGEMENT SYSTEM.
CONSTRUCTION ACTIVITY REQUIREMENTS
SWPPP AMENDMENTS (SECTION 6):
1.ONE OF THE INDIVIDUALS DESCRIBED IN ITEM 21.2.A OR ITEM 21.2.B OR ANOTHER QUALIFIED INDIVIDUAL
MUST COMPLETE ALL SWPPP CHANGES. CHANGES INVOLVING THE USE OF A LESS STRINGENT BMP MUST
INCLUDE A JUSTIFICATION DESCRIBING HOW THE REPLACEMENT BMP IS EFFECTIVE FOR THE SITE
CHARACTERISTICS.
2.PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO
CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER THERE IS A CHANGE IN DESIGN,
CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS HAVING A
SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER.
3.PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO
CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER INSPECTIONS OR
INVESTIGATIONS BY THE SITE OWNER OR OPERATOR, USEPA OR MPCA OFFICIALS INDICATE THE SWPPP IS
NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING THE DISCHARGE OF POLLUTANTS TO
SURFACE WATERS OR GROUNDWATER OR THE DISCHARGES ARE CAUSING WATER QUALITY STANDARD
EXCEEDANCES (E.G., NUISANCE CONDITIONS AS DEFINED IN MINN. R. 7050.0210, SUBP. 2) OR THE SWPPP IS
NOT CONSISTENT WITH THE OBJECTIVES OF A USEPA APPROVED TMDL.
BMP SELECTION AND INSTALLATION (SECTION 7):
1.PERMITTEES MUST SELECT, INSTALL, AND MAINTAIN THE BMPS IDENTIFIED IN THE SWPPP AND IN THIS
PERMIT IN AN APPROPRIATE AND FUNCTIONAL MANNER AND IN ACCORDANCE WITH RELEVANT
MANUFACTURER SPECIFICATIONS AND ACCEPTED ENGINEERING PRACTICES.
EROSION PREVENTION (SECTION 8):
1.BEFORE WORK BEGINS, PERMITTEES MUST DELINEATE THE LOCATION OF AREAS NOT TO BE DISTURBED.
2.PERMITTEES MUST MINIMIZE THE NEED FOR DISTURBANCE OF PORTIONS OF THE PROJECT WITH STEEP
SLOPES. WHEN STEEP SLOPES MUST BE DISTURBED, PERMITTEES MUST USE TECHNIQUES SUCH AS
PHASING AND STABILIZATION PRACTICES DESIGNED FOR STEEP SLOPES (E.G., SLOPE DRAINING AND
TERRACING).
3.PERMITTEES MUST STABILIZE ALL EXPOSED SOIL AREAS, INCLUDING STOCKPILES. STABILIZATION MUST
BE INITIATED IMMEDIATELY TO LIMIT SOIL EROSION WHEN CONSTRUCTION ACTIVITY HAS PERMANENTLY
OR TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WILL NOT RESUME FOR A PERIOD
EXCEEDING 7 CALENDAR DAYS. STABILIZATION MUST BE COMPLETED NO LATER THAN 7 CALENDAR DAYS
AFTER THE CONSTRUCTION ACTIVITY HAS CEASED. STABILIZATION IS NOT REQUIRED ON CONSTRUCTED
BASE COMPONENTS OF ROADS, PARKING LOTS AND SIMILAR SURFACES. STABILIZATION IS NOT REQUIRED
ON TEMPORARY STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY OR ORGANIC COMPONENTS (E.G., CLEAN
AGGREGATE STOCKPILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES) BUT PERMITTEES
MUST PROVIDE SEDIMENT CONTROLS AT THE BASE OF THE STOCKPILE.
4.FOR PUBLIC WATERS THAT THE MINNESOTA DNR HAS PROMULGATED "WORK IN WATER RESTRICTIONS"
DURING SPECIFIED FISH SPAWNING TIME FRAMES, PERMITTEES MUST COMPLETE STABILIZATION OF ALL
EXPOSED SOIL AREAS WITHIN 200 FEET OF THE WATER'S EDGE, AND THAT DRAIN TO THESE WATERS,
WITHIN 24 HOURS DURING THE RESTRICTION PERIOD.
5.PERMITTEES MUST STABILIZE THE NORMAL WETTED PERIMETER OF THE LAST 200 LINEAR FEET OF
TEMPORARY OR PERMANENT DRAINAGE DITCHES OR SWALES THAT DRAIN WATER FROM THE SITE WITHIN
24 HOURS AFTER CONNECTING TO A SURFACE WATER OR PROPERTY EDGE. PERMITTEES MUST
COMPLETE STABILIZATION OF REMAINING PORTIONS OF TEMPORARY OR PERMANENT DITCHES OR
SWALES WITHIN 7 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER OR PROPERTY EDGE AND
CONSTRUCTION IN THAT PORTION OF THE DITCH TEMPORARILY OR PERMANENTLY CEASES.
6.TEMPORARY OR PERMANENT DITCHES OR SWALES BEING USED AS A SEDIMENT CONTAINMENT SYSTEM
DURING CONSTRUCTION (WITH PROPERLY DESIGNED ROCK-DITCH CHECKS, BIO ROLLS, SILT DIKES, ETC.)
DO NOT NEED TO BE STABILIZED. PERMITTEES MUST STABILIZE THESE AREAS WITHIN 24 HOURS AFTER
THEIR USE AS A SEDIMENT CONTAINMENT SYSTEM CEASES
7.PERMITTEES MUST NOT USE MULCH, HYDROMULCH, TACKIFIER, POLYACRYLAMIDE OR SIMILAR EROSION
PREVENTION PRACTICES WITHIN ANY PORTION OF THE NORMAL WETTED PERIMETER OF A TEMPORARY
OR PERMANENT DRAINAGE DITCH OR SWALE SECTION WITH A CONTINUOUS SLOPE OF GREATER THAN 2
PERCENT.
8.PERMITTEES MUST PROVIDE TEMPORARY OR PERMANENT ENERGY DISSIPATION AT ALL PIPE OUTLETS
WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER OR PERMANENT STORMWATER TREATMENT
SYSTEM.
9.PERMITTEES MUST NOT DISTURB MORE LAND (I.E., PHASING) THAN CAN BE EFFECTIVELY INSPECTED AND
MAINTAINED IN ACCORDANCE WITH SECTION 11.
SEDIMENT CONTROL (SECTION 9):
1.PERMITTEES MUST ESTABLISH SEDIMENT CONTROL BMPS ON ALL DOWNGRADIENT PERIMETERS OF THE
SITE AND DOWNGRADIENT AREAS OF THE SITE THAT DRAIN TO ANY SURFACE WATER, INCLUDING CURB
AND GUTTER SYSTEMS. PERMITTEES MUST LOCATE SEDIMENT CONTROL PRACTICES UPGRADIENT OF
ANY BUFFER ZONES. PERMITTEES MUST INSTALL SEDIMENT CONTROL PRACTICES BEFORE ANY
UPGRADIENT LAND-DISTURBING ACTIVITIES BEGIN AND MUST KEEP THE SEDIMENT CONTROL PRACTICES
IN PLACE UNTIL THEY ESTABLISH PERMANENT COVER.
2.IF DOWNGRADIENT SEDIMENT CONTROLS ARE OVERLOADED, BASED ON FREQUENT FAILURE OR
EXCESSIVE MAINTENANCE REQUIREMENTS, PERMITTEES MUST INSTALL ADDITIONAL UPGRADIENT
SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS TO ELIMINATE THE OVERLOADING AND AMEND
THE SWPPP TO IDENTIFY THESE ADDITIONAL PRACTICES AS REQUIRED IN ITEM 6.3.
3.TEMPORARY OR PERMANENT DRAINAGE DITCHES AND SEDIMENT BASINS DESIGNED AS PART OF A
SEDIMENT CONTAINMENT SYSTEM (E.G., DITCHES WITH ROCK-CHECK DAMS) REQUIRE SEDIMENT
CONTROL PRACTICES ONLY AS APPROPRIATE FOR SITE CONDITIONS.
4.A FLOATING SILT CURTAIN PLACED IN THE WATER IS NOT A SEDIMENT CONTROL BMP TO SATISFY ITEM 9.2
EXCEPT WHEN WORKING ON A SHORELINE OR BELOW THE WATERLINE. IMMEDIATELY AFTER THE SHORT
TERM CONSTRUCTION ACTIVITY (E.G., INSTALLATION OF RIP RAP ALONG THE SHORELINE) IN THAT AREA IS
COMPLETE, PERMITTEES MUST INSTALL AN UPLAND PERIMETER CONTROL PRACTICE IF EXPOSED SOILS
STILL DRAIN TO A SURFACE WATER.
5.PERMITTEES MUST RE-INSTALL ALL SEDIMENT CONTROL PRACTICES ADJUSTED OR REMOVED TO
ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF VEHICLES,
IMMEDIATELY AFTER THE SHORT-TERM ACTIVITY IS COMPLETED. PERMITTEES MUST RE-INSTALL
SEDIMENT CONTROL PRACTICES BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE SHORT-TERM
ACTIVITY IS NOT COMPLETE.
6.PERMITTEES MUST PROTECT ALL STORM DRAIN INLETS USING APPROPRIATE BMPS DURING
CONSTRUCTION UNTIL THEY ESTABLISH PERMANENT COVER ON ALL AREAS WITH POTENTIAL FOR
DISCHARGING TO THE INLET.
7.PERMITTEES MAY REMOVE INLET PROTECTION FOR A PARTICULAR INLET IF A SPECIFIC SAFETY CONCERN
(E.G. STREET FLOODING/FREEZING) IS IDENTIFIED BY THE PERMITTEES OR THE JURISDICTIONAL
AUTHORITY (E.G., CITY/COUNTY/TOWNSHIP/MINNESOTA DEPARTMENT OF TRANSPORTATION ENGINEER).
PERMITTEES MUST DOCUMENT THE NEED FOR REMOVAL IN THE SWPPP.
8.PERMITTEES MUST PROVIDE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS AT THE BASE OF
STOCKPILES ON THE DOWNGRADIENT PERIMETER.
9.PERMITTEES MUST LOCATE STOCKPILES OUTSIDE OF NATURAL BUFFERS OR SURFACE WATERS,
INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS UNLESS THERE IS A
BYPASS IN PLACE FOR THE STORMWATER.
10. PERMITTEES MUST INSTALL A VEHICLE TRACKING BMP TO MINIMIZE THE TRACK OUT OF SEDIMENT FROM
THE CONSTRUCTION SITE OR ONTO PAVED ROADS WITHIN THE SITE.
11. PERMITTEES MUST USE STREET SWEEPING IF VEHICLE TRACKING BMPS ARE NOT ADEQUATE TO
PREVENT SEDIMENT TRACKING ONTO THE STREET.
12. PERMITTEES MUST INSTALL TEMPORARY SEDIMENT BASINS AS REQUIRED IN SECTION 14.
13. IN ANY AREAS OF THE SITE WHERE FINAL VEGETATIVE STABILIZATION WILL OCCUR, PERMITTEES MUST
RESTRICT VEHICLE AND EQUIPMENT USE TO MINIMIZE SOIL COMPACTION.
14. PERMITTEES MUST PRESERVE TOPSOIL ON THE SITE, UNLESS INFEASIBLE.
15. PERMITTEES MUST DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS UNLESS INFEASIBLE.
16. PERMITTEES MUST PRESERVE A 50 FOOT NATURAL BUFFER OR, IF A BUFFER IS INFEASIBLE ON THE SITE,
PROVIDE REDUNDANT (DOUBLE) PERIMETER SEDIMENT CONTROLS WHEN A SURFACE WATER IS LOCATED
WITHIN 50 FEET OF THE PROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE
WATER. PERMITTEES MUST INSTALL PERIMETER SEDIMENT CONTROLS AT LEAST 5 FEET APART UNLESS
LIMITED BY LACK OF AVAILABLE SPACE. NATURAL BUFFERS ARE NOT REQUIRED ADJACENT TO ROAD
DITCHES, JUDICIAL DITCHES, COUNTY DITCHES, STORMWATER CONVEYANCE CHANNELS, STORM DRAIN
INLETS, AND SEDIMENT BASINS. IF PRESERVING THE BUFFER IS INFEASIBLE, PERMITTEES MUST
DOCUMENT THE REASONS IN THE SWPPP. SHEET PILING IS A REDUNDANT PERIMETER CONTROL IF
INSTALLED IN A MANNER THAT RETAINS ALL STORMWATER.
17. PERMITTEES MUST USE POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS
IN ACCORDANCE WITH ACCEPTED ENGINEERING PRACTICES, DOSING SPECIFICATIONS AND SEDIMENT
REMOVAL DESIGN SPECIFICATIONS PROVIDED BY THE MANUFACTURER OR SUPPLIER. THE PERMITTEES
MUST USE CONVENTIONAL EROSION AND SEDIMENT CONTROLS PRIOR TO CHEMICAL ADDITION AND MUST
DIRECT TREATED STORMWATER TO A SEDIMENT CONTROL SYSTEM FOR FILTRATION OR SETTLEMENT OF
THE FLOC PRIOR TO DISCHARGE.
DEWATERING AND BASIN DRAINING (SECTION 10):
1.PERMITTEES MUST DISCHARGE TURBID OR SEDIMENT-LADEN WATERS RELATED TO DEWATERING OR
BASIN DRAINING (E.G., PUMPED DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE) TO A TEMPORARY OR
PERMANENT SEDIMENT BASIN ON THE PROJECT SITE UNLESS INFEASIBLE. PERMITTEES MAY DEWATER TO
SURFACE WATERS IF THEY VISUALLY CHECK TO ENSURE ADEQUATE TREATMENT HAS BEEN OBTAINED
AND NUISANCE CONDITIONS (SEE MINN. R. 7050.0210, SUBP. 2) WILL NOT RESULT FROM THE DISCHARGE. IF
PERMITTEES CANNOT DISCHARGE THE WATER TO A SEDIMENTATION BASIN PRIOR TO ENTERING A
SURFACE WATER, PERMITTEES MUST TREAT IT WITH APPROPRIATE BMPS SUCH THAT THE DISCHARGE
DOES NOT ADVERSELY AFFECT THE SURFACE WATER OR DOWNSTREAM PROPERTIES.
2.IF PERMITTEES MUST DISCHARGE WATER CONTAINING OIL OR GREASE, THEY MUST USE AN OIL-WATER
SEPARATOR OR SUITABLE FILTRATION DEVICE (E.G., CARTRIDGE FILTERS, ABSORBENTS PADS) PRIOR TO
DISCHARGE.
3.PERMITTEES MUST DISCHARGE ALL WATER FROM DEWATERING OR BASIN-DRAINING ACTIVITIES IN A
MANNER THAT DOES NOT CAUSE EROSION OR SCOUR IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS
OR INUNDATION OF WETLANDS IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS THAT CAUSES
SIGNIFICANT ADVERSE IMPACT TO THE WETLAND.
4.IF PERMITTEES USE FILTERS WITH BACKWASH WATER, THEY MUST HAUL THE BACKWASH WATER AWAY
FOR DISPOSAL, RETURN THE BACKWASH WATER TO THE BEGINNING OF THE TREATMENT PROCESS, OR
INCORPORATE THE BACKWASH WATER INTO THE SITE IN A MANNER THAT DOES NOT CAUSE EROSION.
INSPECTIONS AND MAINTENANCE (SECTION 11):
1.PERMITTEES MUST ENSURE A TRAINED PERSON, AS IDENTIFIED IN ITEM 21.2.B, WILL INSPECT THE ENTIRE
CONSTRUCTION SITE AT LEAST ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN
24 HOURS AFTER A RAINFALL EVENT GREATER THAN 1/2 INCH IN 24 HOURS.
2.PERMITTEES MUST INSPECT AND MAINTAIN ALL PERMANENT STORMWATER TREATMENT BMPS.
3.PERMITTEES MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS AND POLLUTION
PREVENTION MANAGEMENT MEASURES TO ENSURE INTEGRITY AND EFFECTIVENESS. PERMITTEES MUST
REPAIR, REPLACE OR SUPPLEMENT ALL NONFUNCTIONAL BMPS WITH FUNCTIONAL BMPS BY THE END OF
THE NEXT BUSINESS DAY AFTER DISCOVERY UNLESS ANOTHER TIME FRAME IS SPECIFIED IN ITEM 11.5 OR
11.6. PERMITTEES MAY TAKE ADDITIONAL TIME IF FIELD CONDITIONS PREVENT ACCESS TO THE AREA.
4.DURING EACH INSPECTION, PERMITTEES MUST INSPECT SURFACE WATERS, INCLUDING DRAINAGE
DITCHES AND CONVEYANCE SYSTEMS BUT NOT CURB AND GUTTER SYSTEMS, FOR EVIDENCE OF
EROSION AND SEDIMENT DEPOSITION. PERMITTEES MUST REMOVE ALL DELTAS AND SEDIMENT
DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE
SYSTEMS AND RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL RESULTS IN EXPOSED SOIL.
PERMITTEES MUST COMPLETE REMOVAL AND STABILIZATION WITHIN SEVEN (7) CALENDAR DAYS OF
DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS.
PERMITTEES MUST USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. IF PRECLUDED, REMOVAL AND
STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) DAYS OF OBTAINING ACCESS. PERMITTEES ARE
RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND FEDERAL AUTHORITIES AND
RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING ANY WORK IN SURFACE WATERS.
5.PERMITTEES MUST INSPECT CONSTRUCTION SITE VEHICLE EXIT LOCATIONS, STREETS AND CURB AND
GUTTER SYSTEMS WITHIN AND ADJACENT TO THE PROJECT FOR SEDIMENTATION FROM EROSION OR
TRACKED SEDIMENT FROM VEHICLES. PERMITTEES MUST REMOVE SEDIMENT FROM ALL PAVED
SURFACES WITHIN ONE (1) CALENDAR DAY OF DISCOVERY OR, IF APPLICABLE, WITHIN A SHORTER TIME
TO AVOID A SAFETY HAZARD TO USERS OF PUBLIC STREETS.
6.PERMITTEES MUST REPAIR, REPLACE OR SUPPLEMENT ALL PERIMETER CONTROL DEVICES WHEN THEY
BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/2 OF THE HEIGHT OF THE DEVICE.
7.PERMITTEES MUST DRAIN TEMPORARY AND PERMANENT SEDIMENTATION BASINS AND REMOVE THE
SEDIMENT WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE STORAGE
VOLUME.
8.PERMITTEES MUST ENSURE THAT AT LEAST ONE INDIVIDUAL PRESENT ON THE SITE (OR AVAILABLE TO
THE PROJECT SITE IN THREE (3) CALENDAR DAYS) IS TRAINED IN THE JOB DUTIES DESCRIBED IN ITEM
21.2.B.
9.PERMITTEES MAY ADJUST THE INSPECTION SCHEDULE DESCRIBED IN ITEM 11.2 AS FOLLOWS:
a. INSPECTIONS OF AREAS WITH PERMANENT COVER CAN BE REDUCED TO ONCE PER MONTH, EVEN IF
CONSTRUCTION ACTIVITY CONTINUES ON OTHER PORTIONS OF THE SITE; OR
b.WHERE SITES HAVE PERMANENT COVER ON ALL EXPOSED SOIL AND NO CONSTRUCTION ACTIVITY IS
OCCURRING ANYWHERE ON THE SITE, INSPECTIONS CAN BE REDUCED TO ONCE PER MONTH AND,
AFTER 12 MONTHS, MAY BE SUSPENDED COMPLETELY UNTIL CONSTRUCTION ACTIVITY RESUMES. THE
MPCA MAY REQUIRE INSPECTIONS TO RESUME IF CONDITIONS WARRANT; OR
c.WHERE CONSTRUCTION ACTIVITY HAS BEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS,
INSPECTIONS MAY BE SUSPENDED. INSPECTIONS MUST RESUME WITHIN 24 HOURS OF RUNOFF
OCCURRING, OR UPON RESUMING CONSTRUCTION, WHICHEVER COMES FIRST.
10. PERMITTEES MUST RECORD ALL INSPECTIONS AND MAINTENANCE ACTIVITIES WITHIN 24 HOURS OF
BEING CONDUCTED AND THESE RECORDS MUST BE RETAINED WITH THE SWPPP. THESE RECORDS MUST
INCLUDE:
a.DATE AND TIME OF INSPECTIONS; AND
b.NAME OF PERSONS CONDUCTING INSPECTIONS; AND
c.ACCURATE FINDINGS OF INSPECTIONS, INCLUDING THE SPECIFIC LOCATION WHERE CORRECTIVE
ACTIONS ARE NEEDED; AND
d.CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE
ACTIVITIES); AND
e.DATE OF ALL RAINFALL EVENTS GREATER THAN 1/2 INCHES IN 24 HOURS, AND THE AMOUNT OF
RAINFALL FOR EACH EVENT. PERMITTEES MUST OBTAIN RAINFALL AMOUNTS BY EITHER A PROPERLY
MAINTAINED RAIN GAUGE INSTALLED ONSITE, A WEATHER STATION THAT IS WITHIN ONE (1) MILE OF
YOUR LOCATION, OR A WEATHER REPORTING SYSTEM THAT PROVIDES SITE SPECIFIC RAINFALL DATA
FROM RADAR SUMMARIES; AND
f.IF PERMITTEES OBSERVE A DISCHARGE DURING THE INSPECTION, THEY MUST RECORD AND SHOULD
PHOTOGRAPH AND DESCRIBE THE LOCATION OF THE DISCHARGE (I.E., COLOR, ODOR, SETTLED OR
SUSPENDED SOLIDS, OIL SHEEN, AND OTHER OBVIOUS INDICATORS OF POLLUTANTS); AND
g.ANY AMENDMENTS TO THE SWPPP PROPOSED AS A RESULT OF THE INSPECTION MUST BE
DOCUMENTED AS REQUIRED IN SECTION 6 WITHIN SEVEN (7) CALENDAR DAYS.
POLLUTION PREVENTION MANAGEMENT (SECTION 12):
1.PERMITTEES MUST PLACE BUILDING PRODUCTS AND LANDSCAPE MATERIALS UNDER COVER (E.G.,
PLASTIC SHEETING OR TEMPORARY ROOFS) OR PROTECT THEM BY SIMILARLY EFFECTIVE MEANS
DESIGNED TO MINIMIZE CONTACT WITH STORMWATER. PERMITTEES ARE NOT REQUIRED TO COVER OR
PROTECT PRODUCTS WHICH ARE EITHER NOT A SOURCE OF CONTAMINATION TO STORMWATER OR ARE
DESIGNED TO BE EXPOSED TO STORMWATER.
2.PERMITTEES MUST PLACE PESTICIDES, FERTILIZERS AND TREATMENT CHEMICALS UNDER COVER (E.G.,
PLASTIC SHEETING OR TEMPORARY ROOFS) OR PROTECT THEM BY SIMILARLY EFFECTIVE MEANS
DESIGNED TO MINIMIZE CONTACT WITH STORMWATER.
3.PERMITTEES MUST STORE HAZARDOUS MATERIALS AND TOXIC WASTE, (INCLUDING OIL, DIESEL FUEL,
GASOLINE, HYDRAULIC FLUIDS, PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD
PRESERVATIVES, ADDITIVES, CURING COMPOUNDS, AND ACIDS) IN SEALED CONTAINERS TO PREVENT
SPILLS, LEAKS OR OTHER DISCHARGE. STORAGE AND DISPOSAL OF HAZARDOUS WASTE MATERIALS MUST
BE IN COMPLIANCE WITH MINN. R. CH. 7045 INCLUDING SECONDARY CONTAINMENT AS APPLICABLE.
4.PERMITTEES MUST PROPERLY STORE, COLLECT AND DISPOSE SOLID WASTE IN COMPLIANCE WITH MINN.
R. CH. 7035.
5.PERMITTEES MUST POSITION PORTABLE TOILETS SO THEY ARE SECURE AND WILL NOT TIP OR BE
KNOCKED OVER. PERMITTEES MUST PROPERLY DISPOSE SANITARY WASTE IN ACCORDANCE WITH MINN.
R. CH. 7041.
6.PERMITTEES MUST TAKE REASONABLE STEPS TO PREVENT THE DISCHARGE OF SPILLED OR LEAKED
CHEMICALS, INCLUDING FUEL, FROM ANY AREA WHERE CHEMICALS OR FUEL WILL BE LOADED OR
UNLOADED INCLUDING THE USE OF DRIP PANS OR ABSORBENTS UNLESS INFEASIBLE. PERMITTEES MUST
ENSURE ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED MATERIALS AND
THAT AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED MATERIALS.
PERMITTEES MUST REPORT AND CLEAN UP SPILLS IMMEDIATELY AS REQUIRED BY MINN. STAT. 115.061,
USING DRY CLEAN UP MEASURES WHERE POSSIBLE.
7.PERMITTEES MUST LIMIT VEHICLE EXTERIOR WASHING AND EQUIPMENT TO A DEFINED AREA OF THE SITE.
PERMITTEES MUST CONTAIN RUNOFF FROM THE WASHING AREA IN A SEDIMENT BASIN OR OTHER
SIMILARLY EFFECTIVE CONTROLS AND MUST DISPOSE WASTE FROM THE WASHING ACTIVITY PROPERLY.
PERMITTEES MUST PROPERLY USE AND STORE SOAPS, DETERGENTS, OR SOLVENTS.
8.PERMITTEES MUST PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED
BY WASHOUT OPERATIONS (E.G., CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS
AND OTHER CONSTRUCTION MATERIALS) RELATED TO THE CONSTRUCTION ACTIVITY. PERMITTEES MUST
PREVENT LIQUID AND SOLID WASHOUT WASTES FROM CONTACTING THE GROUND AND MUST DESIGN THE
CONTAINMENT SO IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR AREAS.
PERMITTEES MUST PROPERLY DISPOSE LIQUID AND SOLID WASTES IN COMPLIANCE WITH MPCA RULES.
PERMITTEES MUST INSTALL A SIGN INDICATING THE LOCATION OF THE WASHOUT FACILITY.
PERMIT TERMINATION (SECTION 4 AND SECTION 13):
1.PERMITTEES MUST SUBMIT A NOT WITHIN 30 DAYS AFTER ALL TERMINATION CONDITIONS LISTED IN
SECTION 13 ARE COMPLETE.
2.PERMITTEES MUST SUBMIT A NOT WITHIN 30 DAYS AFTER SELLING OR OTHERWISE LEGALLY
TRANSFERRING THE ENTIRE SITE, INCLUDING PERMIT RESPONSIBILITY FOR ROADS (E.G., STREET
SWEEPING) AND STORMWATER INFRASTRUCTURE FINAL CLEAN OUT, OR TRANSFERRING PORTIONS OF A
SITE TO ANOTHER PARTY. THE PERMITTEES' COVERAGE UNDER THIS PERMIT TERMINATES AT MIDNIGHT
ON THE SUBMISSION DATE OF THE NOT.
3.PERMITTEES MUST COMPLETE ALL CONSTRUCTION ACTIVITY AND MUST INSTALL PERMANENT COVER
OVER ALL AREAS PRIOR TO SUBMITTING THE NOT. VEGETATIVE COVER MUST CONSIST OF A UNIFORM
PERENNIAL VEGETATION WITH A DENSITY OF 70 PERCENT OF ITS EXPECTED FINAL GROWTH. VEGETATION
IS NOT REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREA DICTATES NO VEGETATION, SUCH AS
IMPERVIOUS SURFACES OR THE BASE OF A SAND FILTER.
4.PERMITTEES MUST CLEAN THE PERMANENT STORMWATER TREATMENT SYSTEM OF ANY ACCUMULATED
SEDIMENT AND MUST ENSURE THE SYSTEM MEETS ALL APPLICABLE REQUIREMENTS IN SECTION 15
THROUGH 19 AND IS OPERATING AS DESIGNED.
5.PERMITTEES MUST REMOVE ALL SEDIMENT FROM CONVEYANCE SYSTEMS PRIOR TO SUBMITTING THE
NOT.
6.PERMITTEES MUST REMOVE ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT
CONTROL BMPS PRIOR TO SUBMITTING THE NOT. PERMITTEES MAY LEAVE BMPS DESIGNED TO
DECOMPOSE ON-SITE IN PLACE.
7.FOR RESIDENTIAL CONSTRUCTION ONLY, PERMIT COVERAGE TERMINATES ON INDIVIDUAL LOTS IF THE
STRUCTURES ARE FINISHED AND TEMPORARY EROSION PREVENTION AND DOWNGRADIENT PERIMETER
CONTROL IS COMPLETE, THE RESIDENCE SELLS TO THE HOMEOWNER, AND THE PERMITTEE DISTRIBUTES
THE MPCA'S "HOMEOWNER FACT SHEET" TO THE HOMEOWNER.
8.FOR CONSTRUCTION PROJECTS ON AGRICULTURAL LAND (E.G., PIPELINES ACROSS CROPLAND),
PERMITTEES MUST RETURN THE DISTURBED LAND TO ITS PRECONSTRUCTION AGRICULTURAL USE PRIOR
TO SUBMITTING THE NOT.
SEED NOTES:
ALL SEED MIXES AND APPLICATION SHALL BE IN ACCORDANCE WITH THE MNDOT SEEDING MANUAL.
GENERAL RECOMMENDATIONS:
THE CONTRACTOR IS RESPONSIBLE TO SALVAGE AND PRESERVE EXISTING TOPSOIL NECESSARY FOR FINAL
STABILIZATION AND TO ALSO MINIMIZE COMPACTION IN ALL LANDSCAPE AREAS. IMMEDIATELY BEFORE
SEEDING THE SOIL SHALL BE TILLED TO A MINIMUM DEPTH OF 3 INCHES.
TEMPORARY EROSION CONTROL SEEDING, MULCHING & BLANKET.
SEED
·TEMPORARY SEED SHALL BE MNDOT SEED MIX 21-112 (WINTER WHEAT COVER CROP) FOR WINTER AND
21-111 (OATS COVER CROP) FOR SPRING/SUMMER APPLICATIONS. BOTH SEED MIXES SHALL BE APPLIED
AT A SEEDING RATE OF 100 LBS/ACRE.
MULCH
·IMMEDIATELY AFTER SEEDING, WITHIN 24 HOURS, MNDOT TYPE 1 MULCH SHOULD BE APPLIED TO
PROTECT AND ENHANCE SEED GERMINATION. MULCH SHALL BE APPLIED AT 90% COVERAGE (2 TONS PER
ACRE OF STRAW MULCH)
SLOPES
·3:1 (HORIZ/VERT.) OR FLATTER MUCH SHALL BE COVERED WITH MULCH
·SLOPES STEEPER THAN 3:1 OR DITCH BOTTOMS SHALL BE COVERED WITH EROSION CONTROL BLANKET.
·SEE PLAN FOR MORE DETAILED DITCH AND STEEP SLOPE EROSION CONTROL TREATMENTS.
DESIGN ENGINEER: DAVID J. KNAEBLE P.E.
TRAINING COURSE: DESIGN OF SWPPP
TRAINING ENTITY: UNIVERSITY OF MINNESOTA
INSTRUCTOR: JOHN CHAPMAN
DATES OF TRAINING COURSE: 8/22/2012- 8/23/2012
TOTAL TRAINING HOURS: 12
DATE OF RECERTIFICATION: 4/22/22
EXPIRATION: 5/31/2025
REVISION SUMMARY
DATE DESCRIPTION
PRIOR LAKE DEVELOPMENT, LLC
7455 FRANCE AVENUE, SUITE 351
EDINA, MN 55435
ADAM SERAPHINE
612-616-5801
ADAM@ADAMSERAPHINE.COM
PROJECT NARRATIVE:
PROJECT IS A REDEVELOPMENT OF TWO EXISTING SINGLE-FAMILY HOUSES INTO A SINGLE-FAMILY, VILLA, AND
TOWNHOUSE SUBDIVISION WITH ONE EXISTING HOUSE REMAINING. SITE, GRADING, UTILITY AND LANDSCAPE
IMPROVEMENTS WILL OCCUR.
NATIVE BUFFER NARRATIVE:
PRESERVING A 30 FOOT AVERAGE NATURAL BUFFER AROUND WATER BODIES IS PROVIDED IN
THESE PLANS.
INFILTRATION NARRATIVE:
INFILTRATION IS PROVIDED AS PART OF THE PROJECTS PERMANENT STORM WATER MANAGEMENT SYSTEM.
SOIL CONTAMINATION NARRATIVE:
SOILS ONSITE HAVE NOT BEEN IDENTIFIED AS CONTAMINATED.
SPECIAL TMDL BMP REQUIREMENTS SITE SPECIFIC (IF REQUIRED):
THIS PROJECT IS WITHIN ONE MILE AND DISCHARGES TO LOWER PRIOR LAKE - LOWER PRIOR LAKE IS IDENTIFIED
AS AN IMPAIRED WATER BODY PER THE MPCA'S 303(D) IMPAIRED WATERS LIST. LOWER PRIOR LAKE IS IMPAIRED
FOR FISH BIOASSESSMENTS AND MERCURY IN FISH TISSUE. BECAUSE THIS WATER BODY IS LOCATED WITHIN
ONE MILE OF THE SITE, BMPS AS DEFINED IN THE NPDES PERMIT ITEMS 23.9 AND 23.10 APPLY. THESE ARE AS
FOLLOWS:
1.DURING CONSTRUCTION:
A.STABILIZATION OF ALL EXPOSED SOIL AREAS MUST BE INITIATED IMMEDIATELY TO LIMIT SOIL EROSION
BUT IN NO CASE COMPLETED LATER THAN SEVEN (7) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT
PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED.
B.TEMPORARY SEDIMENT BASIN REQUIREMENTS DESCRIBED IN SECTION 14. MUST BE USED FOR
COMMON DRAINAGE LOCATIONS THAT SERVE AN AREA WITH FIVE (5) OR MORE ACRES DISTURBED AT ONE
TIME.
PERMANENT STABILIZATION NOTES SITE SPECIFIC:
PERMANENT SEED MIX
·FOR THIS PROJECT ALL AREAS THAT ARE NOT TO BE SODDED OR LANDSCAPED SHALL RECEIVE A NATIVE
PERMANENT SEED MIX.
··AREAS IN BUFFERS AND ADJACENT TO OR IN WET AREAS MNDOT SEED MIX 33-261 (STORMWATER
SOUTH AND WEST) AT 35 LBS PER ACRE.
··DRY AREAS MNDOT SEED MIX 35-221 (DRY PRAIRIE GENERAL) AT 40 LBS PER ACRE.
·MAINTENANCE SHALL BE IN ACCORDANCE TO THE MNDOT SEEDING MANUAL.
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
SW1.8
SWPPP - ATTACHMENTS
ATTACHMENT A: SITE SPECIFIC SWPPP DOCUMENT SOILS INFORMATION
GENERAL SITE INFORMATION (5.1)
1. DESCRIBE THE LOCATION AND TYPE OF ALL TEMPORARY AND PERMANENT EROSION PREVENTION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMP'S). INCLUDE THE TIMING FOR INSTALLATION AND PROCEDURES USED TO ESTABLISH ADDITIONAL
TEMPORARY BMP'S AS NECESSARY. (5.5)
THE PROJECT IS PROTECTED BY TWO (W) MAIN BMP'S, SILT FENCE AND INLET PROTECTION DEVICES. THE SILT FENCE WILL BE INSTALLED AT THE DOWNHILL LOCATIONS OF THE SITE AND MONITORED AS NECESSARY. INLET PROTECTION DEVICES WILL BE INSTALLED
IN ALL CATCH BASINS ON THE SITE AND ANY OFF SITE THAT WILL RECEIVE STORMWATER RUNOFF FROM THIS SITE. AS THE PROJECT PROGRESSES ADDITIONAL BMP'S SUCH AS EROSION CONTROL BLANKET MAY BE UTILIZED.
2. ATTACH TO THIS SWPPP A TABLE WITH THE ANTICIPATED QUANTITIES FOR THE LIFE OF THE PROJECT FOR ALL EROSION PREVENTION AND SEDIMENT CONTROL BMP'S (5.7). SEE PAGE SW1.3
3. ATTACH TO THIS SWPPP A SITE MAP THAT INCLUDES THE FOLLOWING FEATURES (5.9):
EXIST AND FINAL GRADES, INCLUDING DIVIDING LINES AND DIRECTION OF FLOW FOR ALL PRE AND POST-CONSTRUCTION STORMWATER RUNOFF DRAINAGE AREAS LOCATED WITHIN THE PROJECT LIMITS.
LOCATIONS OF IMPERVIOUS SURFACES AND SOIL TYPES.
·EXISTING AND FINAL GRADES, INCLUDING DIVIDING LINES AND DIRECTION OF FLOW FOR ALL PRE AND POST-CONSTRUCTION STORMWATER RUNOFF DRAINAGE AREAS LOCATED WITHIN PROJECT LIMITS.
·LOCATIONS OF AREAS NOT TO BE DISTURBED.
·LOCATION OF AREAS OF PHASED CONSTRUCTION.
·ALL SURFACE WATERS AND EXISTING WETLANDS WITHIN ONE MILE FROM THE PROJECT BOUNDARIES THAT WILL RECEIVE STORMWATER RUNOFF FROM THE SITE (IDENTIFIABLE ON MAPS SUCH AS USGS 7.5 MINUTE QUADRANGLE MAPS OR EQUIVALENT. WHERE
SURFACE WATERS RECEIVING RUNOFF ASSOCIATED WITH CONSTRUCTION ACTIVITY WILL NOT FIT ON THE PLAN SHEET, THEY MUST BE IDENTIFIED WITH AN ARROW, INDICATING BOTH DIRECTION AND DISTANCE TO THE SURFACE WATER.
·METHODS TO BE USED FOR FINAL STABILIZATION OF ALL EXPOSED SOIL AREA
4. WERE STORMWATER MITIGATION MEASURES REQUIRED AS THE RESULT OF AN ENVIRONMENTAL, ARCHAEOLOGICAL, OR OTHER REQUIRED LOCAL, STATE OR FEDERAL REVIEW OF THE PROJECT? NO
IF YES, DESCRIBE HOW THESE MEASURES WERE ADDRESSED IN THE SWPPP. (5.16)
N/A
5. IS THE PROJECT LOCATED IN A KARST AREA SUCH THAT ADDITIONAL MEASURES WOULD BE NECESSARY TO PROJECT DRINKING WATER SUPPLY MANAGEMENT AREAS AS DESCRIBED IN MINN. R. CHAPTERS 7050 AND 7060? NO
IF YES, DESCRIBE THE ADDITIONAL MEASURES TO BE USED. (SECTION 23)
N/A
6. DOES THE SITE DISCHARGE TO A CALCEREOUS FEN LISTED IN MINN. R. 7050.0180, SUBP. 6.B?
NO
IF YES, A LETTER OF APPROVAL FROM THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES MUST BE OBTAINED PRIOR TO APPLICATION FOR THIS PERMIT.
7. DOES THE SITE DISCHARGE TO A WATER THAT IS LISTED AS IMPAIRED FOR THE FOLLOWING POLLUTANT(S) OR STRESSOR(S): PHOSPHORUS, TURBIDITY, DISSOLVED OXYGEN OR BIOTIC IMPAIRMENT? USE THE SPECIAL AND IMPAIRED WATERS SEARCH TOOL AT:
WWW.PCA.STATE.MN.US/WATER/STORMWATER/STORMWATER-C.HTML.
YES
IF NO, SKIP TO TRAINING
DOES THE IMPAIRED WATER HAVE AN APPROVED TOTAL MAXIMUM DAILY LOADS (TMDL) WITH AN APPROVED WASTE LOAD ALLOCATION FOR CONSTRUCTION ACTIVITY?
YES
IF YES:
A. LIST THE RECEIVING WATER, THE AREAS OF THE SITE DISCHARGING TO IT, AND THE POLLUTANT(S) IDENTIFIED IN THE TMDL.
B. LIST THE BMP'S AND ANY OTHER SPECIFIC CONSTRUCTION STORMWATER RELATED IMPLEMENTATION ACTIVITIES IDENTIFIED IN THE TMDL.
IF THE SITE HAS A DISCHARGE POINT WITHIN ONE MILE OF THE IMPAIRED WATER AND THE WATER FLOWS TO THE IMPAIRED WATER BUT NO SPECIFIC BMPS FOR CONSTRUCTION ARE IDENTIFIED IN THE TMDL, THE ADDITIONAL BMPS IN SECTION 23 MUST BE ADDED TO
THE SWPPP AND IMPLEMENTED (15.19). THE ADDITIONAL BMPS ONLY APPLY TO THOSE PORTIONS OF THE PROJECT THAT DRAIN TO ONE OF THE IDENTIFIED DISCHARGE POINTS. N/A
8. IDENTIFY ADJACENT PUBLIC WATERS WHERE THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES (DNR) HAS DECLARED “WORK IN WATER RESTRICTIONS” DURING FISH SPAWNING TIMEFRAMES. N/A
SELECTION OF A PERMANENT STORMWATER MANAGEMENT SYSTEM (SECTION 15)
1. WILL THE PROJECT CREATE A NEW CUMULATIVE IMPERVIOUS SURFACE GREATER THAN OR EQUAL TO ONE ACRE?
YES
IF YES, A WATER QUALITY VOLUME OF ONE INCH OF RUNOFF FROM THE CUMULATIVE NEW IMPERVIOUS SURFACES MUST BE RETAINED ON SITE (SEE 16.7 OF THE PERMIT) THROUGH INFILTRATION UNLESS PROHIBITED DUE TO ONE OF THE REASONS IN ITEMS 16.4
THROUGH 16.21. IF INFILTRATION IS PROHIBITED IDENTIFY OTHER METHOD OF MEETING WATER QUALITY REQUIREMENTS (E.G., FILTRATION SYSTEM, WET SEDIMENTATION BASIN, REGIONAL PONDING OR EQUIVALENT METHOD
2. DESCRIBE WHICH METHOD WILL BE USED TO TREAT RUNOFF FROM THE NEW IMPERVIOUS SURFACES CREATED BY THE PROJECT:
INCLUDE ALL CALCULATIONS AND DESIGN INFORMATION FOR THE METHOD SELECTED. SEE SECTION 23 OF THE PERMIT FOR SPECIFIC REQUIREMENTS ASSOCIATED WITH EACH METHOD.
INFILTRATION / REGIONAL PONDING
CALCULATIONS ARE WITHIN THE SITE STORM WATER MANAGEMENT REPORT AND PART OF THIS SWPPP AS ATTACHMENT D.
3. IF IT IS NOT FEASIBLE TO MEET THE TREATMENT REQUIREMENT FOR THE WATER QUALITY VOLUME, DESCRIBE WHY. THIS CAN INCLUDE PROXIMITY TO BEDROCK OR ROAD PROJECTS WHERE THE LACK OF RIGHT OF WAY PRECLUDES THE INSTALLATION OF ANY
PERMANENT STORMWATER MANAGEMENT PRACTICES. DESCRIBE WHAT OTHER TREATMENT, SUCH AS GRASS SWALES, SMALLER PONDS, OR GRIT CHAMBERS, WILL BE IMPLEMENTED TO TREAT RUNOFF PRIOR TO DISCHARGE TO SURFACE WATERS. (15.8)
IT IS FEASIBLE TO MEET REQUIREMENT FOR WATER QUALITY VOLUME.
4. FOR PROJECTS THAT DISCHARGE TO TROUT STREAMS, INCLUDING TRIBUTARIES TO TROUT STREAMS, IDENTIFY METHOD OF INCORPORATING TEMPERATURE CONTROLS INTO THE PERMANENT STORMWATER MANAGEMENT SYSTEM.
N/A
SEDIMENT CONTROL PRACTICES (SECTION 9.1)
DESCRIBE THE METHODS OF SEDIMENT CONTROL BMPS TO BE IMPLEMENTED AT THIS SITE DURING CONSTRUCTION TO MINIMIZE SEDIMENT IMPACTS TO SURFACE WATERS, INCLUDING CURB AND GUTTER
SYSTEMS
1. DESCRIBE METHODS TO BE USED FOR DOWN GRADIENT PERIMETER CONTROL:
SILT FENCE WILL BE INSTALLED AROUND THE ENTIRE PERIMETER OF THE SITE
2. DESCRIBE METHODS TO BE USED TO CONTAIN SOIL STOCKPILES:
SEED AND MULCH AS WELL AS EROSION CONTROL BLANKETS WILL BE UTILIZED AS NECESSARY
3. DESCRIBE METHODS TO BE USED FOR STORM DRAIN INLET PROTECTION:
SEE INLET PROTECTION DETAILS
4. DESCRIBE METHODS TO MINIMIZE VEHICLE TRACKING AT CONSTRUCTION EXITS AND STREET SWEEPING ACTIVITIES:
THE PROJECT WILL UTILIZE A ROCK CONSTRUCTION ENTRANCE.
5. DESCRIBE METHODS, IF APPLICABLE, ADDITIONAL SEDIMENT CONTROLS (E.G., DIVERSION BERMS) TO BE INSTALLED TO KEEP RUNOFF AWAY FROM PLANNED INFILTRATION AREAS WHEN EXCAVATED
PRIOR TO FINAL STABILIZATION OF THE CONTRIBUTING DRAINAGE AREA:
SILT FENCE TO BE INSTALLED IMMEDIATELY AFTER GRADING TO PROTECT INFILTRATION AREAS.
6. DESCRIBE METHODS TO BE USED TO MINIMIZE SOIL COMPACTION AND PRESERVE TOP SOIL (UNLESS INFEASIBLE) AT THIS SITE:
LIGHT TRACKED EQUIPMENT WILL BE USED, TOPSOIL WILL BE STRIPPED AND STOCKPILED
7. DESCRIBE PLANS TO PRESERVE A 50-FOOT NATURAL BUFFER BETWEEN THE PROJECT'S SOIL DISTURBANCE AND A SURFACE WATER OR PLANS FOR REDUNDANT SEDIMENT CONTROLS IF A BUFFER IS
INFEASIBLE:
DOUBLE ROW OF SILT FENCE WILL BE INSTALLED ALONG WETLAND. PROJECT WILL NOT DISTURB WITHIN 200 FEET OF WETLAND.
8. DESCRIBE PLANS FOR USE OF SEDIMENTATION TREATMENT CHEMICALS (E.G., POLYMERS, FLOCCULANTS, ETC.) SEE PART 9.18 OF THE PERMIT:
N/A
9. IS THE PROJECT REQUIRED TO INSTALL A TEMPORARY SEDIMENT BASIN DUE TO 10 OR MORE ACRES DRAINING TO A COMMON LOCATION OR 5 ACRES OR MORE IF THE SITE IS WITHIN 1 MILE OF A SPECIAL
OR IMPAIRED WATER?
YES
IF YES, DESCRIBE (OR ATTACH PLANS ) SHOWING HOW THE BASIN WILL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH SECTION 14.
PROPOSED FILTRATION BASINS WILL SERVE AS TEMPORARY SEDIMENTS BASINS THAT WILL THEN BE CONVERTED TO PERMANENT FILTRATIONS BASINS.
DEWATERING AND BASIN DRAINING (SECTION 10.1)
1. WILL THE PROJECT INCLUDE DEWATERING OR BASIN DRAINING?
NO
IF YES, DESCRIBE MEASURES TO BE USED TO TREAT/DISPOSE OF TURBID OR SEDIMENT-LADEN WATER AND METHOD TO PREVENT EROSION OR SCOUR OF DISCHARGE POINTS (SEE 10.2 THROUGH 10.5 OF
THE PERMIT):
N/A
2. WILL THE PROJECT INCLUDE USE OF FILTERS FOR BACKWASH WATER?
NO
IF YES, DESCRIBE HOW FILTER BACKWASH WATER WILL BE MANAGED ON THE SITE OR PROPERLY DISPOSED (10.6):
N/A
ADDITIONAL BMP'S FOR SPECIAL WATERS AND DISCHARGES TO WETLANDS (SECTION 23.1)
1. SPECIAL WATERS. DOES YOUR PROJECT DISCHARGE TO SPECIAL WATERS?
YES
2. IF PROXIMITY TO BEDROCK OR ROAD PROJECTS WHERE THE LACK OF RIGHT OF WAY PRECLUDES THE INSTALLATION OF ANY OF THE PERMANENT STORMWATER MANAGEMENT PRACTICES, THEN OTHER
TREATMENT SUCH AS GRASSED SWALES, SMALLER PONDS, OR GRIT CHAMBERS IS REQUIRED PRIOR TO DISCHARGE TO SURFACE WATERS. DESCRIBE WHAT OTHER TREATMENT WILL BE PROVIDED.
N/A
3. DESCRIBE EROSION AND SEDIMENT CONTROLS FOR EXPOSED SOIL AREAS WITH A CONTINUOUS POSITIVE SLOPE TO A SPECIAL WATERS, AND TEMPORARY SEDIMENT BASINS FOR AREAS THAT DRAIN FIVE
OR MORE ACRES DISTURBED AT ONE TIME.
N/A
4. DESCRIBE THE UNDISTURBED BUFFER ZONE TO BE USED (NOT LESS THAN 100 LINEAR FEET FROM THE SPECIAL WATER).
N/A
5. DESCRIBE HOW THE PERMANENT STORMWATER MANAGEMENT SYSTEM WILL ENSURE THAT THE PRE AND POST PROJECT RUNOFF RATE AND VOLUME FROM THE 1, AND 2-YEAR 24-HOUR PRECIPITATION
EVENTS REMAINS THE SAME.
N/A
6. DESCRIBE HOW THE PERMANENT STORMWATER MANAGEMENT SYSTEM WILL MINIMIZE ANY INCREASE IN THE TEMPERATURE OF TROUT STREAM RECEIVING WATERS RESULTING IN THE 1, AND 2-YEAR
24-HOUR PRECIPITATION EVENTS.
N/A
7. WETLANDS. DOES YOUR PROJECT DISCHARGE STORMWATER WITH THE POTENTIAL FOR SIGNIFICANT ADVERSE IMPACTS TO A WETLAND (E.G., CONVERSION OF A NATURAL WETLAND TO A STORMWATER
POND)?
YES OR NO
IF YES, DESCRIBE THE WETLAND MITIGATION SEQUENCE THAT WILL BE FOLLOWED IN ACCORDANCE WITH SECTION 22 OF THE PERMIT.
N/A
INSPECTIONS AND MAINTENANCE (SECTION 11.1)
DESCRIBE PROCEDURES TO ROUTINELY INSPECT THE CONSTRUCTION SITE:
·ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND
·WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS, AND WITHIN (7) DAYS AFTER THAT
INSPECTIONS MUST INCLUDE STABILIZED AREAS, EROSION PREVENTION,AND SEDIMENT CONTROL BMP'S AND INFILTRATION AREAS.
INSPECTOR WILL FOLLOW REQUIREMENTS SPECIFIED ABOVE AND FILL OUT "ATTACHMENT B - CONSTRUCTION STORMWATER INSPECTION CHECKLIST"
1. DESCRIBE PRACTICES FOR STORAGE OF BUILDING PRODUCTS WITH A POTENTIAL TO LEACH POLLUTANTS TO MINIMIZE EXPOSURE TO STORMWATER:
ALL BUILDING PRODUCTS WILL BE SEALED AND STORED IN A MANNER TO MINIMIZE EXPOSURE
2. DESCRIBE PRACTICES FOR STORAGE OF PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICAL, AND LANDSCAPE MATERIALS:
ALL LANDSCAPE TREATMENT CHEMICALS WILL BE SEALED AND STORED IN A MANNER TO MINIMIZED EXPOSURE
3. DESCRIBE PRACTICES FOR STORAGE AND DISPOSAL OF HAZARDOUS MATERIALS OR TOXIC WASTE (E.G., OIL, FUEL, HYDRAULIC FLUIDS, PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD
PRESERVATIVE, ADDITIVES, CURING COMPOUNDS, AND ACIDS) ACCORDING TO MINN. R. CH. 7045, INCLUDING RESTRICTED ACCESS AND SECONDARY CONTAINMENT:
ALL HAZARDOUS WASTE WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING TO LOCAL AND STATE LAWS.
4. DESCRIBE COLLECTION, STORAGE AND DISPOSAL OF SOLID WASTE IN COMPLIANCE WITH MINN. R. CH. 7035:
ALL CONSTRUCTION DEBRIS AND SOLID WASTER WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING TO LOCAL AND STATE LAWS
5. DESCRIBE MANAGEMENT OF PORTABLE TOILETS TO PREVENT TIPPING AND DISPOSAL OF SANITARY WASTES IN ACCORDANCE WITH MINN. R. CH. 7040:
SANITARY AND SEPTIC SERVICES WILL BE PROVIDED TO WORKERS WITH PORTABLE FACILITIES MAINTAINED AS NEEDED BY THE PROVIDER.
6. DESCRIBE SPILL PREVENTION AND RESPONSE FOR FUELING AND EQUIPMENT OR VEHICLE MAINTENANCE:
EMPLOYEES WILL BE TRAINED IN TECHNIQUES DESIGNED TO MINIMIZE SPILLS. VEHICLES AND EQUIPMENT SHALL BE CHECKED FOR LEAKS.
7. DESCRIBE CONTAINMENT AND DISPOSAL OF VEHICLE AND EQUIPMENT WASH WATER AND PROHIBITING ENGINE DEGREASING ON THE SITE:
ALL CONSTRUCTION VEHICLES SHALL BE WASHED OFF SITE
8. DESCRIBE STORAGE AND DISPOSAL OF CONCRETE AND OTHER WASHOUT WASTES SO THAT WASTES DO NOT CONTACT THE GROUND:
ALL CONCRETE WASHOUT SHALL OCCUR OFF SITE.
FINAL STABILIZATION (25.22)
1. DESCRIBE METHOD OF FINAL STABILIZATION (PERMANENT COVER) OF ALL DISTURBED AREAS:
FINAL STABILIZATION WILL BE ACCOMPLISHED WITH PAVEMENT, SOD AND LANDSCAPE MATERIALS.
2. DESCRIBE METHODS USED TO CLEAN ALL STORMWATER TREATMENT SYSTEMS AND STORMWATER CONVEYANCE SYSTEMS OF ACCUMULATED SEDIMENT (25.22):
CLEANING OF STORMWATER TREATMENT SYSTEMS SHALL BE DONE BY HAND SUCH AS THE USE OF A SHOVEL.
3. DESCRIBE METHODS FOR REMOVING ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMP'S:
REMOVAL OF TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMP'S CAN BE DONE BY HAND AND PROPERLY DISPOSED OF.
REVISION SUMMARY
DATE DESCRIPTION
PROJECT LOCATION
ADDRESS CREST AVE NE & 140TH ST
NE CITY/TOWNSHIP PRIOR LAKE
STATE MN COUNTY SCOTT
ZIP CODE 55372 PROJECT SIZE 27.5 ACRES
LATTITUDE/LONGITUDE OF APPROX.
CENTROID OF PROJECT 44.750094 N, -93.406568 E
METHOD OF LAT/LONG COLLECTION ONLINE TOOL
PROJECT TYPE RESIDENTIAL AND ROAD CONSTRUCTION
IMPERVIOUS SURFACES (ACRES)
EXISTING 0.9
PROPOSED 9.1
DIFFERENCE 8.2
ESTIMATED CONSTRUCTION TIMELINE
START TBD END TBD
CONSTRUCTION ACTIVITY
DEMOLITION OF ONE SINGLE-FAMILY
HOUSE AND CONSTRUCTION OF
SINGLE-FAMILY, VILLA, AND TOWNHOUSE
SUBDIVISION.
SOIL TYPES POORLY GRADED SAND WITH SILT, SANDY
LEAN CLAY, SILTY SAND
MAP UNIT SYMBOL MAP UNIT NAME
HaB HAYDEN LOAM
HaC HAYDEN LOAM
HaC2 HAYDEN LOAM
HaD HAYDEN LOAM
HaD2 HAYDEN LOAM
HaE2 HAYDEN LOAM
HbC HAYDEN SANDY LOAM
Ma MARSH
TcA TERRIL LOAM
W WATER
RECEIVING WATER BODIES
WATER BODY ID NAME OF WATER BODY WATER BODY TYPE SPECIAL WATER (Y/N)IMPAIRED WATER (Y/N)
1 NA LOWER PRIOR LAKE N Y
2
3
4
SITE LOCATION MAP -
EROSION PREVENTION PRACTICES (SECTION 8.1)
DESCRIBE THE TYPES OF TEMPORARY EROSION PREVENTION BMP'S EXPECTED TO BE IMPLEMENTED ON THIS SITE DURING CONSTRUCTION:
1. DESCRIBE CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION PRACTICES TO MINIMIZE EROSION. DELINEATE AREAS NOT TO BE
DISTURBED (E.G., WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) BEFORE WORK BEGINS.
SILT FENCE WILL BE INSTALLED AT THE DOWNHILL LOCATIONS OF THE SITE.
2. DESCRIBE METHODS OF TEMPORARILY STABILIZING SOILS AND SOIL STOCKPILES (E.G., MULCHES, HYDRAULIC TACKIFIERS, EROSION BLANKETS, ETC.):
TEMPORARY EROSION PROTECTION WILL BE SEED AND MULCH AND EROSION BLANKETS WHERE REQUIRED, WITH PERMANENT COVER BEING EITHER SOD OR LANDSCAPE FEATURES.
3. DESCRIBE METHODS OF DISSIPATING VELOCITY ALONG STORMWATER CONVEYANCE CHANNELS AND AT CHANNEL OUTLETS (E.G., CHECK DAMS, SEDIMENT TRAPS, RIP RAP, ETC.):
SOD WILL BE UTILIZED ALONG CHANNELS AND RIP RAP AT CHANNEL.
4. DESCRIBE METHODS TO BE USED FOR STABILIZATION OF DITCH AND SWALE WETTED PERIMETERS (NOTE THAT MULCH, HYDRAULIC SOIL TACKIFIERS, HYDROMULCHES, ETC. ARE NOT ACCEPTABLE SOIL
STABILIZATION METHODS FOR ANY PART OF A DRAINAGE DITCH OR SWALE)
FINAL STABILIZATION OF SWALES WILL BE SOD
5. DESCRIBE METHODS TO BE USED FOR ENERGY DISSIPATION AT PIPE OUTLETS (E.G., RIP RAP, SPLASH PADS, GABIONS, ETC.)
RIP RAP WILL BE UTILIZED AT PIPE OUTLETS
6. DESCRIBE METHODS TO BE USED TO PROMOTE INFILTRATION AND SEDIMENT REMOVAL ON THE SITE PRIOR TO OFFSITE DISCHARGE, UNLESS INFEASIBLE (E.G., DIRECT STORMWATER FLOW TO
VEGETATED AREAS):
DISCONNECTED IMPERVIOUS AREA AND INFILTRATION AREAS WILL BE UTILIZED
7. FOR DRAINAGE OR DIVERSION DITCHES, DESCRIBE PRACTICES TO STABILIZE THE NORMAL WETTED PERIMETER WITHIN 200 LINEAL FEET OF THE PROPERTY EDGE OR POINT OF DISCHARGE TO SURFACE
WATER. THE LAST 200 LINEAL FEET MUST BE STABILIZED WITHIN 24 HOURS AFTER CONNECTING TO SURFACE WATERS AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR
PERMANENTLY CEASED FOR ALL DISCHARGES TO SPECIAL, IMPAIRED OR “WORK IN WATER RESTRICTIONS”. ALL OTHER REMAINING PORTIONS OF THE TEMPORARY OR PERMANENT DITCHES OR SWALES
WITHIN 14 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER, PROPERTY EDGE AND CONSTRUCTION IN THAT AREA HAS TEMPORARILY OR PERMANENTLY CEASED.
N/A, NO DITCHES ON SITE
8. DESCRIBE ADDITIONAL EROSION PREVENTION MEASURES THAT WILL BE IMPLEMENTED AT THE SITE DURING CONSTRUCTION (E.G., CONSTRUCTION PHASING, MINIMIZING SOIL DISTURBANCE,
VEGETATIVE BUFFERS, HORIZONTAL SLOPE GRADING, SLOPE DRAINING/TERRACING, ETC.):
OTHER EROSION CONTROL PRACTICES INCLUDE BUT ARE NOT LIMITED TO; MINIMIZING SITE EXPOSURE WHEN POSSIBLE.
9. IF APPLICABLE, INCLUDE ADDITIONAL REQUIREMENTS IN APPENDIX A PART C.3 REGARDING MAINTAINING A 100-FOOT BUFFER ZONE OR INSTALLING REDUNDANT BMPS FOR PORTIONS OF THE SITE THAT
DRAIN TO SPECIAL WATERS).
N/A
10. IF APPLICABLE, DESCRIBE ADDITIONAL EROSION PREVENTION BMPS TO BE IMPLEMENTED AT THE SITE TO PROTECT PLANNED FILTRATION AREAS
MINIMIZE SITE EXPOSURE IN AREAS ADJACENT TO FILTRATION AREAS.
Civil Engineering Surveying Landscape Architecture
5000 Glenwood Avenue
Golden Valley, MN 55422
civilsitegroup.com 612-615-0060
COPYRIGHT CIVIL SITE GROUP INC.c
PR
O
J
E
C
T
PRE
L
I
M
I
N
A
R
Y
:
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
2023
ISSUE/SUBMITTAL SUMMARY
DATE DESCRIPTION
11/18/24 CITY SUBMITTAL
PROJECT MANAGER MATT PAVEK
CONTACT NUMBER 612-615-0060 X 701
DRAWN BY AM, MD
REVIEWED BY MP
PROJECT NUMBER 20302
CR
E
S
T
W
O
O
D
S
PR
I
O
R
L
A
K
E
,
M
N
PR
I
O
R
L
A
K
E
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
74
5
5
F
R
A
N
C
E
A
V
E
N
U
E
S
O
U
T
H
,
S
U
I
T
E
3
5
1
,
E
D
I
N
A
,
M
N
5
5
4
3
5
OW
N
E
R
SW1.9
SWPPP - ATTACHMENTS
ATTACHMENT B: SWPPP INSPECTION FORM
ATTACHMENT C: MAINTENANCE PLAN FOR PERMANENT STORM WATER TREATMENT SYSTEM
NOTE: THIS INSPECTION REPORT DOES NOT ADDRESS ALL ASPECTS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM (NPDES/SDS)
CONSTRUCTION STORMWATER PERMIT (PERMIT) ISSUED ON AUGUST 1, 2018. THE COMPLETION OF THIS CHECKLIST DOES NOT GUARANTEE THAT ALL PERMIT REQUIREMENTS ARE
IN COMPLIANCE; IT IS THE RESPONSIBILITY OF THE PERMITTEE(S) TO READ AND UNDERSTAND THE PERMIT REQUIREMENTS.
FACILITY INFORMATION
SITE NAME:
SITE ADDRESS: PERMIT NUMBER:
CITY: STATE: ZIP CODE:
INSPECTION INFORMATION
INSPECTOR NAME: _______________________ PHONE NUMBER: _________________________
ORGANIZATION/COMPANY MAN: _____________________________________________________
DATE (MM/DD/YYYY): _____________________TIME: ____________ AM / PM
IS THE INSPECTOR CERTIFIED IN SEDIMENT AND EROSION CONTROL AND IS IT DOCUMENTED IN THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP)?
IS THIS INSPECTION ROUTINE OR IN RESPONSE TO A STORM EVENT:
RAINFALL AMOUNT (IF APPLICABLE): ____________
IS SITE WITHIN ONE AERIAL MILE OF SPECIAL OR IMPAIRED WATER THAT CAN POTENTIALLY RECEIVE DISCHARGE FROM THE SITE?
IF YES, FOLLOW SECTION 23 AND OTHER APPLICABLE PERMIT REQUIREMENTS
NOTE: IF N/A IS SELECTED AT ANY TIME, SPECIFY WHY IN THE COMMENT AREA FOR THAT SECTION.
EROSION CONTROL REQUIREMENT (SECTION 8.1)
1.ARE SOILS STABILIZED WHERE NO CONSTRUCTION ACTIVITY HAS OCCURRED FOR 14 DAYS (INCLUDING STOCKPILES)?
(7 DAYS WHERE APPLICABLE, OR 24 HOURS DURING MINNESOTA DEPARTMENT OF NATURAL RESOURCES [DNR] FISH
SPAWNING RESTRICTIONS)
2.HAS THE NEED TO DISTURB STEEP SLOPES BEEN MINIMIZED?
3.IF STEEP SLOPES ARE DISTURBED, ARE STABILIZATION PRACTICES DESIGNED FOR STEEP SLOPES USED?
4.ALL DITCHES/SWALES STABILIZED 200' BACK FROM POINT OF DISCHARGE OR PROPERTY EDGE WITHIN 24 HOURS? (MULCH,
HYDROMULCH, TACKIFIER, OR SIMILAR BEST MANAGEMENT PRACTICES [BMPS] ARE NOT ACCEPTABLE IN DITCHES/SWALES
IF THE SLOPE IS GREATER THAN 2%)ARE APPROPRIATE BMP'S INSTALLED PROTECTING INLETS/OUTLETS?
5.DO PIPE OUTLETS HAVE ENERGY DISSIPATION (WITHIN 24 HOURS OF CONNECTION)?
6.IS CONSTRUCTION PHASING BEING FOLLOWED IN ACCORDANCE WITH THE SWPPP?
7.ARE AREAS NOT TO BE DISTURBED MARKED OFF (FLAGS, SIGNS, ETC.)?
COMMENTS:
SEDIMENT CONTROL REQUIREMENTS (SECTION 9.1)
1.ARE PERIMETER SEDIMENT CONTROLS INSTALLED PROPERLY ON ALL DOWN GRADIENT PERIMETERS?
2.ARE APPROPRIATE BMPS INSTALLED PROTECTING INLETS, CATCH BASINS, AND CULVERT INLETS?
3.IS A 50 FOOT NATURAL BUFFER PRESERVED AROUND ALL SURFACE WATERS DURING CONSTRUCTION?
3.1.IF NO, HAVE REDUNDANT SEDIMENT CONTROLS BEEN INSTALLED?
4.DO ALL ERODIBLE STOCKPILES HAVE PERIMETER CONTROL IN PLACE?
5.IS THERE A TEMPORARY SEDIMENT BASIN ON SITE, AND IS IT BUILT AS REQUIRED IN SECTION 14 OF THE PERMIT?
6.IS SOIL COMPACTION BEING MINIMIZED WHERE NOT DESIGNED FOR COMPACTION?
7.IS TOPSOIL BEING PRESERVED UNLESS INFEASIBLE?
8.IF CHEMICAL FLOCCULANTS ARE USED, IS THERE A CHEMICAL FLOCCULANT PLAN IN PLACE?
COMMENTS:
DISCLOSURES:
·AFTER DISCOVERY, THE PERMIT REQUIRES MANY OF THE DEFICIENCIES THAT MAY BE FOUND ON SITE BE CORRECTED WITHIN A SPECIFIED PERIOD OF TIME. SEE PERMIT FOR
MORE DETAILS.
·THE PERMITTEE(S) IS/ARE RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMPS AS WELL AS
EROSION PREVENTION AND SEDIMENT CONTROL BMPS UNTIL ANOTHER PERMITTEE HAS OBTAINED COVERAGE UNDER THIS PERMIT ACCORDING TO SECTION 3, OR THE
PROJECT HAS MET THE TERMINATION CONDITIONS OF THE PERMIT AND A NOTICE OF TERMINATION HAS BEEN SUBMITTED TO THE MINNESOTA POLLUTION CONTROL AGENCY.
Y N N/A
Y N N/A
7 DAY RAIN
Y N
MAINTENANCE AND INSPECTIONS (SECTION 11)
1.ARE ALL PREVIOUSLY STABILIZED AREAS MAINTAINING GROUND COVER?
2.ARE PERIMETER CONTROLS MAINTAINED AND FUNCTIONING PROPERLY, SEDIMENT REMOVED WHEN ONE-HALF FULL?
3.ARE INLET PROTECTION DEVICES MAINTAINED AND ADEQUATELY PROTECTING INLETS?
4.ARE THE TEMPORARY SEDIMENT BASINS BEING MAINTAINED AND FUNCTIONING PROPERLY?
5.ARE VEHICLE TRACKING BMPS AT SITE EXISTS IN PLACE AND MAINTAINED AND FUNCTIONING PROPERLY?
6.IS ALL TRACKED SEDIMENT BEING REMOVED WITHIN 24 HOURS?
7.HAVE ALL SURFACE WATERS, DITCHES, CONVEYANCES, AND DISCHARGE POINTS BEEN INSPECTED?
8.WERE ANY DISCHARGES SEEN DURING THIS INSPECTION (I.E., SEDIMENT, TURBID WATER, OR OTHERWISE)?
IF YES, RECORD THE LOCATION OF ALL POINTS OF DISCHARGE. PHOTOGRAPH AND DESCRIBE THE DISCHARGE (SIZE, COLOR, ODOR, FOAM, OIL SHEEN, TIME, ETC.).
DESCRIBE HOW THE DISCHARGE WILL BE ADDRESSED. WAS THE DISCHARGE A SEDIMENT DELTA? IF YES, WILL THE DELTA BE RECOVERED WITHIN SEVEN DAYS AND
IN ACCORDANCE WITH ITEM 11.5 OF THE PERMIT?
COMMENTS:
Y N N/A
POLLUTION PREVENTION (SECTION 12)
1.ARE ALL CONSTRUCTION MATERIALS THAT CAN LEACH POLLUTANTS UNDER COVER OR PROTECTED?
2.ARE HAZARDOUS MATERIALS BEING PROPERLY STORED?
3.ARE APPROPRIATE BMPS BEING USED TO PREVENT DISCHARGES ASSOCIATED WITH FUELING AND MAINTENANCE OF
EQUIPMENT OR VEHICLES?
4.ARE ALL SOLID WASTES BEING PROPERLY CONTAINED AND DISPOSED OF?
5.IS THERE A CONCRETE/OTHER MATERIAL WASHOUT AREA ON SITE AND IS IT BEING USED?
6.IS THE CONCRETE WASHOUT AREA MARKED WITH A SIGN?
7.ARE THE CONCRETE/OTHER MATERIAL WASHOUT AREAS PROPERLY MAINTAINED?
COMMENTS:
Y N N/A
OTHER
1.IS A COPY OF THE SWPPP, INSPECTION RECORDS, AND TRAINING DOCUMENTATION LOCATED ON THE CONSTRUCTION
SITE, OR CAN IT BE MADE AVAILABLE WITHIN 72 HOURS?
2.HAS THE SWPPP BEEN FOLLOWED AND IMPLEMENTED ON SITE, AND AMENDED AS NEEDED?
3.IS ANY DEWATERING OCCURRING ON SITE?
IF YES, WHAT BMPS ARE BEING USED TO ENSURE THAT CLEAN WATER IS LEAVING THE SITE AND THE DISCHARGE IS NOT
CAUSING EROSION OR SCOUR?
4.WILL A PERMANENT STORMWATER MANAGEMENT SYSTEM BE CREATED FOR THIS PROJECT IF REQUIRED AND IN
ACCORDANCE WITH SECTION 15 OF THE PERMIT (IF ADDING AN ACRE OR MORE OF NEW IMPERVIOUS SURFACE)?
IF YES, DESCRIBE:
5.IF INFILTRATION/FILTRATION SYSTEMS ARE BEING CONSTRUCTED, ARE THEY MARKED AND PROTECTED FROM
COMPACTION AND SEDIMENTATION?
6.DESCRIPTION OF AREAS OF NON-COMPLIANCE NOTED DURING THE INSPECTION, REQUIRED CORRECTIVE ACTIONS, AND RECOMMENDED DATE OF COMPLETION OF
CORRECTIVE ACTIONS:
7.PROPOSED AMENDMENTS TO THE SWPPP:
8.POTENTIAL AREAS OF FUTURE CONCERN:
9.ADDITIONAL COMMENTS
Y N N/A
Y N
REVISION SUMMARY
DATE DESCRIPTION
ATTACHMENT C - ABOVE-GROUND
FACILITY MANAGEMENT SCHEDULE
1.ALL STORMWATER RETENTION, DETENTION AND TREATMENT BASINS MUST BE INSPECTED AT LEAST ONCE A YEAR TO
DETERMINE THAT BASIN RETENTION AND TREATMENT CHARACTERISTICS ARE ADEQUATE. A STORAGE TREATMENT BASIN
WILL BE CONSIDERED INADEQUATE IF SEDIMENT HAS DECREASED THE WET STORAGE VOLUME BY 50 PERCENT OR DRY
STORAGE VOLUME BY 25 PERCENT OF ITS ORIGINAL DESIGN VOLUME. BASED ON THIS INSPECTION, IF A STORMWATER BASIN
REQUIRES SEDIMENT CLEANOUT, THE BASIN WILL BE RESTORED TO ITS ORIGINAL DESIGN CONTOURS AND VEGETATED
STATE WITHIN ONE YEAR OF THE INSPECTION DATE.
2.ALL OUTLET STRUCTURES, CULVERTS, OUTFALL STRUCTURES AND OTHER STORMWATER FACILITIES FOR WHICH
MAINTENANCE REQUIREMENTS ARE NOT OTHERWISE SPECIFIED HEREIN MUST BE INSPECTED IN THE SPRING, SUMMER AND
FALL OF EACH YEAR. WITHIN 30 DAYS OF THE INSPECTION DATE, ALL ACCUMULATED SEDIMENT AND DEBRIS MUST BE
REMOVED SUCH THAT EACH STORMWATER FACILITY OPERATES AS DESIGNED AND PERMITTED. CONTRIBUTING DRAINAGE
AREAS MUST BE KEPT CLEAR OF LITTER AND VEGETATIVE DEBRIS, INFLOW PIPES AND OVERFLOW SPILLWAYS KEPT CLEAR,
INLET AREAS KEPT CLEAN, AND UNDESIRABLE VEGETATION REMOVED. EROSION IMPAIRING THE FUNCTION OR INTEGRITY OF
THE FACILITIES, IF ANY, WILL BE CORRECTED, AND ANY STRUCTURAL DAMAGE IMPAIRING OR THREATENING TO IMPAIR THE
FUNCTION OF THE FACILITIES MUST BE REPAIRED.
3.VOLUME CONTROL FACILITIES AND CONTRIBUTING DRAINAGE AREAS MUST BE INSPECTED EVERY THREE MONTHS DURING
THE OPERATIONAL PERIOD (BETWEEN SPRING SNOWMELT AND FIRST SUBSTANTIAL SNOWFALL) AND MONITORED AFTER
RAINFALL EVENTS OF 1 INCH OR MORE TO ENSURE THAT THE CONTRIBUTING DRAINAGE AREA IS CLEAR OF LITTER AND
DEBRIS, INFLOW PIPES AND OVERFLOW SPILLWAYS ARE CLEAR, INLET AREAS ARE CLEAN, UNDESIRABLE VEGETATION IS
REMOVED AND THERE IS NO EROSION IMPAIRING OR THREATENING TO IMPAIR THE FUNCTION OF A FACILITY. IF SEDIMENT
HAS ACCUMULATED IN A INFILTRATION FEATURE, WITHIN 30 DAYS OF INSPECTION DEPOSITED SEDIMENTS MUST BE
REMOVED, THE INFILTRATION CAPACITY OF THE UNDERLYING SOILS MUST BE RESTORED, AND ANY SURFACE DISTURBANCE
MUST BE STABILIZED. INSPECTION MUST ENSURE THAT SEDIMENT TRAPS AND FOREBAYS ARE TRAPPING SEDIMENT AND
THAT MORE THAN 50 PERCENT OF THE STORAGE VOLUME REMAINS, THE CONTRIBUTING DRAINAGE AREA IS STABLE (I.E., NO
EROSION IS OBSERVED), AND INLETS AND OUTLET/OVERFLOW SPILLWAYS ARE IN GOOD CONDITIONS WITH NO EROSION.
MAINTENANCE TECHNIQUES USED MUST PROTECT THE INFILTRATION CAPACITY OF THE PRACTICE BY LIMITING SOIL
COMPACTION TO THE GREATEST EXTENT POSSIBLE (E.G., BY USING LOW-IMPACT EARTH-MOVING EQUIPMENT).
1 | Page Crest Avenue of Prior Lake, Prior Lake, MN
March 14, 2021
To: Bill Stoddard
From: Vernon Swing, PE
Re: Trip Generation Study – Crest Avenue of Prior Lake Residential Development, Prior Lake, MN
Per your request, Swing Traffic Solutions, LLC has conducted a trip generation analysis for the proposed
Crest Avenue of Prior Lake single family residential development in Prior Lake, MN, which will include 70
new residential units. The proposed development is located on the east side of Crest Avenue, and is just
over 500 feet north of 140th Street NE. This memorandum identifies the anticipated site generated
traffic for the proposed use.
Trip Generation
The trip generation for the proposed Crest Avenue of Prior Lake residential development has been
estimated based on the methodology described by the Institute of Transportation Engineers (ITE) in Trip
Generation, 10th Edition. The 70 new single family homes are represented by ITE in Land Use Code 210,
Single Family Detached Housing. Table 1 summarizes the findings.
Table 1
Trip Generation
Land Use ITE Code AM Peak Hour PM Peak Hour Daily Trips Enter Exit Enter Exit
Single Family Homes (70) 210 13 39 44 25 661
Trips 52 Trips 69 Trips 661 Trips
As shown in Table 1, the site is estimated to generates 13 entering and 39 exiting trips during the
morning traffic peak, 44 entering and 25 exiting trips during the afternoon traffic peak hour, and 611
trips per day. According to ITE, this level of traffic (less than 100 peak hour trips or 10% of passing traffic
whichever is less) will have a minimal impact on the operations of the surrounding streets.
In conclusion, the development will generate low peak hour traffic volumes and will have a minimal
impact on the operations of the adjacent roadway. In other words, the roadway network serving the
proposed development will continue to function adequately with the proposed addition of the Crest
Avenue of Prior Lake development to the Prior Lake area.
Please contact Vernon Swing at vswingtraffic@gmail.com or 612-968-4142 with any questions.
[Phone] 952-447-9800 | [Fax] 952-447-4245 | cityofpriorlake.com
4646 Dakota Street SE
Prior Lake, MN 55372
Memorandum
To: Adam Seraphine, Prior Lake Development, LLC
From: Casey McCabe, Community Development Director
Luke Schwarz, Assistant City Engineer
Kris Keller, Project Engineer
Date: December 5, 2024
Re: The Residences at Crest Woods – Preliminary Plat / Preliminary PUD
We have reviewed the preliminary plat documents submitted for The Residences at Crest Woods
development east of Crest Avenue (CR 18) at 138th Street as prepared by Civil Site Group. The following
documents were reviewed:
• Civil Plan Set - CSG-20302-CREST WOODS-CITY SUBMITTAL-11-18-2024.pdf
Comments are provided within this Memorandum and in the corresponding redlined plan set. Please
note that not all comments within the plan set are in the Memorandum. We have the following
comments with regard to the development:
General
1. The utility and grading plans do not appear to have been updated for the current lot
configuration. Please finalize the lot configuration and update all of the accompanying linework
and utility analysis for city review. All grading and utility plans shall be approved by the City
Engineer prior to final plat / final PUD application.
a. Several lots either do not have utility services or have storm sewer running through the
house pads.
b. The grading contours and elevation labels do not match the current proposed building
pads.
c. Provide updated stormwater surface and storm sewer calculations.
2. Resubmit stormwater calculations for the revised site design for review.
3. Verify previous comments and redlines from the August 29, 2024 Engineering Review Memo
and Redline Plan Comments, as well as Scott County comments from the August 29, 2024 memo
are addressed with the revised submittal.
4. City will allow 10 lots on 138th Street between Lupine Trail and the east limits of development as
previously approved (14 lots currently shown). City staff will work with the developer on a
solution and consider 12 lots on 138th Street between Lupine Trail and the east limits of
development prior to the submission of the final plat application.
5. Developer is required to upgrade pumps at the lift station if the total number of units with
wastewater going to the lift station exceeds 33.
6. Update all plans to reflect the proposed name of the subdivision; The Residences at Crest
Woods.
7. Confirm Outlots are to be privately owned. Identify pond access easement dimensions and
locations for city review.
8. Revise landscape plan to ensure city code requirements related to tree replacement are being
met.
9. Change the name of Jackson Street NE (north of 138th St.) to Lupine Trail NE. There are no
homes addressed off Jackson Street, so this will eliminate confusion and provide better
consistency with street naming.
10. Additional comments will be forthcoming from the Prior Lake – Spring Lake Watershed District
and City of Prior Lake related to wetlands and stormwater requirements. All PLSLWD and
stormwater comments shall be addressed prior to submitting a final plat / final PUD application.
[Phone] 952-447-9800 | [Fax] 952-447-4245 | cityofpriorlake.com
4646 Dakota Street SE
Prior Lake, MN 55372
Memorandum
To: Community Development Department
From: Luke Schwarz, Assistant City Engineer
Kris Keller, Project Engineer
Date: August 29, 2024
Re: Villas at Crest Woods – Preliminary Plat
We have reviewed the preliminary plat documents submitted for the Villas at Crest Woods development
east of Crest Avenue (CR 18) at 138th Street as prepared by Civil Site Group. The following documents
were reviewed:
• Civil Plan Set - 5 Project Plans.pdf
• Geotechnical Report - Geotechnical Evaluation.pdf
• Stormwater Management Study – Stormwater Report.pdf
Comments are provided within this Memorandum and in the corresponding redlined plan set. Please
note that not all comments within the plan set are in the Memorandum. We have the following
comments with regards to stormwater management and engineering:
General
1. Submit for and provide copies to the City of all required permits from regulatory agencies
(MCES, Minnesota Pollution Control Agency, Minnesota Department of Health, NPDES, etc.)
2. An NPDES permit is required for this site as it exceeds 1 acre of disturbance.
3. Additional comments may be generated by PLSLWD’s review of the revised plans
4. Additional redline comments are provided in the accompanying plan set. Provide a response to
all comments in this memo and the redlined plan set.
Plat
1. Provide drainage and utility easements for all public utilities running across private property.
a. The width of the easement should be at least two times the greatest depth of the utility
with a minimum of 20' centered on the utility
2. Provide drainage and utility easements for all drainage swales that convey water from one lot
across another
a. The width of the easement should be a minimum of 10’ with at least 5' on either side of
the center of the swale
3. The City will own the portion of Outlot D south of the trail from the park. All other Outlots
and the remaining portion of Outlot D will be owned by the Homeowners’ Association.
Streets/Trails
1. Update previous traffic generation calculations with the revised unit types.
2. The proposed site plan shows improvements at the Crest Avenue (CSAH 18) and 138th Street
intersection of adding a southbound left turn land and northbound right turn lane. The design
of these improvements will need to be coordinated with Scott County including the required
length of the turn lane bay and the width of the turn lanes. Typically, the turn lane length is
250ft to 300ft and the width is 13ft to 14ft to the face of curb. Include a typical section for the
Crest Avenue (CSAH 18) improvements.
3. 138th Street at Crest Avenue (CSAH 18) is proposed to be widened to include four lanes,
westbound approaching Crest Avenue (CSAH 18) with a right, through and left and eastbound
exiting one through lane. The plan shows the lanes adjacent to the curb at a width of 12ft to
back of curb. At a minimum these widths should be 12ft to the face of curb or 13ft to back of
curb. The taper to the turn lanes should be a minimum of 10:1. A typical section should be
provided for the 138th Street Improvements (Collector Street).
a. Widen the 138th Street right turn lane to a minimum of 12ft to the face of curb
b. Lengthen turn lanes to a minimum of 200ft of storage
i. The taper to the turn lanes should be a minimum of 10:1
4. The side street approaches to 138th Street should have stop sign control.
5. A sight line analysis shall be completed for all intersections.
6. The final plans should include a signing and pavement marking plan, including at a minimum:
size and locations of stop signs, street signs and pedestrian crossing signs, and size type and
location of street lane markings and pedestrian crossing striping.
7. Street Profiles
a. Provide street profiles that show the proposed street grades and vertical curves.
b. Identify centerlines of connecting streets at intersections in profile views.
c. Vertical curves need to meet the minimum required K value (30 for crest curves, 36 for
sag curves) for 30 mph.
8. Provide horizontal curve/alignment information for all roads.
a. Curves must meet a 30 MPH design speed and shall have a minimum 250’ centerline
radius
Stormwater Management
1. Rate Control
a. Submit the .hcp HydroCAD models to allow for review of the wetland bounce and
inundation analysis.
2. Volume Control
a. Include the proposed County Road impervious in PR8C Offsite in the volume control
calculations.
3. Water Quality
a. Include the water quality calculations in the drainage report as an attachment.
4. Freeboard
a. The low floor elevations need to be raised to be 2 feet above the 100-year HWL.
b. Low openings shall be at least 2 feet above the EOF, including low point EOFs.
5. Basin Design
a. Show draintile cleanouts for the filtration basins.
b. Set the draintile at a minimum 0.5% slope.
c. The EOF of a pond should be 1 foot higher than the HWL. The top of the berm should be
2 feet higher than the HWL.
6. Hydrologic and Hydraulic Analysis
a. Revise the HydroCAD labels in the existing model to match the drainage area map.
b. Revise the existing HydroCAD model and existing drainage area map subcatchments
impervious acreage, pervious acreage, and total acreage for consistency between one
another.
c. Only model changes from existing to proposed conditions that are shown on the plans,
or add the required changes to the plans.
i. Wetland 1 bottom elevation and EOF elevation/length is modified from the
existing to proposed conditions model with no grading changes proposed.
ii. Wetland 4 storage and EOF changes from the existing to proposed conditions
model but no changes are shown on the plans.
d. Utilize a minimum time of concentration value of 7 minutes.
Grading Plan
1. The maximum allowable slopes in maintained areas are 4:1. There are several locations of 3:1
slopes near homes off Lupine Trail on the south side of the project.
2. Include house style detail drawing.
3. Show driveway grades as percentages on the grading plan.
4. Label the OHW and 100-year HWL for the wetlands on the grading plan.
5. A retaining wall plan prepared by a licensed engineer is required for all walls exceeding 4-feet in
height.
6. Show wetland buffers and wetland buffer sign locations on the grading plan.
7. Add EOFs using arrows and elevations from low points in addition to the waterbodies.
8. Specify access routes to the ponds (maximum of 8% grade, maximum of 2% cross slope,
minimum of 10’ wide).
9. Grading in northeast corner must be done to accommodate future development of 3 lots.
Utilities
1. Storm Sewer
a. Provide rational calculations for the storm sewer, designed for the 10-year 24-hour
event.
b. Provide inlet capacity calculations.
c. Locate catch basins to collect drainage on the upstream side of the intersection.
d. Locate catch basins on property lines and avoid placement in front of driveways.
e. The minimum allowable pipe size for public storm sewer is 15”. If the 12” pipes shown
on the plans will be privately owned, designate that on the plans.
f. Revise FES elevation into the ponds to match the NWL of the pond.
g. Utilize MnDOT’s standard plate for riprap.
h. Provide riprap at all outfall FES.
i. For the storm sewer that crosses private property, install within a drainage and utility
easement.
j. Match pipe crowns at junction structures.
2. Sanitary Sewer
a. The maximum depth of the sanitary sewer service at the ROW line shall be 10’ unless
documented by a proposed house or building elevation that justifies a deeper service.
b. Adjust or add sanitary sewer structures to keep the watermain alignment within the
roadway
c. Install service risers where cover over the top of the sanitary main is greater than 12’ or
as directed by the engineer.
d. Provide 10 gauge tracer wires for the sanitary sewer services for locating purposes. The
tracer wire should connect to a tracer wire access box at the easement (see Plate #401).
e. Look to direct the sanitary sewer for the townhomes along 138th Street to the south.
i. Negotiate how/where the storm sewer crosses Lupine Trail from Wetland 2 to
Wetland 3 to avoid the sanitary sewer and watermains
3. Watermain
a. Hydrant leads should consist of an 8" x 6" tee with a 6" hydrant lead. An 8"x8" tee with
8" to 6" reducer is not necessary
b. Hydrant leads should be on the same side as the watermain.
c. All water service pipe to be CTS HDPE SDR 9
d. All fittings for watermain shall be Ductile Iron Compact Fittings. Fittings shall be
furnished with fusion bonded epoxy external coating and interior lining. All fittings shall
be wrapped in polyethylene.
e. All watermain hydrant leads to be DIP CL 52
f. Show all proposed storm sewer 'greyed out' or muted on plans (similar to existing)
g. Call out sizes of proposed gate valves
h. Provide additional services to future lots at the east end of 138th Street on the north
side
i. Provide a hydrant at the end of the services for the townhomes on the southwest leg.
Miscellaneous
1. Retaining walls exceeding 4’ in height require a plan prepared by a licensed engineer submitted
for review and approval prior to permit issuance.
SWPPP
1. Add documentation of training to the SWPPP.
2. Include the construction entrance in the estimated BMP quantities tabulation.
3. Because the BMPs will be privately owned, a maintenance agreement is required. Please submit.
4. Add inlet protection to the CBs on CR 18.
5. Provide a note on the plans specifying that sediment control BMPs shall be installed by the
contractor and inspected by the City before any land disturbing activities can occur.
Wetland
1. Wetlands were delineated in 2019 and a replacement plan for the wetland impacts was
approved in 2021 (LGU Approval No. 19023). Mitigation credits were withdrawn March 2022.
Impacts proposed in the preliminary plat are approved. If impacts are modified, the applicant
contact the city for review.
2. Wetland buffers do not comply with Section 3.1.iv of the Public Works Design Manual. Update
buffers to comply with this Section.
PLSLWD
1. Additional comments may be generated by PLSLWD’s review of the revised plans
SCOTT COUNTY TRANSPORTATION SERVICES DIVISION
PROGRAM DELIVERY· TRAFFIC· HIGHWAY OPERATIONS· MOBILITY MANAGEMENT
GOVERNMENT CENTER EAST, 200 FOURTH AVENUE WEST· SHAKOPEE, MN 55379
(952) 496-8346 · Fax: (952) 496-8365 · www.scottcountymn.gov
LISA J. FREESE ANTHONY J. WINIECKI, P.E.
Transportation Services Director County Engineer
An Equal Opportunity/Safety Aware Employer
August 29, 2024
Casey McCabe,
Community Development Director
City of Prior Lake
4646 Dakota Street SE
Prior Lake, MN 55372
SUBJECT: The Villas at Crest Woods PUD Review
Dear Casey,
We have reviewed The Villas at Crest Woods PUD residential development consisting of 13
single-family lots, 16 villa lots, and 69 rowhome lots for property located at 13755 and 13855
Crest Avenue and have the following review comments:
• A minimum of 75 feet of right of way from the county highway centerline is required for
CSAH 18.
• A connection to the county’s stormwater facilities is shown on the plans. A full review
for rate control is required. Any additional comments will be forwarded following the
review of the stormwater study provided on 8/26/24.
• The March 14, 2021, trip generation study should be updated to include the revised
number of units proposed for the development.
• Dedicated right and left turn lanes are required. Please submit detailed construction
with design criteria for turn lanes.
• Please provide sight line triangles on plans; additional right of way may be required on
the plat to accommodate the sight triangles and dedicated turn lanes.
• Roadway lighting is required at the county highway intersection, and a fixture that
meets the minimum county standard shall be located over the proposed stop sign.
• All public street accesses require a County access permit. The plans submitted with the
permit applications must be consistent with County comments; please verify that the
plans include all requirements on the application checklist.
• No ponding, berming, signage, or landscaping is permitted in the County right of way
and any work within the right of way shall require a county permit.
Thank you for the opportunity to review and comment on The Villas at Crest Woods PUD
application. If you have questions or need further information, please contact me at
tdill@co.scott.mn.us or 962-496-8839.
Sincerely,
Terri Dill
Principal Planner – Transportation
Cc: Lisa Freese, Transportation Services Director
Tony Winiecki, County Engineer
Craig Jenson, Transportation Planning Manager
Megan Tasca, Water Resources Engineer
VIA EMAIL
To: Luke Schwarz, Assistant City Engineer
Casey McCabe, Community Development Director
From: Joe Hale, SWCD Permitting Specialist
Cc: Joni Giese, PLSLWD Administrator
Date: September 17, 2024
Subject: Villas at Crest Woods- Preliminary Plat PIDs 259240023 and 259240023
Thank you for the opportunity to provide review comments on the preliminary plat of 13855 and 13755
Crest Avenue NE in the City of Prior Lake. Prior Lake-Spring Lake Watershed District (PLSLWD) staff have
reviewed the preliminary materials provided to the District by the City and offer the following
comments:
Rule D – Stormwater Management
1. Existing conditions pervious areas as modeled with a CN of 80. This must be revised to a CN of
77 per Rule D.3(g).
2. Section 2.3 of the Stormwater Management Report states, “BMPs conservatively designed as
filtration BMPs, additional borings will be obtained to determine infiltration feasibility.” Has this
information been provided, and has infiltration been confirmed to be infeasible?
3. Stormwater Management Report should be amended to include discussion of and calculations
for the modeled filtration bench discharge rates for the North and South ponds (0.43 and 0.58
cfs, respectively).
4. Wetland 2 is proposed to outlet via a new culvert which lowers the control elevation from
1015.3 to the proposed culvert invert of 1013.0. Loss of wetland storage is required to be
mitigated at a ratio of 1:1 in other onsite features above and beyond the storage required for
volume control.
5. If the proposed plan includes filling Wetlands 5 and 6. Wetland storage is required to be
mitigated at a ratio of 1:1 in other onsite features above and beyond the storage required for
volume control.
6. Volume control is planned to be addressed by two filtration basins. Comments regarding these
basins include:
a. Sheet C5.3 Details 3 & 4 refer to a filtration bench section detail which does not appear
to exist. Is this Detail 1?
b. It is unclear if the notes below Sheet C5.3 Detail 3 apply to just the Southern basin or
both basins.
c. The planting soil mix specified in Sheet C5.3 Details 1 and 3 is a phosphorus source,
inappropriate for filtration. This specification must be revised per the MN Stormwater
Manual guidance for biofiltration media in the presence of an underdrain.
d. Sheet C5.3 Detail cross section with exterior planting medium and interior sand is not an
acceptable cross section.
4646 Dakota Street SE, Prior Lake, MN 55372 • (952) 447-4166
www.plslwd.org • info@plslwd.org
e. As part of the Developers Agreement with the City, double ring infiltration testing is
recommended to be required post-construction to confirm construction did not
compromise filtration performance.
7. Sheet L1.0 indicates “Lower Basin Native Seed Mix” for filtration benches and wetland buffer
areas. Provide specifications for review to confirm suitability.
8. SAFL Baffles are recommended at all CBMHs with sumps.
Rule G – Wetland Alteration
1. There are seven (7) wetlands onsite or partially onsite. The stormwater management report and
grading plan suggest Wetlands 5 and 6 are proposed to be filled to accommodate the
development. Please provide a copy of the WCA application for this alteration. If this fill is
approved by the WCA LGU, the storage lost due filling must be mitigated (see Stormwater
Management Comment #5).
2. Proposed grading limits appear to overlap/coincide with wetland boundaries in areas around
Wetlands 1, 2 and 3. This may result in inadvertent wetland fill. Construction limits should be
revised to clearly be upslope of wetland boundaries.
Rule J – Buffer Strips
1. The District’s Comprehensive Wetland Plan classifies onsite wetlands as follows in the table
below. Plan Sheet SW1.7 (Native Buffer Narrative) indicates all waterbodies will be provided
with an average 30-ft buffer. This is inconsistent with Plan Sheet W1.0 which has variable
widths. Neither of these sheets meet the PLSLWD minimum and average buffer widths required
for Wetlands 1, 2, 3 and 4.
Wetland
Delineation #
Management Class (per
approved PLSLWD Wetland Plan)
Apparent Management
Class (per MNRAM)
Minimum Buffer
Width Required [Feet]
Average Buffer
Width Required
[Feet]
Wetland 1 Natural Areas 50 75
Wetland 2 not in inventory Hydrology 25 50
Wetland 3 Natural Areas 50 75
Wetland 4 Hydrology 25 50
Wetland 5 Basic 15 30
Wetland 6 not in inventory Basic 15 30
Wetland 7 Basic 15 30
2. It is suggested that the Wetland Mitigation Plan (Sheet W1.0) be amended to ease review of
required PLSLWD buffers. This sheet should identify for each wetland the minimum buffer
width proposed, the average buffer width proposed, the required buffer area based on the
required average width, and the area of the proposed buffer. The proposed buffer area must be
at least equal to the buffer area required based on the required average width.
3. Add post-construction silt fence (or biologs) at the upland edge of the buffer where the overall
grading limits extend into the buffer.
4646 Dakota Street SE, Prior Lake, MN 55372 • (952) 447-4166
www.plslwd.org • info@plslwd.org
4. Sheet SW1.7 Permanent Stabilization Notes Site Specific specifies seeding of wetland buffer
areas with MNDOT seed mix 33-261 (Stormwater South and West) which is appropriate for
filtration basins, not buffer areas.
5. Sheets SW1.3 through SW1.5 specify MNDOT Category 3 erosion control blanket on pond
slopes, buffer areas and all slopes greater than 4.1. This MNDOT reference appears
incorrect. Erosion control blanket is required to be natural/net-free.
6. The Grading Plan and Wetland Mitigation Plan must be revised to include monumentation of the
upland edge of the wetland buffer at each change in the buffer line bearing.
7. Legal descriptions, and AutoCAD Civil 3D layers for proposed buffers and wetland boundaries
will be required for review and acceptance of PLSLWD conservation easement boundaries.
8. The owner will be required to enter into a Developers Agreement with the District for
establishment of and record Conservation Easements over the wetlands and buffer areas.
Details for buffer monumentation and vegetation establishment are detailed in Rule J
Paragraphs 7 and 8, respectively, and must be incorporated into the construction or landscape
plans.
[Phone] 952-447-9800 | [Fax] 952-447-4245 | cityofpriorlake.com
4646 Dakota Street SE
Prior Lake, MN 55372
Memorandum
To: Community Development Department
From: Luke Schwarz, Assistant City Engineer
Kris Keller, Project Engineer
Date: August 29, 2024
Re: Villas at Crest Woods – Preliminary Plat
We have reviewed the preliminary plat documents submitted for the Villas at Crest Woods development
east of Crest Avenue (CR 18) at 138th Street as prepared by Civil Site Group. The following documents
were reviewed:
• Civil Plan Set - 5 Project Plans.pdf
• Geotechnical Report - Geotechnical Evaluation.pdf
• Stormwater Management Study – Stormwater Report.pdf
Comments are provided within this Memorandum and in the corresponding redlined plan set. Please
note that not all comments within the plan set are in the Memorandum. We have the following
comments with regards to stormwater management and engineering:
General
1. Submit for and provide copies to the City of all required permits from regulatory agencies
(MCES, Minnesota Pollution Control Agency, Minnesota Department of Health, NPDES, etc.)
2. An NPDES permit is required for this site as it exceeds 1 acre of disturbance.
3. Additional comments may be generated by PLSLWD’s review of the revised plans
4. Additional redline comments are provided in the accompanying plan set. Provide a response to
all comments in this memo and the redlined plan set.
Plat
1. Provide drainage and utility easements for all public utilities running across private property.
a. The width of the easement should be at least two times the greatest depth of the utility
with a minimum of 20' centered on the utility
2. Provide drainage and utility easements for all drainage swales that convey water from one lot
across another
a. The width of the easement should be a minimum of 10’ with at least 5' on either side of
the center of the swale
3. The City will own the portion of Outlot D south of the trail from the park. All other Outlots
and the remaining portion of Outlot D will be owned by the Homeowners’ Association.
Streets/Trails
1. Update previous traffic generation calculations with the revised unit types.
2. The proposed site plan shows improvements at the Crest Avenue (CSAH 18) and 138th Street
intersection of adding a southbound left turn land and northbound right turn lane. The design
of these improvements will need to be coordinated with Scott County including the required
length of the turn lane bay and the width of the turn lanes. Typically, the turn lane length is
250ft to 300ft and the width is 13ft to 14ft to the face of curb. Include a typical section for the
Crest Avenue (CSAH 18) improvements.
3. 138th Street at Crest Avenue (CSAH 18) is proposed to be widened to include four lanes,
westbound approaching Crest Avenue (CSAH 18) with a right, through and left and eastbound
exiting one through lane. The plan shows the lanes adjacent to the curb at a width of 12ft to
back of curb. At a minimum these widths should be 12ft to the face of curb or 13ft to back of
curb. The taper to the turn lanes should be a minimum of 10:1. A typical section should be
provided for the 138th Street Improvements (Collector Street).
a. Widen the 138th Street right turn lane to a minimum of 12ft to the face of curb
b. Lengthen turn lanes to a minimum of 200ft of storage
i. The taper to the turn lanes should be a minimum of 10:1
4. The side street approaches to 138th Street should have stop sign control.
5. A sight line analysis shall be completed for all intersections.
6. The final plans should include a signing and pavement marking plan, including at a minimum:
size and locations of stop signs, street signs and pedestrian crossing signs, and size type and
location of street lane markings and pedestrian crossing striping.
7. Street Profiles
a. Provide street profiles that show the proposed street grades and vertical curves.
b. Identify centerlines of connecting streets at intersections in profile views.
c. Vertical curves need to meet the minimum required K value (30 for crest curves, 36 for
sag curves) for 30 mph.
8. Provide horizontal curve/alignment information for all roads.
a. Curves must meet a 30 MPH design speed and shall have a minimum 250’ centerline
radius
Stormwater Management
1. Rate Control
a. Submit the .hcp HydroCAD models to allow for review of the wetland bounce and
inundation analysis.
2. Volume Control
a. Include the proposed County Road impervious in PR8C Offsite in the volume control
calculations.
3. Water Quality
a. Include the water quality calculations in the drainage report as an attachment.
4. Freeboard
a. The low floor elevations need to be raised to be 2 feet above the 100-year HWL.
b. Low openings shall be at least 2 feet above the EOF, including low point EOFs.
5. Basin Design
a. Show draintile cleanouts for the filtration basins.
b. Set the draintile at a minimum 0.5% slope.
c. The EOF of a pond should be 1 foot higher than the HWL. The top of the berm should be
2 feet higher than the HWL.
6. Hydrologic and Hydraulic Analysis
a. Revise the HydroCAD labels in the existing model to match the drainage area map.
b. Revise the existing HydroCAD model and existing drainage area map subcatchments
impervious acreage, pervious acreage, and total acreage for consistency between one
another.
c. Only model changes from existing to proposed conditions that are shown on the plans,
or add the required changes to the plans.
i. Wetland 1 bottom elevation and EOF elevation/length is modified from the
existing to proposed conditions model with no grading changes proposed.
ii. Wetland 4 storage and EOF changes from the existing to proposed conditions
model but no changes are shown on the plans.
d. Utilize a minimum time of concentration value of 7 minutes.
Grading Plan
1. The maximum allowable slopes in maintained areas are 4:1. There are several locations of 3:1
slopes near homes off Lupine Trail on the south side of the project.
2. Include house style detail drawing.
3. Show driveway grades as percentages on the grading plan.
4. Label the OHW and 100-year HWL for the wetlands on the grading plan.
5. A retaining wall plan prepared by a licensed engineer is required for all walls exceeding 4-feet in
height.
6. Show wetland buffers and wetland buffer sign locations on the grading plan.
7. Add EOFs using arrows and elevations from low points in addition to the waterbodies.
8. Specify access routes to the ponds (maximum of 8% grade, maximum of 2% cross slope,
minimum of 10’ wide).
9. Grading in northeast corner must be done to accommodate future development of 3 lots.
Utilities
1. Storm Sewer
a. Provide rational calculations for the storm sewer, designed for the 10-year 24-hour
event.
b. Provide inlet capacity calculations.
c. Locate catch basins to collect drainage on the upstream side of the intersection.
d. Locate catch basins on property lines and avoid placement in front of driveways.
e. The minimum allowable pipe size for public storm sewer is 15”. If the 12” pipes shown
on the plans will be privately owned, designate that on the plans.
f. Revise FES elevation into the ponds to match the NWL of the pond.
g. Utilize MnDOT’s standard plate for riprap.
h. Provide riprap at all outfall FES.
i. For the storm sewer that crosses private property, install within a drainage and utility
easement.
j. Match pipe crowns at junction structures.
2. Sanitary Sewer
a. The maximum depth of the sanitary sewer service at the ROW line shall be 10’ unless
documented by a proposed house or building elevation that justifies a deeper service.
b. Adjust or add sanitary sewer structures to keep the watermain alignment within the
roadway
c. Install service risers where cover over the top of the sanitary main is greater than 12’ or
as directed by the engineer.
d. Provide 10 gauge tracer wires for the sanitary sewer services for locating purposes. The
tracer wire should connect to a tracer wire access box at the easement (see Plate #401).
e. Look to direct the sanitary sewer for the townhomes along 138th Street to the south.
i. Negotiate how/where the storm sewer crosses Lupine Trail from Wetland 2 to
Wetland 3 to avoid the sanitary sewer and watermains
3. Watermain
a. Hydrant leads should consist of an 8" x 6" tee with a 6" hydrant lead. An 8"x8" tee with
8" to 6" reducer is not necessary
b. Hydrant leads should be on the same side as the watermain.
c. All water service pipe to be CTS HDPE SDR 9
d. All fittings for watermain shall be Ductile Iron Compact Fittings. Fittings shall be
furnished with fusion bonded epoxy external coating and interior lining. All fittings shall
be wrapped in polyethylene.
e. All watermain hydrant leads to be DIP CL 52
f. Show all proposed storm sewer 'greyed out' or muted on plans (similar to existing)
g. Call out sizes of proposed gate valves
h. Provide additional services to future lots at the east end of 138th Street on the north
side
i. Provide a hydrant at the end of the services for the townhomes on the southwest leg.
Miscellaneous
1. Retaining walls exceeding 4’ in height require a plan prepared by a licensed engineer submitted
for review and approval prior to permit issuance.
SWPPP
1. Add documentation of training to the SWPPP.
2. Include the construction entrance in the estimated BMP quantities tabulation.
3. Because the BMPs will be privately owned, a maintenance agreement is required. Please submit.
4. Add inlet protection to the CBs on CR 18.
5. Provide a note on the plans specifying that sediment control BMPs shall be installed by the
contractor and inspected by the City before any land disturbing activities can occur.
Wetland
1. Wetlands were delineated in 2019 and a replacement plan for the wetland impacts was
approved in 2021 (LGU Approval No. 19023). Mitigation credits were withdrawn March 2022.
Impacts proposed in the preliminary plat are approved. If impacts are modified, the applicant
contact the city for review.
2. Wetland buffers do not comply with Section 3.1.iv of the Public Works Design Manual. Update
buffers to comply with this Section.
PLSLWD
1. Additional comments may be generated by PLSLWD’s review of the revised plans
SCOTT COUNTY TRANSPORTATION SERVICES DIVISION
PROGRAM DELIVERY· TRAFFIC· HIGHWAY OPERATIONS· MOBILITY MANAGEMENT
GOVERNMENT CENTER EAST, 200 FOURTH AVENUE WEST· SHAKOPEE, MN 55379
(952) 496-8346 · Fax: (952) 496-8365 · www.scottcountymn.gov
LISA J. FREESE ANTHONY J. WINIECKI, P.E.
Transportation Services Director County Engineer
An Equal Opportunity/Safety Aware Employer
August 29, 2024
Casey McCabe,
Community Development Director
City of Prior Lake
4646 Dakota Street SE
Prior Lake, MN 55372
SUBJECT: The Villas at Crest Woods PUD Review
Dear Casey,
We have reviewed The Villas at Crest Woods PUD residential development consisting of 13
single-family lots, 16 villa lots, and 69 rowhome lots for property located at 13755 and 13855
Crest Avenue and have the following review comments:
• A minimum of 75 feet of right of way from the county highway centerline is required for
CSAH 18.
• A connection to the county’s stormwater facilities is shown on the plans. A full review
for rate control is required. Any additional comments will be forwarded following the
review of the stormwater study provided on 8/26/24.
• The March 14, 2021, trip generation study should be updated to include the revised
number of units proposed for the development.
• Dedicated right and left turn lanes are required. Please submit detailed construction
with design criteria for turn lanes.
• Please provide sight line triangles on plans; additional right of way may be required on
the plat to accommodate the sight triangles and dedicated turn lanes.
• Roadway lighting is required at the county highway intersection, and a fixture that
meets the minimum county standard shall be located over the proposed stop sign.
• All public street accesses require a County access permit. The plans submitted with the
permit applications must be consistent with County comments; please verify that the
plans include all requirements on the application checklist.
• No ponding, berming, signage, or landscaping is permitted in the County right of way
and any work within the right of way shall require a county permit.
Thank you for the opportunity to review and comment on The Villas at Crest Woods PUD
application. If you have questions or need further information, please contact me at
tdill@co.scott.mn.us or 962-496-8839.
Sincerely,
Terri Dill
Principal Planner – Transportation
Cc: Lisa Freese, Transportation Services Director
Tony Winiecki, County Engineer
Craig Jenson, Transportation Planning Manager
Megan Tasca, Water Resources Engineer
VIA EMAIL
To: Luke Schwarz, Assistant City Engineer
Casey McCabe, Community Development Director
From: Joe Hale, SWCD Permitting Specialist
Cc: Joni Giese, PLSLWD Administrator
Date: September 17, 2024
Subject: Villas at Crest Woods- Preliminary Plat PIDs 259240023 and 259240023
Thank you for the opportunity to provide review comments on the preliminary plat of 13855 and 13755
Crest Avenue NE in the City of Prior Lake. Prior Lake-Spring Lake Watershed District (PLSLWD) staff have
reviewed the preliminary materials provided to the District by the City and offer the following
comments:
Rule D – Stormwater Management
1. Existing conditions pervious areas as modeled with a CN of 80. This must be revised to a CN of
77 per Rule D.3(g).
2. Section 2.3 of the Stormwater Management Report states, “BMPs conservatively designed as
filtration BMPs, additional borings will be obtained to determine infiltration feasibility.” Has this
information been provided, and has infiltration been confirmed to be infeasible?
3. Stormwater Management Report should be amended to include discussion of and calculations
for the modeled filtration bench discharge rates for the North and South ponds (0.43 and 0.58
cfs, respectively).
4. Wetland 2 is proposed to outlet via a new culvert which lowers the control elevation from
1015.3 to the proposed culvert invert of 1013.0. Loss of wetland storage is required to be
mitigated at a ratio of 1:1 in other onsite features above and beyond the storage required for
volume control.
5. If the proposed plan includes filling Wetlands 5 and 6. Wetland storage is required to be
mitigated at a ratio of 1:1 in other onsite features above and beyond the storage required for
volume control.
6. Volume control is planned to be addressed by two filtration basins. Comments regarding these
basins include:
a. Sheet C5.3 Details 3 & 4 refer to a filtration bench section detail which does not appear
to exist. Is this Detail 1?
b. It is unclear if the notes below Sheet C5.3 Detail 3 apply to just the Southern basin or
both basins.
c. The planting soil mix specified in Sheet C5.3 Details 1 and 3 is a phosphorus source,
inappropriate for filtration. This specification must be revised per the MN Stormwater
Manual guidance for biofiltration media in the presence of an underdrain.
d. Sheet C5.3 Detail cross section with exterior planting medium and interior sand is not an
acceptable cross section.
4646 Dakota Street SE, Prior Lake, MN 55372 • (952) 447-4166
www.plslwd.org • info@plslwd.org
e. As part of the Developers Agreement with the City, double ring infiltration testing is
recommended to be required post-construction to confirm construction did not
compromise filtration performance.
7. Sheet L1.0 indicates “Lower Basin Native Seed Mix” for filtration benches and wetland buffer
areas. Provide specifications for review to confirm suitability.
8. SAFL Baffles are recommended at all CBMHs with sumps.
Rule G – Wetland Alteration
1. There are seven (7) wetlands onsite or partially onsite. The stormwater management report and
grading plan suggest Wetlands 5 and 6 are proposed to be filled to accommodate the
development. Please provide a copy of the WCA application for this alteration. If this fill is
approved by the WCA LGU, the storage lost due filling must be mitigated (see Stormwater
Management Comment #5).
2. Proposed grading limits appear to overlap/coincide with wetland boundaries in areas around
Wetlands 1, 2 and 3. This may result in inadvertent wetland fill. Construction limits should be
revised to clearly be upslope of wetland boundaries.
Rule J – Buffer Strips
1. The District’s Comprehensive Wetland Plan classifies onsite wetlands as follows in the table
below. Plan Sheet SW1.7 (Native Buffer Narrative) indicates all waterbodies will be provided
with an average 30-ft buffer. This is inconsistent with Plan Sheet W1.0 which has variable
widths. Neither of these sheets meet the PLSLWD minimum and average buffer widths required
for Wetlands 1, 2, 3 and 4.
Wetland
Delineation #
Management Class (per
approved PLSLWD Wetland Plan)
Apparent Management
Class (per MNRAM)
Minimum Buffer
Width Required [Feet]
Average Buffer
Width Required
[Feet]
Wetland 1 Natural Areas 50 75
Wetland 2 not in inventory Hydrology 25 50
Wetland 3 Natural Areas 50 75
Wetland 4 Hydrology 25 50
Wetland 5 Basic 15 30
Wetland 6 not in inventory Basic 15 30
Wetland 7 Basic 15 30
2. It is suggested that the Wetland Mitigation Plan (Sheet W1.0) be amended to ease review of
required PLSLWD buffers. This sheet should identify for each wetland the minimum buffer
width proposed, the average buffer width proposed, the required buffer area based on the
required average width, and the area of the proposed buffer. The proposed buffer area must be
at least equal to the buffer area required based on the required average width.
3. Add post-construction silt fence (or biologs) at the upland edge of the buffer where the overall
grading limits extend into the buffer.
4646 Dakota Street SE, Prior Lake, MN 55372 • (952) 447-4166
www.plslwd.org • info@plslwd.org
4. Sheet SW1.7 Permanent Stabilization Notes Site Specific specifies seeding of wetland buffer
areas with MNDOT seed mix 33-261 (Stormwater South and West) which is appropriate for
filtration basins, not buffer areas.
5. Sheets SW1.3 through SW1.5 specify MNDOT Category 3 erosion control blanket on pond
slopes, buffer areas and all slopes greater than 4.1. This MNDOT reference appears
incorrect. Erosion control blanket is required to be natural/net-free.
6. The Grading Plan and Wetland Mitigation Plan must be revised to include monumentation of the
upland edge of the wetland buffer at each change in the buffer line bearing.
7. Legal descriptions, and AutoCAD Civil 3D layers for proposed buffers and wetland boundaries
will be required for review and acceptance of PLSLWD conservation easement boundaries.
8. The owner will be required to enter into a Developers Agreement with the District for
establishment of and record Conservation Easements over the wetlands and buffer areas.
Details for buffer monumentation and vegetation establishment are detailed in Rule J
Paragraphs 7 and 8, respectively, and must be incorporated into the construction or landscape
plans.