ITEM: 5B
CITY COUNCIL AGENDA REPORT
MEETING DATE: January 13, 2026
PREPARED BY: Christine Watson, Public Works Supervisor – Administration
Phil Ryan, Public Works Supervisor – Utilities
PRESENTED BY: Nick Monserud, Public Works Director/City Engineer
AGENDA ITEM: Resolution Authorizing the Purchase of Equipment for the
Raymond and Spring Lake Lift Station Rehabilitation Project
RECOMMENDED ACTION:
Adopt a resolution authorizing the purchase of equipment for the Raymond and Spring Lake lift
station rehabilitation project (2026-09).
BACKGROUND:
The City operates 41 sanitary sewer lift stations that manage the wastewater conveyance into the
Met Council system for treatment at the Metropolitan Council wastewater treatment plant located
in Shakopee. These lift stations are inspected weekly, cleaned at least twice annually, and
inspected annually by a contracted professional in an effort to maximize the useful life of the
components. The pumps and other control components are recommended for rehabilitation every
15-20 years.
A work order with Advanced Engineering and Environmental Services, LLC (AE2S) in the amount
of $124,240 was executed on November 25, 2025 for the design, bidding, and construction
administration for this project. The project plans and specifications will be completed and the
project will be advertised for bid early in 2026. A recommendation to award a contract will be
presented at a future council meeting.
The pumps and control panels for this project often have long procurement times and delivery
windows. Purchasing the equipment at this time – instead of waiting for the contractor to supply
it – will ensure the project stays on schedule for completion in 2026.
Staff requested the attached quotes from Total Control Systems, Inc. (TCS) to provide new control
panels for the Raymond and Spring Lake lift stations that are similar to other recently-replaced
control panels and compatible with the SCADA controls that are being installed in city lift stations.
Public Works staff have strong familiarity with the TCS product, and purchase of these control
panels will provide the desired consistency in the operation of the 41 city lift stations. Therefore,
staff recommend purchasing two control panels from TCS at this time for the quoted amount of
$95,960 ($47,980 each).
Staff also solicited a quote for new pumps at the Raymond lift station. Pumps are typically
replaced during a rehabilitation project, but since the Spring Lake lift station pumps were replaced
in 2022, only the Raymond lift station is in need of new pumps at this time. Staff recommend
purchasing the pumps from Electric Pump for a total of $29,820.
City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372
Item 5B
Page | 2
FINANCIAL IMPACT:
The 2026 CIP includes $720,000 for lift station rehabilitation, which includes the AE2S
engineering services ($124,420) and the equipment described in this report ($125,780). That
leaves $469,800 for a future construction contract to be awarded at a later date.
ALTERNATIVES:
1. Motion and second as part of the consent agenda to adopt a resolution authorizing the
purchase of equipment for the Raymond and Spring Lake lift station rehabilitation
project.
2. Motion and second to remove this item from the consent agenda for further discussion.
ATTACHMENTS:
1. Resolution
2. Quotes
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 26-
A RESOLUTION AUTHORIZING THE PURCHASE OF EQUIPMENT FOR THE RAYMOND
AND SPRING LAKE LIFT STATION REHABILITATION PROJECT (2026-09)
Motion By: Second By:
WHEREAS, staff have requested a quote from Total Control System, Inc for new control
panels at the Raymond and Spring Lake lift stations that are compatible with
existing control panels and SCADA software used at other city lift stations; and
WHEREAS, staff have also requested a quote from Electric Pump to provide new pumps
for the Raymond lift station; and
WHEREAS, the cost of this equipment is included in the $720,000 that is budgeted in the
2026 Capital Improvement Plan (CIP) for lift station rehabilitation; and
WHEREAS, staff recommend purchasing the equipment at this time to avoid possible
delays with ordering and/or shipping.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The City Council hereby authorizes the purchase of the necessary equipment for the
Raymond and Spring Lake lift stations, which cost is budgeted for in the 2026 CIP.
th
Passed and adopted by the Prior Lake City Council this 13day of January 2026.
VOTE Briggs Braid Churchill Lake Hellier
Aye
☐ ☐ ☐ ☐ ☐
Nay
☐ ☐ ☐ ☐ ☐
Abstain
☐ ☐ ☐ ☐ ☐
Absent
☐ ☐ ☐ ☐ ☐
______________________________
Jason Wedel, City Manager
December 18, 2025
To: Brad/Phil Re: Prior Lake, Minnesota –Raymond Ave. Lift Station panel.
________________________________________________________________
Total Control Systems, Inc. (TCS) proposes to furnish equipment and services in accordance
with the project plans and specifications that were received.
Section 16900 Submersible Lift Station Controls
240v single phase power 5hp 3ph pumps
Including: Lift station control panels
Main breaker /Manual Transfer sw. with interlock 100 amp (SE rating)
NEMA 3R 2 door stainless steel enclosure 36h x 60w x 12d
Inner doors
Enclosure SS legs and skirts with louvers 18”
Ventilation Fan and Filters SS hoods with thermostat
Incoming power terminal block
Power TVSS 70K
Pump circuit breakers (2)
Control circuit breakers (5) One for onsite light
Hand-Off-Auto switches, oil tight, 30 mm (2)
Pushbutton switches, oil tight 30mm (2)
Lamps, LED, oil tight, 30mm (12)
Condensation heater/fan, 400 watt
Air Conditioner Stainless steel 4000Btu
Air Conditioner circuit breaker
Starters, VFD ABB ACS580 20hp
Power monitor
Relays
GFI receptacle rated at 20 amps
External alarm strobe
Generator receptacle 100 amp Reuse and install
Control power TVSS
Radio, Cradlepoint Reuse/Mount
Antenna
RF Lead-in and connectors
Uninterruptible power supply (UPS) 850va
Allen-Bradley Micrologix 1400 equipment
Backup float controller
Operator interface Cmore 7” color
Elapsed time meters (3)
Panel Temperature sensor
Space for Fiber Equipment
RTU outlet
Floats (2)
Total Control Systems, Inc
38841 Nyman Drive NE
PO Box 40
Stanchfield, MN 55080-0040
Phone 320-396-4442 / Fax 320-396-
4443
Float weight kit
Submersible transmitter Keller
Door switches (Security)
Alarm text programming
Remote Access
Programming, training
Documentation
Testing and commissioning
Price for the Raymond Ave. SLS control panel: $47,980.00 total labor and materials.
Does not include:
Sales Tax. (Exempt)
Seal fail and Overtemp modules (Reuse)
Concrete pad for panel
Hand holes
Meter sockets/Cold sequence disconnects
Grounding materials
Underground warning tape
Installation of panel
Conduit
Permits
Antenna Poles/Mast
Site Lamp Fixtures
Demolition
Any wire external to panel
- We acknowledge receipt of Addendum No .
- Terms are Net 30 days from invoice date. No retainage allowed. A 1.5%
charge per month added to any past due balance. Price may be dependent
on past credit history.
- This quote/proposal valid for 60 days.
- Work to commence after receipt of an acceptable written purchase order
acknowledging acceptance of our terms.
- F.O.B. job-site.
- Start-up service/training, documentation and equipment adjustment
is included as specified.
- TCSI does not accept any liquidated damages.
- ALL PANELS FURNISHED BY TCS WILL HAVE A UL 508 SERIALIZED OR
UL698A ENCLOSED INDUSTRIAL CONTROL PANEL RELATING TO
HAZARDOUS LOCATIONS WITH INTRINSICALLY SAFE CIRCUIT
EXTENSIONS LABEL, AS REQUIRED.
Sincerely,
TOTAL CONTROL SYSTEMS, INC.
Al Doberstein
AD/kd
Drawings 4-8 weeks after receipt of acceptable order.
Equipment 10-16 weeks after approval.
Accepted By ___________________________ Date __________
December 18, 2025
To: Brad/Phil Re: Prior Lake, Minnesota –Spring Lake Lift Station panel.
________________________________________________________________
Total Control Systems, Inc. (TCS) proposes to furnish equipment and services in accordance
with the project plans and specifications that were received.
Section 16900 Submersible Lift Station Controls
240v single phase power 5hp 3ph pumps
Including: Lift station control panels
Main breaker /Manual Transfer sw. with interlock 100 amp (SE rating)
NEMA 3R 2 door stainless steel enclosure 36h x 60w x 12d
Inner doors
Enclosure SS legs and skirts with louvers 18”
Ventilation Fan and Filters SS hoods with thermostat
Incoming power terminal block
Power TVSS 70K
Pump circuit breakers (2)
Control circuit breakers (5) One for onsite light
Hand-Off-Auto switches, oil tight, 30 mm (2)
Pushbutton switches, oil tight 30mm (2)
Lamps, LED, oil tight, 30mm (12)
Condensation heater/fan, 400 watt
Air Conditioner Stainless steel 4000Btu
Air Conditioner circuit breaker
Starters, VFD ABB ACS/Q580 10hp
Power monitor
Relays
GFI receptacle rated at 20 amps
External alarm strobe
Generator receptacle 100 amp Reuse and install
Control power TVSS
Radio, Cradlepoint Reuse/Mount
Antenna
RF Lead-in and connectors
Uninterruptible power supply (UPS) 850va
Allen-Bradley Micrologix 1400 equipment
Backup float controller
Operator interface Cmore 7” color
Elapsed time meters (3)
Panel Temperature sensor
Space for Fiber Equipment
RTU outlet
Floats (2)
Total Control Systems, Inc
38841 Nyman Drive NE
PO Box 40
Stanchfield, MN 55080-0040
Phone 320-396-4442 / Fax 320-396-
4443
Float weight kit
Submersible transmitter Keller
Door switches (Security)
Alarm text programming
Remote Access
Programming, training
Documentation
Testing and commissioning
Price for the Spring Lake SLS control panel: $47,980.00 total labor and materials.
Does not include:
Sales Tax. (Exempt)
Seal fail and Overtemp modules (Reuse)
Concrete pad for panel
Hand holes
Meter sockets/Cold sequence disconnects
Grounding materials
Underground warning tape
Installation of panel
Conduit
Permits
Antenna Poles/Mast
Site Lamp Fixtures
Demolition
Any wire external to panel
- We acknowledge receipt of Addendum No .
- Terms are Net 30 days from invoice date. No retainage allowed. A 1.5%
charge per month added to any past due balance. Price may be dependent
on past credit history.
- This quote/proposal valid for 60 days.
- Work to commence after receipt of an acceptable written purchase order
acknowledging acceptance of our terms.
- F.O.B. job-site.
- Start-up service/training, documentation and equipment adjustment
is included as specified.
- TCSI does not accept any liquidated damages.
- ALL PANELS FURNISHED BY TCS WILL HAVE A UL 508 SERIALIZED OR
UL698A ENCLOSED INDUSTRIAL CONTROL PANEL RELATING TO
HAZARDOUS LOCATIONS WITH INTRINSICALLY SAFE CIRCUIT
EXTENSIONS LABEL, AS REQUIRED.
Sincerely,
TOTAL CONTROL SYSTEMS, INC.
Al Doberstein
AD/kd
Drawings 4-8 weeks after receipt of acceptable order.
Equipment 10-16 weeks after approval.
Accepted By ___________________________ Date __________
1
TO: City of Prior Lake, MN
Phil Ryan / 763-461-8053 / pryan@priorlakemn.gov
REF: Flygt Submersible Pump Replacement
Raymond Ave LS#37
DATE: December 12, 2025
Flygt Submersible Pumps & Accessories
TAG: Raymond Ave LS#37
Two (2) Flygt NP3102-462MT submersible pump. Pump to be furnished with the
following:
• 5hp, 230V, 3phase, 60Hz, explosion proof motor
• Hard Iron N-Impeller
• 4” Discharge volute
• 50’ Power cable
Two (2) Flygt mini-cas for pump monitoring with 11-pin socket (DIN rail mounted) (shipped to Total Control Systems to install in their control panel)
One (1) Lot of freight, installation, & startup service included
Total Selling Price: $29,820.00
Note the following:
Price is good until June 1, 2026
Pumps are identical to the pumps currently installed at Spring Lake LS#38
and are interchangeable, if needed
Pump monitoring devices will be shipped to Total Control Systems.
Anything not specifically mentioned in this proposal is the responsibility of
others
Thank you for your consideration,
Steven Forsythe
C: 612-840-9499
E: sforsythe@electricpump.com
cc: Justin Kirby 515-505-1578
201 4th Ave SW
New Prague, MN 56071
Office: 952-758-6600
Toll Free: 800-536-5394
Fax: 952-758-7778
4280 E. 14th St.
Des Moines, IA 50313
Office: 515-265-2222
Toll Free: 800-383-7867
Fax: 515-265-8079