Loading...
HomeMy WebLinkAbout05(F) - Resolution Approving a Combined Preliminary and Final Plat and Development Agreement for a Subdivision known as Prior Lake Revival Report ITEM: 5F CITY COUNCIL AGENDA REPORT MEETING DATE: May 12, 2026 PREPARED BY: Paul Moretto, Planner PRESENTED BY: Casey McCabe, Community Development Director AGENDA ITEM: Resolution Approving a Combined Preliminary and Final Plat and Development Agreement for a Subdivision known as Prior Lake Revival RECOMMENDED ACTION: Approval of a resolution approving a Combined Preliminary and Final Plat and Development Agreement for Prior Lake Revival. BACKGROUND: On February 27, 2023 the Prior Lake Planning Commission recommended approval of the preliminary plat and approved a variance for a reduction in the floor area ratio (FAR) of a substantially similar project on this site. The City Council reviewed the proposal and approved Resolution 23-53 approving the Prior Lake Revival Preliminary Plat. As part of this project, stormwater management proved to be a very challenging component of the proposal. The development team for Revival II spent time reviewing alternatives to the previous stormwater plan. The solution was to acquire a parcel to the west of the subject property and include its area into the project. Subsection 9-34 of City Code allows for the combination of a preliminary and final plat in one action due to the simplicity of the proposed subdivision provided:  The resulting subdivision contains no more than 5 lots. The resulting subdivision will contain two lots. Lot 1 Block 1 and Outlot A.  The proposed subdivision is located in an area where streets and utilities are in place and capable of serving the subdivision. Streets and utilities are available and capable of serving the subdivision.  The proposed subdivision does not require the dedication or construction of future streets and will not interfere with the development of adjacent properties. The proposed subdivision will access Duluth Avenue through Revival I and will not require construction of streets or interfere with development of adjacent property.  The resulting lots shall conform with all provisions of the Zoning Code unless a variance has been granted. The resulting lots will both conform with all provisions of the Zoning Code and variances. th On May 4, 2026 the Planning Commission held a hearing to consider a requested variance from the minimum floor area ratio requirement and a recommendation to the city council related to the combined preliminary and final plat. The planning commission voted 5-0 to approve the variance request and to recommend city council approval of combined preliminary and final plat. City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372 Item 5F Page | 2 Current Circumstances The following paragraphs outline the physical characteristics of the existing site, the comprehensive plan and zoning designations, and a description of some of the specifics of the site. PHYSICAL SITE CHARACTERISTICS: Total Site Area: The total site area is 3.76 acres which is proposed to be subdivided into two lots of approximately 1.05 acres, lot one block one, and 2.41 acres, Outlot A, respectively. Topography: This area has relatively level topography, with elevations ranging from the 936’ MSL in the northwestern corner to a high point of 966’ MSL in the southwestern portion of the site above the retaining wall. Access: Access to the site will be from a private access agreement through the parking lot east of the subject property. An ingress and egress easement is in place to allow access through the parking lot to Duluth Avenue SW. 2040 Comprehensive Plan Designation: This property is designated as TC, Town Center on the 2040 Comprehensive Plan Land Use Map Zoning: The site is presently zoned TC, Town Center. PROPOSED PLAN Commercial Development: The development plan calls for a single 10,910 square foot commercial building which will be occupied by three or four businesses. Exterior building elevations with varying colors and materials types including glass, masonry, and architectural cement board. Awnings and varying wall heights as well as wall breaks are also proposed in accordance with the City Code. Materials: Section 10-705 establishes the design requirements for buildings in the TC zoning district. The materials for the proposed building meet the TC requirements for buildings not located on Main Avenue or Dakota Street. Frontage Requirement Proposed (%) (%) Public ROW 50 50 Rear/Side 35 42 (east) | 46 (west) | 43 (south) Building Setbacks: The developer does not request any modification to the re- quired TC, Town Center Zoning District building setbacks: Setbacks Required Proposed Minimum (TC Zoning) Front None 15.3’ Side 0’ 10.1’ Rear 0’ 137.2’ Landscaping: The landscaping plan identifies 23 overstory trees as well as various shrubs and landscape beds in accordance with the City Code. The lot has been surveyed for significant trees with none found on property. Item 5F Page | 3 Sanitary Sewer / Water Mains: Sanitary sewer and watermains will be extended from the private parking lot east of the site. Grading / Storm water: The site will be graded so that the storm water drainage is directed to a storm water basin on outlot A to meet the City’s water quality and runoff requirements. The basin will pretreat the stormwater runoff of the development prior to flowing into the area wetlands. Fees and Assessments: This development will be subject to the standard development fees including park dedication and trunk utility service charges. FINANCIAL IMPACT: Construction of the project will help diversify the city’s property tax base. ALTERNATIVES: 1. Motion and a second to approve a resolution approving the Combined Preliminary and Final Plat and Development Agreement for Prior Lake Revival with conditions. 2. Remove this item from the consent agenda for additional discussion. ATTACHMENTS: 1. Location Map 2. Preliminary/Final Plat 3. Review Memo 4/22/2026 4. Development Agreement 5. Resolution 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 26-___ A RESOLUTION APPROVING THE COMBINED PRELIMINARY AND FINAL PLAT AND DEVELOPMENT AGREEMENT FOR PRIOR LAKE REVIVAL Motion By: Second By: WHEREAS, Prior Lake Revival LLC (the “Developer”) has requested approval of a Combined Preliminary and Final Plat to be known as Prior Lake Revival for a parcel legally described as: SEE EXHIBIT A; and WHEREAS, the Prior Lake Planning Commission conducted a public hearing on May 4, 2026, to consider the request for Combined Preliminary and Final Plat; and WHEREAS, notice of the public hearing on said Combined Preliminary and Final Plat and was duly published and mailed in accordance with the applicable Prior Lake Ordinances; and WHEREAS, the Planning Commission heard all persons interested in the Combined Preliminary and Final Plat at the public hearing, and the Commission recommended the City Council approve the Combined Preliminary and Final Plat for Prior Lake Revival on a 5-0 vote subject to certain conditions; and WHEREAS, the City Council considered the Planning Commission’s recommendation and Developers request for approval of a Combined Preliminary and Final Plat for Prior Lake Revival on May 12, 2026, and found it met the requirements of Subsections 9-34, 9-66 and 9-67 of the Prior Lake Subdivision Code; and WHEREAS, the City Council approved the combined Preliminary and Final Plat, and Development Agreement for Prior Lake Revival on May 12, 2026. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The City Council approves the Final Plat of Prior Lake Revival subject to the following conditions: a) The Developer shall obtain the required permits from other state or local agencies prior to any work on the site. b) The Developer shall revise the plans in accordance with the requirements contained in the Community Development / Public Works Departments memorandum dated April 22, 2026. 1 c) The Developer shall record an access and maintenance easement over the pond located on Outlot A to the satisfaction of the Public Works Director. d) The Developer shall record the Final Plat and Development Agreement within ninety (90) days after approval of this plat. th PASSED AND ADOPTED THIS 12 DAY OF May 2026. VOTE Briggs Braid Churchill Lake Hellier Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ___________________________ Jason Wedel, City Manager 2 EXHIBIT A Legal Description PRIOR LAKE REVIVAL Scott County, Minnesota That part of Government Lot One (1), Section Two (2), Township One Hundred Fourteen (114), Range Twenty-two (22), Scott County, Minnesota, together with that part of the Northeast Quarter of the Northwest Quarter (NE 1/4 of NW 1/4) of said Section 2, Township 114, Range 22, Scott County, Minnesota, described as follows: Commencing at the Northwest corner of Lot 9, Block 2, West Side Addition to Prior Lake; thence North along the northerly extension of the West line of said Lot 9 a distance of 369.4 feet to the center line of the Chicago, Milwaukee and St. Paul Railroad; thence Southeasterly along said center line to its intersection with the northerly extension of the East line of Lot 7, Block 2; thence South along said extension a distance of 322.5 feet to the Northeast corner of said Lot 7; thence West along the North line of Block 2 to the point of beginning; Together with: A tract commencing at the Northwest corner of Lot 14, Block 2, West Side Addition to Prior Lake; thence North along the northerly extension of the West line of said Lot 14 a distance of 526.25 feet to the center line of said railroad; thence Southeasterly along said center line to its intersection with the northerly extension of the East line of Lot 10, Block 2; thence South along said extension a distance of 369.4 feet to the Northeast corner of said Lot 10; thence West along the North line of Block 2 to the point of beginning; Together with: A tract beginning at a point on the North line of Block 2, West Side Addition to Prior Lake, distant 100.0 feet East of the Northwest corner thereof; thence East along said North line 150.0 feet to the Northeast corner of Lot 10; thence North along the extension of the East line of said Lot 10 a distance of 116.5 feet; thence West parallel with said North line 150.0 feet; thence South 116.05 feet to the point of beginning; Together with: A tract commencing at the Northwest corner of Lot 14, Block 2, West Side Addition to Prior Lake; thence North along the northerly extension of the West line thereof 100.0 feet; thence East 100.0 feet; thence South 100.0 feet; thence West 100.0 feet to the point of beginning; Together with: The North 16.5 feet of the tract above described beginning at a point 100.0 feet East of the Northwest corner of Block 2, West Side Addition to Prior Lake; Together with: 3 That part of the Northeast Quarter of the Northwest Quarter (NE 1/4 of NW 1/4), Section 2, Township 114, Range 22, described as follows: Beginning at the Northeast corner of Lot 5, Block 2, Westside Addition to Prior Lake; thence West 100.0 feet to the Northwest corner of Lot 6; thence North along the extension of the dividing line between Lots 6 and 7 a distance of 268.0 feet, more or less, to the South right-of- way line of said railroad; thence Southeasterly along said right-of-way line 103.5 feet; thence South 242.0 feet, more or less, to the point of beginning; Together with: That part of the Northeast Quarter of the Northwest Quarter (NE 1/4 of NW 1/4), Section 2, Township 114, Range 22, described as follows: Beginning at the Northeast corner of Lot 3, Block 2, Westside Addition to Prior Lake; thence West 100.0 feet to the Northwest corner of Lot 4; thence North along the extension of the dividing line between Lots 4 and 5 a distance of 241.7 feet to the South right-of-way line of said railroad; thence Southeasterly along said right-of-way line 103.5 feet; thence South 215.0 feet to the point of beginning. EXCEPTING THEREFROM the North 50.0 feet for railroad right-of-way where previously excepted. 4 ’ N [Phone] 952-447-9800 | [Fax] 952-447-4245 | cityofpriorlake.com 4646 Dakota Street SE Prior Lake, MN 55372 Memorandum To: Nick Monserud, City Engineer Luke Schwarz, Assistant City Engineer Stephanie Thulien, Project Engineer From: Laura Pietila, Project Engineer Kris Keller, Project Engineer Date: April 22, 2026 Re: Revival II – Site Plan Review We have reviewed the revised civil plans submitted for the Revival II site dated March 30, 2026 as prepared by Rehder & Associates. The following documents were reviewed: • Civil Plan Set - 03 CIVIL SET_CITY SUBMITTAL_3-30-26.pdf • Stormwater Management Plan - 03 STORMWATER MANAGEMENT REPORT_3-30-26.pdf Comments are provided within this Memorandum and in the corresponding redlined plan set. Please note that not all comments within the plan set are in the Memorandum. We have the following comments with regards to stormwater management and engineering: General 1. Submit for and provide copies to the City of all required permits from regulatory agencies (Scott County, MCES, Minnesota Pollution Control Agency, Minnesota Department of Health, NPDES, etc.) 2. Additional comments may be generated by PLSLWD’s review of the revised plans. 3. Additional comments may be generated by Scott County’s review of the revised plans. 4. Plans shall be signed by an engineer licensed in the State of Minnesota. 5. Provide a location map/title page/plan sheet index 6. Additional redline comments are provided in the accompanying plan set. Provide a response to all comments in this memo and the redlined plan set. 7. Existing Conditions/Demolition Plans 1. No comments Site Plan/Grading Plan 1. Provide a restoration plan including tree removal and preservation. 2. The basin slopes are 3:1. Revise to be a maximum of 4:1. 3. Add a construction limit line. 4. Show the maintenance access route to the basin and OCS that meets width and slope requirements. 5. Call out the outlet elevation and HWL for all basins shown on the plan. 6. Label the parking lot EOFs. 7. Provide easements over the stormwater infrastructure. 8. Provide additional slope labels along curb lines and across the parking areas 9. Identify sections of tipout curb 10. Provide additional contours and spot elevations showing drainage getting out and away from the existing building to the east Utility Plans 1. Provide ownership and maintenance agreements defining responsibilities for sanitary sewer and water utilities in the future. 2. Storm Sewer a. Submit storm sewer drainage calculations. b. The minimum pipe size shall be 15”. c. FES must be RCP. d. Use the MnDOT standard detail for riprap. e. Install marking signs adjacent to storm sewer structures in the green space (see City Plate #103). f. Label the OCS structure. Details 1. Maximum 8 City detail plates per sheet Stormwater Management 1. HydroCAD Model a. Update the HydroCAD model drainage area and impervious acreage to match the SWMP/plans. b. Revise the rainfall depths to match the design manual (2-yr = 2.84”, 10-yr = 4.22”, 100-yr = 7.39”). c. Label the small drainage area on the existing drainage area map south of CSAH 21 or merge to combine with 3S. 2. Basin Design a. Modify the EOF of the pond so it is 1’ higher than the HWL. b. Modify the top of berm so it is 2’ higher than the HWL. c. Provide pretreatment meeting MN Stormwater Manual requirements. d. Revise the basin berm side slopes to be a maximum of 4:1. e. Revise the top of the basin berm to be 10’ wide. f. Add cleanouts at draintile bends. g. Line the basin due to the presence of groundwater. 3. Provide water quality calculations showing 60% TP and 90% TSS removal. 4. Freeboard a. Provide 2’ of freeboard between the building and the parking lot EOF. SWPPP 1. Specify who will be responsible for the long-term maintenance of the stormwater management system. If the basin will be privately owned, provide a maintenance plan and agreement. 2. Provide double silt fence adjacent to the wetland. Scott County 1. Any work within the County right-of-way shall require a County permit. 2. Additional comments may be generated by Scott County’s review of the revised plans PLSLWD 1. Additional comments may be generated by PLSLWD’s review of the revised plans