Loading...
HomeMy WebLinkAbout05(E) - Approve a Work Order Amendment for the Lords Bridge Rehabilitation Project (CP 2024-02) Report ITEM: 5E CITY COUNCIL AGENDA REPORT MEETING DATE: July 28, 2026 PREPARED BY: Christine Watson, Public Works Supervisor – Administration PRESENTED BY: Nick Monserud, Public Works Director/City Engineer AGENDA ITEM: Approve a Work Order Amendment for the Lords Bridge Rehabilitation Project (CP 2024-02) RECOMMENDED ACTION: Approve a work order amendment for the Lords bridge rehabilitation project (CP 2024-02). BACKGROUND: On December 4, 2023 the City Council authorized a work order with WSB LLC in the amount of $146,770 for engineering services for the Lords bridge rehabilitation project (2024-02). The city has paid $89,967 to-date for this work order, which expired on June 30, 2026. Due to significant delays with this project related to pursuing MnDOT bridge funding, WSB has submitted an updated proposal to extend the completion date and adjust for current pricing. The attached amendment has been reviewed by the city attorney and includes the following changes to the original work order: • Adjust the amount from $146,770 to $154,461.50 ($64,494.50 remaining) • Adjust the due date to December 31, 2028 All other terms and conditions of the original work order remain in full force and effect. FINANCIAL IMPACT: The 2025 Capital Improvement Plan included $300,000 to complete the bridge rehabilitation project in 2025. This funding has been carried over to due to the delays in the project. The $64,494.50 remaining cost for the amended work order will be paid from the $300,000 project fund. Over the last several years, staff and our consultant have worked successfully with the MnDOT bridge department to identify State Bridge Funding for this project. We currently anticipate receiving $278,700 in funds which will cover a significant portion of the project cost. ALTERNATIVES: 1. Motion and second as part of the consent agenda to approve the work order amendment with WSB for the Lords bridge rehabilitation project (CP 2024-02). 2. Motion and second to remove this item from the consent agenda for additional discussion. ATTACHMENTS: 1. Work Order Amendment City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372 Page 1 of 3 Public Works Consultant Pool Work Order Amendment Lords Street Bridge Rehabilitation Project (2024-02) WSB & ASSOCIATES, INCORPORATED, dba WSB LLC This work order amendment is issued on this 28th day of July, 2026 by the City of Prior Lake (“City”) pursuant to the Public Works Consultant Pool Work Order dated December 4, 2023 between the City and WSB & Associates, Incorporated, dba WSB LLC (“Consultant”). Based on the mutual promises and covenants set forth herein, the sufficiency of which are hereby acknowledged, the City and Consultant agree to extend the Term of the original work order to December 31, 2028 and increase the amount of the work order to $154,461.50 to accommodate the year-over-year increase in fees from 2025 to 2027 as noted in Exhibit A. All other terms and conditions of the original work order, included herein as Exhibit B, shall remain in effect. ISSUED BY CITY OF PRIOR LAKE __________________________________ Mayor RECEIVED AND ACCEPTED BY WSB LLC _____________________________________ Signature ____________________________________ Title __________________________________ City Manager Page 2 of 3 EXHIBIT A Amended Proposal G:\.Clients All\Prior Lake\Proposals\2024 Lords Street Bridge\Prior Lake Lords Street Bridge Rehab_3_23_2026_Amendment.docx 5 4 0 G A T E W A Y B L V D | B U R N S V I L L E , MN | 55 3 3 7 | 9 5 2 . 7 3 7 . 4 6 6 0 | W S B E N G . C O M June 30, 2026 Mr. Nick Monserud Assistant City Engineer City of Prior Lake 4646 Dakota St SE Prior Lake, MN 55372 RE: Amendment No. 1 for the Supplemental Agreement to Provide Professional Engineering Services to complete Final Design, Topographic Survey, and Construction Administration Support and Testing for the Lords Street Bridge Rehabilitation (Bridge No. 70513) for Provide Construction Administration Support for the City’s 2025 Street Improvement Projects Dear Mr. Monserud: On behalf of WSB we are pleased to submit this Amendment to the Supplemental Agreement to our Public Works Consultant Pool Master Agreement, dated April 20, 2020 to provide engineering services to the City of Prior Lake. Our original services included bridge rehabilitation design including plan preparation and construction document preparation for Bridge No. 70513 Lords Street NE over Prior Lake, topographic survey, final design, bidding, and assisting the City with Construction Administration for rehabilitation of Bridge No. 70513 as part of the City’s 2025 construction program. We are seeking an amendment to offset the rate changes. Construction was originally intended to be in 2025 and is now expected to be in 2027. In addition, we would like to extend the contract from June 30, 2026 to October 31, 2027. Task 4 – Assisting the City with Construction Management (Same an Original WO) 4.1 Construction Staking WSB will provide construction staking and survey for construction of the project. WSB assumes one-time staking for all required staking needs. Any re-staking will be billed at a time and materials hourly rate. 4.2 Construction Contract Administration WSB will provide Contract Administration services through construction of the project and final project closeout. This will include: •Preparation of materials for and attendance at the preconstruction meeting for the project. •Responding to all contractor requests for information (RFI). •Responding to all City requests for information/clarification during construction. We understand that the City anticipates needing construction observation support for the project. WSB has included construction observation services for the 2027 construction season. EXHIBIT A - AMENDED PROPOSAL Mr. Nick Monserud June 30, 2026 Page 2 G:\.Clients All\Prior Lake\Proposals\2024 Lords Street Bridge\Prior Lake Lords Street Bridge Rehab_3_23_2026_Amendment.docx 4.3 Construction Materials Testing WSB will provide the following construction materials testing services for the project: o Perform gradations for reclaimed aggregate, topsoil and bituminous mix. o Perform bituminous density testing o Perform concrete testing as needed • Coordination with City inspection staff to determine testing frequency and locations. • Communicate verbal testing results to the City inspection staff as soon as results are available. • Provide written testing reports to the City within two weeks of testing. • Utilize City survey stationing for all testing results. Schedule Based on our discussions with City Staff, we are proposing the following schedule for the 2027 Lords Street Bridge Rehabilitation Project: • • October – December 2026 – Construction letting • May – October 2027: Bridge Construction (total 8-week construction window once construction beings) PROPOSED FEE WSB will provide the services as outlined in Project Approach/Scope of Services. Our proposal has considered estimated year-over-year increases in our annual fee schedule. We estimate we will need an amendment of $7,691.50 and an overall fee of $154,461.50 (hourly not to exceed) to complete the project. The proposed scope and fee presented herein represents our complete understanding of the project based on site visits and discussions with City staff. If you have any questions or concerns, please feel free to contact me at (952) 843-8323. Once again, we appreciate the opportunity to submit this proposal and look forward to working with you and your staff. Sincerely, WSB Monica Heil, PE Senior Vice President, Municipal Attachments Cc: Kevin Anderson, PE, WSB Carl Osberg, PE, WSB Paul Kyle, PE, WSB G:\.Clients All\Prior Lake\Proposals\2024 Lords Street Bridge\Prior Lake Lords Street Bridge Rehab_3_23_2026_Amendment.docx 5 4 0 G A T E W A Y B L V D | B U R N S V I L L E , MN | 55 3 3 7 | 9 5 2 . 7 3 7 . 4 6 6 0 | W S B E N G . C O M REVISED WORK ORDER FEES (2027 CONSTRUCTION) ORIGINAL WORK ORDER FEES (2025 CONSTRUCTION) Page 3 of 3 EXHIBIT B Original Work Order December 4, 2023 Page 1 of 2 Public Works Consultant Pool Work Order Lords Street Bridge Rehabilitation Project (CP 2024-02) WSB & ASSOCIATES, INCORPORATED, dba WSB This work order (“Work Order”) is issued on this 4th day of December, 2023 by the City of Prior Lake (“City”) pursuant to the Public Works Consultant Pool – Master Agreement dated April 20, 2020 (“Contract”) between the City and WSB & Associates, Incorporated, dba WSB (“Consultant”). Based on the mutual promises and covenants set forth herein, the sufficiency of which are hereby acknowledged, the City and Consultant agree as follows: 1.Scope of Work Order. Consultant agrees to provide, perform and complete all the services requested by the City in this Work Order and attached Exhibit 1 (“Work”), which Work shall be subject to the terms and conditions of this Work Order and the Contract. 2.Term of Work Order. All Work requested by this Work Order shall be completed by July 31, 2026. 3.Compensation for Work Order. City agrees to pay the Consultant a fixed sum of $146,770 as full and complete payment for the Work requested by this Work Order. 4.Consultant Representative. Consultant has designated Monica Heil to manage the Work Order subject to the supervision of Consultant’s representative. ISSUED BY CITY OF PRIOR LAKE ___________________________________ Mayor ___________________________________ City Manager RECEIVED AND ACCEPTED BY WSB & ASSOCIATES, INC. _____________________________________ Signature ____________________________________ Title Vice President of Municipal Services EXHIBIT B - ORIGINAL WORK ORDER Page 2 of 2 Exhibit 1 – Scope of Work Order G:\.Clients All\Prior Lake\Proposals\2024 Lords Street Bridge\Prior Lake Lords Street Bridge Rehab Prof. Engineering Services Proposal 11_29_23.docx 5 4 0 G A T E W A Y B L V D | B U R N S V I L L E , MN | 55 3 3 7 | 9 5 2 . 7 3 7 . 4 6 6 0 | W S B E N G . C O M November 27, 2023 Mr. Nick Monserud Assistant City Public Works Director City of Prior Lake 4646 Dakota St SE Prior Lake, MN 55372 RE: Supplemental Agreement to Provide Professional Engineering Services to complete Final Design, Topographic Survey, and Construction Observation/Administration Support and Testing for the Lords Street Bridge Rehabilitation (Bridge No. 70513) for Dear Mr. Monserud: On behalf of WSB we are pleased to submit this Supplemental Agreement to our Public Works Consultant Pool Master Agreement, dated April 20, 2020 to provide engineering services to the City of Prior Lake. Specifically, our services will include State Aid funding requests and meetings, bridge inspection, rehabilitation design including plan preparation and construction document preparat ion, topographic survey, bidding, and assisting the City with Construction Observation and Administration for rehabilitation of Bridge No. 70513 (Lords Street NE over Prior Lake) as part of the City’s 2025 construction program. PROJECT UNDERSTANDING Bridge No. 70513 carries Lords Street NE over Prior Lake. The bridge currently has an LPI (Local Planning Index) of 55, which means its rehabilitation/repair is eligible for State funding. The bridge is a timber slab span bridge constructed in 1986. The timber deck slab is in good to fair condition ; the timber pier caps are in poor condition; the CIP steel pier piling is in fair to poor condition; the timber abutments are in fair condition; and the timber railings are in fair condition. The bridge is currently load posted due to deterioration of the piers. Bridge rehabilitation and bridge replacement have both been considered as potential ways to upgrade the current conditions and bridge rehabilitation has been selected as the preferred approach. This proposal outlines work needed to design and administer construction of a brid ge rehabilitation project of the piers and other items as outlined in the Tasks below. PROJECT APPROACH/SCOPE OF SERVICES WSB’s project scope and proposed tasks are based on our understanding of the project, and we propose the following scope of services: Task 1 – Topographic Survey WSB will complete the topographic survey for the entire bridge and approaches a minimum of 200 feet beyond each end of the bridge. Survey controls will be set up for the project area followed immediately by the topographic survey of the existing conditions within the road right-of-way. Topographic survey will include 200 feet of adjacent roadways that abut the project area. Survey of all utilities within these areas will be included. Topographic survey data will assist with developing final repair elevations on the bridge and for any pavement rehabilitation methodologies adjacent to the bridge. It is also proposed to complete the Gopher State One Call locate request for maps as a part of the topographic survey work. EXHIBIT 1 Mr. Nick Monserud November 27, 2023 Page 2 G:\.Clients All\Prior Lake\Proposals\2024 Lords Street Bridge\Prior Lake Lords Street Bridge Rehab Prof. Engineering Services Proposal 11_29_23.docx Task 2 – Project Communication WSB will support City Staff in developing meeting materials and will attend one neighborhood meeting for the project. WSB will serve as an extension of City Staff in these meetings, working with members of the public to identify potential areas of concern and incorporating comments received into the final design of the project. WSB will also meet: 1) monthly (virtually) with City staff to update progress 2) with City and MnDOT State Aid staff to properly submit deliverables and funding requests and address any comments. Task 3 – Final Design Project Management Project management includes the development of the project plan through bidding. This task includes the appropriation of necessary staff and resources at all stages of the final design process to achieve project milestones and completion. This includes f requent communication and coordination with City staff and its agents governing all aspects of the project. Proper completion of this task will allow for open lines of communication and routine updates on project issues, as well as keeping the project on schedule and within budget. Design, Specifications, and Plan Preparation WSB will complete the following tasks: • field investigation to verify bridge and approach condition • bridge funding applications and documentation • design and prepare the project plans consistent with MnDOT Bridge Office and State Aid standards and local regulatory standards. • specifications consistent with MnDOT Bridge Office and State Aid standards, City and local regulatory standards. • project quantities and prepare the project Bid Form. • Engineer’s Opinion of Probable Cost on the final design. • quality control reviews regularly throughout the duration of the design. • project meetings with City staff and design team (WSB staff) members as necessary. The project plans will be generally organized as follows: • Title sheet • General layout • Statement of Estimated Quantities and Tabulations • Bridge Repair details including staging and falsework requirements • Standard details • Removals including environmental restrictions • Traffic staging or detour plans • Minor roadway approach improvement plans • Erosion control • SWPPP Deliverables: • 60% Plan Submittal: Draft bridge repair plan set for MnDOT Bridge State Aid and City review and comment Mr. Nick Monserud November 27, 2023 Page 3 G:\.Clients All\Prior Lake\Proposals\2024 Lords Street Bridge\Prior Lake Lords Street Bridge Rehab Prof. Engineering Services Proposal 11_29_23.docx • 90% Plan and Specification Submittal: Draft plan set and specifications for MnDOT Bridge State Aid and City review and comment • 100% Plan and Specification Submittal: Three (3) 11” x 17” final plan sets and three (3) specifications for your files Permits Prepare the following assumed permit for project: • MNDNR Work in Public Waters Permit Bidding Assistance Prepare the Advertisement for Bid in compliance with the City’s practices; facilitate project bidding by answering contractor questions, prepare the Addenda if necessary, and host the virtual bid opening for the project. The cost to advertise the project will be paid by the City of Prior Lake. WSB will submit the Advertisement for Bid to the local paper and to Finance and Commerce. As-builts WSB will prepare as-builts detailing the scope of the bridge repair elements . Deliverables will include a .pdf version of the as-builts. Task 4 – Assisting the City with Construction Management Construction Staking WSB will provide construction staking and survey for construction of the project. WSB assumes one -time staking for all required staking needs. Any re-staking will be billed at a time and materials hourly rate. Construction Contract Administration WSB will provide Contract Administration services through construction of the project and final project closeout. This will include: • Preparation of materials for and attendance at the preconstruction meeting for the project. • Bi-weekly project progress meetings for the duration of the project • Responding to all contractor requests for information (RFI). • Responding to all City requests for information/clarification during construction. • Labor Compliance interviews and documentation We understand that the City anticipates needing part- to full-time construction observation support for the project. WSB has included construction observation services for the 2025 construction season. We have assumed bridge construction activities will last 8-weeks. It is anticipated that the contract documents will specify that construction can be completed within a 4-month window in the summer of 2025, but that once construction commences, work is to be completed within 8-weeks. We are estimating 40 hours per week of construction observation needs to meet reporting and observation requirements necessitated by the State Bridge Funding requirements. If construction activities are longer in duration, we may need to negotiate additional fees. Should the contractor’s schedule require less than 8-weeks of construction observation and administration support, WSB will only invoice the City for actual hours spent on the job. Mr. Nick Monserud November 27, 2023 Page 4 G:\.Clients All\Prior Lake\Proposals\2024 Lords Street Bridge\Prior Lake Lords Street Bridge Rehab Prof. Engineering Services Proposal 11_29_23.docx Construction Materials Testing WSB will provide the following construction materials testing services for the project: o Perform gradations for reclaimed aggregate, topsoil and bituminous mix (for any roadway patching at the bridge surface) o Perform bituminous density testing o Perform concrete testing as needed • Coordination with City inspection staff to determine testing frequency and locations. • Communicate verbal testing results to the City inspection staff as soon as results are available. • Provide written testing reports to the City within two weeks of testing. • Utilize City survey stationing for all testing results. Schedule Based on our discussions with City Staff, we are proposing the following schedule for the 2025 Lords Street Bridge Rehabilitation Project: • December 2024: Authorize the contract with WSB • December 2023 – April 2024: o Bridge Funding Request o Topographic survey o Bridge Design and Drafting • April 2024: 60% Plans • June 2024: 90% plans and Specifications • July 2024 – Signed Plans and Specification • October 2024 - Approve plans and specifications and authorize ads for bid • November 2024 – Construction letting • May – July 2025: Bridge Construction PROPOSED FEE WSB will provide the services as outlined in Project Approach/Scope of Services. Our budget was developed based on our understanding of the scope and experience with previous bridge reconstruction projects and anticipates 2025 construction. Our proposal has considered estimated year-over-year increases in our annual fee schedule. We estimate an hourly fee not to exceed fee of $146,770.00 The proposed scope and fee presented herein represents our complete understanding of the project based on site visits and discussions with City staff. If you have any questions or concerns, please feel free to contact me at (952) 737-4675. Once again, we appreciate the opportunity to submit this proposal and look forward to working with you and your staff. Sincerely, WSB Monica Heil, PE Vice President of Municipal Services Attachment Cc: Carl Osberg, PE, WSB 0 Project Management and Meetings 12.0 8.0 8.0 2.0 1.0 $6,745 1 Survey 2.0 8.0 8.0 $3,725 2 Project Communication 4.0 4.0 0.0 12.0 8.0 1.0 0.0 0.0 0.0 0.0 0.0 $5,920 2.1 Funding, Agency, Utility Coordination 4.0 4.0 1.0 $2,140 2.2 Public Invovement (1 meeting and 1 graphic)12.0 8.0 $3,780 3 Final Design 5.0 101.5 46.0 0.0 0.0 6.0 10.0 12.0 104.0 3.0 0.0 $56,501 3.1 Bridge Repair Recommendations 6.0 $1,378 3.2 Geotechnical Report & Boring (if needed - not included in fee total below)$7,500 3.3 60% Bridge Design & Plans 1.0 21.0 4.0 41.0 $12,957 General Plan & Elevation 4.0 8.0 $2,322 Transverse Section and Notes 1.0 4.0 $931 Bridge Layout 1.0 4.0 $931 Bridge Repair Details and Notes 8.0 16.0 $4,643 Bridge Aesthetics 1.0 1.0 $405 Bridge Survey Sheet 1.0 4.0 $931 Bridge Survey Plan & Profile 1.0 4.0 $931 Cost Estimate 4.0 $919 Quality Assurance 1.0 4.0 $944 3.4 90% and 100% Final Bridge Plans, Specifications & Estimate 1.0 44.5 14.0 51.0 2.0 $22,019 General Plan & Elevation 2.0 4.0 $1,161 Transverse Section, SEQ and Notes 2.0 2.0 8.0 $2,211 Bridge Layout 0.5 1.0 $290 Deck Repair Details 8.0 12.0 $3,942 Abutment Repair Details 8.0 12.0 $3,942 Pier Repair Details 8.0 12.0 $3,942 Bridge Survey Sheet 1.0 1.0 $405 Bridge Survey Plan & Profile 1.0 1.0 $405 Special Provisions 8.0 2.0 $2,006 Bridge Rating for MnDOT 2.0 8.0 $1,854 Cost Estimate 4.0 $919 Quality Assurance 1.0 4.0 $944 3.5 Roadway, Traffic and Staging 4.0 16.0 $3,708 3.6 Permitting and SWPPP 8.0 $1,838 3.7 Environmental Documentation (Not Required)$0 3.8 Regulated Materials Survey 4.0 10.0 $3,089 3.9 Wetland Delineation and Report 2.0 12.0 1.0 $2,442 3.10 Hydraulic Review 6.0 4.0 4.0 $2,777 3.11 Bidding Services 2.0 8.0 8.0 $3,725 3.12 As-builts 1.0 4.0 8.0 $2,568 4 Construction Services 10.0 16.0 360.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 $73,826 4.1 Construction Staking 1.0 12.0 $3,208 4.2 Construction Administration and Observation 8.0 8.0 320.0 8.0 $61,562 4.3 Construction Materials Testing 1.0 8.0 40.0 $9,056 SUBTOTAL HOURS - FINAL DESIGN 31.0 129.5 416.0 12.0 8.0 9.0 10.0 12.0 112.0 4.0 28.0 $146,716.96 Hourly Billing Rate $246.75 $229.69 $174.30 $210.00 $157.50 $234.15 $215.25 $157.50 $175.35 $84.00 $246.75 Subtotal Fees by Labor Designation $7,649 $29,745 $72,509 $2,520 $1,260 $2,107 $2,153 $1,890 $19,639 $336 $6,909 $146,717 Laboratory Expenses $100.00 Mileage Expenses ( $0.535/mile)$53.50 Subtotal Fees - Not To Exceed $146,770 $146,770.46 Footnotes (1) Permit Fees will be paid by the City and are NOT INCLUDED IN WSB TOTAL COST. WSB has prepared an hourly estimate to perform the tasks as described in the Project Schedule. This detailed estimate sheet is organized by labor category and billable hourly rate, in order to determine estimated cost. BRIDGE NO 70513 REHABILITATION - PRELIMINARY AND FINAL DESIGN TASK NO.DESCRIPTION PROJ. MGR.SR. ENGINEER PUBLIC INVOLVEMENT LEAD PROJECT ENGINEER SENIOR TECH CLERICAL SURVEY CREW WSB Labor SUBTOTAL FEES - FINAL BRIDGE DESIGN - NOT TO EXCEED SENIOR ENV. SCIENTIST SENIOR ENV. SCIENTISTGRAPHICS ENV. SCIENTIST