HomeMy WebLinkAbout05(F) - Resolution Approving a Limited Use Permit with MnDOT for Trunk Highway 13 Non-Motorized Trails Report
ITEM: 5F
CITY COUNCIL AGENDA REPORT
MEETING DATE: July 22, 2025
PREPARED BY: Christine Watson, Public Works Supervisor – Administration
Luke Schwarz – Assistant City Engineer
PRESENTED BY: Nick Monserud, Public Works Director/City Engineer
AGENDA ITEM: Resolution Approving a Limited Use Permit with MnDOT for Trunk
Highway 13 Non-Motorized Trails
RECOMMENDED ACTION:
Adopt a resolution approving a Limited Use Permit with MnDOT for Trunk Highway 13 Non-
Motorized Trails.
BACKGROUND:
The City currently has five (5) separate Limited Use Permits (LUPs) with MnDOT for the use and
maintenance of non-motorized trails along Trunk Highway 13 (TH 13), each with different
expiration dates. With the upcoming addition of the new Trail Segment 1 (CR 42 to Oakland
Beach Ave SE), MnDOT wishes to combine the LUPs into one master trail permit (7001-00404)
that will cover all non-motorized trails within MnDOT right-of-way on TH 13.
Effective upon the issuance of this new permit, MnDOT will terminate the five (5) existing LUPs
and such permits will be null and void as of that date. The new LUP 7001-0040 will expire on
June 3, 2035. The termination letter for the existing LUPs is attached.
The attached LUP 7001-0040 has been reivewed by City staff and the City Attorney. Staff
recommend council approval to execute the new LUP 7001-0040 with MnDOT.
FINANCIAL IMPACT:
There is no financial impact for this item. It is for administrative and authorization purposes
only.
ALTERNATIVES:
1. Motion and second as part of the consent agenda to adopt a resolution approving a
Limited Use Permit with MnDOT for Trunk Highway 13 Non-Motorized Trails.
2. Motion and second to remove this item from the consent agenda for further discussion.
ATTACHMENTS:
1. Attach 1 - MnDOT Resolution
2. Attach 2 - LUP Termination Letter
3. Attach 3 - LUP 7001-0040
City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372
Exhibit B City Resolution Page 1 of 1 LU1016 7/9/2025
EXHIBIT B
CITY OF PRIOR LAKE
RESOLUTION
IT IS RESOLVED that the City of Prior Lake enter into Limited Use Permit No. 7001-0040 with
the State of Minnesota, Department of Transportation for the following purposes:
To provide for maintenance and use by the City of Prior Lake upon, along and adjacent to Trunk
Highway No. 13 and the limits of which are defined in said Limited Use Permit.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PRIOR
LAKE AS FOLLOWS; that the Mayor and the City Manager are authorized to execute the
Limited Use Permit and its amendments, and that the City of Prior Lake enter into Limited Use
Permit No. 7001-0040 with the State of Minnesota, Department of Transportation.
CERTIFICATION
I certify that the above Resolution is an accurate copy of the Resolution adopted by the City
Council of the City of Prior Lake, Minnesota at an authorized meeting held on the 22nd day of July,
2025, as shown by the minutes of the meeting in my possession.
Subscribed and sworn to before me this 22nd
day of July, 2025
Notary Public ________________________
My Commission Expires _______________
C.S. 7001 (T.H. 13)
LUP # 7001-0040
____________________________________
(Signature)
____________________________________
(Type or Print Name)
____________________________________
(Title)
____________________________________
(Signature)
____________________________________
(Type or Print Name)
____________________________________
(Title)
LUP Termination Letter Page 1 of 1 LU1018 6/10/2025
Metro District Right of Way Office Tel: 651-234-7500
1500 W. County Road B2
Roseville, MN 55113
Fax: 651-234-7708
June 10, 2025
Luke Schwarz
Asst City Engineer
City of Prior Lake
16776 Fish Point Rd SE
Prior Lake, MN 55372
Subject: C.S. 7001 (T.H. 13)
LUP # 7001-0013
LUP # 7001-0021
LUP # 7001-0024
LUP # 7001-0033
Limited Use Permit for Non-Motorized Trail
Termination Notice
Dear Mr. Schwarz:
This letter serves as MnDOT’s formal notice to terminate the Limited Use Permits
referred to as #7001-0013, # 7001-0021, # 7001-0024, and # 7001-0033 by and
between the State of Minnesota, Department of Transportation (MnDOT) and the City of
Prior Lake.
A new non-motorized trail is being constructed with SP 201-010-008, and the existing TH
13 trails are being compile to create a City-wide trail permit. To bring the City into compliance
with current Federal and State regulations and policies, MNDOT will issue LUP # 7001-
0040, included with this letter.
Effective on the issuance of Limited Use Permit # 7001-0040, MnDOT terminates these
Limited Use Permits and such permits are null and void effective on such date.
If you have any questions or concerns, please contact me at: 651-234-7586 or e-mail
Lisa.Dircks@state.mn.us
Sincerely,
Lisa Dircks
Metro Limited Use Permit Facilitator
LUP – Standardized LUP Form Page 1 of 6 LU1001 6/13/2025
STATE OF MINNESOTA
DEPARTMENT OF TRANSPORTATION
LIMITED USE PERMIT
C.S. 7001 (T.H. 13)
County of Scott
LUP # 7001-0040
Permittee: City of Prior Lake
Expiration Date: 06/03/2035
Coop./Const. Agmt #1031912
Coop./Const. Agmt #1031080
Coop./Const. Agmt #1058429
In accordance with Minnesota Statutes Section 161.434, the State of Minnesota, through its
Commissioner of Transportation, (“MnDOT”), hereby grants a Limited Use Permit (the “LUP”) to City
of Prior Lake, (“Permittee”), to use the area within the right of way of Trunk Highway No. 13 as shown
in red on Exhibit "A", (the “Area”) attached hereto and incorporated herein by reference. This Limited
Use Permit is executed by the Permittee pursuant to resolution, a certified copy of which is attached
hereto as Exhibit B.
Non-Motorized Trail
The Permittee's use of the Area is limited to only the constructing, maintaining and operating a
nonmotorized trail ("Facility") and the use thereof may be further limited by the Code of Federal
Regulations, including, but not limited to 23 C.F.R. 217 also published as the Federal-Aid Policy
Guide.
The permittee agrees that this permit totally replaces and supersedes the previously issued Limited
Use permits affecting the Area, specifically: The first permit, #7001-0013, was issued on 10/12/2015
on CS 7001 (TH 13=117). The second permit, #7001-0021, was issued on 12/18/2018 on CS 7001
(TH 13=117). The third permit, # 7001-0024, was issued on 6/24/2019 on CS 7001 (TH 13=117). The
fourth permit, #7001-0033, was issued on 1/11/2022 on CS 7001 (TH 13=117). The fifth permit, #
7001-009, was issued on 8/20/2007 on CS 7001 (TH 13=117). Upon issuance of this permit each of
these earlier issued permits are cancelled.
In addition, the following special provisions shall apply:
LUP – Standardized LUP Form Page 2 of 6 LU1001 6/13/2025
SPECIAL PROVISIONS
1. TERM. This LUP terminates at 11:59PM on 06/03/2035 (“Expiration Date”) subject to the right
of cancellation by MnDOT, with or without cause, by giving the Permittee ninety (90) days
written notice of such cancellation. This LUP will not be renewed except as provided below.
Provided this LUP has not expired or terminated, MnDOT may renew this LUP for a period of up
to ten (10) years, provided Permittee delivers to MnDOT, not later than ninety (90) days prior to
the Expiration Date, a written request to extend the term. Any extension of the LUP term will be
under the same terms and conditions in this LUP, provided:
(a) At the time of renewal, MnDOT will review the Facility and Area to ensure the Facility and
Area are compatible with the safe and efficient operation of the highway and the Facility
and Area are in good condition and repair. If, in MnDOT’s sole determination,
modifications and repairs to the Facility and Area are needed, Permittee will perform such
work as outlined in writing in an amendment of this LUP; and
(b) Permittee will provide to MnDOT a certified copy of the resolution from the applicable
governmental body authorizing the Permittee’s use of the Facility and Area for the
additional term.
If Permittee’s written request to extend the term is not timely given, the LUP will expire on the
Expiration Date.
Permittee hereby voluntarily releases and waives any and all claims and causes of action for
damages, costs, expenses, losses, fees and compensation arising from or related to any
cancellation or termination of this LUP by MnDOT. Permittee agrees that it will not make or
assert any claims for damages, costs, expenses, losses, fees and compensation based upon
the existence, cancellation or termination of the LUP. Permittee agrees not to sue or institute
any legal action against MnDOT based upon any of the claims released in this paragraph.
2. REMOVAL. Upon the Expiration Date or earlier termination, at the Permittee’s sole cost and
expense Permittee will:
(a) Remove the Facility and restore the Area to a condition satisfactory to the MnDOT District
Engineer; and
(b) Surrender possession of the Area to MnDOT.
If, without MnDOT’s written consent, Permittee continues to occupy the Area after the Expiration
Date or earlier termination, Permittee will remain subject to all conditions, provisions, and
obligations of this LUP, and further, Permittee will pay all costs and expenses, including
attorney’s fees, in any action brought by MnDOT to remove the Facility and the Permittee from
the Area.
LUP – Standardized LUP Form Page 3 of 6 LU1001 6/13/2025
3. CONSTRUCTION. The construction, maintenance, and supervision of the Facility shall be at no
cost or expense to MnDOT.
Before construction of any kind, the plans for such construction shall be approved in writing by
the MnDOT's District Engineer. Approval in writing from MnDOT District Engineer shall be
required for any changes from the approved plan.
The Permittee will construct the Facility at the location shown in the attached Exhibit "A", and in
accordance with MnDOT-approved plans and specifications. Further, Permittee will construct
the Facility using construction procedures compatible with the safe and efficient operation of the
highway.
Upon completion of the construction of the Facility, the Permittee shall restore all disturbed
slopes and ditches in such manner that drainage, erosion control and aesthetics are
perpetuated.
The Permittee shall preserve and protect all utilities located on the lands covered by this LUP at
no expense to MnDOT and it shall be the responsibility of the Permittee to call the Gopher State
One Call System at 1-800-252-1166 at least 48 hours prior to performing any excavation.
Any crossings of the Facility over the trunk highway shall be perpendicular to the centerline of
the highway and shall provide and ensure reasonable and adequate stopping sight distance.
4. MAINTENANCE. Any and all maintenance of the Facility shall be provided by the Permittee at
its sole cost and expense, including, but not limited to, plowing and removal of snow and
installation and removal of regulatory signs. No signs shall be placed on any MnDOT or other
governmental agency sign post within the Area. MnDOT will not mark obstacles for users on
trunk highway right of way.
5. USE. Other than as identified and approved by MnDOT, no permanent structures or no
advertising devices in any manner, form or size shall be allowed on the Area. No commercial
activities shall be allowed to operate upon the Area.
Any use permitted by this LUP shall remain subordinate to the right of MnDOT to use the
property for highway and transportation purposes. This LUP does not grant any interest
whatsoever in land, nor does it establish a permanent park, recreation area or wildlife or
waterfowl refuge. No rights to relocation benefits are established by this LUP.
This LUP is non-exclusive and is granted subject to the rights of others, including, but not limited
to public utilities which may occupy the Area.
6. APPLICABLE LAWS. This LUP does not release the Permittee from any liability or obligation
imposed by federal law, Minnesota Statutes, local ordinances, or other agency regulations
LUP – Standardized LUP Form Page 4 of 6 LU1001 6/13/2025
relating thereto and any necessary permits relating thereto shall be applied for and obtained by
the Permittee.
Permittee at its sole cost and expense, agrees to comply with, and provide and maintain the
Area, Facilities in compliance with all applicable laws, rules, ordinances and regulations issued
by any federal, state or local political subdivision having jurisdiction and authority in connection
with said Area including the Americans with Disabilities Act (“ADA”). If the Area and Facilities
are not in compliance with the ADA or other applicable laws MnDOT may enter the Area and
perform such obligation without liability to Permittee for any loss or damage to Permittee thereby
incurred, and Permittee shall reimburse MnDOT for the cost thereof, plus 10% of such cost for
overhead and supervision within 30 days of receipt of MnDOT’s invoice.
7. CIVIL RIGHTS. The Permittee for itself, successors in interest, and assigns, as a part of the
consideration hereof, does hereby covenant and agree that in the event improvements are
constructed, maintained, or otherwise operated on the Property described in this Limited Use
Permit for a purpose for which a MnDOT activity, facility, or program is extended or for another
purpose involving the provision of similar services or benefits, the Permittee will maintain and
operate such improvements and services in compliance with all requirements imposed by the
Acts and Regulations relative to nondiscrimination in federally-assisted programs of the United
States Department of Transportation, Federal Highway Administration, (as may be amended)
such that no person on the grounds of race, color, national origin, sex, age, disability, income-
level, or limited English proficiency will be excluded from participation in, denied the benefits of,
or be otherwise subjected to discrimination in the use of said improvements.
8. SAFETY. MnDOT shall retain the right to limit and/or restrict any activity, including the parking
of vehicles and assemblage of Facility users, on the highway right of way over which this LUP is
granted, so as to maintain the safety of both the motoring public and Facility users.
9. ASSIGNMENT. No assignment of this LUP is allowed.
10. IN WRITING. Except for those which are set forth in this LUP, no representations, warranties,
or agreements have been made by MnDOT or Permittee to one another with respect to this
LUP.
11. ENVIRONMENTAL. The Permittee shall not dispose of any materials regulated by any
governmental or regulatory agency onto the ground, or into any body of water, or into any
container on the State’s right of way. In the event of spillage of regulated materials, the
Permittee shall notify in writing MnDOT’s District Engineer and shall provide for cleanup of the
spilled material and of materials contaminated by the spillage in accordance with all applicable
federal, state and local laws and regulations, at the sole expense of the Permittee.
12. MECHANIC’S LIENS. The Permittee (for itself, its contractors, subcontractors, its materialmen,
and all other persons acting for, through or under it or any of them), covenants that no laborers',
mechanics', or materialmens' liens or other liens or claims of any kind whatsoever shall be filed
LUP – Standardized LUP Form Page 5 of 6 LU1001 6/13/2025
or maintained by it or by any subcontractor, materialmen or other person or persons acting for,
through or under it or any of them against the work and/or against said lands, for or on account
of any work done or materials furnished by it or any of them under any agreement or any
amendment or supplement thereto.
13. NOTICES. All notices which may be given, by either party to the other, will be deemed to have
been fully given when served personally on MnDOT or Permittee or when made in writing
addressed as follows:
to Permittee at: and to MnDOT at:
City of Prior Lake State of Minnesota, Department of Transportation
4646 Dakota St SE Metro District Right of Way
Prior Lake, MN 55372 1500 W. County Road B2
Roseville, MN 55113
The address to which notices are mailed may be changed by written notice given by either
party to the other.
14. INDEMNIFICATION AND RELEASE. Permittee shall indemnify, defend to the extent
authorized by the Minnesota Attorney General’s Office, hold harmless and release the State of
Minnesota, its Commissioner of Transportation, employees, the FHWA, and any successors
and assigns of the foregoing, from and against all claims, demands, and causes of action for
injury to or death of persons or loss of or damage to property (including Permittee’s property)
occurring on the Area and Facility or arising out of or associated with Permittee’s use and
occupancy of the Area and Facility, regardless of whether such injury, death, loss, or damage
(i) is caused in part by the negligence (but not the gross negligence or willful misconduct) of
MnDOT or (ii) is deemed to be the responsibility of MnDOT because of its failure to supervise,
inspect, or control the operations of Permittee or otherwise discover or prevent actions or
operations of Permittee giving rise to liability to any person. Nothing in this LUP shall obligate
Permittee to indemnify or save MnDOT harmless from (a) any gross negligence or willful
misconduct of MnDOT or its employees, contractors, agents, or anyone for whom MnDOT is
legally responsible, or (b) any claims, demands or causes of action not arising out of or
associated with Permittee’s occupancy or use of the Area and Facility.
Permittee hereby releases the State of Minnesota, its Commissioner of Transportation,
employees, the FHWA, and any successors and assigns of the foregoing, from and against all
claims, demands, suits, losses, costs, expenses, and causes of action for loss of or damages to
the Area and Facility or to Permittee’s property on or about the Area and Facility, except when
such loss or damage is caused solely by the negligence of MnDOT or its employees,
contractors, agents, or anyone for whom MnDOT is legally responsible.
MnDOT’s liability is subject to the Minnesota Tort Claims Act, Minn. Stat. §3.736 and other
applicable law.
LUP – Standardized LUP Form Page 6 of 6 LU1001 6/13/2025
MINNESOTA DEPARTMENT
OF TRANSPORTATION
RECOMMENDED FOR APPROVAL
CITY OF PRIOR LAKE
By_________________________________
Its Mayor
And________________________________
Its City Manager
By:______________________________
District Engineer
Date_____________________________
APPROVED BY:
COMMISSIONER OF TRANSPORTATION
By:______________________________
Director, Office of Land Management
Date____________________________
The Commissioner of Transportation
by the execution of this permit
certifies that this permit is
necessary in the public interest
and that the use intended is for
public purposes.
935
940
945
950
955
960
935
940
945
950
955
960
930
935
940
945
950
955
930
935
940
945
950
955
930
935
940
945
950
955
930
935
940
945
950
955
935
940
945
950
955
960
935
940
945
950
955
960
0.85%
-4.63%
1.25%3.05%VP
I
:
3
5
+
6
0
.
0
6
EL
:
9
4
1
.
9
4
VP
I
:
3
5
+
8
1
.
1
4
EL
:
9
4
2
.
5
8
VPI: 32+24.10
EL: 950.39
A = -5.48%
K = 31.95
L=175'
VPI: 34+39.28
EL: 940.43
A = 5.88%
K = 34.02
L=200'
HP
:
3
1
+
6
3
.
7
5
EL
:
9
4
9
.
7
6
LP
:
3
4
+
9
6
.
7
5
EL
:
9
4
1
.
4
1
VP
C
:
3
1
+
3
6
.
6
0
EL
:
9
4
9
.
6
5
VP
T
:
3
5
+
3
9
.
2
8
EL
:
9
4
1
.
6
8
VP
T
:
3
3
+
1
1
.
6
0
EL
:
9
4
6
.
3
4
VP
C
:
3
3
+
3
9
.
2
8
EL
:
9
4
5
.
0
6
94
8
.
9
1
94
9
.
3
30+50
94
9
.
1
2
94
9
.
3
94
9
.
3
3
94
9
.
4
31+00
94
9
.
5
5
95
0
.
2
94
9
.
7
3
95
0
.
3
31+50
94
9
.
7
4
95
0
.
3
94
9
.
5
6
95
0
.
1
32+00
94
9
.
1
7
94
9
.
9
94
8
.
6
0
94
8
.
9
32+50
94
7
.
8
2
94
7
.
9
94
6
.
8
6
94
6
.
6
33+00
94
5
.
7
2
94
5
.
5
94
4
.
5
8
94
4
.
6
33+50
94
3
.
5
9
94
3
.
9
94
2
.
7
9
94
3
.
4
34+00
94
2
.
1
7
94
3
.
0
94
1
.
7
4
94
2
.
5
34+50
94
1
.
4
8
94
2
.
1
94
1
.
4
2
94
1
.
6
35+00
94
1
.
5
3
94
1
.
7
94
1
.
8
1
94
1
.
8
35+50
94
2
.
4
0
94
2
.
5
94
2
.
9
36+00 36+50 37+00 37+50 38+00
94
8
.
8
0
94
8
.
9
32+32
94
8
.
3
7
94
8
.
2
32+50
94
7
.
6
0
94
7
.
4
94
6
.
6
3
94
6
.
2
33+00
94
5
.
5
0
94
4
.
9
94
4
.
3
6
94
4
.
1
33+50
94
3
.
3
7
94
3
.
1
94
3
.
0
5
94
2
.
8
33+84
94
3
.
0
5
94
2
.
8
60+00
94
1
.
6
6
94
2
.
0
60+50
94
1
.
0
6
94
1
.
3
61+00
94
2
.
2
8
94
2
.
6
94
1
.
2
5
94
1
.
9
-1.04%
VP
I
:
6
0
+
0
0
.
0
0
EL
:
9
4
3
.
0
5
VP
I
:
6
0
+
2
0
.
6
6
EL
:
9
4
2
.
4
1
VP
I
:
6
0
+
4
1
.
0
9
EL
:
9
4
1
.
8
6
VP
I
:
6
0
+
6
3
.
8
7
EL
:
9
4
1
.
3
9
VP
I
:
6
0
+
8
7
.
4
2
EL
:
9
4
1
.
1
2
94
7
.
6
6
94
8
.
0
50+31
94
7
.
0
4
94
7
.
2
50+50
94
6
.
0
7
94
6
.
1
94
4
.
9
3
94
5
.
0
51+00
94
3
.
7
9
94
3
.
9
94
2
.
8
2
94
2
.
8
51+50
94
2
.
0
1
94
2
.
1
94
1
.
2
9
94
1
.
6
52+00
94
0
.
7
9
94
1
.
2
94
0
.
5
6
94
1
.
0
52+50
94
0
.
6
7
94
1
.
2
94
0
.
9
1
94
1
.
4
52+96
-3.24%-3.75%
-1.10%1.07%
VP
I
:
5
0
+
4
8
.
9
3
EL
:
9
4
7
.
0
8
VP
I
:
5
0
+
7
3
.
9
3
EL
:
9
4
6
.
1
2
VP
I
:
5
0
+
9
4
.
1
2
EL
:
9
4
5
.
2
0
VP
I
:
5
1
+
2
3
.
6
6
EL
:
9
4
3
.
8
5
VP
I
:
5
1
+
4
6
.
5
7
EL
:
9
4
2
.
9
4
VP
I
:
5
1
+
6
9
.
7
9
EL
:
9
4
2
.
1
7
VP
I
:
5
1
+
9
3
.
3
0
EL
:
9
4
1
.
4
7
VP
I
:
5
2
+
1
9
.
2
4
EL
:
9
4
0
.
8
8
VP
I
:
5
2
+
4
1
.
3
7
EL
:
9
4
0
.
6
1
VP
I
:
5
2
+
6
2
.
6
5
EL
:
9
4
0
.
5
4
VP
I
:
5
2
+
9
0
.
7
6
EL
:
9
4
0
.
8
4
94
1
.
4
9
94
1
.
6
61+50 62+00
94
1
.
2
2
94
1
.
5
94
1
.
7
1.07%LP
:
6
1
+
0
8
.
9
5
EL
:
9
4
1
.
0
5
VP
I
:
6
1
+
7
1
.
9
3
EL
:
9
4
1
.
7
2
-4.63%
VP
I
:
3
3
+
1
1
.
7
6
EL
:
9
4
6
.
1
1
VP
I
:
3
3
+
3
9
.
4
4
EL
:
9
4
4
.
8
3
C
C
S
S
S
D
C
C
S
C
C
C E
E
X
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
C
C
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
E
E
E
E
E
E
E
E
E
E
E
E E
C
C
C
C
C
C
C
X
X
X
C G
G
S
D
>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>>>>>>>>
>>
>>>>
>>
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>
>
>
>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>
>
>>
>>
>>
>
>
>>>>>>>>>>>>>>>>>>>>>>>>>>
>>>>
>>
>>
>>>>>>>>>>>>>>
>>
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>>
>>
>>
>>
>>
>>>>
40
+
0
0
41
+
0
0
3
31+00
32+00
33+00
34+00
35+00 36+00
EP: 36+16.79
PI: 35+08.31
PI: 35+60.06
PI: 31+56.02
PC: 34+02.79
PT: 34+78.60
2
.
0
0
%
31+00
32+00
3
31+00
STA: 31+89.17 PLEASANT STREET CL=
STA: 40+35.19 MAIN AVENUE CL
PLEASANT STREET LEFT LOC ALIGNMENT 2 (ANGLED PARKING)
PLEASANT STREET LEFT EOP-LOC ALIGNMENT
33+00
34+00
35+00 36+00 3
32+59.29
33+00
3
STA: 33+84.28 PLEASANT STREET RIGHT EOP ALIGNMENT 1=
STA: 60+00 PLEASANT STREET RIGHT EOP ALIGNMENT 2
PLEASANT STREET RIGHT EOP ALIGNMENT 2
PLEASANT STREET RIGHT EOP ALIGNMENT 1
33+00
34+003
6
60+00
61+00
EP: 61+79.95
PI: 61+48.15
PI: 61+49.52
PI: 61+63.91
PI: 61+71.93
PT: 60+55.21
PLEASANT STREET RIGHT LOC ALIGNMENT 2 (ANGLED PARKING)
51+00
52+00
PC: 51+58.04
PT: 50+31.47
PT: 52+08.96
L =7 5 .8 1 R =3 0 0 .0 0 Δ =1 4 °2 8 '4 2"
16323
PLATE
ON MAIN
L
L
C
16328
PRIOR LA
K
E
,
C
I
T
Y
OF & CIT
Y
M
A
N
A
G
E
R
16318
PRIOR LA
K
E
C
I
T
Y
OF & CIT
Y
M
A
N
A
G
E
R
16306
VETERAN
S
O
F
FOREIGN
W
A
R
S
&
VFW POS
T
6
2
0
8
LE
MANAGEMENT
PROPERTIES
PRIOR LAKE
CITY OF &
CITY MANAGER
LANGHO
R
S
T
RANDY
W & C/O
DELORES
LANGHO
R
S
T
P
R
I
O
R
L
A
K
E
C
I
T
Y
O
F
&
C
I
T
Y
M
A
N
A
G
E
R
STREET CONSTRUCTION NOTES:
1.ALL CURB WITH ADJACENT SIDEWALK SHALL HAVE A
CONCRETE SILL PER MnDOT STANDARD PLAN 5-297.254.
2.ALL PEDESTRIAN RAMPS AND LANDINGS SHALL BE 6 INCH
CONCRETE.
3.ALL RESIDENTIAL DRIVEWAYS (INCLUDING THE SIDEWALK
THROUGH DRIVEWAY) SHALL BE 6 INCHES.
4.ALL COMMERCIAL DRIVEWAYS (INCLUDING THE SIDEWALK
THROUGH DRIVEWAY) SHALL BE 7 INCHES.
5.ALL RESIDENTIAL SIDEWALK SHALL BE 4 INCH CONCRETE.
6.ALL COMMERCIAL SIDEWALK (INCLUDING PAVED
BOULEVARDS) SHALL BE 6 INCH CONCRETE.
7.PAVED BOULEVARDS SHALL BE TIE TO THE CONCRETE WALK
PER MnDOT STANDARD PLAN 5-297.254.
8.SIDEWALKS SHALL MEET ADA LANDING REQUIREMENTS AT
ALL BUILDING ENTRANCES.
9.CONSTRUCT PEDESTRIAN RAMPS IN CONFORMANCE WITH
MnDOT STANDARD PLAN 5-297.250.
10.SEE LANDSCAPING SHEETS FOR ADDITIONAL STREETSCAPING.
11.COORDINATE OVERHEAD POWER BURIAL WITH CITY'S
ELECTRICIAN & XCEL ENERGY (SEE SPECS).
STREET LEGEND
4 INCH CONCRETE WALK
6 INCH CONCRETE WALK
6 INCH CONCRETE WALK SPECIAL 1
6 INCH CONCRETE WALK SPECIAL 2
INSTALL SALVAGED MAIL BOX SUPPORT1
7 INCH CONCRETE DRIVEWAY PAVEMENT
6 INCH CONCRETE DRIVEWAY PAVEMENT
BITUMINOUS PATCH SPECIAL 1
BITUMINOUS PAVEMENT
BITUMINOUS PATCH SPECIAL 2
BRICK PAVERS
17'
DATELIC. NO.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
SHEET
B
o
l
t
o
n
&
M
e
n
k
,
I
n
c
.
20
2
1
,
A
l
l
R
i
g
h
t
s
R
e
s
e
r
v
e
d
c H:
\
P
L
A
K
\
T
1
8
1
2
0
6
6
5
\
C
A
D
\
C
3
D
\
1
2
0
6
6
5
C
6
0
1
-
1
2
0
6
6
5
C
6
0
6
-
S
T
R
E
E
T
S
.
d
w
g
12
/
1
3
/
2
0
2
1
5
:
3
9
:
1
1
P
M
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
ISSUED FOR DATENO.
R
12224 NICOLLET AVENUE
BURNSVILLE, MINNESOTA 55337
Phone: (952) 890-0509
Email: Burnsville@bolton-menk.com
www.bolton-menk.comBRADLEY J. FISHER
56595 MM/DD/YYYY
DOWNTOWN SOUTH RECONSTRUCTION
SAP 201-102-002, SAP 201-119-003, & SAP 201-131-001
ARK
ARK
BJF
T18.120665
R
C6.06STREET PLAN & PROFILE
PLEASANT STREET
FEETSCALE
0 25 50
HORZ.
FEETSCALE
0 5 10
VERT.
B618 C&G
B618 C&G
B618 C&G
B618 C&G
B618 C&G
B618 C&G
B6
1
8
C
&
G
B6
1
8
C
&
G
17'
17'17'
R/W 80' +/-
60' F/F
36' F/F
R/W 64' +
/
-
R/W 78.5
'
+
/
-
R/W 66'
60' F/F
EXISTING GROUND PROFILE
PROPOSED CL PROFILE
NOTE: PROFILE AND STATIONING BASED ON PLEASANT STREET CENTERLINE ALIGNMENT
PLEASAN
T
S
T
R
E
E
T
MA
I
N
A
V
E
N
U
E
TH
1
3
PROPOSED CL ELEVEXISTING ELEV
PROPOSED ELEVEXISTING ELEV PROPOSED ELEVEXISTING ELEV PROPOSED ELEVEXISTING ELEV
NOTE: PROFILE AND STATIONING BASED ON PLEASANT STREET RIGHT LOC ALIGNMENT 2NOTE: PROFILE AND STATIONING BASED ON PLEASANT STREET RIGHT EOP ALIGNMENT 2NOTE: PROFILE AND STATIONING BASED ON PLEASANT STREET RIGHT EOP ALIGNMENT
EXISTING GROUND PROFILE
PROPOSED
EOP
PROFILE
PROPOSED EOP PROFILE PROPOSED LOC PROFILE
EXISTING GROUND PROFILE
SEE INTERSECTION
DETAIL SHEET C6.16
SEE INTERSECTION
DETAIL SHEET C6.15
43' F/F
MnDOT R/W
EXISTING GROUND PROFILE
SUBSURFACE DRAIN CLEANOUT (TYP)
4" PERF PE PIPE DRAIN (TYP)
4" PERF PE PIPE DRAIN (TYP)
STA. 35+86.42
END CONSTRUCTION
SAP 201-102-002
65 SY 7" CONCRETE
VALLEY GUTTER
DRAFTDRAFT
EXHIBIT A REALMS LUP # 7001-0013(2 of 4)
DESIGN TEAM
12' 45
,-14' B424 C&G +80 1:10 TAPER
....._ 14' '�--�.........__ -
--1-1-1-1 1 -:::,:_-!-1-.::,........[--,_
I � • .._ '-..:
-'f-ffi!'< f-!"..!11-�f"Y'• y • ·- • m.-� -.,, • • • •
��� ":IP-�'"' ,.� -----.. -----t, -----~
• ------_Uf. ;;;;RU--;;;,/.: -
v
)
LIMITS
/ _ _..,.INSET A "--.
SCAlE IN FEET
O' 25' 50'
',,,'
3 06 ; 63.21 RT MATCH EXISTING 17.5' BITUMINOUS
f hereby ce by me or under
DRAWN BY: NCM L--l--1-----J---------------------1 DESIGNER: KMP L--l--1-----J---------------------1
licensed Professlonol nesoto,
CHECKED BY: � NO. BY DATE REVISIONS Printed Name:
� SEH
=---� B424 C&G --�--------
��¾. ·�-
86 C
150TH ST, W. STA 25+57.70
� ....... "' / • OTES:
l ------
<>= INPLACE TRAFFIC
.... TRAFFIC
...,. I
SCAlE IN FEET
O' 25' 50'
EE INTE RSECTION DETAILS FOR DRIVEWAY INFORMATION.
PHONE: 651.490.2000 3535 VAIJNAJS CENTER DR. ST, PAUL, MN 55110-5196 www.sehinc.com
MINNESOTA DEPARTMENT OF TRANSPORTATION T.H. 13/15OTH STREET INTERSECTION RECONSTRUCTION S.P. 7001-104 (TH 13), S.A.P. 201-105-008
1--.........(_,. �''..
'-, ;" ''¾, , ..... ...._ ....
CONSTRUCTION PLAN
FlLE NO.
CP4
OF CP9
DESIGNED BY:
CHECKED BY:
P
r
o
j
e
c
t
s
\
M
i
n
n
e
s
o
t
a
\
0
2
5
6
9
7
-
0
0
0
\
0
5
_
D
i
s
c
i
p
l
i
n
e
\
R
o
a
d
w
a
y
\
0
3
_
S
h
e
e
t
s
\
0
2
5
6
9
7
-
0
0
0
-
1
8
5
c
p
p
-
p
l
a
n
-
0
0
1
4
/
2
2
/
2
0
2
5
3
:
1
8
:
0
9
P
M
F
I
L
E
N
A
M
E
:
D
A
T
E
:
T
I
M
E
:
DRAWN BY:
ofSheet No.Sheets
City of Prior Lake
TH 13 Trail
Prior Lake, Minnesota
SP 201-010-008, SP 7001-143 (TH 13)
95
SIGNATURE:
PRINTED NAME:
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED
I AM A DULY LICENSED PROFESSIONAL ENGINEER
MKV
MKV
KH
MARCUS VANDERBRUG, P.E.
3/18/2025 56164
SCALE IN FEET
0 25 50
CONSTRUCTION & DRAINAGE PLAN & PROFILE
55
TOP OF FINISHED SURFACE
PROFILE GRADE�
INPLACE GROUNDLINE
TRAIL - SEGMENT 1 STA 100+24.79
BEGIN
INPLACE GROUNDLINE ELEVATION
PROFILE ELEVATION
Trail - Segment 1
SP 201-010-008, SP 7001-143 (TH 13)
9
2
0
.
6
0
9
1
8
.
8
9
9
1
7
.
5
3
9
1
5
.
6
0
9
1
7
.
1
2
9
1
7
.
8
2
9
1
7
.
6
7
9
1
8
.
5
7
9
2
0
.
0
8
9
2
0
.
9
1
9
2
1
.
3
8
9
2
1
.
1
5
9
2
1
.
2
4
100+00 101+00 102+00 103+00 104+00 105+00 106+00
910 910
912 912
914 914
916 916
918 918
920 920
922 922
924 924
926 926
928 928
930 930
TRAIL-SEGMENT 1�
10' BIT TRAIL
D I CATCH BASIN/DROP INLET
APRON
MH MANHOLE
STRUCTURE NUMBER
STORM SEWER PIPE
FLOW PATH
LEGEND
SEE STD PLANS & PED RAMP DETAILS
SIDEWALK PEDESTRIAN CURB RAMP
CHAIN LINK FENCE
TEMPORARY EASEMENT
EXISTING R/W
CONSTRUCTION LIMITS
(CONTRACTOR TO DESIGN AND CONSTRUCT)
EARTH RETENTION SYSTEM (TEMPORARY)
SEE INSET D FOR BITUMINOUS MIX TYPE
VERTICAL CONTROL
BASED ON NGVD 88 DATUM
ELEVATIONS FOR THIS PLAN ARE
V
P
I
1
0
6
+
0
0
.
0
0
EL
9
2
1
.
3
1
V
P
I
1
0
0
+
2
5
.
0
0
E
L
9
1
8
.
8
9
V
P
C
1
0
5
+
5
0
.0
0
EL 9
2
1
.
5
1
LVC = 100.00'
SSD = 577.95'
EX = -0.26'
K = 49
9
2
0
.
6
0
LVC = 100.00'
EX = 0.12'
K = 107
V
P
I
1
0
1
+
6
3
.
1
9
E
L
9
1
9
.
0
0
V
P
C
1
0
1
+
1
3
.
1
9
E
L
9
1
8
.
9
6
V
P
T
1
0
2
+
1
3
.
1
9
E
L
9
1
9
.
5
1
+1.01%
+0.08%
9
1
8
.
8
9
9
1
7
.
5
3
9
1
5
.
6
0
9
1
7
.
1
2
9
1
7
.
8
2
9
1
7
.
6
7
9
1
8
.
5
7
9
2
0
.
0
8
9
2
0
.
9
1
9
2
1
.
3
8
9
2
1
.
1
5
9
2
1
.
2
4
V
P
I
1
0
4
+
5
0
.
0
0
E
L
9
2
1
.
9
1
V
H
P
1
0
4
+
7
1
.
7
0
E
L
9
2
1
.
7
6
V
P
C
1
0
4
+
0
0
.
0
0
E
L
9
2
1
.
4
0
V
P
T
1
0
5
+
0
0
.
0
0
E
L
9
2
1
.
7
1
-0.40%+1.01%-0.40%
+0.08%
+1.01%
-0.40%
LVC = 100.00'
SSD = 813.41'
EX = -0.18'
K = 71
BEGIN SP 201-010-008, SP 7001-143 (TH 13)
TRAIL- SEGMENT 1 STA 100+24.79
TH 13
O
A
K
LA
N
D
B
EA
CH
A
V
E SE
100
105
0000
S
E
E
S
H
E
E
T
C
P
2
M
A
T
C
H
L
I
N
E
S
T
A
1
0
6
+
0
0
.
0
0
1
1
2
3
DESIGNED BY:
CHECKED BY:
P
r
o
j
e
c
t
s
\
M
i
n
n
e
s
o
t
a
\
0
2
5
6
9
7
-
0
0
0
\
0
5
_
D
i
s
c
i
p
l
i
n
e
\
R
o
a
d
w
a
y
\
0
3
_
S
h
e
e
t
s
\
0
2
5
6
9
7
-
0
0
0
-
1
8
5
c
p
p
-
p
l
a
n
-
0
0
1
4
/
2
2
/
2
0
2
5
3
:
1
8
:
1
0
P
M
F
I
L
E
N
A
M
E
:
D
A
T
E
:
T
I
M
E
:
DRAWN BY:
ofSheet No.Sheets
City of Prior Lake
TH 13 Trail
Prior Lake, Minnesota
SP 201-010-008, SP 7001-143 (TH 13)
95
SIGNATURE:
PRINTED NAME:
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED
I AM A DULY LICENSED PROFESSIONAL ENGINEER
MKV
MKV
KH
MARCUS VANDERBRUG, P.E.
3/18/2025 56164
MH
DI DI
SCALE IN FEET
0 25 50
CONSTRUCTION & DRAINAGE PLAN & PROFILE
56
TOP OF FINISHED SURFACE
PROFILE GRADE�
INPLACE GROUNDLINE
INPLACE GROUNDLINE ELEVATION
PROFILE ELEVATION
Trail - Segment 1
9
2
0
.
6
0
9
1
9
.
3
2
9
1
7
.
7
2
9
1
6
.
3
0
9
1
4
.
6
4
9
1
4
.
1
2
9
1
3
.
3
5
9
1
1
.
9
6
9
1
2
.
3
4
9
1
3
.
5
6
9
1
4
.
5
0
9
1
4
.
2
7
9
1
4
.
0
8
106+00 107+00 108+00 109+00 110+00 111+00 112+00
906 906
908 908
910 910
912 912
914 914
916 916
918 918
920 920
922 922
924 924
TRAIL-SEGMENT 1�
STA 112+13.72
TRAIL - SEGMENT 1
END CONSTRUCTION
10' BIT TRAIL STORM SEWER
CONNECT TO EXISTING
STORM SEWER
CONNECT TO EXISTING
D I CATCH BASIN/DROP INLET
APRON
MH MANHOLE
STRUCTURE NUMBER
STORM SEWER PIPE
FLOW PATH
LEGEND
SEE STD PLANS & PED RAMP DETAILS
SIDEWALK PEDESTRIAN CURB RAMP
CHAIN LINK FENCE
TEMPORARY EASEMENT
EXISTING R/W
CONSTRUCTION LIMITS
(CONTRACTOR TO DESIGN AND CONSTRUCT)
EARTH RETENTION SYSTEM (TEMPORARY)
SEE INSET D FOR BITUMINOUS MIX TYPE
VERTICAL CONTROL
BASED ON NGVD 88 DATUM
ELEVATIONS FOR THIS PLAN ARE
LVC = 325.00'
EX = 1.46'
K = 90
V
P
I
1
0
9
+
5
0
.
0
0
E
L
9
1
2
.
7
5
V
P
I
1
0
6
+
0
0
.
0
0
E
L
9
2
1
.
3
1
V
L
P
1
1
0
+
0
8
.
0
6
E
L
9
1
4
.
0
3
V
P
T
1
0
6
+
5
0
.
0
0
E
L
9
2
0
.
0
9
V
P
C
1
0
7
+
8
7
.
5
0
E
L
9
1
6
.
7
2
V
P
T
1
1
1
+
1
2
.
5
0
E
L
9
1
4
.
6
3
-2
.44%+1.16%
-2
.44%
+1.16%LVC = 100.00'
SSD = 577.95'
EX = -0.26'
K = 49
9
2
1
.
0
5
9
2
0
.
0
9
9
1
8
.
8
6
9
1
7
.
6
4
9
1
6
.
4
3
9
1
5
.
4
1
9
1
4
.
6
8
9
1
4
.
2
2
9
1
4
.
0
3
9
1
4
.
1
3
9
1
4
.
5
0
9
1
5
.
0
7
9
1
5
.
6
5
TH 13
R
U
S
T
I
C
R
D
S
E
R
U
ST
IC
R
D
SE
110
200
5002
50015000
0000
M
A
T
C
H
L
I
N
E
S
T
A
S
E
E
S
H
E
E
T
5
5
1
0
6
+
0
0
.
0
0
1
1
2
3
DESIGNED BY:
CHECKED BY:
P
r
o
j
e
c
t
s
\
M
i
n
n
e
s
o
t
a
\
0
2
5
6
9
7
-
0
0
0
\
0
5
_
D
i
s
c
i
p
l
i
n
e
\
R
o
a
d
w
a
y
\
0
3
_
S
h
e
e
t
s
\
0
2
5
6
9
7
-
0
0
0
-
1
8
5
c
p
p
-
p
l
a
n
-
0
0
1
4
/
2
2
/
2
0
2
5
3
:
1
8
:
1
1
P
M
F
I
L
E
N
A
M
E
:
D
A
T
E
:
T
I
M
E
:
DRAWN BY:
ofSheet No.Sheets
City of Prior Lake
TH 13 Trail
Prior Lake, Minnesota
SP 201-010-008, SP 7001-143 (TH 13)
95
SIGNATURE:
PRINTED NAME:
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED
I AM A DULY LICENSED PROFESSIONAL ENGINEER
MKV
MKV
KH
MARCUS VANDERBRUG, P.E.
3/18/2025 56164
SCALE IN FEET
0 25 50
CONSTRUCTION & DRAINAGE PLAN & PROFILE
57
TOP OF FINISHED SURFACE
PROFILE GRADE�
INPLACE GROUNDLINE
INPLACE GROUNDLINE ELEVATIONPROFILE ELEVATION
Trail - Segment 2
9
1
5
.
8
7
9
1
2
.
9
3
9
1
4
.
0
8
9
1
4
.
2
2
9
1
4
.
0
5
9
1
4
.
0
2
9
1
3
.
8
0
9
1
3
.
8
0
9
1
3
.
6
9
9
1
4
.
5
2
9
1
5
.
7
7
9
1
6
.
0
5
9
1
6
.
2
6
9
1
6
.
6
1
200+00 201+00 202+00 203+00 204+00 205+00 206+00
906 906
908 908
910 910
912 912
914 914
916 916
918 918
920 920
922 922
924 924
TRAIL-SEGMENT 2�
STA 200+12.50
TRAIL - SEGMENT 2
BEGIN CONSTRUCTION
10' BIT TRAIL
DESIGN SINGLE SLOPE TYPE 42A
CONCRETE MEDIAN BARRIER
IMPACT ATTENUATOR
+45
+21.5 D I CATCH BASIN/DROP INLET
APRON
MH MANHOLE
STRUCTURE NUMBER
STORM SEWER PIPE
FLOW PATH
LEGEND
SEE STD PLANS & PED RAMP DETAILS
SIDEWALK PEDESTRIAN CURB RAMP
CHAIN LINK FENCE
TEMPORARY EASEMENT
EXISTING R/W
CONSTRUCTION LIMITS
(CONTRACTOR TO DESIGN AND CONSTRUCT)
EARTH RETENTION SYSTEM (TEMPORARY)
SEE INSET D FOR BITUMINOUS MIX TYPE
VERTICAL CONTROL
BASED ON NGVD 88 DATUM
ELEVATIONS FOR THIS PLAN ARE
VP
I
2
0
2
+
3
1
.
9
8
EL
9
1
5
.
5
9
VP
I
2
0
3
+
6
4
.
4
1
EL
9
1
5
.
8
7
V
P
I
2
0
5
+
6
9
.
7
8
EL
9
1
6
.
9
2
V
P
I
2
0
6
+
3
0
.
0
0
EL
9
1
7
.
0
4
V
P
I
2
0
0
+
1
7
.
5
5
EL
9
1
5
.
8
5
VP
C
2
0
3
+
4
4
.
4
1
EL
9
1
5
.
8
4
VP
T
2
0
3
+
8
4
.
4
1
EL
9
1
5
.
8
5
VP
C
2
0
5
+
5
4
.
7
8
EL
9
1
6
.
8
1
VP
T
2
0
5
+
8
4
.
7
8
EL
9
1
6
.
9
5
VP
C
2
0
6
+
1
5
.
0
0
EL
9
1
7
.
0
1
VP
T
2
0
6
+
4
5
.
0
0
EL
9
1
7
.
0
5
VP
C
2
0
2
+
1
6
.
9
8
EL
9
1
5
.
6
0
VP
T
2
0
2
+
4
6
.
9
8
EL
9
1
5
.
6
3
+0.11%
LVC = 40.00'
SSD = 3778.68'
EX = -0.01'
K = 139
LVC = 30.00'
SSD = 2190.34'
EX = -0.02'
K = 60 LVC = 30.00'
SSD = 12376.02'
EX = -0.00'
K = 344
LVC = 30.00'
EX = 0.01'
K = 82
9
1
7
.
0
6
LVC = 40.00'
EX = 0.07'
K = 30
VH
P
2
0
3
+
6
7
.
7
8
EL
9
1
5
.
8
6
V
P
C
2
0
4
+
3
7
.
7
9
E
L
9
1
5
.
7
9
V
P
T
2
0
4
+
7
7
.
7
9
E
L
9
1
6
.
0
1
V
P
C
2
0
6
+
4
5
.
7
7
E
L
9
1
7
.
0
5
-0.29%
+0.69%
+0.20%
-0.07%-0.08%+0.29%+0.17%-0.12%+1.23%
LVC = 30.00'
SSD = 2023.47'
EX = -0.02'
K = 56
LVC = 30.00'
EX = 0.01'
K = 142
V
P
I
2
0
1
+
3
8
.
5
6
E
L
9
1
5
.
6
6
V
P
I
2
0
4
+
5
7
.
7
9
E
L
9
1
5
.
7
6
V
P
I
2
0
0
+
8
9
.
0
7
E
L
9
1
5
.
8
0
V
P
I
2
0
2
+
8
3
.
2
5
E
L
9
1
5
.
7
4
V
P
I
2
0
5
+
2
8
.
3
3
E
L
9
1
6
.
6
3
V
L
P
2
0
2
+
2
3
.
1
3
E
L
9
1
5
.
6
0
V
L
P
2
0
4
+
4
1
.
3
3
E
L
9
1
5
.
7
8
V
P
C
2
0
0
+
7
4
.
0
7
E
L
9
1
5
.
8
1
V
P
T
2
0
1
+
0
4
.
0
7
E
L
9
1
5
.
7
6
V
P
C
2
0
2
+
6
8
.
2
5
E
L
9
1
5
.
6
9
V
P
T
2
0
2
+
9
8
.
2
5
E
L
9
1
5
.
7
6
V
P
C
2
0
5
+
1
3
.
3
3
E
L
9
1
6
.
4
5
V
P
T
2
0
5
+
4
3
.
3
3
E
L
9
1
6
.
7
3
V
P
C
2
0
1
+
2
3
.
5
6
E
L
9
1
5
.
7
0
V
P
T
2
0
1
+
5
3
.
5
6
E
L
9
1
5
.
6
5
LVC = 30.00'
SSD = 5032.95'
EX = -0.01'
K = 139
LVC = 30.00'
SSD = 8792.27'
EX = -0.00'
K = 244
9
1
5
.
8
5
9
1
5
.
8
3
9
1
5
.
7
7
9
1
5
.
6
5
9
1
5
.
6
1
9
1
5
.
6
4
9
1
5
.
7
6
9
1
5
.
8
5
9
1
5
.
8
3
9
1
5
.
8
0
9
1
6
.
2
8
9
1
6
.
7
8
9
1
6
.
9
8
TH 13
R
U
S
T
I
C
R
D
S
E
R
U
ST
IC
R
D
SE
200
205
5004
5003
5004A
0000
S
E
E
S
H
E
E
T
C
P
4
M
A
T
C
H
L
I
N
E
S
T
A
2
0
6
+
3
0
.
0
0
1
1
2
3
DESIGNED BY:
CHECKED BY:
P
r
o
j
e
c
t
s
\
M
i
n
n
e
s
o
t
a
\
0
2
5
6
9
7
-
0
0
0
\
0
5
_
D
i
s
c
i
p
l
i
n
e
\
R
o
a
d
w
a
y
\
0
3
_
S
h
e
e
t
s
\
0
2
5
6
9
7
-
0
0
0
-
1
8
5
c
p
p
-
p
l
a
n
-
0
0
1
4
/
2
2
/
2
0
2
5
3
:
1
8
:
1
2
P
M
F
I
L
E
N
A
M
E
:
D
A
T
E
:
T
I
M
E
:
DRAWN BY:
ofSheet No.Sheets
City of Prior Lake
TH 13 Trail
Prior Lake, Minnesota
SP 201-010-008, SP 7001-143 (TH 13)
95
SIGNATURE:
PRINTED NAME:
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED
I AM A DULY LICENSED PROFESSIONAL ENGINEER
MKV
MKV
KH
MARCUS VANDERBRUG, P.E.
3/18/2025 56164
G
P
915
915
SCALE IN FEET
0 25 50
CONSTRUCTION & DRAINAGE PLAN & PROFILE
58
TOP OF FINISHED SURFACE
PROFILE GRADE�
INPLACE GROUNDLINE
INPLACE GROUNDLINE ELEVATIONPROFILE ELEVATION
Trail - Segment 2
9
1
6
.
6
1
9
1
7
.
1
6
9
1
7
.
5
3
9
1
8
.
0
1
9
1
8
.
3
9
9
1
8
.
5
0
9
1
8
.
5
7
9
1
8
.
5
9
9
1
9
.
2
1
9
1
9
.
7
7
9
2
0
.
2
0
9
2
0
.
6
2
9
2
1
.
4
4
9
1
9
.
9
1
207+00 208+00 209+00 210+00 211+00 212+00 213+00
910 910
912 912
914 914
916 916
918 918
920 920
922 922
924 924
926 926
928 928
930 930
EARTH RETENTION SYSTEM (TEMPORARY)
APPOXIMATE LOCATION FOR
TRAIL-SEGMENT 2�
10' BIT TRAIL
DESIGN SINGLE SLOPE TYPE 42A
CONCRETE MEDIAN BARRIER
+45+81
+30
IMPACT ATTENUATOR
RETAINING WALL 1
FOR DEPRESSION
PROPOSED CONTOURS
+80.5
D I CATCH BASIN/DROP INLET
APRON
MH MANHOLE
STRUCTURE NUMBER
STORM SEWER PIPE
FLOW PATH
LEGEND
SEE STD PLANS & PED RAMP DETAILS
SIDEWALK PEDESTRIAN CURB RAMP
CHAIN LINK FENCE
TEMPORARY EASEMENT
EXISTING R/W
CONSTRUCTION LIMITS
(CONTRACTOR TO DESIGN AND CONSTRUCT)
EARTH RETENTION SYSTEM (TEMPORARY)
SEE INSET D FOR BITUMINOUS MIX TYPE
VERTICAL CONTROL
BASED ON NGVD 88 DATUM
ELEVATIONS FOR THIS PLAN ARE
VP
I
2
0
7
+
3
9
.
0
9
EL
9
1
7
.
5
9
VP
I
2
0
8
+
3
8
.
5
0
EL
9
1
8
.
6
7
VP
C
2
0
8
+
2
3
.
5
0
EL
9
1
8
.
5
3
VP
T
2
0
8
+
5
3
.
5
0
EL
9
1
8
.
7
4
VP
T
2
0
7
+
5
4
.
0
9
EL
9
1
7
.
7
8
VP
C
2
1
0
+
2
0
.
0
0
EL
9
1
9
.
5
9
VP
T
2
1
0
+
5
0
.
0
0
EL
9
1
9
.
8
6
LVC = 30.00'
SSD = 2139.77'
EX = -0.02'
K = 59
LVC = 30.00'
EX = 0.02'
K = 52
LVC = 30.00'
EX = 0.02'
K = 63
9
2
1
.
5
4
LVC = 30.00'
EX = 0.02'
K = 54
LVC = 30.00'
EX = 0.01'
K = 130
LVC = 20.00'
EX = 0.01'
K = 39
V
P
I
2
0
6
+
6
0
.
7
7
E
L
9
1
7
.
0
7
V
P
I
2
0
9
+
5
4
.
5
6
E
L
9
1
9
.
1
6
V
P
I
2
1
2
+
5
0
.
0
0
EL
9
2
1
.
7
0
V
P
T
2
0
6
+
7
5
.
7
7
E
L
9
1
7
.
1
7
-0.71%
+1.13%
+0.11%
+1.24%
+0.93%+0.42%
+0.65%
+1.25%
LVC = 30.00'
SSD = 3505.30'
EX = -0.01'
K = 97
LVC = 40.00'
SSD = 2745.87'
EX = -0.02'
K = 101
LVC = 50.00'
SSD = 577.52'
EX = -0.12'
K = 26
9
1
7
.
0
6
9
1
7
.
3
3
9
1
7
.
7
3
9
1
8
.
3
1
9
1
8
.
7
2
9
1
8
.
9
3
9
1
9
.
1
5
9
1
9
.
4
6
9
1
9
.
8
6
9
2
0
.
3
5
9
2
0
.
7
2
9
2
1
.
1
0
9
2
1
.
5
7
LVC = 50.00'
EX = 0.30'
K = 10
V
P
I
2
1
0
+
3
5
.
0
0
E
L
9
1
9
.
6
9
V
P
I
2
1
2
+
0
2
.
8
7
E
L
9
2
1
.
1
1
V
P
I
2
0
7
+
8
9
.
9
1
E
L
9
1
8
.
2
2
V
P
I
2
1
0
+
8
3
.
5
8
E
L
9
2
0
.
2
3
V
L
P
2
1
2
+
8
7
.
3
7
E
L
9
2
1
.
4
6
V
H
P
2
1
2
+
5
6
.
8
9
E
L
9
2
1
.
5
8
V
P
C
2
0
7
+
7
4
.
9
1
E
L
9
1
8
.
0
4
V
P
T
2
0
8
+
0
4
.
9
1
E
L
9
1
8
.
3
6
V
P
C
2
1
0
+
6
3
.
5
8
E
L
9
2
0
.
0
1
V
P
T
2
1
1
+
0
3
.
5
8
E
L
9
2
0
.
3
8
V
P
C
2
1
2
+
2
5
.
0
0
E
L
9
2
1
.
3
9
V
P
T
2
1
2
+
7
5
.
0
0
E
L
9
2
1
.
5
2
V
P
C
2
0
7
+
2
4
.
0
9
E
L
9
1
7
.
4
9
V
P
C
2
0
9
+
3
9
.
5
6
E
L
9
1
9
.
1
0
V
P
T
2
0
9
+
6
9
.
5
6
E
L
9
1
9
.
2
6
V
P
C
2
1
1
+
9
2
.
8
7
E
L
9
2
1
.
0
4
V
P
T
2
1
2
+
1
2
.
8
7
E
L
9
2
1
.
2
3
V
P
C
2
1
2
+
8
0
.
0
0
E
L
9
2
1
.
4
8
+0.67%
+0.73%
TH 13
210
5005
5006
5007
5008
0000
M
A
T
C
H
L
I
N
E
S
T
A
S
E
E
S
H
E
E
T
5
7
2
0
6
+
3
0
.
0
0
S
E
E
S
H
E
E
T
5
9
M
A
T
C
H
LI
N
E
S
T
A 2
1
2
+
8
0.0
0
2
2
1
2
3
DESIGNED BY:
CHECKED BY:
P
r
o
j
e
c
t
s
\
M
i
n
n
e
s
o
t
a
\
0
2
5
6
9
7
-
0
0
0
\
0
5
_
D
i
s
c
i
p
l
i
n
e
\
R
o
a
d
w
a
y
\
0
3
_
S
h
e
e
t
s
\
0
2
5
6
9
7
-
0
0
0
-
1
8
5
c
p
p
-
p
l
a
n
-
0
0
1
4
/
2
2
/
2
0
2
5
3
:
1
8
:
1
3
P
M
F
I
L
E
N
A
M
E
:
D
A
T
E
:
T
I
M
E
:
DRAWN BY:
ofSheet No.Sheets
City of Prior Lake
TH 13 Trail
Prior Lake, Minnesota
SP 201-010-008, SP 7001-143 (TH 13)
95
SIGNATURE:
PRINTED NAME:
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED
I AM A DULY LICENSED PROFESSIONAL ENGINEER
MKV
MKV
KH
MARCUS VANDERBRUG, P.E.
3/18/2025 56164
M
SCALE IN FEET
0 25 50
CONSTRUCTION & DRAINAGE PLAN & PROFILE
59
TOP OF FINISHED SURFACE
PROFILE GRADE�
INPLACE GROUNDLINE
INPLACE GROUNDLINE ELEVATIONPROFILE ELEVATION
Trail - Segment 2
9
1
9
.
9
1
9
2
1
.
4
0
9
2
3
.
5
7
9
2
3
.
4
9
9
2
4
.
6
9
9
2
5
.
3
9
9
2
5
.
5
2
9
2
5
.
4
7
9
2
6
.
1
0
9
2
5
.
9
5
9
2
6
.
5
4
9
2
7
.
7
9
9
2
8
.
0
6
213+00 214+00 215+00 216+00 217+00 218+00 219+00
916 916
918 918
920 920
922 922
924 924
926 926
928 928
930 930
932 932
934 934
TRAIL-SEGMENT 2�
12' BIT TRAIL
IMPACT ATTENUATOR
+32
CONNECT TO EXISTING WATERMAIN
4 LIN FT
6" WATERMAIN DUCTILE IRON CL 52
STA 213+04.54 5.2' RT
6" GATE VALVE & BOX
STA 213+06.31 3.2' RT
HYDRANT D I CATCH BASIN/DROP INLET
APRON
MH MANHOLE
STRUCTURE NUMBER
STORM SEWER PIPE
FLOW PATH
LEGEND
SEE STD PLANS & PED RAMP DETAILS
SIDEWALK PEDESTRIAN CURB RAMP
CHAIN LINK FENCE
TEMPORARY EASEMENT
EXISTING R/W
CONSTRUCTION LIMITS
(CONTRACTOR TO DESIGN AND CONSTRUCT)
EARTH RETENTION SYSTEM (TEMPORARY)
SEE INSET D FOR BITUMINOUS MIX TYPE
VERTICAL CONTROL
BASED ON NGVD 88 DATUM
ELEVATIONS FOR THIS PLAN ARE
9
2
9
.
0
7
9
2
1
.
5
4
9
2
3
.
1
4
9
2
4
.
7
7
9
2
5
.
7
6
9
2
6
.
2
4
9
2
6
.
6
9
9
2
7
.
1
3
9
2
7
.
5
3
9
2
7
.
8
0
9
2
8
.
0
5
9
2
8
.
3
2
9
2
8
.
6
6
LVC = 50.00'
EX = 0.30'
K = 10
LVC = 100.00'
EX = 0.04'
K = 282
V
P
I
2
1
3
+
0
5
.
0
0
E
L
9
2
1
.
3
1
V
P
I
2
1
8
+
2
4
.
4
6
E
L
9
2
8
.
4
3
V
P
I
2
1
4
+
0
5
.
0
0
E
L
9
2
5
.
4
0
V
P
I
2
1
6
+
4
5
.
0
0
E
L
9
2
7
.
5
3
V
P
C
2
1
3
+
4
2
.
5
0
E
L
9
2
2
.
8
4
V
P
T
2
1
4
+
6
7
.
5
0
E
L
9
2
5
.
9
6
V
P
C
2
1
6
+
1
0
.
0
0
E
L
9
2
7
.
2
2
V
P
T
2
1
6
+
8
0
.
0
0
E
L
9
2
7
.
7
0
V
P
T
2
1
3
+
3
0
.
0
0
E
L
9
2
2
.
3
3
V
P
C
2
1
7
+
7
4
.
4
6
E
L
9
2
8
.
1
8
V
P
T
2
1
8
+
7
4
.
4
6
E
L
9
2
8
.
8
6
-0.71%
+4.09%
+0.89%
+0.50%+0.86%
LVC = 125.00'
SSD = 398.99'
EX = -0.50'
K = 39
LVC = 70.00'
SSD = 2836.05'
EX = -0.03'
K = 182
BOUDIN ST NE
215
0000
M
A
T
C
H
LI
N
E S
T
A
S
E
E S
H
E
E
T
6
0
2
1
8
+
8
0.0
0
S
E
E
S
H
E
E
T
C
P
4
M
A
T
C
H
LI
N
E
S
T
A
2
1
2
+
8
0.
0
0
1
2
3
DESIGNED BY:
CHECKED BY:
P
r
o
j
e
c
t
s
\
M
i
n
n
e
s
o
t
a
\
0
2
5
6
9
7
-
0
0
0
\
0
5
_
D
i
s
c
i
p
l
i
n
e
\
R
o
a
d
w
a
y
\
0
3
_
S
h
e
e
t
s
\
0
2
5
6
9
7
-
0
0
0
-
1
8
5
c
p
p
-
p
l
a
n
-
0
0
1
4
/
2
2
/
2
0
2
5
3
:
1
8
:
1
4
P
M
F
I
L
E
N
A
M
E
:
D
A
T
E
:
T
I
M
E
:
DRAWN BY:
ofSheet No.Sheets
City of Prior Lake
TH 13 Trail
Prior Lake, Minnesota
SP 201-010-008, SP 7001-143 (TH 13)
95
SIGNATURE:
PRINTED NAME:
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED
I AM A DULY LICENSED PROFESSIONAL ENGINEER
MKV
MKV
KH
MARCUS VANDERBRUG, P.E.
3/18/2025 56164
DESIGNED BY:
CHECKED BY:
P
r
o
j
e
c
t
s
\
M
i
n
n
e
s
o
t
a
\
0
2
5
6
9
7
-
0
0
0
\
0
5
_
D
i
s
c
i
p
l
i
n
e
\
R
o
a
d
w
a
y
\
0
3
_
S
h
e
e
t
s
\
0
2
5
6
9
7
-
0
0
0
-
1
8
5
c
p
p
-
p
l
a
n
-
0
0
1
4
/
2
2
/
2
0
2
5
3
:
1
8
:
1
4
P
M
F
I
L
E
N
A
M
E
:
D
A
T
E
:
T
I
M
E
:
DRAWN BY:
ofSheet No.Sheets
City of Prior Lake
TH 13 Trail
Prior Lake, Minnesota
SP 201-010-008, SP 7001-143 (TH 13)
95
SIGNATURE:
PRINTED NAME:
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED
I AM A DULY LICENSED PROFESSIONAL ENGINEER
MKV
MKV
KH
MARCUS VANDERBRUG, P.E.
3/18/2025 56164
MH
MH
M
M
M
M
M
SCALE IN FEET
0 25 50
CONSTRUCTION & DRAINAGE PLAN & PROFILE
60
TOP OF FINISHED SURFACE
PROFILE GRADE�
INPLACE GROUNDLINE
TOP OF FINISHED SURFACE
PROFILE GRADE�
INPLACE GROUNDLINE
INPLACE GROUNDLINE ELEVATION
PROFILE ELEVATION
INPLACE GROUNDLINE ELEVATIONPROFILE ELEVATION
Trail - Segment 3Trail - Segment 2
9
2
8
.
0
6
9
2
8
.
4
2
9
2
7
.
5
4
9
2
7
.
3
1
9
2
9
.
3
8
9
2
7
.
5
2
9
2
8
.
6
4
9
2
7
.
4
4
9
3
0
.
3
4
9
3
0
.
1
6
9
3
0
.
9
5
9
3
2
.
0
0
219+00 220+00
916 916
918 918
920 920
922 922
924 924
926 926
928 928
930 930
932 932
934 934
300+00 301+00 302+00 303+00 304+00
920 920
922 922
924 924
926 926
928 928
930 930
932 932
934 934
936 936
938 938
940 940
TRAIL-SEGMENT 3�
TRAIL-SEGMENT 2�
STA 220+00.54
TRAIL - SEGMENT 2
END CONSTRUCTION
STA 299+96.12
TRAIL - SEGMENT 3
BEGIN CONSTRUCTION
12' BIT TRAIL
1
2' BI
T TR
AI
L 10' BIT TRAIL
CURB STYLE
MATCH EXISTING
CURB STYLE
MATCH EXISTING
+65
+25
+43
D I
TAMS 2333334
ADJUST FRAME AND RING CASTING
TAMS 2333331
ADJUST FRAME AND RING CASTING
CATCH BASIN/DROP INLET
APRON
MH MANHOLE
STRUCTURE NUMBER
STORM SEWER PIPE
FLOW PATH
LEGEND
SEE STD PLANS & PED RAMP DETAILS
SIDEWALK PEDESTRIAN CURB RAMP
CHAIN LINK FENCE
TEMPORARY EASEMENT
EXISTING R/W
CONSTRUCTION LIMITS
(CONTRACTOR TO DESIGN AND CONSTRUCT)
EARTH RETENTION SYSTEM (TEMPORARY)
SEE INSET D FOR BITUMINOUS MIX TYPE
VERTICAL CONTROL
BASED ON NGVD 88 DATUM
ELEVATIONS FOR THIS PLAN ARE
V
P
I
2
1
9
+
2
9
.
1
6
E
L
9
2
9
.
3
2
+0.86%
9
2
9
.
0
7
9
2
9
.
3
2
V
P
I
3
0
1
+
6
6
.
0
2
E
L
9
3
0
.
4
4
V
P
I
3
0
1
+
3
5
.
0
0
E
L
9
3
0
.
8
6
V
P
I
3
0
1
+
9
5
.
6
8
E
L
9
3
0
.
7
5
V
P
I
3
0
0
+
6
0
.
0
0
E
L
9
3
0
.
5
8
VL
P
3
0
1
+
6
7
.
1
6
EL
9
3
0
.
4
9
VL
P
3
0
2
+
9
8
.
2
5
EL
9
3
0
.
3
6
VH
P
3
0
1
+
2
3
.
1
0
EL
9
3
0
.
8
0
V
H
P
3
0
2
+
0
4
.
7
3
E
L
9
3
0
.
7
0
V
P
C
3
0
1
+
1
4
.
0
0
E
L
9
3
0
.
7
8
V
P
T
3
0
1
+
5
6
.
0
0
E
L
9
3
0
.
5
8
V
P
C
3
0
1
+
7
5
.
6
8
E
L
9
3
0
.
5
4
V
P
T
3
0
2
+
1
5
.
6
8
E
L
9
3
0
.
6
7
V
P
C
3
0
1
+
5
7
.
0
2
E
L
9
3
0
.
5
6
V
P
C
3
0
2
+
9
0
.
0
0
E
L
9
3
0
.
3
8
-1.37%
LVC = 42.00'
SSD = 638.59'
EX = -0.09'
K = 24
LVC = 40.00'
SSD = 758.96'
EX = -0.07'
K = 27
LVC = 60.00'
SSD = 337.49'
EX = -0.26'
K = 17
LVC = 18.00'
EX = 0.05'
K = 7
+1.06%
9
3
0
.
5
8
9
3
0
.
7
3
9
3
0
.
6
5
9
3
0
.
6
9
9
3
0
.
5
4
9
3
0
.
3
6
9
3
1
.
0
1
9
3
2
.
2
6
LVC = 60.00'
EX = 0.22'
K = 21
V
P
I
3
0
3
+
2
0
.
0
0
E
L
9
3
0
.
2
6
V
P
I
3
0
4
+
4
2
.
8
8
E
L
9
3
3
.
3
4
V
P
C
3
0
4
+
1
2
.
8
8
E
L
9
3
2
.
5
9
V
P
T
3
0
1
+
7
5
.
0
2
E
L
9
3
0
.
5
3
V
P
T
3
0
3
+
5
0
.
0
0
E
L
9
3
1
.
0
1
+0.38%-0.40%
+2.51%
BOUDIN ST NE
C
O
M
M
E
R
C
E
A
V
E
COM M ERCE AVE
TH 13
2
2
0
3
0
0
0000
S
E
E
S
H
E
E
T
C
P
5
M
A
T
C
H
LI
N
E S
T
A 2
1
8
+
8
0.0
0
M
A
T
C
H
LI
N
E
S
T
A 3
0
4
+
5
0.0
0
S
E
E
S
H
E
E
T
C
P
7
1 1
1
1
1
1
3
3
3
3
1
2
3
DESIGNED BY:
CHECKED BY:
P
r
o
j
e
c
t
s
\
M
i
n
n
e
s
o
t
a
\
0
2
5
6
9
7
-
0
0
0
\
0
5
_
D
i
s
c
i
p
l
i
n
e
\
R
o
a
d
w
a
y
\
0
3
_
S
h
e
e
t
s
\
0
2
5
6
9
7
-
0
0
0
-
1
8
5
c
p
p
-
p
l
a
n
-
0
0
1
4
/
2
2
/
2
0
2
5
3
:
1
8
:
1
5
P
M
F
I
L
E
N
A
M
E
:
D
A
T
E
:
T
I
M
E
:
DRAWN BY:
ofSheet No.Sheets
City of Prior Lake
TH 13 Trail
Prior Lake, Minnesota
SP 201-010-008, SP 7001-143 (TH 13)
95
SIGNATURE:
PRINTED NAME:
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED
I AM A DULY LICENSED PROFESSIONAL ENGINEER
MKV
MKV
KH
MARCUS VANDERBRUG, P.E.
3/18/2025 56164
M
M
M
M
SCALE IN FEET
0 25 50
CONSTRUCTION & DRAINAGE PLAN & PROFILE
61
TOP OF FINISHED SURFACE
PROFILE GRADE�
INPLACE GROUNDLINE
INPLACE GROUNDLINE ELEVATIONPROFILE ELEVATION
Trail - Segment 3
9
3
3
.
0
8
9
3
3
.
4
4
9
3
3
.
8
7
9
3
5
.
1
7
9
3
6
.
1
6
9
3
7
.
3
2
9
3
8
.
1
3
9
3
9
.
1
4
9
4
0
.
0
8
9
4
0
.
7
4
305+00 306+00 307+00 308+00 309+00
926 926
928 928
930 930
932 932
934 934
936 936
938 938
940 940
942 942
944 944
TRAIL-SEGMENT 3�
10' BIT TRAIL 10' BIT TRAIL
CURB STYLE
MATCH EXISTING
D I CATCH BASIN/DROP INLET
APRON
MH MANHOLE
STRUCTURE NUMBER
STORM SEWER PIPE
FLOW PATH
LEGEND
SEE STD PLANS & PED RAMP DETAILS
SIDEWALK PEDESTRIAN CURB RAMP
CHAIN LINK FENCE
TEMPORARY EASEMENT
EXISTING R/W
CONSTRUCTION LIMITS
(CONTRACTOR TO DESIGN AND CONSTRUCT)
EARTH RETENTION SYSTEM (TEMPORARY)
SEE INSET D FOR BITUMINOUS MIX TYPE
VERTICAL CONTROL
BASED ON NGVD 88 DATUM
ELEVATIONS FOR THIS PLAN ARE
VP
I
3
0
4
+
9
8
.
8
8
EL
9
3
2
.
7
8
V
H
P
3
0
4
+
5
5
.
7
9
E
L
9
3
3
.
1
3
VP
T
3
0
4
+
7
2
.
8
8
EL
9
3
3
.
0
4
LVC = 60.00'
SSD = 337.49'
EX = -0.26'
K = 17
V
P
C
3
0
6
+
4
6
.
5
8
E
L
9
3
6
.
3
5
VP
I
3
0
6
+
7
6
.
5
8
EL
9
3
7
.
0
5
V
P
I
3
0
5
+
4
4
.
1
5
E
L
9
3
3
.
1
8
VP
T
3
0
7
+
0
6
.
5
8
EL
9
3
7
.
5
4
+1.65%
LVC = 60.00'
SSD = 1652.75'
EX = -0.05'
K = 90
-1.00%
9
3
3
.
1
8
9
3
3
.
3
8
9
3
5
.
1
0
9
3
6
.
4
3
9
3
7
.
4
3
9
3
8
.
2
5
9
3
9
.
0
8
9
3
9
.
9
4
9
4
0
.
8
5
LVC = 60.00'
EX = 0.01'
K = 327
V
P
I
3
0
8
+
3
1
.
5
8
E
L
9
3
9
.
6
0
V
P
I
3
0
6
+
1
1
.
5
8
E
L
9
3
5
.
5
4
V
P
C
3
0
5
+
8
1
.
5
8
E
L
9
3
4
.
4
9
V
P
T
3
0
6
+
4
1
.
5
8
E
L
9
3
6
.
2
4
V
P
C
3
0
8
+
0
1
.
5
8
E
L
9
3
9
.
1
0
V
P
T
3
0
8
+
6
1
.
5
8
E
L
9
4
0
.
1
5
+3.50%
+2.31%
+1.83%
LVC = 60.00'
SSD = 936.91'
EX = -0.09'
K = 50
9
3
3
.
1
2
9
3
2
.
7
8
COMMERCE AVE
TH 13
305
0000
M
A
T
C
H
L
I
N
E
S
T
A
S
E
E
S
H
E
E
T
6
0
3
0
4
+
5
0
.
0
0
S
E
E
S
H
E
E
T
C
P
8
M
A
T
C
H
L
I
N
E
S
T
A
3
0
9
+
5
0
.
0
0
1
1
3
1
2
3
DESIGNED BY:
CHECKED BY:
P
r
o
j
e
c
t
s
\
M
i
n
n
e
s
o
t
a
\
0
2
5
6
9
7
-
0
0
0
\
0
5
_
D
i
s
c
i
p
l
i
n
e
\
R
o
a
d
w
a
y
\
0
3
_
S
h
e
e
t
s
\
0
2
5
6
9
7
-
0
0
0
-
1
8
5
c
p
p
-
p
l
a
n
-
0
0
1
4
/
2
2
/
2
0
2
5
3
:
1
8
:
1
6
P
M
F
I
L
E
N
A
M
E
:
D
A
T
E
:
T
I
M
E
:
DRAWN BY:
ofSheet No.Sheets
City of Prior Lake
TH 13 Trail
Prior Lake, Minnesota
SP 201-010-008, SP 7001-143 (TH 13)
95
SIGNATURE:
PRINTED NAME:
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
I HEREBY CERTIFY THAT THIS SHEET WAS PREPARED
I AM A DULY LICENSED PROFESSIONAL ENGINEER
MKV
MKV
KH
MARCUS VANDERBRUG, P.E.
3/18/2025 56164
M M
M
M
SCALE IN FEET
0 25 50
CONSTRUCTION & DRAINAGE PLAN & PROFILE
62
TOP OF FINISHED SURFACE
PROFILE GRADE�
INPLACE GROUNDLINE
TRAIL - SEGMENT 3 STA 314+38.11
END
INPLACE GROUNDLINE ELEVATIONPROFILE ELEVATION
Trail - Segment 3
9
4
1
.
4
3
9
4
2
.
6
3
9
4
3
.
2
6
9
4
3
.
9
6
9
4
4
.
8
4
9
4
5
.
4
8
9
4
6
.
2
5
9
4
7
.
1
7
9
4
8
.
1
7
9
4
9
.
1
6
310+00 311+00 312+00 313+00 314+00
936 936
938 938
940 940
942 942
944 944
946 946
948 948
950 950
952 952
954 954
TRAIL-SEGMENT 3�
10' BIT TRAIL
D I CATCH BASIN/DROP INLET
APRON
MH MANHOLE
STRUCTURE NUMBER
STORM SEWER PIPE
FLOW PATH
LEGEND
SEE STD PLANS & PED RAMP DETAILS
SIDEWALK PEDESTRIAN CURB RAMP
CHAIN LINK FENCE
TEMPORARY EASEMENT
EXISTING R/W
CONSTRUCTION LIMITS
(CONTRACTOR TO DESIGN AND CONSTRUCT)
EARTH RETENTION SYSTEM (TEMPORARY)
SEE INSET D FOR BITUMINOUS MIX TYPE
VERTICAL CONTROL
BASED ON NGVD 88 DATUM
ELEVATIONS FOR THIS PLAN ARE
+1.83%
9
4
1
.
7
7
9
4
2
.
6
8
9
4
3
.
4
8
9
4
4
.
1
4
9
4
4
.
8
1
9
4
5
.
7
1
9
4
6
.
6
2
9
4
7
.
5
4
9
4
8
.
4
6
9
4
9
.
3
7
LVC = 30.00'
EX = 0.02'
K = 59
V
P
I
3
1
1
+
5
1
.
5
8
E
L
9
4
4
.
8
2
V
P
I
3
1
0
+
2
6
.
5
8
E
L
9
4
3
.
1
7
V
P
I
3
1
4
+
0
3
.
3
5
E
L
9
4
9
.
4
3
V
P
C
3
0
9
+
9
6
.
5
8
E
L
9
4
2
.
6
2
V
P
T
3
1
0
+
5
6
.
5
8
E
L
9
4
3
.
5
7
V
P
C
3
1
1
+
3
6
.
5
8
E
L
9
4
4
.
6
2
V
P
T
3
1
1
+
6
6
.
5
8
E
L
9
4
5
.
0
9
+1.83%
+1.32%
LVC = 60.00'
SSD = 2140.69'
EX = -0.04'
K = 117
TRAIL- SEGMENT 3 STA 314+06.17
END SP 201-010-008, SP 7001-143 (TH 13)TH 13
E
G
A
N
D
R
310
0000
M
A
T
C
H
L
I
N
E
S
T
A
S
E
E
S
H
E
E
T
6
1
3
0
9
+
5
0
.
0
0
SP 201-010-008, SP 7001-143 (TH 13)
1
2
3