Loading...
HomeMy WebLinkAbout05(D) - Resolution Receiving the Quote and Awarding a Contract to Replace the Well 5 Motor Control Center (2026-20) Report ITEM: 5D CITY COUNCIL AGENDA REPORT MEETING DATE: May 12, 2026 PREPARED BY: Christine Watson, Public Works Supervisor – Administration Phil Ryan, Public Works Supervisor – Utilities PRESENTED BY: Nick Monserud, Public Works Director/City Engineer AGENDA ITEM: Resolution Receiving the Quote and Awarding a Contract to Replace the Well 5 Motor Control Center (2026-20) RECOMMENDED ACTION: Adopt a resolution to receive the quote and award a contract to replace the Well 5 motor control center (2026-20). BACKGROUND: The City operates six municipal wells that pump groundwater to the Prior Lake water treatment plant, and one municipal well that pumps water to the Shakopee Mdewakanton Sioux Community water treatment plant. Treated water from both treatment plants is then distributed throughout the sytem to provide potable drinking water for the Prior Lake community. Water demand in the City of Prior Lake exceeded one billion gallons in 2023, with a five-year average of 877 million gallons per year. The seven municipal wells each contain a motor control center that controls the speed and operating intervals of the pumps at each well. The motor control centers at each well are the original units and some are nearing their expected replacement interval. The motor control center at Well 5 (constructed in 1988) has experienced a significant amount of corrosion on the wiring and other components and is in need of replacement. It is scheduled for replacement in 2027. Staff solicited a quote from Total Control Systems, Inc. (TCS) to replace the motor control center at Well 5. The staff at TCS have performed a significant amount of work on our water system components in the past and are familiar with the current setup and programming, including the master telemetry (communications) unit which was updated in February 2024. The City Council has previously approved using a single-source contractor for this type of work in order to maintain consistency, continuity, and efficiency for this critically important function of water management. TCS submitted a quote in the amount of $100,561 to build and install a new motor control center at Well 5. Although this is a planned improvement in 2027, staff recommend Council award a contract at this time so TCS is able to begin procuring the necessary parts to build the motor control center, which may take up to 40 weeks depending on lead times for the various parts. FINANCIAL IMPACT: This is a planned improvement with $150,000 included in the 2027 Water Utility CIP for this project. A separate contract will be proposed next year for the electrical work that will be needed complete the project once the new control center is installed. The total project cost is estimated to be within the budgeted $150,000. City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372 Item 5D Page | 2 ALTERNATIVES: 1. Motion and second as part of the consent agenda to adopt a resolution to receive the quote and award a contract to replace the Well 5 motor control center (2026-20). 2. Motion and second to remove this item from the consent agenda for further discussion. ATTACHMENTS: 1. 20260512 Receive Bids Award Contract Well 5 Motor Control - RESO 2. Attach 2 - TCS quote 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 26- A RESOLUTION RECEIVING THE QUOTE AND AWARDING A CONTRACT TO REPLACE THE WELL 5 MOTOR CONTROL CENTER (2026-20) Motion By: Second By: WHEREAS, the city operates seven municipal wells that each contain a motor control center the controls the speed and operating intervals of the pumps at each well; and WHEREAS, the motor control center at Well 5 (constructed in 1988) has experienced a significant amount of corrosion on the wiring and other components and is in need of replacement; and WHEREAS, Total Control Systems, Inc. (TCS), a contractor that has performed a significant amount of work on our water system components and is familiar with the current setup and programming, has submitted a quote in the amount of $100,561 to replace the motor control center at Well 5; and WHEREAS, the City Council has previously approved using a single-source contractor for this type of work in order to maintain consistency, continuity, and efficiency for this critically important function of water management; and WHEREAS, although this is a planned improvement in 2027, staff recommend Council award a contract at this time so TCS is able to begin procuring the necessary parts to build the motor contol center, which may take up to 40 weeks depending on lead times for the various parts. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The City Council authorizes a contract with Total Control Systems, Inc. in the amount of $100,561 to replace the Well 5 motor control center (2026-20). 3. Funding will come from the Water Utility Fund th Passed and adopted by the Prior Lake City Council this 12 day of May 2026. VOTE Briggs Braid Churchill Lake Hellier Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Jason Wedel, City Manager April 14, 2026 To: Phil/Brad Re: Prior Lake, Minnesota –Well 5 Wellhouse upgrade. ________________________________________________________________ Total Control Systems, Inc. (TCS) proposes to furnish equipment and services in accordance with the project plans and specifications that were received. MCC and equipment replacement in Well 5, 75hp Submersible Pump Including: MCC per existing line up Main CB 400amp SE rated Panelboard LP 18CKT CB per existing Transformer LP-XFMR 10KVA TVSS 160KAIC VFD 75hp HD AB 753 Spare 15amp 3pole 480v CB Power meter and monitor (PM500) Supervisory Control panel in MCC Relays, pushbuttons, switches, lights, contactors Elapsed time meter Surge protection Power Supplies Alarm horn Flood float switch Air Temperature Sensor Door Switches : Allen-Bradley Compactlogix PLC equipment Ethernet Switch Operator interface Cmore 8” Color Ethernet Terminal blocks Uninterruptible Power Supplies (UPS) Temperature sensor All programming and configuration Modifications to SCADA system and communications SCADA master PLC modifications Submittals O&M manuals Warranty 1 year Start-up and commissioning Shipping Warranty Total Control Systems, Inc 38841 Nyman Drive NE PO Box 40 Stanchfield, MN 55080-0040 Phone 320-396-4442 / Fax 320-396- 4443 Price for the Well 5 control package: $ 100,561.00 Total no tax. Does not include: Sales Tax (Exempt) Electrical Contractor or Installation Cradlepoint Radio Equipment (reuse) Antenna or mounts (reuse) Flow Meter Drawdown Sensor Hand holes Meter sockets/Cold sequence disconnects CT Enclosures Grounding materials Underground warning tape Installation of panels Conduit Permits Demolition Any electrical wiring external to supplied panels - We acknowledge receipt of Addendum No.. - Terms are Net 30 days from invoice date. No retainage allowed. A 1.5% charge per month added to any past due balance. Price may be dependent on past credit history. - This quote/proposal valid for 60 days. - Work to commence after receipt of an acceptable written purchase order acknowledging acceptance of our terms. - F.O.B. job-site. - Start-up service/training, documentation and equipment adjustment is included as specified. - TCSI does not accept any liquidated damages. - All insurance coverage per specifications, additional coverage not included. - ALL PANELS FURNISHED BY TCS WILL HAVE A UL 508 SERIALIZED OR UL698A ENCLOSED INDUSTRIAL CONTROL PANEL RELATING TO HAZARDOUS LOCATIONS WITH INTRINSICALLY SAFE CIRCUIT EXTENSIONS LABEL, AS REQUIRED. If you have any questions regarding our proposal, please contact our office. We look forward to working with you on this project. Sincerely, TOTAL CONTROL SYSTEMS, INC. Al Doberstein AD/kd Submittals 4-6 weeks after receipt of acceptable order. Equipment 12-40 weeks after engineer’s approval. Accepted By ___________________________ Date __________