HomeMy WebLinkAbout07(A) - Public hearing to Consider the 2027-2031 Capital Improvement Program (CIP), Capital Improvement Plan (Facilities) and Street Reconstruction Plan Report ITEM: 7A CITY COUNCIL AGENDA REPORT MEETING DATE: August 12, 2026 PREPARED BY: Jason Etter, Accounting Manager Nicole Klekner, Finance Director Chris Watson, Public Works Supervisor - Administration Nick Monserud, Public Works Director PRESENTED BY: Nicole Klekner and Nick Monserud AGENDA ITEM: Public hearing to Consider the 2027-2031 Capital Improvement Program (CIP), Capital Improvement Plan (Facilties) and Street Reconstruction Plan RECOMMENDED ACTION: The purpose of this agenda item is for the City Council to conduct a public hearing on the proposed projects within the 2027-2031 Capital Improvement Plan for facilities and 2027-2031 Street Reconstruction Plan. Since both the Capital Improvement Plan for Facilities and the Street Reconstruction Plan propose to utilize bonds issued under State Statutes 475.521 and 475.58, respectively, a public hearing for purposes of reviewing the plans are required. Approval of the Street Reconstruction Plan requires a super majority (4 of 5 council members) for approval. Approval of the Capital Improvement Plan for Facilities requires a majority (3 of 5 council members). RECOMMENDED ACTION 2: In addition, the council will be asked to approve the overall five-year (2027-2031) Capital Improvement Program (CIP) which includes all plans: the transportation, equipment replacement, park, facilities, technology, water, sewer, and stormwater plans. BACKGROUND: The Capital Improvement Program is one of the City’s long-term financial planning tools. The CIP is updated on an annual basis. The CIP is designed to identify infrastructure improvements and the associated funding sources needed due to ongoing maintenance, repair, and community growth. Such projects include city-initiated improvements, as well as county and state road improvements. The following long-term planning documents are part of the CIP:  Pavement Management Plan – identifies the annual street improvement project(s) and annual street overlay project. o Annual Street Improvement Project(s) – identifies the major roadway improvements involving both new and reconstruction projects that need to be coordinated with Scott County. o Annual Street Overlay – identifies the city’s annual street overlay costs and anticipated project levy and bonding for the special assessment portion of the annual project costs.  Equipment Replacement Plan – identifies the city’s vehicle and equipment needs and establishes a regular replacement schedule.  Park Plan – identifies the new park capital improvements and the equipment replacement demands for 49 parks. City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372 Item 7A Page | 2  Facilities Management Plan – identifies major repairs or improvements to all city-owned buildings.  Technology Plan – identifies hardware and software needs and establishes a regular replacement schedule.  Water Plan – identifies major replacements or additional infrastructure needed to supply potable water to the city.  Sewer Plan – identifies major replacements or additional infrastructure needed to collect and discharge sanitary waste from the city.  Storm Water Plan – identifies major repairs or additional infrastructure needed to manage storm water discharge in the city. Each plan in the CIP was reviewed with the City Council during the June 23 work session, and overall tax levy and debt impacts were reviewed at the July 28 work session. At those meetings, Staff provided a detailed overview of the 2027 projects and highlights of other major projects scheduled for 2027-2031. During the work session, guidance was provided to staff regarding changes in the overall tax levy and planned 2027 utility rates. Current Circumstances A presentation of the 2027-2031 CIP will be provided to inform the Council and the public of the planned projects, financial planning, and financial impact of the CIP as part of the annual CIP update. A public hearing is being held today for the purpose of receiving public input on the 2027-2031 Capital Improvement Plan (as a part of the City’s Facilities Management Plan) and the Street Reconstruction Plan (as a part of the City’s overall Transportation Plan). The projects that are reflected in year 2027 of the five-year CIP have been incorporated into the 2027 budget. The improvements that are funded in full or partially by tax levies have a direct impact on the level of property taxes payable in future years. Bond proceeds are utilized to pay for projects, and debt levies are adopted to repay the debt service. The following draft documents are included: 1) Five-Year Capital Improvement Plan (Attachment 6), Facilities Capital Improvement Plan (Attachment 4), and 3) the Street Reconstruction Plan (Attachment 5). It is important for the Council to recognize that the CIP is a flexible planning tool that is affected by the actions of other governmental agencies such as the State, the County and the Shakopee Mdewakanton Sioux Community. Summary of Capital Improvement Program Planning Documents: See Attachment 6 for the draft Capital Improvement Program (CIP) documents. PAVEMENT MANAGEMENT PLAN – TRANSPORATION AND STREET OVERLAY PROJECTS The Pavement Management Plan has been updated to identify a combination of mill and overlay, rehabilitation and reconstruction projects based on an average annual cost of $11,200,000 for streets over the 10-year planning period. Funding for pavement management includes annual gas and electric franchise fee revenue dedicated to pavement management, estimated at an annual average of $1,500,000/year for the five-year planning period. Staff recommend reviewing and updating the franchise fees every three years. The Council recently approved updated rates for 2025. Item 7A Page | 3 The proposed projects for 2027 – 2031 are noted below. 2027 – Northwood Phase 2 This is proposed to be a complete reconstruction of the street including water, sewer, and stormwater improvements. The project area includes Fremont Rd NW as well as numerous side streets adjacent to Fremont Rd NW and Northwood Rd NW. 2027 – Wilds & Jeffers This area was rehabilitated in 2024-2025 and is scheduled for seal coating, which is customary 2-3 years after new pavement is installed to help seal in the oils and prolong the life of the pavement. 2028 – Green Heights This is proposed to be a complete reconstruction of the street with water, sewer, and stormwater improvements. The project area includes Green Heights Trail SW, Pershing St SW, and other adjacent cross streets. 2029 – Northwood Phase 3 This is proposed to be a complete reconstruction of the street with water, sewer, and stormwater improvements. The project area includes the southern portion of Northwood Rd and Butternut Circle NW. 2029 – Sunset Hills This is proposed to be a complete reconstruction of the street with water, sewer, and stormwater improvements. The project area includes Sunset Trail SW and Sunray Cir SW. th 2030 – 180 Street Paving th This section of 180 St. from Sunray Blvd to Fairlawn Ave is currently gravel. This project includes paving this section of roadway. Also, as part of the Aspen Ridge Development, the Developer has contributed $326,834 towards this project. 2030 - Mill and Overlay Projects Planned overlays for 2030 include Adelmann St SE, Trailhead Ln, and Fish Point Road from Fawn Meadow Curve SE to Oak Point Dr. 2030 – Berens Road Extension This project is an extension of Berens Rd to CSAH 21 and is identified in Scott County’s Transportation Improvement Plan. 2031 – Big Woods Trail (County Project) This is a proposed trail rehabilitation from Revere Way to Franklin Trail along CSAH 21. EQUIPMENT REPLACEMENT PLAN (ERP) An evaluation of the condition of the City’s fleet is completed annually and the ERP is updated. A Vehicle Replacement Rating (VRR) is used as a tool in completing equipment evaluations in an objective and systematic way using data collected through the fleet management system. The ERP also includes an inventory and replacement schedule for equipment attachments and emergency sirens to ensure appropriate funding is identified for these items as well. The cost for these items is updated annually based on recent purchases and other industry changes. See Attachment 6 for more details. Item 7A Page | 4 Funding Sources: Based on the planned use of funds for equipment replacement, the annual tax levy needs to be increased to meet our needs. The council has directed staff to smooth the levy increase where possible, so an annual increase of approximately $50,000 has been built into the plan. Our goal is to maintain the levy at a level that provides adequate cash flow to cover the next year’s expenditures, to absorb an unplanned equipment failure, or to fund an unanticipated equipment need. Our average annual equipment funding need is $1,700,000 per year over the next 10 years. The proposed tax levy funding level for 2027 is $1,025,000. We will continue to incrementally increase the property tax levy to get to our annual funding goal. Debt issuance is proposed in this fund in 2027 and 2028, primarily for fire truck replacements. See Attachment 6 for more details. PARK PLAN The Council adopted the Parks and Trails System Plan on March 12, 2024, and amended the City’s 2040 comprehensive plan on June 11, 2024, to reflect the recently adopted Parks and Trails System plan. This plan includes current parks and proposed changes/updates as well as the city’s future needs and location of new parks. The City’s park referendum request did not advance based on the election results in November 2025 so there will be ongoing park funding discussions as the Council makes decisions on future park impacts. Fund 225 – New Park improvements In accordance with State Statutes, revenues in the Capital Park Fund may only be used for the acquisition and development of new parks, recreational facilities, playgrounds, trails, wetlands, or open space based on the approved park systems plan. Fund 430 – Existing Park replacements/improvements This plan funds capital replacement projects, park amenities, and trail, sidewalk, and boardwalk replacement. The plan proposes a phased increase in the tax levy to cover the capital projects in the plan. See Attachment 6 for park plan details. FACILITY MANAGEMENT PLAN (FMP) The FMP was developed to plan for major repairs, replacements, and upgrades for all our facilities. The FMP uses standard life expectancy of the facility components and equipment to determine the appropriate placement in the plan. City Hall and the Police Station buildings were both built in 2006 and need significant facility component replacement. An evaluation was completed to determine the remaining useful life of some of the major facility components such as HVAC systems, roofing, etc. Based on this evaluation and review by the Facilities Manager, significant facility project costs for City Hall, the Police Station and the Library are included in the FMP including replacement of roofing, HVAC updates, and parking/safety enhancements. The Maintenance Center expansion is slated for 2032 with engineering and project planning costs starting in 2030. Bonding for these major projects has been updated to include bonding each year from 2027-2032. See Attachment 6 for facilities plan details. Item 7A Page | 5 TECHNOLOGY PLAN The Technology Plan is used to plan for current and long-range IT capital needs including general equipment, network infrastructure and software needs. While this plan is reflective of the needs of our various departments, the actual request could change as part of the budget review process. See Attachment 6. Significant projects include phone system upgrade in 2028, Council Chambers equipment in 2031 and election equipment in 2031. UTILITY FUNDS – FINANCIAL MANAGEMENT PLANS The City’s utility funds finance their portions of the Capital Improvement Program through transfers-out to other funds and by transactions occurring within the specific utility funds themselves. The utility funds make transfers-out to the Construction Fund for their portions of the Pavement Management Plan (PMP) projects. Other items that specifically relate only to that utility are accounted for within the fund, such as a water tower rehabilitation occurring in the Water fund. Staff develop a financial management plan for each utility fund that includes planning financing sources for capital activities. The financial management plans for water, sewer and stormwater utility services achieve the following goals:  Rate Calculation: Provide a rate calculation that results in equitable and competitive fixed versus variable portion charge to customers, and considers conservation impact of tiers and block rates.  Revenue Sufficiency: Focus on revenue sufficiency to provide cash balances that support the following objectives: o Revenue to meet current and future obligations o Avoid future debt issuance consistent with City objectives o Cash on hand to provide: • Three months of operating expense • Following year debt service payments • Following year capital acquisition (planned to be paid from cash) • Reserves for replacement of infrastructure located under private streets • Reserves for future capital improvements 2027 Resident Impact and Sample Bill: The City plans for annual increases in utility rates to accomplish the objectives discussed above while moderating the effects on utility users. Based upon the City’s current estimates and water consumption level and utility replacement component of street projects, utility customers will experience increases of 4.0-4.2% in their 2027 utility bill based on their level of water use. For the utility funds to support operations and their respective portions of the Capital Improvement Program, funding is achieved through rates charged and/or debt issuance over the 10-year planning period. To achieve this, the following rate increases are proposed for 2027 (medium water user): 2027 Proposed Annual Monthly FundRate IncreaseImpactImpact Water4.0%$ 24 $ 2 Sewer4.5%$ 30 $ 3 Stormwater3.0%$ 5 $ 0 Combined Total4.1%$ 59$ 5 Item 7A Page | 6 MCES fee details: It should be noted that City utility bills also include an MCES Fee for sewer. This fee does not support City operations or the Capital Improvement Plan, but rather is a fee collected by the City from residents to pay the Metropolitan Council’s Environmental Services fee for regional wastewater treatment. The fee will increase 6.94% for 2027, reflecting the increased fee that the Metropolitan Council is charging Prior Lake. This fee increase as well as the utility rate increases needed to support operations and the Capital Improvement Plan is reflected below. The projected annual increase for all utility services is shown below: Sample Bimonthly Utility Bill: FINANCIAL IMPACT: Debt Analysis and Tax Impact In reviewing the 2027-2031 Capital Improvement Program, the City Council should consider the level of debt as well as the annual tax impact of the scheduled projects. Amount as of Debt TypePurpose December 31, 2025 G.O. Special Assessments 7,055,000Street Improvement Projects G.O. TIF Bonds0Tax Increment Project G.O. Bonds (MV) 1,565,000 Referendum Project (Fire Station #2) G.O. Bonds2,965,000Street Reconstruction Projects G.O. Bonds3,760,000Public Works Building and CIP Projects 520,000 G.O. BondsEquipment Item 7A Maintenance Facility, Water Treatment G.O. Revenue Bonds5,555,000 Page | 7 Facility & Utility Replacement Projects G.O. Capital Improvement The 2027-2031 CIP includes projects that are planned to be funded by bond proceeds/debt. 2,625,000City Hall & Police Station Bonds Energy Lease Loan Payable Guaranteed Energy Savings Program Bonds are issued for the project costs that the city is funding through tax levies as well as the 0 (GESP)Projects 24,045,000 Total costs that are specially assessed to property owners. As of 12/31/2025, the City of Prior Lake had $24,000,000 in debt. The following chart reflects the type of debt. One-third of the debt is for facilities: Water Treatment Plant (through 2030), Fire Station 2, City Hall, and the Police Station (through 2031). The 2027-2031 CIP anticipates the following bonding (debt issuance) needs:  The Equipment Replacement Plan includes $3,810,000 of bonding for major equipment replacement expenditures primarily for fire truck replacements (ladder truck in 2027 and pumper truck in 2028).  Bonding of $3,500,000 for major park replacement expenditures includes the replacement of the entrance road and four parking lots at Ponds Park in 2028.  The Facilities Plan includes $11,230,000 of bonding for major facility repairs for City Hall and Police Station including replacement of membrane roofing and heating, ventilation, and air conditioning (HVAC) updates, addition of dormitories at Fire Station 2, and parking/safety enhancements.  The Pavement Management Plan includes bonding of $12,900,000 for transportation plan projects and street mill & overlay projects. The repayment sources for this bonding include: o Tax levy Long-Term Financial Planning Long-Term Financial Planning Bond Proceeds for Capital Projects Projected Change in Debt Outstanding Projected Bonding by Year Fund Name 202620272028202920302031 20272028202920302031 Total Debt Outstanding (Existing & Planned) Revolving Equip Fund F410 2,265,000 1,545,000 - - - Governmental Funds Debt Outstanding 20,980,000 22,550,000 30,225,000 32,030,000 32,680,000 32,505,000 Revolving Park Equip Fund F430 - 3,500,000 - - - Enterprise Funds Debt Outstanding 3,585,000 2,735,000 6,995,000 6,245,000 5,460,000 11,460,000 Facilities Mgmt Fund F440 515,000 3,915,000 2,165,000 2,060,000 2,575,000 Total Debt Outstanding (Existing & Planned) 24,565,000 25,285,000 37,220,000 38,275,000 38,140,000 43,965,000 PIR Revolving Fund F450 - - - 710,000 - Construction Fund F501 2,895,000 2,810,000 4,215,000 1,575,000 695,000 - Governmental Funds Subtotal 5,675,000 11,770,000 6,380,000 4,345,000 3,270,000 Item 7A Page | 8 Water Fund - - - - - Stormwater Fund - - - - - Sanitary Sewer Fund - 5,150,000 - - 6,815,000 o Project Special Assessment (the City provides the upfront funding for the special Utility Funds Subtotal - 5,150,000 - - 6,815,000 assessment portion via bonding) City total Debt Issuance - All funds 5,675,000 16,920,000 6,380,000 4,345,000 10,085,000  The Sewer Fund includes bonding of $11,970,000 for planned expenditures for sewer replacement costs on street reconstruction projects as well as lift station rehab, sewer lining, and SCADA software update. The table below summarizes the proposed bonding by fund and year: Summary of Projected Debt Balances The following tables reflect all bonding requirements referenced in the CIP, Pavement Management Plan, Facilities Management Plan, and Equipment Replacement Plan. Based on the proposed projects in the CIP, debt is projected to increase from $24,000,000 at the end of 2025 to $44,000,000 at the end of 2031. Projected Debt per Capita: Projected debt per capita based on the current capital projects planned is shown in the table below. The city is working to manage its debt load while providing needed capital replacement projects in a growing city. Projected CIP Tax Levy Long-Term Financial Planning Projected Debt Service (funded by Utility Fund CIP Tax Levies: 20272028202920302031 2027-2031 CIP Revenues) Debt Service Levy 3,454,655 3,889,440 4,390,759 4,060,724 3,530,139 Projected 20272028202920302031 Equipment Revolving Fund 1,025,000 1,075,000 1,075,000 1,150,000 1,200,000 202620272028202920302031 Water 801,700 810,450 645,350 652,650 659,200 Revolving Park Equip Fund 655,000 705,000 705,000 750,000 800,000 Debt Per Capita (assumes population growth) Sewer 165,500 168,000 497,325 394,550 391,900 Facilities Management Fund 355,000 405,000 555,000 600,000 650,000 Debt Per Capita 868 890 1,304 1,328 1,311 1,497 Stormwater 87,650 90,650 88,400 91,150 88,650 PIR Fund - - - - - Total CIP Tax Levies 5,489,655 6,074,440 6,725,759 6,560,724 6,180,139 Item 7A Page | 9 Bond Repayment through Debt Service Tax Levy: The table below is a summary of the annual projected total CIP tax levy by component. Bond Repayment Debt Service supported by Water and Sewer Fund Revenues: The projected annual debt service for the utility funds is shown below: CIP Impact on Long Range Financial Plan: The financial plan incorporates the debt and tax levy impacts of the Capital Improvement Program. Approval of the CIP does not obligate the City to complete the proposed projects or purchases. The 2027 projects and proposed purchases will be incorporated into the 2027 budget requests for budgeted funds. Further Council approvals may be necessary to comply with state statutes and the city’s purchasing policy. The City’s financial planning reflects funding general operations, future planned capital improvements, including related debt service on planned bond issuance to support capital improvements for streets, equipment replacement and facilities capital maintenance projects. Debt repayment is based on level annual debt service payments. Funding for proposed projects in the CIP results in an estimated 10-year average tax levy increase of 6.8% and an estimated 10-year average tax rate increase of 3.0%. This is in line with the parameters established in the City’s 2023 long range financial planning study. CITY OF PRIOR LAKE CITY PROPERTY TAX PROJECTION Five Year Planning Period 202620272028202920302031 TAX LEVIES General Fund Levy - Tax Capacity 16,267,024 16,864,136 18,032,656 19,595,626 20,819,085 22,357,525 General Fund Levy - Market Value 265,888 273,988 281,638 283,838 290,738 277,888 Debt Service Fund 2,979,220 3,454,655 3,889,440 4,390,759 4,060,724 3,530,139 Item 7A CIP Funds 1,825,000 2,035,000 2,185,000 2,335,000 2,500,000 2,650,000 Total Tax Levies 21,337,132 22,627,779 24,388,735 26,605,223 27,670,547 28,815,553 Page | 10 Annual $ Change 1,485,227 1,290,646 1,760,956 2,216,489 1,065,324 1,145,006 TOTAL % CHANGE IN TAX LEVIES7.5%6.0%7.8%9.1%4.0%4.1% The estimated tax levies and tax rate projections for the city’s five-year financial plan are shown CITY TAX CAPACITY TAX RATE32.03%33.54%35.45%35.77%36.05% below. Annual % Change2.07%4.72%5.69%0.92%0.77% Debt per Capita 868 890 1,304 1,328 1,311 1,497 Bonds Outstanding 24,565,000 25,285,000 37,220,000 38,275,000 38,140,000 43,965,000 Change in Bonds Outstanding 720,000 11,935,000 1,055,000 (135,000) 5,825,000 ALTERNATIVES: 1. Motion and Second to close the Public Hearing and 1) approve the 2027-2031 Capital Improvement Program, 2) approve the 2027-2031 Capital Improvement Plan as part of the Facilities Management Plan and 3) approve the 2027-2031 Street Reconstruction Plan ATTACHMENTS: 1. Resolution - Conduct a Public hearing to Consider the Approval of the 2027-2031 Capital Improvement Program (CIP) 2. Resolution - Conduct a Public hearing to Consider the Approval of the 2027-2031 Capital Improvement Plan (facilities) 3. Resolution - Conduct a Public hearing to Consider the Approval of the 2027-2031 Street Reconstruction Plan 4. 2027-2031 Capital Improvement Plan (facilities) \[Bonding authority - MN Statutes Section\] 5. 2027-2031 Street Reconstruction Plan \[Bonding authority - MN Statutes Section 475.58\] 6. 2027-2031 Capital Improvement Program – Draft 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 26- A RESOLUTION APPROVING THE 2027 – 2031 CAPITAL IMPROVEMENT PRGRAM (CIP) Motion By: Second By: WHEREAS, the CIP is a flexible planning document that attempts to balance the financial resources of the City with its needs; and WHEREAS, during the course of the preparation and review of the 2027 to 2031 CIP the City Council has considered, for each capital improvement and for the CIP overall: the condition of the City's existing infrastructure, including the projected need for repair or replacement; the likely demand for the improvement; the estimated cost of the improvement; the available public resources; the level of overlapping debt in the City; the relative benefits and costs of alternative uses of the funds; operating costs of the proposed improvements; and alternatives for providing services most efficiently through shared facilities with other cities or local government units; and WHEREAS, the CIP covers a period of five (5) years and is updated annually; and WHEREAS, Staff presented a summary of the 2027-2031 CIP at the August 12, 2026, City Council meeting to provide information to the public on the planned projects, financial planning, financial impact of the CIP, and capital spending priorities of the City Council; and WHEREAS, the City expects to reimburse the expenditures made for certain costs of the projects included in the CIP from the proceeds of bonds. Therefore, a separate resolution RES19-092 was previously approved establishing procedures relating to compliance with reimbursement bond regulations under the Internal Revenue Code. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The 2027-2031 Capital Improvement Program is hereby approved. Passed and adopted by the Prior Lake City Council this 12th day of August 2026. VOTE Briggs Braid Churchill Hellier Lake Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Jason Wedel, City Manager EXTRACT OF MINUTES OF A MEETING OF THE CITY COUNCIL OF THE CITY OF PRIOR LAKE, MINNESOTA HELD: August 12, 2026 Pursuant to due call and notice thereof, a regular or special meeting of the City Council of the City of Prior Lake, Scott County, Minnesota, was duly held at City Hall on August 12, 2026, at 7:00 P.M., for the purpose, in part, of giving preliminary approval to the issuance of general obligation capital improvement plan bonds and adopting the capital improvement plan. The following members were present: and the following were absent: Member _____________ introduced the following resolution and moved its adoption: RESOLUTION NO. _____________ RESOLUTION GIVING PRELIMINARY APPROVAL TO THE ISSUANCE OF GENERAL OBLIGATION CAPITAL IMPROVEMENT PLAN BONDS IN AN AMOUNT NOT TO EXCEED $11,230,000 AND ADOPTING THE CITY OF PRIOR LAKE, MINNESOTA, CAPITAL IMPROVEMENT PLAN FOR THE YEARS 2027 through 2031 WHEREAS, the City Council (the "Council") of the City of Prior Lake, Minnesota (the "City") proposes to issue its general obligation capital improvement plan bonds, in one or more series, (the "Bonds") and adopt the Capital Improvement Plan for the years 2027 through 2031 (the "Plan"); and WHEREAS, the City has caused notice of the public hearing on the intention to issue the Bonds and on the proposed adoption of the Plan to be posted pursuant to and in accordance with Minnesota Statutes, Sections 475.521 and 331A.10, subd. 2; and WHEREAS, a public hearing on the intention to issue the Bonds and on the proposed Plan has been held on this date; and WHEREAS, in approving the Plan, the Council considered for each project and for the overall Plan: 1. The condition of the City's existing infrastructure, including the projected need for repair and replacement; 2. The likely demand for the improvement; 3. The estimated cost of the improvement; 4. The available public resources; 5. The level of overlapping debt in the City; 6. The relative benefits and costs of alternative uses of the funds; 7. Operating costs of the proposed improvements; and 8. Alternatives for providing services more efficiently through shared facilities with other local governmental units; and 301685640v1 WHEREAS, the Council has determined that the issuance of general obligation capital improvement plan bonds in the aggregate principal amount of up to $11,230,000 is the best way to finance the capital improvements identified in the Plan. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Prior Lake, Minnesota that the Council hereby ratifies the actions of the City Clerk in causing the publication of the Public Hearing Notice to be posted on the City's website and on the Minnesota Newspaper Association's statewide public notice website, as required by law; and the City hereby adopts the Plan and authorizes the issuance of up to $11,230,000 aggregate principal amount of general obligation capital improvement plan bonds. The motion for the adoption of the foregoing resolution was duly seconded by member ____________ and, after full discussion thereof and upon a vote being taken thereon, the following voted in favor thereof: and the following voted against the same: Whereupon the resolution was declared duly passed and adopted. \[Bonds must be approved by at least a three-fifths vote of the membership.\] \[Issuance of Bonds is subject to a 30-day reverse referendum after the public hearing.\] 2 301685640v1 STATE OF MINNESOTA SCOTT COUNTY CITY OF PRIOR LAKE I, the undersigned, being the duly qualified and acting City Clerk of the City of Prior Lake, Minnesota, DO HEREBY CERTIFY that I have compared the attached and foregoing extract of minutes with the original thereof on file in my office, and that the same is a full, true and complete transcript of the minutes of a meeting of the City Council, duly called and held on the date therein indicated, insofar as the minutes relate to a resolution giving preliminary approval to the issuance of the City's general obligation capital improvement plan bonds and adopting the City's capital improvement plan therefor. WITNESS my hand on August 12, 2026. _______________________________________ Heidi Simon, City Clerk 3 301685640v1 EXTRACT OF MINUTES OF A MEETING OF THE CITY COUNCIL OF THE CITY OF PRIOR LAKE, MINNESOTA HELD: August 12, 2026 Pursuant to due call and notice thereof, a regular or special meeting of the City Council of the City of Prior Lake, Scott County, Minnesota, was duly held at City Hall on August 12, 2026, at 7:00 P.M., for the purpose, in part, of adopting a street reconstruction plan and authorizing issuance of street reconstruction bonds. The following members were present: and the following were absent: Member ______________ introduced the following resolution and moved its adoption: RESOLUTION NO. ___________ RESOLUTION ADOPTING A STREET RECONSTRUCTION PLAN AND APPROVING THE ISSUANCE OF GENERAL OBLIGATION STREET RECONSTRUCTION BONDS WHEREAS, the City Council (the "Council") of the City of Prior Lake, Minnesota (the "City"), has determined that it is in the best interest of the City to authorize the issuance and sale of general obligation street reconstruction bonds pursuant to Minnesota Statutes, Section 475.58, subdivision 3b, as amended (the "Act"), to finance the cost of street reconstruction projects, as described in the proposed street reconstruction plan described below, a copy of which is on file in the City Clerk's office; and WHEREAS, pursuant to the Act, the City is authorized to issue and sell general obligation street reconstruction bonds for street reconstruction under the circumstances and within the limitations set forth in the Act. The Act provides that a street reconstruction plan may be financed with general obligation street reconstruction bonds, following adoption of a street reconstruction plan, after a public hearing on the street reconstruction plan and on the issuance of general obligation street reconstruction bonds and other proceedings conducted in accordance with the requirements of the Act; and WHEREAS, pursuant to the Act, the City has prepared a five year street reconstruction plan for calendar years 2027 through 2031, which describes the streets to be reconstructed, the estimated costs and any planned reconstruction of other streets in the City, including the issuance of general obligation street reconstruction bonds under the Act (the "Plan"), to determine the funding strategy for street reconstruction projects; and WHEREAS, on August 12, 2026, the Council held a public hearing on the adoption of the Plan and the issuance of not to exceed $14,040,000 general obligation street reconstruction bonds (the "Bonds") under the Plan for street reconstruction improvements to those streets described in the Plan (the "Street Reconstruction Projects") after posting the notice of public hearing not less than 10 days nor more than 28 days prior to the date thereof on the City's website and on the Minnesota Newspaper Association's statewide public notice website,; and 301685636v1 WHEREAS, all parties who appeared at the public hearing were given an opportunity to express their views with respect to the proposal to adopt the Plan and to undertake and finance the Street Reconstruction Projects by the issuance of Bonds and any written comments submitted prior to the public hearing were considered. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Prior Lake, Minnesota, as follows: 1. Public Hearing Notice. The Council hereby ratifies the actions of the City Clerk in causing the publication of the Public Hearing Notice to be posted on the City's website and on the Minnesota Newspaper Association's statewide public notice website, as required by law. 2. City Policies and Goals. The financing of the Street Reconstruction Projects and the issuance and sale of the Bonds would further the policies and goals of the City as set forth in the Plan, hereby adopted by the Council in connection with the issuance of the Bonds. 3. Adoption of Street Reconstruction Plan. Based on information received at the public hearing, such written comments (if any) and such other facts and circumstances as the Council deems relevant, it is hereby found, determined and declared that: (a) the Street Reconstruction Projects proposed in the Plan will allow the City to upgrade its transportation infrastructure to accommodate anticipated and existing residential and commercial development; and (b) the Plan is hereby approved and adopted in the form presently on file with the City. 4. Authorization and Approval of Bonds. The City is hereby authorized to issue the Bonds, the proceeds of which will be used, together with any additional funds of the City which might be required, to finance certain costs of the Street Reconstruction Projects and to pay costs of issuance of the Bonds. 5. Execution of Documents. The Mayor and City Manager are authorized and directed to execute such other documents and instruments as may be required to give effect to the transactions herein contemplated. 6. Voter Referendum Contingency. Pursuant to the Act, a petition requesting a vote on the question of issuing the Bonds, signed by voters equal to five percent of the votes cast in the last municipal general election, may be filed within thirty days of the public hearing. Upon receipt of such petition within the prescribed time period, the City may issue the Bonds only after obtaining the approval of a majority of the voters voting on the question of the issuance of the Bonds. The authorizations and approvals contained herein are subject to and contingent upon not receiving such a petition, or, in the event such a petition is filed, the approving vote of a majority of the voters voting on the question of the issuance of the Bonds. The motion for the adoption of the foregoing resolution was duly seconded by member _____________ and, after a full discussion thereof and upon a vote being taken thereon, the following voted in favor thereof: 2 301685636v1 and the following voted against the same: Whereupon the resolution was declared duly passed and adopted. \[Bonds must be approved by at least a two-thirds vote of the membership present.\] \[Issuance of Bonds is subject to a 30-day reverse referendum after the public hearing.\] 3 301685636v1 STATE OF MINNESOTA SCOTT COUNTY CITY OF PRIOR LAKE I, the undersigned, being the duly qualified and acting City Clerk of the City of Prior Lake, Minnesota, DO HEREBY CERTIFY that I have compared the attached and foregoing extract of minutes with the original thereof on file in my office, and that the same is a full, true and complete transcript of the minutes of a meeting of the City Council, duly called and held on the date therein indicated, insofar as the minutes relate to adopting a street reconstruction plan and the issuance of general obligation street reconstruction bonds. WITNESS my hand on August 12, 2026. ________________________________ Heidi Simon, City Clerk 4 301685636v1 CITY OF PRIOR LAKE, MN 2027 to 2031 CAPITAL IMPROVEMENT PLAN August 12, 2026 Adopted ______________, 2026 CITY OF PRIOR LAKE 2027-2031 CAPITAL IMPROVEMENT PLAN I. INTRODUCTION In 2003, the Minnesota State Legislature adopted a statute that generally exempts city and town general obligation bonds issued under a capital improvement plan from the referendum requirements usually required for city halls, public works, public safety facilities and libraries. The statute on general obligation capital improvement plan bonds is Minnesota Statutes, Section 475.521 (the “Act”). On August 12, 2026, the City Council held a public hearing on the adoption of the 2027-2031 Capital Improvement Plan and the issuance of general obligation improvement bonds. On August 12, 2026, the City Council adopted Resolution No. 26-_____ approving the 2027- 2031 Capital Improvement Plan (the “CIP”). The approved 2027-2031 Capital Improvement Plan anticipates the issuance of general obligation bonds to finance certain facilities improvements as described in the CIP. In order for the City of Prior Lake (the “City”) to proceed to issue general obligation bonds, pursuant to the Act, the City must make certain findings. These findings are included in this document. II. PURPOSE Under the Act, a capital improvement is a major expenditure of City funds for the acquisition or betterment to public lands, buildings, or other improvements used as a city hall, town hall, library, public safety, or public works facility, which has a useful life of five years or more. Under the Act, capital improvements do not include light rail transit or related activities, parks, road/bridges, administrative buildings other than a city hall or town hall, or land for those facilities. For the purposes of the Act, the CIP is a document designed to anticipate capital improvement expenditures and schedule them over at least a five-year period so that they may be purchased in the most efficient and cost-effective method possible. A CIP allows the matching of expenditures with anticipated income. As potential expenditures are reviewed, the City considers the benefits, costs, alternatives, and impact on operating expenditures. Before issuing bonds under a CIP, the City must hold a public hearing on the CIP and the proposed bonds and must then approve the CIP and authorize the issuance of the bonds by at least a 3/5 majority. If a petition signed by voters equal to at least 5 percent of the votes cast in the last general City election requesting a vote on the issuance of bonds is received by the municipal clerk within 30 days after the public hearing, then the bonds may not be issued unless approved by the voters at an election. A-1 The statute has established certain criteria that must be considered for each project to be undertaken pursuant to this CIP (the “Projects”). These criteria are: 1. Condition of the City’s existing infrastructure and projected need for repair or replacement 2. Demand for the improvement 3. Cost of the improvement 4. Availability of public resources 5. Level of overlapping debt 6. Cost/benefits of alternative uses of funds 7. Operating costs of the proposed improvements 8. Alternatives for providing services most efficiently through shared facilities with other municipalities or local governments The CIP is designed to be updated and modified on an annual basis. In this manner, it becomes an ongoing fiscal planning tool that continually anticipates future capital expenditures and funding sources. III. PLAN SUMMARY This CIP is intended to describe and analyze the need for the Projects in accordance with the Act. The City may modify this CIP from year to year as authorized by the Act. Following is a summary of estimated expenditures for the Projects, including cost of bond issuance (financing costs): 2027 Expenditures The City intends to do a bathroom remodel at the Thomas Ryan facility. The combined estimated cost of the improvements to these facilities along with cost of issuance to be financed through bond proceeds is $515,000. 2028 Expenditures The City intends to do multiple projects. City Hall improvements include a bathroom remodel, carpet, chiller, air handler and a BAS upgrade. Fire Station 2 will see a dorm remodel project. The Police Station improvements include a bathroom remodel, boiler replacement, BAS upgrade, carpet, locker room remodel and VAV boxes. The combined estimated cost of the improvements to these facilities along with cost of issuance to be financed through bond proceeds is $3,915,000. 2029 Expenditures The City intends for maintenance and remodel in City Hall and the Library/Club Prior. The major improvement in City Hall will be roofing. The Library/Club Prior will see A-2 roofing, air handling units, carpet and a BAS upgrade. The combined estimated cost of the improvements to these facilities along with cost of issuance to be financed through bond proceeds is $2,165,000. 2030 expenditures The City intends for multiple improvements around the City. Fire Station 1 will see a rooftop unit, infrared heaters and windows. We anticipate engineering fees for the Maintenance Facility. The Police Station plan includes roofing and parking enhancements. The combined estimated cost of the improvement to these facilities along with cost of issuance to be financed through bond proceeds is $2,060,000. 2031 Expenditures The City intends for roofing at Fire Station 1 and engineering costs for the Maintenance Facility. The combined estimated cost of the improvements to these facilities along with cost of issuance to be financed through bond proceeds is $2,575,000. Analysis The City has analyzed the eight points required by the Act for the Projects on an individual basis and as a whole. The findings are as follows: 1. Conditions of City Infrastructure, Including the Projected Need for Repair or Replacement and Need for the Project Improvements to City public safety, public works, and city hall facilities in future years are for capital maintenance and repair of existing facilities. 2. Likely Demand for the Project The City’s basic government service operations, including administration, police, fire, and public works operations are housed in facilities that are in need of capital maintenance and repair. 3. Estimated Cost of the Project The estimated cost, including architectural/engineering, contingency, legal and bonding, of the Project is set forth above. 4. Available Public Resources The City does not have sufficient cash reserves on hand to finance the improvement of the city hall and public works and public safety facilities without issuing bonds. The City plans to use the bond proceeds to reimburse the City for the Projects. A-3 5. Level of Overlapping Debt in the City As of July 2, 2026, the level of overlapping debt in the City is provided in the table below: 2025/2026 2025/2026 Tax Outstanding Tax Capacity General Percentage Taxpayers’ Capacity Value Applicable Obligation Share (1)(1) (2) Issuer Value in Cityin City Debt of Debt Scott County $ 345,024,650 $67,263,937 19.50% $86,835,000 $16,932,825 ISD No. 719 (Prior Lake-Savage) 108,716,245 64,331,356 59.17 109,983,926 65,077,489 ISD No. 720 (Shakopee) 108,106,610 2,932,581 2.71 85,014,567 2,303,895 (3) Metropolitan Council 6,503,726,905 67,263,937 1.03 12,100,000 124,630 (4) Metro Transit 5,665,367,373 67,263,937 1.19 223,650,000 2,661,435 $ 87,100,274 Total Indirect Debt: (1) Tax Capacity Value is after tax increment deduction and fiscal disparity adjustments. (2) As of July 2, 2026, unless noted otherwise. (3) Metropolitan Council has $12,100,000 of general obligation debt outstanding as of December 31, 2025. This debt is payable from ad valorem taxes levied on all taxable property within the Metropolitan Taxing District. This amount excludes $1,122,348,000 of general obligation debt payable from wastewater and sewer revenues, and lease agreements. (4) Metropolitan Transit has $223,650,000 of property tax supported general obligation debt outstanding as of December 31, 2025. Transit debt is issued by the Metropolitan Council for public transit operations and is payable from ad valorem taxes levied on all taxable property within the Metropolitan Transit District. This amount excludes $181,410,000 of general obligation debt payable from revenues. A-4 6. Relative Benefits and Costs of Alternative Uses of the Funds The proposed Projects could potentially be financed through the issuance of lease-revenue bonds. However, both costs of issuance and overall debt service payments would be significantly higher, since lease-revenue bonds are not general obligation debt and are therefore not as attractive to potential purchasers. The issuance of general obligation capital improvement plan bonds represents the most cost-efficient way to finance the proposed Projects. 7. Operating Costs of the Proposed Project Operating costs are not expected to be impacted to any significant degree with the proposed improvements. 8. Alternatives for Providing Services Most Efficiently Through Shared Facilities with Other Municipalities or Local Government Units The proposed capital improvements are being made to maximize effective, cost-effective City facilities, and as such, there would be no greater efficiency achieved through constructing shared facilities with other local government units. IV. FINANCING THE CAPITAL IMPROVEMENT PLAN The total amount of requested expenditures under the CIP is expected not to exceed $11,230,000, including estimated cost of issuance of bonds. These expenditures are to be funded by the sale of the City’s general obligation capital improvement plan bonds not to exceed $11,230,000. In the financing of the CIP, two statutory limitations apply. Under Minnesota Statutes, Chapter 475, as amended, with few exceptions, a municipality cannot incur debt in excess of 3% of the assessor’s Estimated Market Value (“EMV”) for the municipality. In the case of a municipality with a population of 2,500 or less, the bonds are not subject to the net debt limits. The City’s 2025 population was approximately 28,500. Therefore, the proposed general obligation capital improvement plan bonds to be issued in the years 2027 through 2031 would be subject to the debt limit. Another limitation on bonding under the Act is that without referendum, the total amount that can be used for principal and interest in any one year for CIP debt cannot exceed 0.16% of the EMV for the City. The City has portions of four outstanding series of bonds, its General Obligation Bonds, Series 2018A (the “Series 2018A Bonds”), General Obligation Bonds, Series 2021A (the “Series 2021A Bonds”), General Obligation Bonds, Series 2021B (the “Series 2021B Bonds”), and General Obligation Bonds, Series 2026A (the “Series 2026A Bonds” and together with the Series 2018A Bonds, the Series 2021A Bonds, the Series 2021B Bonds, the “Outstanding CIP Bonds”), issued under the Act. The maximum amount of principal and interest due in any calendar year on the Outstanding CIP Bonds, combined, is $1,273,338. In payable year 2026, the City’s EMV was $6,089,682,900. Therefore, the total amount available to be used to pay principal and interest on the outstanding bonds plus any new bonds issued under this Plan is $9,743,493 per year ($6,089,682,900 x 0.16% = $9,743,493, which is greater than the maximum amount of principal and interest due in any year on the Outstanding CIP Bonds plus the proposed new bonds.). A-5 Under this CIP the City may issue up to $11,230,000 in general obligation capital improvement plan bonds in the years 2027 through 2031 to finance the Projects. If the City were to issue general obligation capital improvement bonds in the maximum principal amount of $11,230,000 for the Projects, the bond issue would be repaid over a period not to exceed thirty (30) years pursuant to the Act. Expected debt service on the proposed bonds for the Projects is within the statutory limits. Annual Review of the Capital Improvement Plan The City Council, using the process outlined in this CIP, plans to review this CIP annually, considering proposed expenditures, making priority decisions, and seeking funding for those expenditures it deems necessary for the City. If deemed appropriate, the City Council will prepare an update to this CIP. (The remainder of this page is intentionally blank) A-6 CITY OF PRIOR LAKE, MN 2027 to 2031 STREET RECONSTRUCTION PLAN AS OF AUGUST 12, 2026 City of Prior Lake 2026-2030 Street Reconstruction Plan Page 2 of 4 City of Prior Lake, MN 2027 to 2031 Street Reconstruction Plan I. Introduction The City of Prior Lake (the “City”) historically has conducted street maintenance and reconstruction as part of its annual operational budget or as part of a street improvement capital improvement project. The maintenance and reconstruction have included seal coating, mill and overlay, complete reconstruction, and other such items incidental to the maintenance of city streets. The City finds that it does not always have the resources for reconstructing streets as quickly as required, due to increased need for major reconstruction projects. Due to this fact, the City has in the past and plans to in the future finance a portion of its street reconstruction through the issuance of General Obligation Street Reconstruction Bonds. II. Statutory Authority and Requirements Minnesota Statutes, Section 475.58, Subdivision 3b (the “Act”) authorizes Minnesota cities to adopt a Street Reconstruction Plan. The Plan must cover at least a five-year period and set forth the streets to be reconstructed, the estimated costs, and any planned reconstruction of other streets in the municipality over the next five years. Street Reconstruction Bonds can be used to finance the reconstruction and bituminous overlay of existing city streets. Eligible improvements may include turn lanes, bicycle lanes, sidewalks, paths, and other improvements having a substantial public safety function, realignments, other modifications to intersect with state and county roads, and the local share of state and county road projects. Except in the case of turn lanes, bicycle lanes, sidewalks, paths, and other safety improvements, realignments, intersection modifications, and the local share of state and county road projects, street reconstruction does not include the portion of project cost allocable to widening a street or adding curbs and gutters where none previously existed. Street Reconstruction Bonds are subject to the debt limit. The Act sets forth specific requirements for the issuance of Street Reconstruction Bonds, which are as follows: • The projects financed under this authority must be described in a street reconstruction plan, as described above. • The city must publish notice of and hold a public hearing on the proposed plan and the related issuance of bonds. The notice must be published at least ten days but not more than 28 days prior to the hearing date. • The Plan must be approved by a vote of a two-thirds majority of the members of the governing body present at the meeting following a public hearing. City of Prior Lake 2026-2030 Street Reconstruction Plan Page 3 of 4 • The issuance of bonds is subject to a reverse referendum. An election is required if voters equal to 5% of the votes cast in the last municipal general election file a petition with the city clerk within 30 days of the public hearing. If the city decides not to undertake an election, it may not propose the issuance of Street Reconstruction Bonds for the same purpose and in the same amount for a period of 365 days from the date of receipt of the petition. If the question of issuing the bonds is submitted and not approved by the voters, the provisions of section 475.58, subdivision 1a, shall apply (no resubmission for same purpose/amount for 180 days). III. History and Existing Street Reconstruction Bonds At the time of the approval of the Plan, the following Street Reconstruction (issued under Chapter 475) were outstanding: IV. Net Debt Limits Minnesota Statutes Section 475.53, Subd. 1 states that no municipality, except a school district or a city of the first class, shall incur or be subject to a net debt in excess of three percent of the market value of taxable property in the municipality. Bonds issued under the authority granted by this Street Reconstruction Plan are subject to the net debt limit restriction described above. The net debt capacity for the City at time of approval of the Original Plan is shown below under Statutory Debt Limit. Statutory Debt Limit Minnesota Statutes, Section 475.53 states that a city or county may not incur or be subject to a net debt in excess of three percent (3%) of its estimated market value. Net debt is, with limited exceptions, debt paid solely from ad valorem taxes. Bond Issue Amount Outstanding $3,505,000 G.O. Bonds, Series 2016A $40,000 $8,270,000 G.O. Bonds, Series 2018A 450,000 $2,065,000 G.O. Bonds, Series 2019A 680,000 $5,760,000 G.O. Bonds, Series 2021A 1,445,000 $1,620,000 G.O. Bonds, Series 2023A 350,000 Total Outstanding Street Reconstruction Bonds $ 2,965,000 City of Prior Lake 2026-2030 Street Reconstruction Plan Page 4 of 4 At time of approval of the proposed Plan the City’s Statutory Debt Limit is as follows: Computation of Legal Debt Margin as of July 1, 2026: 2026 Estimated Market Value $ 5,929,639,937 Multiplied by 3% x .03 Statutory Debt Limit $ 177,889,198 Outstanding debt applicable to debt limit: $3,630,000 G.O. Bonds, Series 2016A $ 40,000 $8,720,000 G.O. Bonds, Series 2018A 775,000 $2,065,000 G.O. Bonds, Series 2019A 765,000 $5,760,000 G.O. Bonds, Series 2021A 3,305,000 $5,870,000 G.O. Bonds, Series 2021B 2,625,000 $1,620,000 G.O. Bonds, Series 2023A 350,000 Less outstanding debt applicable to debt limit: $ 7,860,000 Legal debt margin $ 170,029,198 The Plan provides for the issuance of a not to exceed amount of $14,040,000 in General Obligation Street Reconstruction Bonds between January 1, 2027 and December 31, 2031. This amount includes estimated cost of issuance of bonds, capitalized interest and rounding. The proposed bond issuance is within the current City’s Legal Debt Margin, as of the date of adoption of the Plan. V. Proposed Street Reconstruction and Cost Estimate The Plan is detailed in Table A. The City reserves the right to adjust the amount of annual spending between years provided the overall not to exceed amount in the Plan is not increased. CITY OF PRIOR LAKE 2027-2031 STREET RECONSTRUCTION PLAN AMOUNTS January 1, 2027 through December 31, 2027 Northwood Street Recon Project - Phase 2 1,900,000$ CSAH 17 Expansion 70,000 CR 12 & CSAH 17 Intersection 110,000 TOTAL 2027 2,080,000$ January 1, 2028 through December 31, 2028 Green Heights Area 3,310,000$ TOTAL 2028 3,310,000$ January 1, 2029 through December 31, 2029 Sunset Hills Area 4,750,000$ Northwood Street Recon Project - Phase 3 940,000 TOTAL 2029 5,690,000$ January 1, 2030 through December 31, 2030 180th St Paving 690,000$ Berens Road Extension 830,000 Adelmann St Mill and Overlay 250,000 Fish Point Mill and Overlay 450,000 Clearly Lake Area Mill and Overlay 70,000 TOTAL 2030 2,290,000$ January 1, 2031 through December 31, 2031 None -$ TOTAL 2031 -$ GRAND TOTAL (1/1/2027 THROUGH 12/31/2031)13,370,000 Bond Issuance Costs, Capitalized Interest, and Rounding 670,000 GRAND TOTAL 14,040,000 TABLE A CapitalCapital ImprovementImprovement ProgramProgram Capital Improvement Program 2027-20312027-20312027-2031 DRAFT 4646 Dakota Street SE Prior Lake, MN 55372 Date: August 12, 2026 To: Mayor Briggs, Council Members and Residents of Prior Lake From: Jason Wedel, City Manager Subject: 2027-2031 Capital Improvement Program The City of Prior Lake plans for the long-term maintenance and improvement of public infrastructure through the development of a five-year Capital Improvement Program (CIP). The CIP serves as the City's strategic roadmap for investing in and maintaining essential public assets, including streets, trails, parks, public buildings, water mains, sanitary sewer infrastructure, vehicles, and other major equipment. The 2027–2031 CIP aligns with the City Council's strategic priorities and long-range financial planning efforts. Each year, the program is reviewed, updated, and adopted by the City Council to reflect completed projects, changing community needs, evolving priorities, and available financial resources. This annual review ensures that the City remains responsive while maintaining a disciplined approach to infrastructure planning. The Capital Improvement Program is one of the City's most important financial planning tools. By identifying future infrastructure needs well in advance, the City can responsibly plan for major investments, coordinate projects efficiently, and ensure that funding is available when needed. This proactive approach supports reliable public services, protects the City's existing infrastructure, and helps preserve the quality of life that residents expect. A key objective of the CIP is to maximize the use of pay-as-you-go funding whenever practical. By setting aside resources in advance and planning projects over multiple years, the City minimizes its reliance on debt financing, reduces long-term borrowing costs, and maintains the financial flexibility necessary to address future community needs. This disciplined approach reflects the City's ongoing commitment to sound fiscal stewardship and responsible management of public resources. ______________________________ Jason Wedel, City Manager DRAFT 2027-2031 CAPITAL IMPROVEMENT PROGRAM Adopted August 12, 2026 by the PRIOR LAKE CITY COUNCIL Term Expires Mayor Kirt Briggs December 31, 2028 Councilmember Zach Braid December 31, 2028 Councilmember Kim Churchill December 31, 2026 Councilmember Victor Lake December 31, 2026 Councilmember Ethan Hellier December 31, 2028 STAFF City Manager Jason Wedel Assistant City Manager Lori Olson Finance Nicole Klekner City Engineer/Public Works Nick Monserud Police Chief Liam Duggan Fire Chief Rick Steinhaus Community Development Casey McCabe DRAFT TABLE OF CONTENTS (Pg 1 of 2) 1. Department Summary  This table summarizes total project costs each year by department. 2. Funding Source Summary  This table summarizes the impact of the projects identified in the CIP on each of the funding sources. 3. Pavement Management Plan (2027-2031)  Projects by Department - This table provides a five-year summary of street overlay and improvement projects.  Projects & Funding Sources by Department – This table provides the five- year detail of street overlay and improvement projects and funding sources by project.  Funding Summary – This table provides a five-year summary of the funding sources being used for projects.  Sources and Uses of Funds – This table provides a five-year projection of revenues, expenditures, and fund balance.  The Transportation Plan Map identifies the proposed CIP projects.  The Street Reconstruction Plan (adopted 8/12/2026) identifies the projects that could potentially be funded by street reconstruction bonds 4. Equipment Replacement Plan (2027-2031)  Projects by Department – This table provides the five-year detail of equipment replacement by department.  Projects & Funding Sources by Department – This table provides the five- year detail of equipment replacement and funding sources.  Funding Summary – This table provides a five-year summary of the funding sources being used for equipment replacement.  Sources and Uses of Funds – This table provides a five-year projection of revenues, expenditures, and fund balance. 5. Park Plan (2027-2031)  Projects by Department and Category – This table provides the five-year detail of park development and replacement projects.  Projects & Funding Sources by Department – This table provides the five- year detail of park development and replacement projects and funding sources.  Funding Summary – This table provides a five-year summary of the funding sources being used for the park plan.  Sources and Uses of Funds – This table provides a five-year projection of revenues, expenditures, and fund balance. DRAFT TABLE OF CONTENTS (Pg 2 of 2) 6. Facilities Management Plan (2027-2031) Projects by Department and Category – This table provides the five-year detail of facility improvement projects. Projects & Funding Sources by Department – This table provides the five- year detail of facility improvements and funding sources. Funding Summary – This table provides a five-year summary of the funding sources being used for facility improvements. Sources and Uses of Funds – This table provides a five-year projection of revenues, expenditures, and fund balance. The Capital Improvement Plan (adopted 8/12/26) identifies the projects that could potentially be funded by capital improvement plan bonds. 7. Technology Plan (2027-2031) Projects by Department and Category – This table provides the five-year detail of technology equipment and infrastructure. Projects & Funding Sources by Department – This table provides the five- year detail of technology equipment and funding sources. 8.Enterprise Funds These tables provide a summary of uses and sources of funds and planned capital projects for Water, Sewer and Storm Water 9.Debt Analysis & Tax Impact 10.City Financial Management Plan DRAFT 2027-2031 CAPITAL IMPROVEMENT PROGRAM Two of the goals of the city’s Strategic Plan are “Stable and Sustainable Infrastructure” and “High Quality Parks & Trails.” These goals contain objectives for financial stability and a comprehensive funding strategy to ensure sufficient resources. The CIP is a primary tool for meeting these objectives and providing a sound strategy for our capital needs. The Prior Lake Capital Improvement Program (CIP) addresses these goals by focusing on long- term planning for the expansion, replacement and/or maintenance of capital assets. Capital assets refer to infrastructure (water, sewer, storm water, and streets), vehicles and equipment, park equipment, facilities, and technology software and hardware. The CIP is reviewed on an annual basis to identify the need for expansion, replacement and/or maintenance; the timeframe to complete the project; and the appropriate funding source. The final document reflects the specific goals, policies and priorities of the City Council and the Strategic Plan. It is important to note that the CIP is a planning document and contains estimates for the project and equipment costs. Prior to the implementation of any individual improvement project, staff must prepare a feasibility study, conduct a public hearing, request bids for the construction costs, and obtain approval for all phases of the project from the City Council. The CIP also includes the following long-term plans: Pavement Management Plan (Annual Street Improvement Project(s) and Street Overlay), Equipment Replacement Plan, Park Equipment Replacement Plan, Technology Plan, Facilities Management Plan and plans for each of the three enterprise funds including Water, Sewer, and Storm Water. The Pavement Management Plan identifies the annual street improvement project(s) and annual street overlay project. o Annual Street Improvement Project(s) – identifies the major roadway improvements involving both new and reconstruction projects that need to be coordinated with Scott County. o Annual Street Overlay – identifies the City’s annual street overlay costs and anticipated project levy and bonding for the special assessment portion of the annual project costs. The Equipment Replacement Plan serves to identify the City’s equipment needs on a long-term basis and to provide a regular replacement schedule. The equipment purchases for the Fire, Police and Public Works departments are processed through a revolving equipment fund. Equipment purchases that are typically less than $10,000 are incorporated into the annual operating budgets for the specific departments. DRAFT The Park Plan – identifies the new park capital improvements and the equipment replacement demands for neighborhood parks. The Facilities Management Plan identifies major repairs or improvements to all City-owned buildings. The Technology Plan identifies the hardware and major software needs for each department and establishes a regular replacement schedule The Enterprise Funds plans (Water, Sewer and Storm Water) identify the amount of capital necessary for infrastructure replacements and improvements needed to supply water to the city, collect and discharge sanitary waste, and treat stormwater discharge in the city. DRAFT 2027 through 2031 Capital Improvement Plan Prior Lake, MN Department Summary Department 2027 2028 2029 2030 2031 Total Building Inspection 60,000 120,000 180,000 Cable 140,000 140,000 Central Garage 20,000 20,000 20,000 35,000 20,000 115,000 Elections 115,000 115,000 Engineering 60,000 60,000 Facilities 2,014,760 4,227,260 2,490,500 2,414,500 3,231,000 14,378,020 Fire 1,669,540 1,000,000 20,000 87,500 2,777,040 Parks 546,500 204,000 273,500 40,500 368,500 1,433,000 Parks: Projects 2,230,000 4,136,000 877,000 283,500 290,000 7,816,500 Police 184,600 660,000 362,000 355,000 405,000 1,966,600 Streets 765,000 851,000 272,000 615,500 810,000 3,313,500 Streets: Overlay 106,000 2,394,000 2,500,000 Streets: Transportation 8,472,000 8,887,000 13,198,000 3,104,000 995,000 34,656,000 Technology 38,000 16,000 10,000 21,000 85,000 Trunk Fund 1,500,000 2,000,000 3,500,000 Utility: Sewer Fund 1,527,000 2,021,000 2,011,000 2,381,000 1,637,500 9,577,500 Utility: Storm Water Fund 585,000 607,000 459,000 481,000 644,000 2,776,000 Utility: Water Fund 710,000 928,000 788,500 227,000 1,685,000 4,338,500 GRAND TOTAL 20,402,400 25,663,260 20,841,500 12,478,500 10,342,000 89,727,660 Produced Using Plan-It CIP Software 1 DRAFT 2027 through 2031 Capital Improvement Plan Prior Lake, MN Funding Source Summary Source 2027 2028 2029 2030 2031 Total Cable Franchise Fund (F210) 70,000 70,000 Capital Park Fund (F225) 750,000 550,000 1,300,000 City MSA Funds 600,000 106,000 3,000,000 500,000 319,000 4,525,000 Construction Fund (F501) 397,000 397,000 County 250,000 250,000 Developer - Upfront Costs 325,000 325,000 Facilities Management Fund (F440) 1,514,760 436,760 432,000 500,000 731,000 3,614,520 Federal Grant 850,000 850,000 Franchise Fees 1,211,000 1,600,000 1,400,000 812,000 5,023,000 General Fund (F101) 108,000 16,000 10,000 136,000 270,000 G.O. Capital Equipment Bonds 2,259,540 1,483,000 3,742,540 G.O. Capital Imp Bonds - 2028 7,196,500 7,196,500 G.O. Capital Improvement Bonds 500,000 2,058,500 1,914,500 2,500,000 6,973,000 G.O. SA Bonds - Overlay Assessment 685,000 685,000 G.O. SA Bonds - Project Assessment 862,000 646,000 1,913,000 3,421,000 G.O. SA Bonds - Project Levy 1,948,000 2,081,000 2,181,000 1,529,000 676,000 8,415,000 Grants/Other Contrib. 240,000 240,000 Revolving Equip. Fund (F410) 926,100 1,052,000 1,007,500 1,193,500 1,650,166 5,829,266 Revolving Park Equip. Fund (F430) 630,000 730,000 327,000 283,500 290,000 2,260,500 SMSC Cost Sharing 1,000,000 1,000,000 Storm Trunk Fund 762,000 762,000 Trunk Reserve Fund (F502) 1,500,000 2,000,000 3,500,000 Utility: Sewer Fund (F604) 2,586,000 3,554,000 4,131,000 1,911,250 1,674,167 13,856,417 Utility: Storm Water Fund (F602) 1,174,000 1,280,000 1,396,000 721,000 644,000 5,215,000 Utility: Water Fund (F601) 1,911,000 3,482,000 2,435,500 456,750 1,721,667 10,006,917 GRAND TOTAL 20,402,400 25,663,260 20,841,500 12,478,500 10,342,000 89,727,660 Produced Using Plan-It CIP Software 2 DRAFT 2027 through 2031 Permanent Imp Revolving Fund (450) Prior Lake, MN Projects By Category Category Project # 2027 2028 2029 2030 2031 Total Streets: Street Overlay Adelmann St Mill and Overlay PIR30-000001 517,000 517,000 Cleary Lake Area Mill and Overlay PIR34-000003 459,000 459,000 CR 42 M&O PIR28-000001 106,000 106,000 Fish Point Mill and Overlay PIR30-000002 1,418,000 1,418,000 Streets: Street Overlay Total 0 106,000 0 2,394,000 0 2,500,000 GRAND TOTAL 0 106,000 0 2,394,000 0 2,500,000 Produced Using Plan-It CIP Software 3.1 DRAFT 2027 through 2031 Permanent Imp Revolving Fund (450) Prior Lake, MN Projects & Funding Sources By Department Department Project # 2027 2028 2029 2030 2031 Total Streets: Overlay Adelmann St Mill and Overlay PIR30-000001 0 0 0 517,000 0 517,000 Franchise Fees 295,000 295,000 G.O. SA Bonds - Overlay Assessment 222,000 222,000 Cleary Lake Area Mill and Overlay PIR34-000003 0 0 0 459,000 0 459,000 Construction Fund (F501) 397,000 397,000 G.O. SA Bonds - Overlay Assessment 62,000 62,000 CR 42 M&O PIR28-000001 0 106,000 0 0 0 106,000 City MSA Funds 106,000 106,000 Fish Point Mill and Overlay PIR30-000002 0 0 0 1,418,000 0 1,418,000 City MSA Funds 500,000 500,000 Franchise Fees 517,000 517,000 G.O. SA Bonds - Overlay Assessment 401,000 401,000 Streets: Overlay Total 0 106,000 0 2,394,000 0 2,500,000 GRAND TOTAL 0 106,000 0 2,394,000 0 2,500,000 Produced Using Plan-It CIP Software 3.2 DRAFT 2027 through 2031 Permanent Imp Revolving Fund (450) Prior Lake, MN Funding Source Summary Source 2027 2028 2029 2030 2031 Total City MSA Funds 106,000 500,000 606,000 Construction Fund (F501) 397,000 397,000 Franchise Fees 812,000 812,000 G.O. SA Bonds - Overlay Assessment 685,000 685,000 GRAND TOTAL 0 106,000 0 2,394,000 0 2,500,000 Produced Using Plan-It CIP Software 3.3 DRAFT CITY OF PRIOR LAKE PIR Revolving Fund F450 2027 2028 2029 2030 2031 Projected Projected Projected Projected Projected REVENUE AND OTHER SOURCES Special assessments 202,839 193,883 184,927 242,398 155,659 Intergovernmental MSA - - - - - Investment income 36,600 20,000 20,000 20,000 20,000 Bonds issued (incl prem/disc) assessment portion - - - 710,000 - Transfers in Construction Fund (F501)- 400,000 - 1,709,000 - Total Revenues and Other Fund Sources 239,439 613,883 204,927 2,681,398 175,659 EXPENDITURES AND OTHER USES Capital Outlay - (106,000) - (2,394,000) - Cost of issuance of bonds - -- (25,000) - Transfers out to debt service funds (424,900) (425,500) (427,425) (52,825) (210,888) Total Expenditures and Other Uses (424,900) (531,500) (427,425) (2,471,825) (210,888) CHANGE IN FUND BALANCE (185,461) 82,383 (222,498) 209,573 (35,229) Beginning Fund Balance 312,934 127,473 209,856 (12,642) 196,931 Ending Fund Balance 127,473 209,856 (12,642) 196,931 161,702 3.4 DRAFT 2027 through 2031 Construction Fund (501) Prior Lake, MN Projects By Category Category Project # 2027 2028 2029 2030 2031 Total Streets: City Jurisdiction Lords Street Bridge Rehab TRN24-000002 300,000 300,000 Frost Point Circle TRN25-000002 49,000 49,000 Northwood Phase 2 TRN27-000001 4,779,000 4,779,000 CSAH 17 Expansion TRN27-000002 211,000 211,000 Wilds Jeffers Sealcoat TRN27-000003 520,000 520,000 CR12 & CSAH 17 Intersection TRN27-000004 1,447,000 1,447,000 Green Heights TRN28-000001 657,000 7,772,000 8,429,000 Northwood Phase 3 TRN29-000001 202,000 404,000 4,781,000 5,387,000 Sunset Hills Area TRN29-000002 356,000 711,000 8,417,000 9,484,000 Berens Road Extension TRN30-000001 2,000,000 2,000,000 Raspberry Ridge Neighborhood TRN31-000001 308,000 308,000 Big Woods Trail (CR21) TRN31-000002 103,000 103,000 Big Woods Trail (CR82) TRN31-000003 216,000 216,000 Carriage Hills Coachman Recon TRN34-000001 159,000 319,000 478,000 180th St Paving TRN34-000002 945,000 945,000 Streets: City Jurisdiction Total 8,472,000 8,887,000 13,198,000 3,104,000 995,000 34,656,000 GRAND TOTAL 8,472,000 8,887,000 13,198,000 3,104,000 995,000 34,656,000 Produced Using Plan-It CIP Software sm5 DRAFT 2027 through 2031 Construction Fund (501) Prior Lake, MN Projects & Funding Sources By Department Department Project # 2027 2028 2029 2030 2031 Total Streets: Transportation Lords Street Bridge Rehab TRN24-000002 300,000 0 0 0 0 300,000 Franchise Fees 60,000 60,000 Grants/Other Contrib. 240,000 240,000 Frost Point Circle TRN25-000002 0 0 0 0 49,000 49,000 G.O. SA Bonds - Project Levy 49,000 49,000 Northwood Phase 2 TRN27-000001 4,779,000 0 0 0 0 4,779,000 Franchise Fees 1,151,000 1,151,000 G.O. SA Bonds - Project Assessment 862,000 862,000 G.O. SA Bonds - Project Levy 254,000 254,000 Utility: Sewer Fund (F604) 1,059,000 1,059,000 Utility: Storm Water Fund (F602) 589,000 589,000 Utility: Water Fund (F601) 864,000 864,000 CSAH 17 Expansion TRN27-000002 211,000 0 0 0 0 211,000 City MSA Funds 150,000 150,000 G.O. SA Bonds - Project Levy 61,000 61,000 Wilds Jeffers Sealcoat TRN27-000003 520,000 0 0 0 0 520,000 G.O. SA Bonds - Project Levy 520,000 520,000 CR12 & CSAH 17 Intersection TRN27-000004 1,447,000 0 0 0 0 1,447,000 City MSA Funds 450,000 450,000 G.O. SA Bonds - Project Levy 100,000 100,000 Storm Trunk Fund 762,000 762,000 Utility: Water Fund (F601) 135,000 135,000 Green Heights TRN28-000001 657,000 7,772,000 0 0 0 8,429,000 Franchise Fees 1,600,000 1,600,000 G.O. SA Bonds - Project Assessment 646,000 646,000 G.O. SA Bonds - Project Levy 657,000 1,370,000 2,027,000 Utility: Sewer Fund (F604) 1,533,000 1,533,000 Utility: Storm Water Fund (F602) 473,000 473,000 Utility: Water Fund (F601) 2,150,000 2,150,000 Northwood Phase 3 TRN29-000001 202,000 404,000 4,781,000 0 0 5,387,000 City MSA Funds 1,900,000 1,900,000 G.O. SA Bonds - Project Assessment 825,000 825,000 G.O. SA Bonds - Project Levy 25,000 25,000 Utility: Sewer Fund (F604) 1,184,000 1,184,000 Utility: Storm Water Fund (F602) 269,000 269,000 Utility: Water Fund (F601) 202,000 404,000 578,000 1,184,000 Sunset Hills Area TRN29-000002 356,000 711,000 8,417,000 0 0 9,484,000 City MSA Funds 1,100,000 1,100,000 Franchise Fees 1,400,000 1,400,000 G.O. SA Bonds - Project Assessment 1,088,000 1,088,000 G.O. SA Bonds - Project Levy 356,000 711,000 2,156,000 3,223,000 Utility: Sewer Fund (F604) 936,000 936,000 Utility: Storm Water Fund (F602) 668,000 668,000 Utility: Water Fund (F601) 1,069,000 1,069,000 Berens Road Extension TRN30-000001 0 0 0 2,000,000 0 2,000,000 County 250,000 250,000 G.O. SA Bonds - Project Levy 750,000 750,000 SMSC Cost Sharing 1,000,000 1,000,000 Produced Using Plan-It CIP Software 3.6 DRAFT Department Project # 2027 2028 2029 2030 2031 Total Raspberry Ridge Neighborhood TRN31-000001 0 0 0 0 308,000 308,000 G.O. SA Bonds - Project Levy 308,000 308,000 Big Woods Trail (CR21) TRN31-000002 0 0 0 0 103,000 103,000 City MSA Funds 103,000 103,000 Big Woods Trail (CR82) TRN31-000003 0 0 0 0 216,000 216,000 City MSA Funds 216,000 216,000 Carriage Hills Coachman Recon TRN34-000001 0 0 0 159,000 319,000 478,000 G.O. SA Bonds - Project Levy 159,000 319,000 478,000 180th St Paving TRN34-000002 0 0 0 945,000 0 945,000 Developer - Upfront Costs 325,000 325,000 G.O. SA Bonds - Project Levy 620,000 620,000 Streets: Transportation Total 8,472,000 8,887,000 13,198,000 3,104,000 995,000 34,656,000 GRAND TOTAL 8,472,000 8,887,000 13,198,000 3,104,000 995,000 34,656,000 Produced Using Plan-It CIP Software sm7 DRAFT 2027 through 2031 Construction Fund (501) Prior Lake, MN Funding Source Summary Source 2027 2028 2029 2030 2031 Total City MSA Funds 600,000 3,000,000 319,000 3,919,000 County 250,000 250,000 Developer - Upfront Costs 325,000 325,000 Franchise Fees 1,211,000 1,600,000 1,400,000 4,211,000 G.O. SA Bonds - Project Assessment 862,000 646,000 1,913,000 3,421,000 G.O. SA Bonds - Project Levy 1,948,000 2,081,000 2,181,000 1,529,000 676,000 8,415,000 Grants/Other Contrib. 240,000 240,000 SMSC Cost Sharing 1,000,000 1,000,000 Storm Trunk Fund 762,000 762,000 Utility: Sewer Fund (F604) 1,059,000 1,533,000 2,120,000 4,712,000 Utility: Storm Water Fund (F602) 589,000 473,000 937,000 1,999,000 Utility: Water Fund (F601) 1,201,000 2,554,000 1,647,000 5,402,000 GRAND TOTAL 8,472,000 8,887,000 13,198,000 3,104,000 995,000 34,656,000 Produced Using Plan-It CIP Software 3.8 DRAFT CITY OF PRIOR LAKE Construction Fund F501 2027 2028 2029 2030 2031 Projected Projected Projected Projected Projected REVENUE AND OTHER SOURCES Franchise fees 1,302,000 1,478,000 1,488,000 1,499,000 1,702,000 Intergovernmental 240,000 - - 1,250,000 - Intergovernmental MSA 1,090,000 1,106,400 1,123,000 1,139,800 1,156,900 Investment income 56,700 50,000 50,000 50,000 50,000 Other financing sources - - - 325,000 - Bonds issued (incl prem/disc) city portion 2,033,000 2,144,338 2,245,460 1,575,000 695,000 Bonds issued (incl prem/disc) assessment portion 862,000 665,662 1,969,540 - - Transfers in Water Fund (F601)1,201,000 2,554,000 2,253,000 - - Water Quality Fund (F602)589,000 473,000 937,000 - - Sewer Fund (F604)1,059,000 1,533,000 2,120,000 - - Other Funds 762,000 - - - - Total Revenues and Other Fund Sources 9,194,700 10,004,400 12,186,000 5,838,800 3,603,900 EXPENDITURES AND OTHER USES Capital Outlay (8,472,000) (8,887,000) (13,198,000) (3,104,000) (995,000) Cost of issuance of bonds (85,000) (83,000) (121,000) (46,000) (19,000) Paid to General Fund for engineering (185,000) (185,000) (185,000) (185,000) (185,000) Transfers out to PIR Fund (F450)-(400,000) - (1,709,000) - Total Expenditures and Other Uses (8,742,000) (9,555,000) (13,504,000) (5,044,000) (1,199,000) CHANGE IN FUND BALANCE 452,700 449,400 (1,318,000) 794,800 2,404,900 Beginning Fund Balance 550,199 1,002,899 1,452,299 134,299 929,099 Ending Fund Balance 1,002,899 1,452,299 134,299 929,099 3,333,999 3.9 DRAFT CAMPBELL LAKE SPRING LAKE BLIND LAKE CLEARY LAKE HAAS LAKE LOWER PRIOR LAKE JEFFERS POND O'DOWD LAKE PIKE LAKE MYSTIC LAKE CATES LAKE ARCTIC LAKEHOWARD LAKE UPPER PRIOR LAKE 44 78 12 87 23 82 21 17 16 42 18 27 83 14 13 13 282 ϮϬϮϳ ϮϬϮϴ ϮϬϮϵ ϮϬϯϬ ϮϬϯϭ 3DYHPHQW0DQDJHPHQW 3ODQ227231 This product is for informational purposes and is not suitable for legal, engineering, or surveying purposes. This product has been produced by the City of Prior Lake for the sole purpose of geographic reference. No warranty is made by the City of Prior Lake regarding specific accuracy or completeness. *UHHQ+HLJKWV$UHD 228 6XQVHW+LOOV 22 %LJ:RRGV7UO&582 &RXQW\3URMHFW 231 /RUGV6W%ULGJH 227 7UDLOKHDG/Q0 2 23 %LJ:RRGV7UO&521 &RXQW\3URMHFW 231 0 1 Miles &6$+17([SDQVLRQ &RXQW\3URMHFW 227 &5 &6$+17,QWHUVHFWLRQ &RXQW\3URMHFW 227 $GHOPDQQ0 2 23 )LVK3W5G0 2 23 1RUWKZRRG3KDVH3 22 1RUWKZRRG3KDVH2 227 %HUHQV5RDG([WHQVLRQ 23 Last Updated 6/11/2026 18WK6W3DYLQJ 23 &5420 2 &RXQW\3URMHFW 228 3.1 DRAFT CITY OF PRIOR LAKE, MN 2027 to 2031 STREET RECONSTRUCTION PLAN AS OF AUGUST 12, 2026 3.11 DRAFT City of Prior Lake 2027-2031 Street Reconstruction Plan Page 2 of 4 City of Prior Lake, MN 2027 to 2031 Street Reconstruction Plan I.Introduction The City of Prior Lake (the “City”) historically has conducted street maintenance and reconstruction as part of its annual operational budget or as part of a street improvement capital improvement project. The maintenance and reconstruction have included seal coating, mill and overlay, complete reconstruction, and other such items incidental to the maintenance of city streets. The City finds that it does not always have the resources for reconstructing streets as quickly as required, due to increased need for major reconstruction projects. Due to this fact, the City has in the past and plans to in the future finance a portion of its street reconstruction through the issuance of General Obligation Street Reconstruction Bonds. II.Statutory Authority and Requirements Minnesota Statutes, Section 475.58, Subdivision 3b (the “Act”) authorizes Minnesota cities to adopt a Street Reconstruction Plan. The Plan must cover at least a five-year period and set forth the streets to be reconstructed, the estimated costs, and any planned reconstruction of other streets in the municipality over the next five years. Street Reconstruction Bonds can be used to finance the reconstruction and bituminous overlay of existing city streets. Eligible improvements may include turn lanes, bicycle lanes, sidewalks, paths, and other improvements having a substantial public safety function, realignments, other modifications to intersect with state and county roads, and the local share of state and county road projects. Except in the case of turn lanes, bicycle lanes, sidewalks, paths, and other safety improvements, realignments, intersection modifications, and the local share of state and county road projects, street reconstruction does not include the portion of project cost allocable to widening a street or adding curbs and gutters where none previously existed. Street Reconstruction Bonds are subject to the debt limit. The Act sets forth specific requirements for the issuance of Street Reconstruction Bonds, which are as follows: •The projects financed under this authority must be described in a street reconstruction plan, as described above. •The city must publish notice of and hold a public hearing on the proposed plan and the related issuance of bonds. The notice must be published at least ten days but not more than 28 days prior to the hearing date. •The Plan must be approved by a vote of a two-thirds majority of the members of the governing body present at the meeting following a public hearing. 3.1 DRAFT City of Prior Lake 2027-2031 Street Reconstruction Plan Page 3 of 4 •The issuance of bonds is subject to a reverse referendum. An election is required if voters equal to 5% of the votes cast in the last municipal general election file a petition with the city clerk within 30 days of the public hearing. If the city decides not to undertake an election, it may not propose the issuance of Street Reconstruction Bonds for the same purpose and in the same amount for a period of 365 days from the date of receipt of the petition. If the question of issuing the bonds is submitted and not approved by the voters, the provisions of section 475.58, subdivision 1a, shall apply (no resubmission for same purpose/amount for 180 days). III.History and Existing Street Reconstruction Bonds At the time of the approval of the Plan, the following Street Reconstruction (issued under Chapter 475) were outstanding: IV.Net Debt Limits Minnesota Statutes Section 475.53, Subd. 1 states that no municipality, except a school district or a city of the first class, shall incur or be subject to a net debt in excess of three percent of the market value of taxable property in the municipality. Bonds issued under the authority granted by this Street Reconstruction Plan are subject to the net debt limit restriction described above. The net debt capacity for the City at time of approval of the Original Plan is shown below under Statutory Debt Limit. Statutory Debt Limit Minnesota Statutes, Section 475.53 states that a city or county may not incur or be subject to a net debt in excess of three percent (3%) of its estimated market value. Net debt is, with limited exceptions, debt paid solely from ad valorem taxes. Bond Issue Amount Outstanding $3,505,000 G.O. Bonds, Series 2016A $40,000 $8,270,000 G.O. Bonds, Series 2018A 450,000 $2,065,000 G.O. Bonds, Series 2019A 680,000 $5,760,000 G.O. Bonds, Series 2021A 1,445,000 $1,620,000 G.O. Bonds, Series 2023A 350,000 Total Outstanding Street Reconstruction Bonds $ 2,965,000 3.1 DRAFT City of Prior Lake 2027-2031 Street Reconstruction Plan Page 4 of 4 At time of approval of the proposed Plan the City’s Statutory Debt Limit is as follows: Computation of Legal Debt Margin as of July 1, 2026: 2026 Estimated Market Value $ 5,929,639,937 Multiplied by 3% x .03 Statutory Debt Limit $ 177,889,198 Outstanding debt applicable to debt limit: $3,630,000 G.O. Bonds, Series 2016A $ 40,000 $8,720,000 G.O. Bonds, Series 2018A 775,000 $2,065,000 G.O. Bonds, Series 2019A 765,000 $5,760,000 G.O. Bonds, Series 2021A 3,305,000 $5,870,000 G.O. Bonds, Series 2021B 2,625,000 $1,620,000 G.O. Bonds, Series 2023A 350,000 Less outstanding debt applicable to debt limit: $ 7,860,000 Legal debt margin $ 170,029,198 The Plan provides for the issuance of a not to exceed amount of $14,040,000 in General Obligation Street Reconstruction Bonds between January 1, 2027 and December 31, 2031. This amount includes estimated cost of issuance of bonds, capitalized interest and rounding. The proposed bond issuance is within the current City’s Legal Debt Margin, as of the date of adoption of the Plan. V.Proposed Street Reconstruction and Cost Estimate The Plan is detailed in Table A. The City reserves the right to adjust the amount of annual spending between years provided the overall not to exceed amount in the Plan is not increased. 3.1 DRAFT CITY OF PRIOR LAKE 2027-2031 STREET RECONSTRUCTION PLAN AMOUNTS January 1, 2027 through December 31, 2027 Northwood Street Recon Project - Phase 2 1,900,000$ CSAH 17 Expansion 70,000 CR 12 & CSAH 17 Intersection 110,000 TOTAL 2027 2,080,000$ January 1, 2028 through December 31, 2028 Green Heights Area 3,310,000$ TOTAL 2028 3,310,000$ January 1, 2029 through December 31, 2029 Sunset Hills Area 4,750,000$ Northwood Street Recon Project - Phase 3 940,000 TOTAL 2029 5,690,000$ January 1, 2030 through December 31, 2030 180th St Paving 690,000$ Berens Road Extension 830,000 Adelmann St Mill and Overlay 250,000 Fish Point Mill and Overlay 450,000 Clearly Lake Area Mill and Overlay 70,000 TOTAL 2030 2,290,000$ January 1, 2031 through December 31, 2031 None -$ TOTAL 2031 -$ GRAND TOTAL (1/1/2027 THROUGH 12/31/2031)13,370,000 Bond Issuance Costs, Capitalized Interest, and Rounding 670,000 GRAND TOTAL 14,040,000 TABLE A 3.15 DRAFT 2027 through 2031 Revolving Equipment Fund (410) Prior Lake, MN Projects By Department Department Project # 2027 2028 2029 2030 2031 Total Building Inspection 1/2 Ton Pickup 6394 60,000 60,000 Pickup 1/2 Ton 6395 60,000 60,000 Truck 1/2 Ton 6398 60,000 60,000 Building Inspection Total 0 0 0 60,000 120,000 180,000 Central Garage Plasma Cutter 8921 4,500 4,500 Refurbishing REFUR 20,000 20,000 20,000 20,000 20,000 100,000 Welder 8920 10,500 10,500 Central Garage Total 20,000 20,000 20,000 35,000 20,000 115,000 Engineering Truck-1 Ton 6399 60,000 60,000 Engineering Total 0 0 60,000 0 0 60,000 Fire Fire Ladder Truck 9280 1,369,540 1,369,540 Fire Radios FD-RADIOS 67,500 67,500 Fire Truck Pumper 9222 300,000 1,000,000 1,300,000 Pressure Washer - FS1 8002 20,000 20,000 Pressure Washer - FS2 8003 20,000 20,000 Fire Total 1,669,540 1,000,000 20,000 87,500 0 2,777,040 Parks Aerator 8262 9,000 9,000 Aerovator 8265 16,000 16,000 Electric Scissor Lift 8551 25,000 25,000 Fertilizer Spreader 8267 8,500 8,500 Forklift 8558 46,500 46,500 Mower-16FT 8504 175,000 175,000 Mower-6FT 8524 62,000 62,000 Mower-6FT 8523 68,000 68,000 Mower-6FT 8526 62,000 62,000 Mower-6FT 8525 62,000 62,000 Mower Walk Behind 8511 8,500 8,500 Pickup 1/2 Ton 8541 60,000 60,000 Pick-Up 1/2 Ton 8319 60,000 60,000 Scissor Lift Drop Deck Trailer 8552 16,000 16,000 Skid Steer Combo Plane 8279 5,000 5,000 Skid Steer - Tracks 8502 87,000 87,000 Skid Steer - Wheels 8501 113,000 113,000 Sod Cutter 8512 6,000 6,000 Stump Grinder 8272 12,000 12,000 Tiller 8268 9,000 9,000 Top Dresser 8273 20,000 20,000 Tractor 8505 150,000 150,000 Tractor Snow Blower 8270 14,500 14,500 Trail Blower 8278 7,500 7,500 Trailer 8531 17,500 17,500 Trailer-Small (IRRIG) 8554 8,000 8,000 Truck 1/2 Ton - Sanitation 8508 115,000 115,000 Produced Using Plan-It CIP Software 4.1 DRAFT Department Project # 2027 2028 2029 2030 2031 Total Truck 1 Ton Dump 8546 120,000 120,000 Utility Vehicle 8536 35,000 35,000 Utility Vehicle-Field Groomer 8537 35,000 35,000 Parks Total 546,500 204,000 273,500 40,500 368,500 1,433,000 Police 2007 Siren@1500 Spring Lake Cir., Jordan PD-Siren15 46,600 46,600 Chief 7131 55,000 55,000 Drug Task Force Car 7298 55,000 55,000 Investigator 7134 55,000 55,000 Investigator 7137 55,000 55,000 Polaris XP 1000 Crew 7138 42,000 42,000 Speed Sign Trailer 7200 15,000 15,000 Squad New 7116 71,000 71,000 Squads-Marked Multiple 1 292,000 292,000 Squads-Marked Multiple 3 284,000 308,000 592,000 Squads-Marked Multiple 2 138,000 300,000 438,000 SWAT Van 7133 250,000 250,000 Police Total 184,600 660,000 362,000 355,000 405,000 1,966,600 Streets Asphalt Roller 8474 58,000 58,000 F350 Super Cab 4X4 8494 65,000 65,000 Generator - MC GEN-MC 130,000 130,000 Hook Truck 8521 180,000 235,000 415,000 Hot Patcher 8429 68,000 68,000 Message Board 8275 16,000 16,000 Pickup 1.5 Ton Dump 8550 150,000 150,000 Pressure Washer - Portable 8001 20,000 20,000 Pressure Washer - Wash Bay 8000 20,000 20,000 Skid Steer 8781 110,000 110,000 Skid Steer Box Broom 8255 8,000 8,000 Skid Steer Jack Hammer 8280 10,000 10,000 Skid Steer Post Hole Auger 8252 5,000 5,000 Skid Steer Rock Bucket 8251 2,500 2,500 Street Sweeper-Regenerative 8471 400,000 400,000 Trailer 8482 18,000 18,000 Trailer 8479 25,000 25,000 Truck 1.5 Ton Dump 8459 150,000 150,000 Truck-1.5 Ton-Dump 8452 145,000 145,000 Truck-1 Ton 8453 65,000 65,000 Truck-5 Ton-Dump 8468 185,000 230,000 415,000 Truck-5 Ton-Dump 8469 155,000 233,000 388,000 Truck 5 Ton Dump Single Axle 8518 185,000 185,000 Truck-5 Ton-Dump-Single Axle 8467 225,000 225,000 Truck-9 Ton-Dump-Tandem 8464 220,000 220,000 Streets Total 765,000 851,000 272,000 615,500 810,000 3,313,500 GRAND TOTAL 3,185,640 2,735,000 1,007,500 1,193,500 1,723,500 9,845,140 Produced Using Plan-It CIP Software 4.2 DRAFT 2027 through 2031 Revolving Equipment Fund (410) Prior Lake, MN Projects & Funding Sources By Department Department Project # 2027 2028 2029 2030 2031 Total Building Inspection 1/2 Ton Pickup 6394 0 0 0 0 60,000 60,000 Revolving Equip. Fund (F410) 60,000 60,000 Pickup 1/2 Ton 6395 0 0 0 0 60,000 60,000 Revolving Equip. Fund (F410) 60,000 60,000 Truck 1/2 Ton 6398 0 0 0 60,000 0 60,000 Revolving Equip. Fund (F410) 60,000 60,000 Building Inspection Total 0 0 0 60,000 120,000 180,000 Central Garage Plasma Cutter 8921 0 0 0 4,500 0 4,500 Revolving Equip. Fund (F410) 4,500 4,500 Refurbishing REFUR 20,000 20,000 20,000 20,000 20,000 100,000 Revolving Equip. Fund (F410) 20,000 20,000 20,000 20,000 20,000 100,000 Welder 8920 0 0 0 10,500 0 10,500 Revolving Equip. Fund (F410) 10,500 10,500 Central Garage Total 20,000 20,000 20,000 35,000 20,000 115,000 Engineering Truck-1 Ton 6399 0 0 60,000 0 0 60,000 Revolving Equip. Fund (F410) 60,000 60,000 Engineering Total 0 0 60,000 0 0 60,000 Fire Fire Ladder Truck 9280 1,369,540 0 0 0 0 1,369,540 G.O. Capital Equipment Bonds 1,369,540 1,369,540 Fire Radios FD-RADIOS 0 0 0 67,500 0 67,500 Revolving Equip. Fund (F410) 67,500 67,500 Fire Truck Pumper 9222 300,000 1,000,000 0 0 0 1,300,000 G.O. Capital Equipment Bonds 300,000 1,000,000 1,300,000 Pressure Washer - FS1 8002 0 0 20,000 0 0 20,000 Revolving Equip. Fund (F410) 20,000 20,000 Pressure Washer - FS2 8003 0 0 0 20,000 0 20,000 Revolving Equip. Fund (F410) 20,000 20,000 Fire Total 1,669,540 1,000,000 20,000 87,500 0 2,777,040 Parks Aerator 8262 0 0 0 0 9,000 9,000 Revolving Equip. Fund (F410) 9,000 9,000 Aerovator 8265 0 0 16,000 0 0 16,000 Revolving Equip. Fund (F410) 16,000 16,000 Electric Scissor Lift 8551 25,000 0 0 0 0 25,000 Revolving Equip. Fund (F410) 25,000 25,000 Fertilizer Spreader 8267 0 8,500 0 0 0 8,500 Revolving Equip. Fund (F410) 8,500 8,500 Forklift 8558 46,500 0 0 0 0 46,500 Revolving Equip. Fund (F410) 46,500 46,500 Mower-16FT 8504 175,000 0 0 0 0 175,000 Revolving Equip. Fund (F410) 175,000 175,000 Mower-6FT 8523 0 68,000 0 0 0 68,000 Revolving Equip. Fund (F410) 68,000 68,000 Mower-6FT 8524 0 0 0 0 62,000 62,000 Produced Using Plan-It CIP Software 4.3 DRAFT Department Project # 2027 2028 2029 2030 2031 Total Revolving Equip. Fund (F410) 62,000 62,000 Mower-6FT 8526 0 0 0 0 62,000 62,000 Revolving Equip. Fund (F410) 62,000 62,000 Mower-6FT 8525 0 0 0 0 62,000 62,000 Revolving Equip. Fund (F410) 62,000 62,000 Mower Walk Behind 8511 0 0 8,500 0 0 8,500 Revolving Equip. Fund (F410) 8,500 8,500 Pickup 1/2 Ton 8541 0 0 60,000 0 0 60,000 Revolving Equip. Fund (F410) 60,000 60,000 Pick-Up 1/2 Ton 8319 0 0 60,000 0 0 60,000 Revolving Equip. Fund (F410) 60,000 60,000 Scissor Lift Drop Deck Trailer 8552 16,000 0 0 0 0 16,000 Revolving Equip. Fund (F410) 16,000 16,000 Skid Steer Combo Plane 8279 0 0 0 5,000 0 5,000 Revolving Equip. Fund (F410) 5,000 5,000 Skid Steer - Tracks 8502 87,000 0 0 0 0 87,000 Revolving Equip. Fund (F410) 87,000 87,000 Skid Steer - Wheels 8501 0 113,000 0 0 0 113,000 Revolving Equip. Fund (F410) 113,000 113,000 Sod Cutter 8512 0 0 0 0 6,000 6,000 Revolving Equip. Fund (F410) 6,000 6,000 Stump Grinder 8272 12,000 0 0 0 0 12,000 Revolving Equip. Fund (F410) 12,000 12,000 Tiller 8268 0 0 9,000 0 0 9,000 Revolving Equip. Fund (F410) 9,000 9,000 Top Dresser 8273 0 0 0 20,000 0 20,000 Revolving Equip. Fund (F410) 20,000 20,000 Tractor 8505 0 0 0 0 150,000 150,000 Revolving Equip. Fund (F410) 150,000 150,000 Tractor Snow Blower 8270 0 14,500 0 0 0 14,500 Revolving Equip. Fund (F410) 14,500 14,500 Trail Blower 8278 0 0 0 7,500 0 7,500 Revolving Equip. Fund (F410) 7,500 7,500 Trailer 8531 0 0 0 0 17,500 17,500 Revolving Equip. Fund (F410) 17,500 17,500 Trailer-Small (IRRIG) 8554 0 0 0 8,000 0 8,000 Revolving Equip. Fund (F410) 8,000 8,000 Truck 1/2 Ton - Sanitation 8508 115,000 0 0 0 0 115,000 Revolving Equip. Fund (F410) 115,000 115,000 Truck 1 Ton Dump 8546 0 0 120,000 0 0 120,000 Revolving Equip. Fund (F410) 120,000 120,000 Utility Vehicle 8536 35,000 0 0 0 0 35,000 Revolving Equip. Fund (F410) 35,000 35,000 Utility Vehicle-Field Groomer 8537 35,000 0 0 0 0 35,000 Revolving Equip. Fund (F410) 35,000 35,000 Parks Total 546,500 204,000 273,500 40,500 368,500 1,433,000 Police 2007 Siren@1500 Spring Lake Cir., Jordan PD-Siren15 46,600 0 0 0 0 46,600 Revolving Equip. Fund (F410) 46,600 46,600 Chief 7131 0 55,000 0 0 0 55,000 Revolving Equip. Fund (F410) 55,000 55,000 Drug Task Force Car 7298 0 0 55,000 0 0 55,000 Revolving Equip. Fund (F410) 55,000 55,000 Investigator 7134 0 0 0 55,000 0 55,000 Revolving Equip. Fund (F410) 55,000 55,000 Produced Using Plan-It CIP Software 4.4 DRAFT Department Project # 2027 2028 2029 2030 2031 Total Investigator 7137 0 0 0 0 55,000 55,000 Revolving Equip. Fund (F410) 55,000 55,000 Polaris XP 1000 Crew 7138 0 0 0 0 42,000 42,000 Revolving Equip. Fund (F410) 42,000 42,000 Speed Sign Trailer 7200 0 0 15,000 0 0 15,000 Revolving Equip. Fund (F410) 15,000 15,000 Squad New 7116 0 71,000 0 0 0 71,000 Revolving Equip. Fund (F410) 71,000 71,000 Squads-Marked Multiple 1 0 0 292,000 0 0 292,000 Revolving Equip. Fund (F410) 292,000 292,000 Squads-Marked Multiple 2 138,000 0 0 300,000 0 438,000 Revolving Equip. Fund (F410) 138,000 300,000 438,000 Squads-Marked Multiple 3 0 284,000 0 0 308,000 592,000 Revolving Equip. Fund (F410) 284,000 308,000 592,000 SWAT Van 7133 0 250,000 0 0 0 250,000 G.O. Capital Equipment Bonds 250,000 250,000 Police Total 184,600 660,000 362,000 355,000 405,000 1,966,600 Streets Asphalt Roller 8474 0 0 58,000 0 0 58,000 Revolving Equip. Fund (F410) 58,000 58,000 F350 Super Cab 4X4 8494 0 0 0 0 65,000 65,000 Revolving Equip. Fund (F410) 65,000 65,000 Generator - MC GEN-MC 0 0 0 0 130,000 130,000 Revolving Equip. Fund (F410) 130,000 130,000 Hook Truck 8521 0 0 180,000 235,000 0 415,000 Revolving Equip. Fund (F410) 180,000 235,000 415,000 Hot Patcher 8429 0 68,000 0 0 0 68,000 Revolving Equip. Fund (F410) 68,000 68,000 Message Board 8275 0 0 16,000 0 0 16,000 Revolving Equip. Fund (F410) 16,000 16,000 Pickup 1.5 Ton Dump 8550 0 150,000 0 0 0 150,000 Revolving Equip. Fund (F410) 150,000 150,000 Pressure Washer - Portable 8001 0 0 0 0 20,000 20,000 Revolving Equip. Fund (F410) 20,000 20,000 Pressure Washer - Wash Bay 8000 20,000 0 0 0 0 20,000 Revolving Equip. Fund (F410) 20,000 20,000 Skid Steer 8781 0 0 0 0 110,000 110,000 Revolving Equip. Fund (F410) 36,666 36,666 Utility: Sewer Fund (F604) 36,667 36,667 Utility: Water Fund (F601) 36,667 36,667 Skid Steer Box Broom 8255 0 0 0 8,000 0 8,000 Revolving Equip. Fund (F410) 8,000 8,000 Skid Steer Jack Hammer 8280 0 0 0 10,000 0 10,000 Revolving Equip. Fund (F410) 10,000 10,000 Skid Steer Post Hole Auger 8252 0 0 0 0 5,000 5,000 Revolving Equip. Fund (F410) 5,000 5,000 Skid Steer Rock Bucket 8251 0 0 0 2,500 0 2,500 Revolving Equip. Fund (F410) 2,500 2,500 Street Sweeper-Regenerative 8471 0 400,000 0 0 0 400,000 Revolving Equip. Fund (F410) 200,000 200,000 Utility: Storm Water Fund (F602) 200,000 200,000 Trailer 8482 0 0 18,000 0 0 18,000 Revolving Equip. Fund (F410) 18,000 18,000 Trailer 8479 0 0 0 25,000 0 25,000 Revolving Equip. Fund (F410) 25,000 25,000 Produced Using Plan-It CIP Software 4.5 DRAFT Department Project # 2027 2028 2029 2030 2031 Total Truck 1.5 Ton Dump 8459 0 0 0 150,000 0 150,000 Revolving Equip. Fund (F410) 150,000 150,000 Truck-1.5 Ton-Dump 8452 145,000 0 0 0 0 145,000 G.O. Capital Equipment Bonds 145,000 145,000 Truck-1 Ton 8453 0 0 0 0 65,000 65,000 Revolving Equip. Fund (F410) 65,000 65,000 Truck-5 Ton-Dump 8468 0 0 0 185,000 230,000 415,000 Revolving Equip. Fund (F410) 185,000 230,000 415,000 Truck-5 Ton-Dump 8469 155,000 233,000 0 0 0 388,000 G.O. Capital Equipment Bonds 233,000 233,000 Revolving Equip. Fund (F410) 155,000 155,000 Truck 5 Ton Dump Single Axle 8518 0 0 0 0 185,000 185,000 Revolving Equip. Fund (F410) 185,000 185,000 Truck-5 Ton-Dump-Single Axle 8467 225,000 0 0 0 0 225,000 G.O. Capital Equipment Bonds 225,000 225,000 Truck-9 Ton-Dump-Tandem 8464 220,000 0 0 0 0 220,000 G.O. Capital Equipment Bonds 220,000 220,000 Streets Total 765,000 851,000 272,000 615,500 810,000 3,313,500 GRAND TOTAL 3,185,640 2,735,000 1,007,500 1,193,500 1,723,500 9,845,140 Produced Using Plan-It CIP Software 4.6 DRAFT 2027 through 2031 Revolving Equipment Fund (410) Prior Lake, MN Funding Source Summary Source 2027 2028 2029 2030 2031 Total G.O. Capital Equipment Bonds 2,259,540 1,483,000 3,742,540 Revolving Equip. Fund (F410) 926,100 1,052,000 1,007,500 1,193,500 1,650,166 5,829,266 Utility: Sewer Fund (F604) 36,667 36,667 Utility: Storm Water Fund (F602) 200,000 200,000 Utility: Water Fund (F601) 36,667 36,667 GRAND TOTAL 3,185,640 2,735,000 1,007,500 1,193,500 1,723,500 9,845,140 Produced Using Plan-It CIP Software 4.7 DRAFT CITY OF PRIOR LAKE Revolving Equip Fund F410 2027 2028 2029 2030 2031 Projected Projected Projected Projected Projected REVENUE AND OTHER SOURCES Taxes 1,025,000 1,075,000 1,075,000 1,150,000 1,200,000 Investment income 16,400 20,000 20,000 20,000 20,000 Bonds issued (incl prem/disc) city portion 2,265,000 1,545,000 - - - Transfers in Water Fund (F601)- - - - 36,667 Water Quality Fund (F602 - 200,000 - - - Sewer Fund (F604)- -- - 36,667 Sale of capital assets - -- - - Total Revenues and Other Fund Sources 3,306,400 2,840,000 1,095,000 1,170,000 1,293,334 EXPENDITURES AND OTHER USES Capital Outlay (3,185,640) (2,735,000) (1,007,500) (1,193,500) (1,723,500) Cost of issuance of bonds (65,000) (45,000) - - - Total Expenditures and Other Uses (3,250,640) (2,780,000) (1,007,500) (1,193,500) (1,723,500) CHANGE IN FUND BALANCE 55,760 60,000 87,500 (23,500) (430,166) Beginning Fund Balance 383,154 438,914 498,914 586,414 562,914 Ending Fund Balance 438,914 498,914 586,414 562,914 132,748 4.8 DRAFT 2027 through 2031 Capital Parks (225) Prior Lake, MN Projects By Category Category Project # 2027 2028 2029 2030 2031 Total New Park Development Future Neighborhood Park Development 225-001 550,000 550,000 TH 13 Trail Segment 2 (150th St to Candy Cove) PRK26-000001 1,600,000 1,600,000 New Park Development Total 1,600,000 0 550,000 0 0 2,150,000 GRAND TOTAL 1,600,000 0 550,000 0 0 2,150,000 Produced Using Plan-It CIP Software 5.1 DRAFT 2027 through 2031 Capital Parks (225) Prior Lake, MN Projects & Funding Sources By Department Department Project # 2027 2028 2029 2030 2031 Total Parks: Projects Future Neighborhood Park Development 225-001 0 0 550,000 0 0 550,000 Capital Park Fund (F225) 550,000 550,000 TH 13 Trail Segment 2 (150th St to Candy Cove) PRK26-000001 1,600,000 0 0 0 0 1,600,000 Capital Park Fund (F225) 750,000 750,000 Federal Grant 850,000 850,000 Parks: Projects Total 1,600,000 0 550,000 0 0 2,150,000 GRAND TOTAL 1,600,000 0 550,000 0 0 2,150,000 Produced Using Plan-It CIP Software 5.2 DRAFT 2027 through 2031 Capital Parks (225) Prior Lake, MN Funding Source Summary Source 2027 2028 2029 2030 2031 Total Capital Park Fund (F225) 750,000 550,000 1,300,000 Federal Grant 850,000 850,000 GRAND TOTAL 1,600,000 0 550,000 0 0 2,150,000 Produced Using Plan-It CIP Software 5.3 DRAFT CITY OF PRIOR LAKE Capital Park Fund F225 2027 2028 2029 2030 2031 Projected Projected Projected Projected Projected REVENUE AND OTHER SOURCES Intergovernmental 850,000 - - - - Charges for services 308,800 318,400 410,000 422,000 543,750 Lease income 30,267 32,000 32,000 32,000 32,000 Investment income 31,600 15,000 15,000 15,000 15,000 Total Revenues and Other Fund Sources 1,220,667 365,400 457,000 469,000 590,750 EXPENDITURES AND OTHER USES Capital Outlay (1,600,000) - (550,000) - - Other uses (5,600) (5,600) (5,600) (5,600) (5,600) Total Expenditures and Other Uses (1,605,600) (5,600) (555,600) (5,600) (5,600) CHANGE IN FUND BALANCE (384,933) 359,800 (98,600) 463,400 585,150 Beginning Fund Balance 1,077,636 692,703 1,052,503 953,903 1,417,303 Ending Fund Balance 692,703 1,052,503 953,903 1,417,303 2,002,453 5.4 DRAFT 2027 through 2031 Revolving Park Equipment Fund (430) Prior Lake, MN Projects By Category Category Project # 2027 2028 2029 2030 2031 Total Park Replacement Boudins BB Court Maintenance 430-006 20,000 20,000 Crystal Lake Fishing Pier 430-049 80,000 80,000 Eagle Brook BB Court Maintenance 430-072 15,000 15,000 Eagle Brook Picnic Shelter 430-073 30,000 30,000 Enclave BB Court Maintenance 430-050 15,000 15,000 Green Oaks BB Court Maintenance 430-075 10,000 10,000 Green Oaks Picnic Shelter 430-017 20,000 20,000 Howard Lake BB Court Maintenance 430-051 15,000 15,000 Jeffers Picnic Shelter 430-077 30,000 30,000 Knob Hill BB Court Maintenance 430-001 20,000 20,000 Memorial Backstop, Batters Eye, Cages, Dugouts 430-056 265,000 265,000 Memorial BB Court Maintenance 430-004 22,000 22,000 Memorial Concession Building 430-057 250,000 250,000 Memorial Drinking Fountain 430-052 12,000 12,000 Memorial Parking Lots (2) 430-039 350,000 350,000 Memorial Windscreen 430-025 7,000 7,000 Misc Playground PLAY 250,000 250,000 250,000 250,000 250,000 1,250,000 Northwood Meadows BB Court Maintenance 430-047 15,000 15,000 Oakland BB Court Maintenance 430-007 22,000 22,000 Ponds Parking Lots (4), Entrance Road 430-069 75,000 2,500,000 2,575,000 Ryan Backstop, Batters Eye, Cages, Dugouts 430-059 250,000 250,000 Sand Point BB Court Maintenance 430-027 10,000 10,000 Sand Point Beach Renovation Study 430-030 100,000 100,000 Spring Lake Pickleball Courts 430-060 40,000 40,000 Timbercrest BB Court Maintenance 430-037 10,000 10,000 Watzls City Docks 430-043 150,000 150,000 Watzls Lighting 430-063 8,500 8,500 Wilds BB Court Maintenance 430-048 20,000 20,000 Wilds North BB Court Maintenance 430-010 15,000 15,000 Willows BB Court Maintenance 430-011 20,000 20,000 Woodridge Ballfield 430-054 20,000 20,000 Park Replacement Total 630,000 4,136,000 327,000 283,500 290,000 5,666,500 GRAND TOTAL 630,000 4,136,000 327,000 283,500 290,000 5,666,500 Produced Using Plan-It CIP Software um5 DRAFT 2027 through 2031 Revolving Park Equipment Fund (430) Prior Lake, MN Projects & Funding Sources By Department Department Project # 2027 2028 2029 2030 2031 Total Parks: Projects Boudins BB Court Maintenance 430-006 0 0 20,000 0 0 20,000 Revolving Park Equip. Fund (F430) 20,000 20,000 Crystal Lake Fishing Pier 430-049 80,000 0 0 0 0 80,000 Revolving Park Equip. Fund (F430) 80,000 80,000 Eagle Brook BB Court Maintenance 430-072 15,000 0 0 0 0 15,000 Revolving Park Equip. Fund (F430) 15,000 15,000 Eagle Brook Picnic Shelter 430-073 30,000 0 0 0 0 30,000 Revolving Park Equip. Fund (F430) 30,000 30,000 Enclave BB Court Maintenance 430-050 15,000 0 0 0 0 15,000 Revolving Park Equip. Fund (F430) 15,000 15,000 Green Oaks BB Court Maintenance 430-075 0 0 0 0 10,000 10,000 Revolving Park Equip. Fund (F430) 10,000 10,000 Green Oaks Picnic Shelter 430-017 0 20,000 0 0 0 20,000 Revolving Park Equip. Fund (F430) 20,000 20,000 Howard Lake BB Court Maintenance 430-051 15,000 0 0 0 0 15,000 Revolving Park Equip. Fund (F430) 15,000 15,000 Jeffers Picnic Shelter 430-077 30,000 0 0 0 0 30,000 Revolving Park Equip. Fund (F430) 30,000 30,000 Knob Hill BB Court Maintenance 430-001 0 20,000 0 0 0 20,000 Revolving Park Equip. Fund (F430) 20,000 20,000 Memorial Backstop, Batters Eye, Cages, Dugouts 430-056 0 265,000 0 0 0 265,000 G.O. Capital Imp Bonds - 2028 265,000 265,000 Memorial BB Court Maintenance 430-004 0 22,000 0 0 0 22,000 G.O. Capital Imp Bonds - 2028 22,000 22,000 Memorial Concession Building 430-057 0 250,000 0 0 0 250,000 G.O. Capital Imp Bonds - 2028 250,000 250,000 Memorial Drinking Fountain 430-052 0 12,000 0 0 0 12,000 G.O. Capital Imp Bonds - 2028 12,000 12,000 Memorial Parking Lots (2) 430-039 0 350,000 0 0 0 350,000 G.O. Capital Imp Bonds - 2028 350,000 350,000 Memorial Windscreen 430-025 0 7,000 0 0 0 7,000 G.O. Capital Imp Bonds - 2028 7,000 7,000 Misc Playground PLAY 250,000 250,000 250,000 250,000 250,000 1,250,000 Revolving Park Equip. Fund (F430) 250,000 250,000 250,000 250,000 250,000 1,250,000 Northwood Meadows BB Court Maintenance 430-047 0 0 0 15,000 0 15,000 Revolving Park Equip. Fund (F430) 15,000 15,000 Oakland BB Court Maintenance 430-007 0 0 22,000 0 0 22,000 Revolving Park Equip. Fund (F430) 22,000 22,000 Ponds Parking Lots (4), Entrance Road 430-069 75,000 2,500,000 0 0 0 2,575,000 G.O. Capital Imp Bonds - 2028 2,500,000 2,500,000 Revolving Park Equip. Fund (F430) 75,000 75,000 Ryan Backstop, Batters Eye, Cages, Dugouts 430-059 0 250,000 0 0 0 250,000 Revolving Park Equip. Fund (F430) 250,000 250,000 Sand Point BB Court Maintenance 430-027 0 0 0 10,000 0 10,000 Revolving Park Equip. Fund (F430) 10,000 10,000 Produced Using Plan-It CIP Software 5.6 DRAFT Department Project # 2027 2028 2029 2030 2031 Total Sand Point Beach Renovation Study 430-030 100,000 0 0 0 0 100,000 Revolving Park Equip. Fund (F430) 100,000 100,000 Spring Lake Pickleball Courts 430-060 0 40,000 0 0 0 40,000 Revolving Park Equip. Fund (F430) 40,000 40,000 Timbercrest BB Court Maintenance 430-037 0 0 0 0 10,000 10,000 Revolving Park Equip. Fund (F430) 10,000 10,000 Watzls City Docks 430-043 0 150,000 0 0 0 150,000 Revolving Park Equip. Fund (F430) 150,000 150,000 Watzls Lighting 430-063 0 0 0 8,500 0 8,500 Revolving Park Equip. Fund (F430) 8,500 8,500 Wilds BB Court Maintenance 430-048 0 0 0 0 20,000 20,000 Revolving Park Equip. Fund (F430) 20,000 20,000 Wilds North BB Court Maintenance 430-010 0 0 15,000 0 0 15,000 Revolving Park Equip. Fund (F430) 15,000 15,000 Willows BB Court Maintenance 430-011 0 0 20,000 0 0 20,000 Revolving Park Equip. Fund (F430) 20,000 20,000 Woodridge Ballfield 430-054 20,000 0 0 0 0 20,000 Revolving Park Equip. Fund (F430) 20,000 20,000 Parks: Projects Total 630,000 4,136,000 327,000 283,500 290,000 5,666,500 GRAND TOTAL 630,000 4,136,000 327,000 283,500 290,000 5,666,500 Produced Using Plan-It CIP Software rk7 DRAFT 2027 through 2031 Revolving Park Equipment Fund (430) Prior Lake, MN Funding Source Summary Source 2027 2028 2029 2030 2031 Total G.O. Capital Imp Bonds - 2028 3,406,000 3,406,000 Revolving Park Equip. Fund (F430) 630,000 730,000 327,000 283,500 290,000 2,260,500 GRAND TOTAL 630,000 4,136,000 327,000 283,500 290,000 5,666,500 Produced Using Plan-It CIP Software 5.8 DRAFT CITY OF PRIOR LAKE Revolving Park Equip Fund F430 2027 2028 2029 2030 2031 Projected Projected Projected Projected Projected REVENUE AND OTHER SOURCES Taxes 655,000 705,000 705,000 750,000 800,000 Intergovernmental 283,600 - - - - Investment income 20,100 15,000 15,000 15,000 15,000 Miscellaneous 200,000 - - - - Bonds issued (incl prem/disc) city portion - 3,500,000 - - - Total Revenues and Other Fund Sources 1,158,700 4,220,000 720,000 765,000 815,000 EXPENDITURES AND OTHER USES Capital Outlay (630,000) (4,136,000) (327,000) (283,500) (290,000) Cost of issuance of bonds - (100,000) - - - Total Expenditures and Other Uses (630,000) (4,236,000) (327,000) (283,500) (290,000) CHANGE IN FUND BALANCE 528,700 (16,000) 393,000 481,500 525,000 Beginning Fund Balance 236,761 765,461 749,461 1,142,461 1,623,961 Ending Fund Balance 765,461 749,461 1,142,461 1,623,961 2,148,961 5.9 DRAFT 2027 through 2031 Facilities Management Fund (440) Prior Lake, MN Projects By Category Category Project # 2027 2028 2029 2030 2031 Total Facil: City Hall Air Handler (2) 440-094 250,000 250,000 BAS Upgrade 440-215 210,000 210,000 Bathroom Remodel - Main Level 440-216 350,000 350,000 Brick Wallcovering / Cherrywood Paneling 440-088 35,000 35,000 Carpet 440-038 250,000 250,000 Chiller 440-095 175,000 175,000 Chiller Pipe to AHU Coils 440-238 75,000 75,000 Chiller Primary Pumps 440-213 120,000 120,000 Chiller Secondary Pumps 440-214 30,000 30,000 Coiling Doors 440-037 16,500 16,500 Emergency Lighting 440-209 35,000 35,000 Emergency Repairs - All Bldgs 440-208 150,000 150,000 150,000 150,000 150,000 750,000 Epoxy Mechanical Room Floors 440-239 20,000 20,000 Glass Doors 440-034 12,000 12,000 Greenheck Exhaust (2) 440-093 14,000 14,000 Lighting Fixtures (interior/exterior) 440-097 279,000 279,000 Lighting Repairs 440-236 35,000 35,000 Membrane Roofing 440-017 540,000 540,000 Miscellaneous 440-096 7,000 7,000 Parking Lot / Sidewalks 440-098 150,000 150,000 Patio Replacement 440-242 45,000 45,000 Project Development for 2028 Imp 440-189 79,000 111,000 190,000 Re-Key/New Locksets 440-241 40,000 40,000 Retaining Wall 440-205 75,000 75,000 Roof Safety Ladders 2 440-235 20,000 20,000 Secured Entry Card Reader System 440-190 10,000 10,000 SIdewalk Repairs 440-237 35,000 35,000 Stairwell Flooring 440-240 20,000 20,000 Steel Door and Frames 440-099 30,000 30,000 Facil: City Hall Total 284,000 1,955,500 785,000 185,000 609,000 3,818,500 Facil: City Owned Properties Auto Shop Roof Repairs 440-266 5,000 5,000 Lakeside Eats & Treats Roof 440-265 16,000 16,000 Pike Lake House Demolition 440-264 70,000 70,000 Facil: City Owned Properties Total 91,000 0 0 0 0 91,000 Facil: Fire Station #1 Infrared Heaters 440-071 180,000 180,000 Membrane Roofing 440-073 290,000 290,000 Re-Key/New Locksets 440-267 20,000 20,000 Rooftop Unit 440-072 171,000 171,000 Trash Enclosure 440-122 3,500 3,500 Windows - Aluminum 440-084 70,000 70,000 Facil: Fire Station #1 Total 0 0 20,000 424,500 290,000 734,500 Facil: Fire Station #2 Air Exchanger 440-124 20,000 20,000 Carpet 440-012 40,000 40,000 Dorm Project 440-269 600,000 600,000 Produced Using Plan-It CIP Software ogj DRAFT Category Project # 2027 2028 2029 2030 2031 Total Dorm Project Development 440-268 75,000 75,000 Epoxy Flooring 440-059 82,000 82,000 Exhaust Fan (2) 440-123 15,000 15,000 Forced Air Furnace (3) 440-024 15,000 15,000 Gas Monitor (2) 440-127 15,000 15,000 Irrigation System 440-055 14,000 14,000 Make-Up Air Unit 440-125 60,000 60,000 Miscellaneous 440-126 14,000 14,000 Overhead Doors 14x14 440-056 32,500 32,500 Pressure Washer (2 Stations) 440-057 11,500 11,500 Re-Key/New Locksets 440-270 20,000 20,000 Facil: Fire Station #2 Total 170,000 600,000 34,000 155,000 55,000 1,014,000 Facil: Library & Club Prior Air Handling Unit - McQuay 440-114 125,000 125,000 Air Handling Unit - Trane 440-110 125,000 125,000 Building Automation System 440-251 175,000 175,000 Carpet 440-256 120,000 120,000 Condensing Unit 440-064 75,000 75,000 Humidifiers (2) 440-115 30,000 30,000 Light Fixtures 440-065 63,000 63,000 Membrane Roofing 440-252 360,000 360,000 Metal Roofing Re-Caulk 440-253 100,000 100,000 Project Development for 2029 Imp 440-226 66,760 66,760 78,000 211,520 Re-Key/New Locksets 440-255 30,000 30,000 Restroom Exhaust Fan 440-111 5,500 5,500 Restroom Remodel 440-254 250,000 250,000 Secured Entry Card Reader System 440-194 10,000 10,000 Tile Walls 440-067 20,000 20,000 Wall Coverings 440-113 25,000 25,000 Facil: Library & Club Prior Total 66,760 66,760 1,591,500 0 0 1,725,020 Facil: Maintenance Ctr. Maintenance Center Expansion 440-186 1,000,000 2,000,000 3,000,000 Secured Entry Card Reader System 440-198 10,000 10,000 Facil: Maintenance Ctr. Total 0 0 10,000 1,000,000 2,000,000 3,010,000 Facil: Park Amenities Lakefront Door and Locks 440-260 25,000 25,000 Lakefront Flooring 440-261 30,000 30,000 Lakefront Paint Exterior 440-259 50,000 50,000 Lakefront Roof Replacement 440-258 175,000 175,000 Lakefront Upper Restroom Door 440-263 25,000 25,000 Ponds Doors 440-257 30,000 30,000 Re-Key/New Locksets 440-262 30,000 30,000 Ryan Park Bathroom Remodel 430-082 750,000 750,000 Facil: Park Amenities Total 1,090,000 25,000 0 0 0 1,115,000 Facil: Police Station Air Handler - McQuay 440-104 85,000 85,000 Bathroom Remodel - 3 440-222 225,000 225,000 Bell and Gosset Pump 440-102 25,000 25,000 Boilers 440-075 150,000 150,000 Building Automation System 440-248 175,000 175,000 Carpet 440-185 225,000 225,000 Dato Closet Split Unit 440-246 14,000 14,000 Epoxy Flooring 440-107 85,000 85,000 Epoxy Mechanical Room Floors 440-249 20,000 20,000 Produced Using Plan-It CIP Software 6.2 DRAFT Category Project # 2027 2028 2029 2030 2031 Total Front Entry Security Update 440-101 125,000 125,000 Greenheck Exhaust (2) 440-103 25,000 25,000 Gym Flooring 440-244 55,000 55,000 Light Fixtures 440-045 140,000 140,000 Locker Room Remodel 440-049 250,000 250,000 Membrane Roofing 440-029 350,000 350,000 Overhead Coiling Door (2) 440-047 18,000 18,000 Parking Lot / Sidewalks 440-108 87,000 87,000 Parking / Safety Enhancements 440-087 300,000 300,000 Project Development for 2026 Imp 440-192 49,000 49,000 98,000 Re-Key/New Locksets 440-250 40,000 40,000 Roof Safety Ladders 2 440-245 20,000 20,000 Secured Entry Card Reader System 440-193 10,000 10,000 Space Needs Study 440-243 75,000 75,000 Stairwell Flooring 440-247 15,000 15,000 Steel Doors and Frames 440-109 50,000 50,000 VAV Boxes 440-106 208,000 208,000 Facil: Police Station Total 313,000 1,580,000 50,000 650,000 277,000 2,870,000 GRAND TOTAL 2,014,760 4,227,260 2,490,500 2,414,500 3,231,000 14,378,020 Produced Using Plan-It CIP Software 6.3 DRAFT 2027 through 2031 Facilities Management Fund (440) Prior Lake, MN Projects & Funding Sources By Department Department Project # 2027 2028 2029 2030 2031 Total Facilities Air Exchanger 440-124 20,000 0 0 0 0 20,000 Facilities Management Fund (F440) 20,000 20,000 Air Handler (2) 440-094 0 250,000 0 0 0 250,000 G.O. Capital Imp Bonds - 2028 250,000 250,000 Air Handler - McQuay 440-104 0 85,000 0 0 0 85,000 G.O. Capital Imp Bonds - 2028 85,000 85,000 Air Handling Unit - McQuay 440-114 0 0 125,000 0 0 125,000 G.O. Capital Improvement Bonds 125,000 125,000 Air Handling Unit - Trane 440-110 0 0 125,000 0 0 125,000 G.O. Capital Improvement Bonds 125,000 125,000 Auto Shop Roof Repairs 440-266 5,000 0 0 0 0 5,000 Facilities Management Fund (F440) 5,000 5,000 BAS Upgrade 440-215 0 210,000 0 0 0 210,000 G.O. Capital Imp Bonds - 2028 210,000 210,000 Bathroom Remodel - 3 440-222 0 225,000 0 0 0 225,000 G.O. Capital Imp Bonds - 2028 225,000 225,000 Bathroom Remodel - Main Level 440-216 0 350,000 0 0 0 350,000 G.O. Capital Imp Bonds - 2028 350,000 350,000 Bell and Gosset Pump 440-102 0 25,000 0 0 0 25,000 G.O. Capital Imp Bonds - 2028 25,000 25,000 Boilers 440-075 0 150,000 0 0 0 150,000 G.O. Capital Imp Bonds - 2028 150,000 150,000 Brick Wallcovering / Cherrywood Paneling 440-088 0 35,000 0 0 0 35,000 G.O. Capital Imp Bonds - 2028 35,000 35,000 Building Automation System 440-248 0 175,000 0 0 0 175,000 Facilities Management Fund (F440) 175,000 175,000 Building Automation System 440-251 0 0 175,000 0 0 175,000 G.O. Capital Improvement Bonds 175,000 175,000 Carpet 440-185 0 225,000 0 0 0 225,000 G.O. Capital Imp Bonds - 2028 225,000 225,000 Carpet 440-038 0 250,000 0 0 0 250,000 G.O. Capital Imp Bonds - 2028 250,000 250,000 Carpet 440-012 0 0 0 0 40,000 40,000 G.O. Capital Improvement Bonds 40,000 40,000 Carpet 440-256 0 0 120,000 0 0 120,000 G.O. Capital Improvement Bonds 120,000 120,000 Chiller 440-095 0 175,000 0 0 0 175,000 G.O. Capital Imp Bonds - 2028 175,000 175,000 Chiller Pipe to AHU Coils 440-238 0 75,000 0 0 0 75,000 Facilities Management Fund (F440) 75,000 75,000 Chiller Primary Pumps 440-213 0 120,000 0 0 0 120,000 G.O. Capital Imp Bonds - 2028 120,000 120,000 Chiller Secondary Pumps 440-214 0 30,000 0 0 0 30,000 G.O. Capital Imp Bonds - 2028 30,000 30,000 Coiling Doors 440-037 0 16,500 0 0 0 16,500 G.O. Capital Imp Bonds - 2028 16,500 16,500 Condensing Unit 440-064 0 0 75,000 0 0 75,000 Produced Using Plan-It CIP Software 6.4 DRAFT Department Project # 2027 2028 2029 2030 2031 Total G.O. Capital Improvement Bonds 75,000 75,000 Dato Closet Split Unit 440-246 14,000 0 0 0 0 14,000 Facilities Management Fund (F440) 14,000 14,000 Dorm Project 440-269 0 600,000 0 0 0 600,000 G.O. Capital Imp Bonds - 2028 600,000 600,000 Dorm Project Development 440-268 75,000 0 0 0 0 75,000 Facilities Management Fund (F440) 75,000 75,000 Emergency Lighting 440-209 0 0 0 35,000 0 35,000 G.O. Capital Improvement Bonds 35,000 35,000 Emergency Repairs - All Bldgs 440-208 150,000 150,000 150,000 150,000 150,000 750,000 Facilities Management Fund (F440) 150,000 150,000 150,000 150,000 600,000 G.O. Capital Imp Bonds - 2028 150,000 150,000 Epoxy Flooring 440-059 0 0 0 82,000 0 82,000 G.O. Capital Improvement Bonds 82,000 82,000 Epoxy Flooring 440-107 85,000 0 0 0 0 85,000 Facilities Management Fund (F440) 85,000 85,000 Epoxy Mechanical Room Floors 440-239 0 20,000 0 0 0 20,000 Facilities Management Fund (F440) 20,000 20,000 Epoxy Mechanical Room Floors 440-249 0 20,000 0 0 0 20,000 Facilities Management Fund (F440) 20,000 20,000 Exhaust Fan (2) 440-123 15,000 0 0 0 0 15,000 Facilities Management Fund (F440) 15,000 15,000 Forced Air Furnace (3) 440-024 0 0 0 0 15,000 15,000 Facilities Management Fund (F440) 15,000 15,000 Front Entry Security Update 440-101 0 125,000 0 0 0 125,000 G.O. Capital Imp Bonds - 2028 125,000 125,000 Gas Monitor (2) 440-127 0 0 0 15,000 0 15,000 G.O. Capital Improvement Bonds 15,000 15,000 Glass Doors 440-034 0 12,000 0 0 0 12,000 G.O. Capital Imp Bonds - 2028 12,000 12,000 Greenheck Exhaust (2) 440-093 0 14,000 0 0 0 14,000 G.O. Capital Imp Bonds - 2028 14,000 14,000 Greenheck Exhaust (2) 440-103 0 25,000 0 0 0 25,000 G.O. Capital Imp Bonds - 2028 25,000 25,000 Gym Flooring 440-244 55,000 0 0 0 0 55,000 Facilities Management Fund (F440) 55,000 55,000 Humidifiers (2) 440-115 0 0 30,000 0 0 30,000 G.O. Capital Improvement Bonds 30,000 30,000 Infrared Heaters 440-071 0 0 0 180,000 0 180,000 G.O. Capital Improvement Bonds 180,000 180,000 Irrigation System 440-055 0 0 0 14,000 0 14,000 Facilities Management Fund (F440) 14,000 14,000 Lakefront Door and Locks 440-260 25,000 0 0 0 0 25,000 Facilities Management Fund (F440) 25,000 25,000 Lakefront Flooring 440-261 30,000 0 0 0 0 30,000 Facilities Management Fund (F440) 30,000 30,000 Lakefront Paint Exterior 440-259 50,000 0 0 0 0 50,000 Facilities Management Fund (F440) 50,000 50,000 Lakefront Roof Replacement 440-258 175,000 0 0 0 0 175,000 Facilities Management Fund (F440) 175,000 175,000 Lakefront Upper Restroom Door 440-263 0 25,000 0 0 0 25,000 Facilities Management Fund (F440) 25,000 25,000 Lakeside Eats & Treats Roof 440-265 16,000 0 0 0 0 16,000 Facilities Management Fund (F440) 16,000 16,000 Light Fixtures 440-045 0 0 0 0 140,000 140,000 G.O. Capital Improvement Bonds 140,000 140,000 Produced Using Plan-It CIP Software nf5 DRAFT Department Project # 2027 2028 2029 2030 2031 Total Light Fixtures 440-065 0 0 63,000 0 0 63,000 G.O. Capital Improvement Bonds 63,000 63,000 Lighting Fixtures (interior/exterior) 440-097 0 0 0 0 279,000 279,000 Facilities Management Fund (F440) 279,000 279,000 Lighting Repairs 440-236 35,000 0 0 0 0 35,000 Facilities Management Fund (F440) 35,000 35,000 Locker Room Remodel 440-049 0 250,000 0 0 0 250,000 G.O. Capital Imp Bonds - 2028 250,000 250,000 Maintenance Center Expansion 440-186 0 0 0 1,000,000 2,000,000 3,000,000 G.O. Capital Improvement Bonds 1,000,000 2,000,000 3,000,000 Make-Up Air Unit 440-125 60,000 0 0 0 0 60,000 Facilities Management Fund (F440) 60,000 60,000 Membrane Roofing 440-073 0 0 0 0 290,000 290,000 G.O. Capital Improvement Bonds 290,000 290,000 Membrane Roofing 440-017 0 0 540,000 0 0 540,000 G.O. Capital Improvement Bonds 540,000 540,000 Membrane Roofing 440-029 0 0 0 350,000 0 350,000 G.O. Capital Improvement Bonds 350,000 350,000 Membrane Roofing 440-252 0 0 360,000 0 0 360,000 G.O. Capital Improvement Bonds 360,000 360,000 Metal Roofing Re-Caulk 440-253 0 0 100,000 0 0 100,000 G.O. Capital Improvement Bonds 100,000 100,000 Miscellaneous 440-096 0 7,000 0 0 0 7,000 G.O. Capital Imp Bonds - 2028 7,000 7,000 Miscellaneous 440-126 0 0 14,000 0 0 14,000 Facilities Management Fund (F440) 14,000 14,000 Overhead Coiling Door (2) 440-047 0 18,000 0 0 0 18,000 G.O. Capital Imp Bonds - 2028 18,000 18,000 Overhead Doors 14x14 440-056 0 0 0 32,500 0 32,500 Facilities Management Fund (F440) 32,500 32,500 Parking Lot / Sidewalks 440-098 0 0 0 0 150,000 150,000 Facilities Management Fund (F440) 150,000 150,000 Parking Lot / Sidewalks 440-108 0 0 0 0 87,000 87,000 Facilities Management Fund (F440) 87,000 87,000 Parking / Safety Enhancements 440-087 0 0 0 300,000 0 300,000 Facilities Management Fund (F440) 300,000 300,000 Patio Replacement 440-242 0 0 45,000 0 0 45,000 G.O. Capital Improvement Bonds 45,000 45,000 Pike Lake House Demolition 440-264 70,000 0 0 0 0 70,000 Facilities Management Fund (F440) 70,000 70,000 Ponds Doors 440-257 30,000 0 0 0 0 30,000 Facilities Management Fund (F440) 30,000 30,000 Pressure Washer (2 Stations) 440-057 0 0 0 11,500 0 11,500 G.O. Capital Improvement Bonds 11,500 11,500 Project Development for 2026 Imp 440-192 49,000 49,000 0 0 0 98,000 Facilities Management Fund (F440) 49,000 49,000 G.O. Capital Imp Bonds - 2028 49,000 49,000 Project Development for 2028 Imp 440-189 79,000 111,000 0 0 0 190,000 Facilities Management Fund (F440) 79,000 79,000 G.O. Capital Imp Bonds - 2028 111,000 111,000 Project Development for 2029 Imp 440-226 66,760 66,760 78,000 0 0 211,520 Facilities Management Fund (F440) 66,760 66,760 78,000 211,520 Re-Key/New Locksets 440-241 0 0 40,000 0 0 40,000 Facilities Management Fund (F440) 40,000 40,000 Re-Key/New Locksets 440-250 0 0 40,000 0 0 40,000 Facilities Management Fund (F440) 40,000 40,000 Produced Using Plan-It CIP Software nf6 DRAFT Department Project # 2027 2028 2029 2030 2031 Total Re-Key/New Locksets 440-255 0 0 30,000 0 0 30,000 Facilities Management Fund (F440) 30,000 30,000 Re-Key/New Locksets 440-262 30,000 0 0 0 0 30,000 Facilities Management Fund (F440) 30,000 30,000 Re-Key/New Locksets 440-267 0 0 20,000 0 0 20,000 Facilities Management Fund (F440) 20,000 20,000 Re-Key/New Locksets 440-270 0 0 20,000 0 0 20,000 Facilities Management Fund (F440) 20,000 20,000 Restroom Exhaust Fan 440-111 0 0 5,500 0 0 5,500 G.O. Capital Improvement Bonds 5,500 5,500 Restroom Remodel 440-254 0 0 250,000 0 0 250,000 G.O. Capital Improvement Bonds 250,000 250,000 Retaining Wall 440-205 0 75,000 0 0 0 75,000 G.O. Capital Imp Bonds - 2028 75,000 75,000 Roof Safety Ladders 2 440-235 20,000 0 0 0 0 20,000 Facilities Management Fund (F440) 20,000 20,000 Roof Safety Ladders 2 440-245 20,000 0 0 0 0 20,000 Facilities Management Fund (F440) 20,000 20,000 Rooftop Unit 440-072 0 0 0 171,000 0 171,000 G.O. Capital Improvement Bonds 171,000 171,000 Ryan Park Bathroom Remodel 430-082 750,000 0 0 0 0 750,000 Facilities Management Fund (F440) 250,000 250,000 G.O. Capital Improvement Bonds 500,000 500,000 Secured Entry Card Reader System 440-190 0 0 10,000 0 0 10,000 Facilities Management Fund (F440) 10,000 10,000 Secured Entry Card Reader System 440-193 0 0 10,000 0 0 10,000 Facilities Management Fund (F440) 10,000 10,000 Secured Entry Card Reader System 440-194 0 0 10,000 0 0 10,000 Facilities Management Fund (F440) 10,000 10,000 Secured Entry Card Reader System 440-198 0 0 10,000 0 0 10,000 Facilities Management Fund (F440) 10,000 10,000 SIdewalk Repairs 440-237 0 35,000 0 0 0 35,000 Facilities Management Fund (F440) 35,000 35,000 Space Needs Study 440-243 75,000 0 0 0 0 75,000 Facilities Management Fund (F440) 75,000 75,000 Stairwell Flooring 440-240 0 20,000 0 0 0 20,000 Facilities Management Fund (F440) 20,000 20,000 Stairwell Flooring 440-247 15,000 0 0 0 0 15,000 Facilities Management Fund (F440) 15,000 15,000 Steel Door and Frames 440-099 0 0 0 0 30,000 30,000 G.O. Capital Improvement Bonds 30,000 30,000 Steel Doors and Frames 440-109 0 0 0 0 50,000 50,000 Facilities Management Fund (F440) 50,000 50,000 Tile Walls 440-067 0 0 20,000 0 0 20,000 G.O. Capital Improvement Bonds 20,000 20,000 Trash Enclosure 440-122 0 0 0 3,500 0 3,500 Facilities Management Fund (F440) 3,500 3,500 VAV Boxes 440-106 0 208,000 0 0 0 208,000 G.O. Capital Imp Bonds - 2028 208,000 208,000 Wall Coverings 440-113 0 0 25,000 0 0 25,000 G.O. Capital Improvement Bonds 25,000 25,000 Windows - Aluminum 440-084 0 0 0 70,000 0 70,000 Produced Using Plan-It CIP Software nf7 DRAFT Department Project # 2027 2028 2029 2030 2031 Total G.O. Capital Improvement Bonds 70,000 70,000 Facilities Total 2,014,760 4,227,260 2,490,500 2,414,500 3,231,000 14,378,020 GRAND TOTAL 2,014,760 4,227,260 2,490,500 2,414,500 3,231,000 14,378,020 Produced Using Plan-It CIP Software nf8 DRAFT 2027 through 2031 Facilities Management Fund (440) Prior Lake, MN Funding Source Summary Source 2027 2028 2029 2030 2031 Total Facilities Management Fund (F440) 1,514,760 436,760 432,000 500,000 731,000 3,614,520 G.O. Capital Imp Bonds - 2028 3,790,500 3,790,500 G.O. Capital Improvement Bonds 500,000 2,058,500 1,914,500 2,500,000 6,973,000 GRAND TOTAL 2,014,760 4,227,260 2,490,500 2,414,500 3,231,000 14,378,020 Produced Using Plan-It CIP Software 6.9 DRAFT CITY OF PRIOR LAKE Facilities Mgmt Fund F440 2027 2028 2029 2030 2031 Preliminary Budget Projected Projected Projected Projected REVENUE AND OTHER SOURCES Taxes 355,000 405,000 555,000 600,000 650,000 Investment income 21,400 20,000 20,000 20,000 20,000 Miscellaneous - - - - - Bonds issued (incl prem/disc) city portion 515,000 3,915,000 2,165,000 2,060,000 2,575,000 Transfers in Water Fund (F601)- - - - - Sewer Fund (F604)- - - - - General fund (F101 reserves)130,000 - - - - Total Revenues and Other Fund Sources 1,021,400 4,340,000 2,740,000 2,680,000 3,245,000 EXPENDITURES AND OTHER USES Capital Outlay (2,154,760) (4,227,260) (2,490,500) (2,414,500) (3,231,000) Cost of issuance of bonds (15,000) (115,000) (65,000) (60,000) (75,000) Other uses - - - (10,000) - Total Expenditures and Other Uses (2,169,760) (4,342,260) (2,555,500) (2,484,500) (3,306,000) CHANGE IN FUND BALANCE (1,148,360) (2,260) 184,500 195,500 (61,000) Beginning Fund Balance 1,165,085 16,725 14,465 198,965 394,465 Ending Fund Balance 16,725 14,465 198,965 394,465 333,465 6.10 DRAFT CITY OF PRIOR LAKE, MN 2027 to 2031 CAPITAL IMPROVEMENT PLAN August 12, 2026 Adopted ______________, 2026 6.11 DRAFT A-1 CITY OF PRIOR LAKE 2027-2031 CAPITAL IMPROVEMENT PLAN I.INTRODUCTION In 2003, the Minnesota State Legislature adopted a statute that generally exempts city and town general obligation bonds issued under a capital improvement plan from the referendum requirements usually required for city halls, public works, public safety facilities and libraries. The statute on general obligation capital improvement plan bonds is Minnesota Statutes, Section 475.521 (the “Act”). On August 12, 2026, the City Council held a public hearing on the adoption of the 2027-2031 Capital Improvement Plan and the issuance of general obligation improvement bonds. On August 12, 2026, the City Council adopted Resolution No. 26-_____ approving the 2027- 2031 Capital Improvement Plan (the “CIP”). The approved 2027-2031 Capital Improvement Plan anticipates the issuance of general obligation bonds to finance certain facilities improvements as described in the CIP. In order for the City of Prior Lake (the “City”) to proceed to issue general obligation bonds, pursuant to the Act, the City must make certain findings. These findings are included in this document. II.PURPOSE Under the Act, a capital improvement is a major expenditure of City funds for the acquisition or betterment to public lands, buildings, or other improvements used as a city hall, town hall, library, public safety, or public works facility, which has a useful life of five years or more. Under the Act, capital improvements do not include light rail transit or related activities, parks, road/bridges, administrative buildings other than a city hall or town hall, or land for those facilities. For the purposes of the Act, the CIP is a document designed to anticipate capital improvement expenditures and schedule them over at least a five-year period so that they may be purchased in the most efficient and cost-effective method possible. A CIP allows the matching of expenditures with anticipated income. As potential expenditures are reviewed, the City considers the benefits, costs, alternatives, and impact on operating expenditures. Before issuing bonds under a CIP, the City must hold a public hearing on the CIP and the proposed bonds and must then approve the CIP and authorize the issuance of the bonds by at least a 3/5 majority. If a petition signed by voters equal to at least 5 percent of the votes cast in the last general City election requesting a vote on the issuance of bonds is received by the municipal clerk within 30 days after the public hearing, then the bonds may not be issued unless approved by the voters at an election. 6.12 DRAFT A-2 The statute has established certain criteria that must be considered for each project to be undertaken pursuant to this CIP (the “Projects”). These criteria are: 1.Condition of the City’s existing infrastructure and projected need for repair or replacement 2.Demand for the improvement 3.Cost of the improvement 4.Availability of public resources 5. Level of overlapping debt 6.Cost/benefits of alternative uses of funds 7. Operating costs of the proposed improvements 8.Alternatives for providing services most efficiently through shared facilities with other municipalities or local governments The CIP is designed to be updated and modified on an annual basis. In this manner, it becomes an ongoing fiscal planning tool that continually anticipates future capital expenditures and funding sources. III.PLAN SUMMARY This CIP is intended to describe and analyze the need for the Projects in accordance with the Act. The City may modify this CIP from year to year as authorized by the Act. Following is a summary of estimated expenditures for the Projects, including cost of bond issuance (financing costs): 2027 Expenditures The City intends to do a bathroom remodel at the Thomas Ryan facility. The combined estimated cost of the improvements to these facilities along with cost of issuance to be financed through bond proceeds is $515,000. 2028 Expenditures The City intends to do multiple projects. City Hall improvements include a bathroom remodel, carpet, chiller, air handler and a BAS upgrade. Fire Station 2 will see a dorm remodel project. The Police Station improvements include a bathroom remodel, boiler replacement, BAS upgrade, carpet, locker room remodel and VAV boxes. The combined estimated cost of the improvements to these facilities along with cost of issuance to be financed through bond proceeds is $3,915,000. 2029 Expenditures The City intends for maintenance and remodel in City Hall and the Library/Club Prior. The major improvement in City Hall will be roofing. The Library/Club Prior will see 6.13 DRAFT A-3 roofing, air handling units, carpet and a BAS upgrade. The combined estimated cost of the improvements to these facilities along with cost of issuance to be financed through bond proceeds is $2,165,000. 2030 expenditures The City intends for multiple improvements around the City. Fire Station 1 will see a rooftop unit, infrared heaters and windows. We anticipate engineering fees for the Maintenance Facility. The Police Station plan includes roofing and parking enhancements. The combined estimated cost of the improvement to these facilities along with cost of issuance to be financed through bond proceeds is $2,060,000. 2031 Expenditures The City intends for roofing at Fire Station 1 and engineering costs for the Maintenance Facility. The combined estimated cost of the improvements to these facilities along with cost of issuance to be financed through bond proceeds is $2,575,000. Analysis The City has analyzed the eight points required by the Act for the Projects on an individual basis and as a whole. The findings are as follows: 1. Conditions of City Infrastructure, Including the Projected Need for Repair or Replacement and Need for the Project Improvements to City public safety, public works, and city hall facilities in future years are for capital maintenance and repair of existing facilities. 2.Likely Demand for the Project The City’s basic government service operations, including administration, police, fire, and public works operations are housed in facilities that are in need of capital maintenance and repair. 3. Estimated Cost of the Project The estimated cost, including architectural/engineering, contingency, legal and bonding, of the Project is set forth above. 4.Available Public Resources The City does not have sufficient cash reserves on hand to finance the improvement of the city hall and public works and public safety facilities without issuing bonds. The City plans to use the bond proceeds to reimburse the City for the Projects. 6.14 DRAFT A-4 5. Level of Overlapping Debt in the City As of July 2, 2025, the level of overlapping debt in the City is provided in the table below: Issuer 2025/2026 Tax Capacity Value(1) 2025/2026 Tax Capacity Value in City(1) Percentage Applicable in City Outstanding General Obligation Debt(2) Taxpayers’ Share of Debt Scott County $ 345,024,650 $67,263,937 19.50% $86,835,000 $16,932,825 ISD No. 719 (Prior Lake-Savage) 108,716,245 64,331,356 59.17 109,983,926 65,077,489 ISD No. 720 (Shakopee) 108,106,610 2,932,581 2.71 85,014,567 2,303,895 Metropolitan Council 6,503,726,905 67,263,937 1.03 12,100,000 (3) 124,630 Metro Transit 5,665,367,373 67,263,937 1.19 223,650,000 (4) 2,661,435 Total Indirect Debt: $ 87,100,274 (1)Tax Capacity Value is after tax increment deduction and fiscal disparity adjustments. (2)As of July 2, 2025, unless noted otherwise. (3)Metropolitan Council has $12,100,000 of general obligation debt outstanding as of December 31, 2025. This debt is payable from ad valorem taxes levied on all taxable property within the Metropolitan Taxing District. This amount excludes $1,122,348,000 of general obligation debt payable from wastewater and sewer revenues, and lease agreements. (4) Metropolitan Transit has $223,650,000 of property tax supported general obligation debt outstanding as of December 31, 2025. Transit debt is issued by the Metropolitan Council for public transit operations and is payable from ad valorem taxes levied on all taxable property within the Metropolitan Transit District. This amount excludes $181,410,000 of general obligation debt payable from revenues. 6.15 DRAFT A-5 6. Relative Benefits and Costs of Alternative Uses of the Funds The proposed Projects could potentially be financed through the issuance of lease-revenue bonds. However, both costs of issuance and overall debt service payments would be significantly higher, since lease-revenue bonds are not general obligation debt and are therefore not as attractive to potential purchasers. The issuance of general obligation capital improvement plan bonds represents the most cost-efficient way to finance the proposed Projects. 7. Operating Costs of the Proposed Project Operating costs are not expected to be impacted to any significant degree with the proposed improvements. 8. Alternatives for Providing Services Most Efficiently Through Shared Facilities with Other Municipalities or Local Government Units The proposed capital improvements are being made to maximize effective, cost-effective City facilities, and as such, there would be no greater efficiency achieved through constructing shared facilities with other local government units. IV.FINANCING THE CAPITAL IMPROVEMENT PLAN The total amount of requested expenditures under the CIP is expected not to exceed $11,230,000, including estimated cost of issuance of bonds. These expenditures are to be funded by the sale of the City’s general obligation capital improvement plan bonds not to exceed $11,230,000. In the financing of the CIP, two statutory limitations apply. Under Minnesota Statutes, Chapter 475, as amended, with few exceptions, a municipality cannot incur debt in excess of 3% of the assessor’s Estimated Market Value (“EMV”) for the municipality. In the case of a municipality with a population of 2,500 or less, the bonds are not subject to the net debt limits. The City’s 2025 population was approximately 28,500. Therefore, the proposed general obligation capital improvement plan bonds to be issued in the years 2027 through 2031 would be subject to the debt limit. Another limitation on bonding under the Act is that without referendum, the total amount that can be used for principal and interest in any one year for CIP debt cannot exceed 0.16% of the EMV for the City. The City has portions of four outstanding series of bonds, its General Obligation Bonds, Series 2018A (the “Series 2018A Bonds”), General Obligation Bonds, Series 2021A (the “Series 2021A Bonds”), General Obligation Bonds, Series 2021B (the “Series 2021B Bonds”), and General Obligation Bonds, Series 2026A (the “Series 2026A Bonds” and together with the Series 2018A Bonds, the Series 2021A Bonds, the Series 2021B Bonds, the “Outstanding CIP Bonds”), issued under the Act. The maximum amount of principal and interest due in any calendar year on the Outstanding CIP Bonds, combined, is $1,273,338. In payable year 2026, the City’s EMV was $6,089,682,900. Therefore, the total amount available to be used to pay principal and interest on the outstanding bonds plus any new bonds issued under this Plan is $9,743,493 per year ($6,089,682,900 x 0.16% = $9,743,493, which is greater than the maximum amount of principal and interest due in any year on the Outstanding CIP Bonds plus the proposed new bonds.). 6.16 DRAFT A-6 Under this CIP the City may issue up to $11,230,000 in general obligation capital improvement plan bonds in the years 2027 through 2031 to finance the Projects. If the City were to issue general obligation capital improvement bonds in the maximum principal amount of $11,230,000 for the Projects, the bond issue would be repaid over a period not to exceed thirty (30) years pursuant to the Act. Expected debt service on the proposed bonds for the Projects is within the statutory limits. Annual Review of the Capital Improvement Plan The City Council, using the process outlined in this CIP, plans to review this CIP annually, considering proposed expenditures, making priority decisions, and seeking funding for those expenditures it deems necessary for the City. If deemed appropriate, the City Council will prepare an update to this CIP. (The remainder of this page is intentionally blank) 6.17 DRAFT 2027 through 2031 Technology (101/210) Prior Lake, MN Projects By Department Department Project # 2027 2028 2029 2030 2031 Total Cable Chambers Cameras and Mics COMM-005 140,000 140,000 Cable Total 140,000 0 0 0 0 140,000 Elections Tabulators - qty 2 ELEC-002 115,000 115,000 Elections Total 0 0 0 0 115,000 115,000 Technology Firewall Replacement TECH-NW-001 5,000 5,000 General Equipment Contingency TECH-EQ-001 10,000 10,000 HP DesignJet T1500 - CD/Eng TECH-EQ-009 10,000 10,000 Ricoh MP C2504 Fire TECH-EQ-008 11,000 11,000 Ricoh MP C4503 - CD/Eng TECH-EQ-003 11,000 11,000 Ricoh MP C4504 - Admin TECH-EQ-005 13,000 13,000 Virtual Server TECH-NW-012 25,000 25,000 Technology Total 38,000 16,000 10,000 0 21,000 85,000 GRAND TOTAL 178,000 16,000 10,000 0 136,000 340,000 Produced Using Plan-It CIP Software 7.1 DRAFT 2027 through 2031 Technology (101/210) Prior Lake, MN Projects & Funding Sources By Department Department Project # 2027 2028 2029 2030 2031 Total Cable Chambers Cameras and Mics COMM-005 140,000 0 0 0 0 140,000 Cable Franchise Fund (F210) 70,000 70,000 General Fund (F101) 70,000 70,000 Cable Total 140,000 0 0 0 0 140,000 Technology Firewall Replacement TECH-NW-001 0 5,000 0 0 0 5,000 General Fund (F101) 5,000 5,000 General Equipment Contingency TECH-EQ-001 0 0 10,000 0 0 10,000 General Fund (F101) 10,000 10,000 HP DesignJet T1500 - CD/Eng TECH-EQ-009 0 0 0 0 10,000 10,000 General Fund (F101) 10,000 10,000 Ricoh MP C2504 Fire TECH-EQ-008 0 11,000 0 0 0 11,000 General Fund (F101) 11,000 11,000 Ricoh MP C4503 - CD/Eng TECH-EQ-003 0 0 0 0 11,000 11,000 General Fund (F101) 11,000 11,000 Ricoh MP C4504 - Admin TECH-EQ-005 13,000 0 0 0 0 13,000 General Fund (F101) 13,000 13,000 Virtual Server TECH-NW-012 25,000 0 0 0 0 25,000 General Fund (F101) 25,000 25,000 Technology Total 38,000 16,000 10,000 0 21,000 85,000 GRAND TOTAL 178,000 16,000 10,000 0 21,000 225,000 Produced Using Plan-It CIP Software 7.2 DRAFT Water Fund Summary of Key Financial Information Water Fund 2026 (estimate)2027 2028 2029 2030 2031 2032 2033 2034 2035 Cash by Purpose For future capital improvements 4,668,343 2,130,806 1,229,842 2,538,313 2,493,774 3,420,266 2,761,375 2,343,671 3,240,744 4,305,659 For following year pay-go capital 1,911,000 3,482,000 2,435,500 227,000 1,685,000 1,511,025 2,086,076 3,467,155 2,067,763 2,039,401 For 3-months of operating cash 1,033,485 1,055,866 1,008,793 1,039,905 1,074,231 1,120,318 1,400,624 1,187,398 1,226,675 1,267,248 For following year debt service 801,700 810,450 645,350 652,650 659,200 - - - - - Ending Cash 8,414,528 7,479,122 5,319,485 4,457,869 5,912,205 6,051,610 6,248,076 6,998,223 6,535,182 7,612,308 High Volume Customer (78,000 gallons)3.0% 4.0% 3.0% 3.0% 3.0% 4.0% 4.0% 3.0% 3.0% 3.0% Medium Volume Customer (18,000 gallons)3.0% 4.0% 3.0% 3.0% 3.0% 4.0% 4.0% 3.0% 3.0% 3.0% Low Volume Customer (8,000 gallons)3.0% 4.0% 3.0% 3.0% 3.0% 4.0% 4.0% 3.0% 3.0% 3.0% Average Annual % Change in Water Bill for Billing Period 8.1 DRAFT Water Fund Capital Improvement Plan Water Fund EstimateProject Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Capital OutlayTransportation Plan 1,161,600 1,201,000 2,554,000 1,647,000 - - - 1,362,000 3,320,000 1,865,000 Wells 60,000 445,000 52,000 65,000 65,000 67,500 140,000 72,500 75,000 75,000 Boosters and misc projects 475,000 70,000 80,500 228,500 91,500 72,000 80,000 35,000 30,000 25,000 Current Year Projects - Facilities 145,000 140,000 765,500 440,000 10,000 - - - - - Water Storage & Tower Reconditioning 1,810,000 - - - - 40,000 - - - - Technology Plan - SCADA - - - - 10,000 10,500 11,025 11,576 12,155 12,763 Equipment - 55,000 - - 20,500 215,000 - 575,000 - 60,000 WTP Filter Media Replacement - -- 25,000 - 1,250,000 1,250,000 - - - WTF Rehabs & Equipment - -30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 Total Capital Outlay 3,651,600 1,911,000 3,482,000 2,435,500 227,000 1,685,000 1,511,025 2,086,076 3,467,155 2,067,763 Source of FundsBond proceeds - - - - - - - - - - Current revenue / use of cash in fund 3,651,600 1,911,000 3,482,000 2,435,500 227,000 1,685,000 1,511,025 2,086,076 3,467,155 2,067,763 Total Source of Funds 3,651,600 1,911,000 3,482,000 2,435,500 227,000 1,685,000 1,511,025 2,086,076 3,467,155 2,067,763 8.2 DRAFT Stormwater Fund Summary of Key Financial Information Stormwater Fund 2026 (estimate)2027 2028 2029 2030 2031 2032 2033 2034 2035 Cash by Purpose For future capital improvements 3,336,145 3,218,229 2,739,466 3,525,690 4,157,350 4,846,345 6,264,909 5,331,759 4,962,354 4,284,047 For following year pay-go capital 1,174,000 1,080,000 1,396,000 481,000 644,000 658,000 - 2,316,000 1,865,000 2,006,000 For 3-months of operating cash 270,260 267,316 325,793 284,541 293,567 302,880 313,741 332,974 332,639 386,947 For following year debt service 87,650 90,650 88,400 91,150 88,650 91,150 88,400 231,880 199,570 197,883 Ending Cash 4,868,055 4,656,194 4,549,659 4,382,381 5,183,567 5,898,375 6,667,050 8,212,613 7,359,563 6,874,877 Per Residential Equivalent Unit 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% Average Annual % Increase for Fees and Charges 8. DRAFT Stormwater Fund Capital Improvement Plan Stormwater Fund Estimate Project Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Capital Outlay Transportation Plan 600,490 589,000 473,000 937,000 - - - 705,000 1,630,000 1,165,000 Pond Maintenance & Retrofit 218,000 230,000 237,000 244,000 251,000 259,000 267,000 275,000 283,000 291,000 Stormwater Improvements 150,000 165,000 170,000 175,000 180,000 185,000 191,000 197,000 203,000 209,000 Stormwater Pond Planning 34,000 - - - - - - - - - LSWMP Implementation Plan - - - - 50,000 200,000 200,000 200,000 200,000 200,000 Misc projects - 190,000 200,000 40,000 - - - - - - Total Capital Outlay 1,002,490 1,174,000 1,080,000 1,396,000 481,000 644,000 658,000 1,377,000 2,316,000 1,865,000 Source of Funds Bond Proceeds - - - - - - - 1,451,600 - - Current revenue / use of cash in fund 1,002,490 1,174,000 1,080,000 1,396,000 481,000 644,000 658,000 (74,600) 2,316,000 1,865,000 Total Source of Funds 1,002,490 1,174,000 1,080,000 1,396,000 481,000 644,000 658,000 1,377,000 2,316,000 1,865,000 8.4 DRAFT Sewer Fund Summary of Key Financial Information Sewer Fund 2026 (estimate)2027 2028 2029 2030 2031 2032 2033 2034 2035 Cash by Purpose For future capital improvements 547,416 2,870,364 2,156,741 2,136,107 4,626,078 9,925,880 6,101,917 7,553,835 6,559,664 4,691,208 For following year pay-go capital 2,586,000 - 4,131,000 2,381,000 - 1,569,025 - 4,685,155 3,253,763 4,199,401 For 3-months of operating cash 985,308 994,707 1,100,174 1,108,517 1,157,011 1,266,273 2,512,461 1,361,484 1,374,856 1,435,484 For following year debt service 165,500 168,000 497,325 394,550 391,900 1,055,408 917,700 1,518,540 1,391,230 1,393,568 Ending Cash 4,284,224 4,033,071 7,885,239 6,020,174 6,174,988 13,816,586 9,532,078 15,119,014 12,579,513 11,719,660 High Volume Customer (47,000 gallons)7.5% 4.4% 3.4% 3.4% 4.0% 4.0% 3.4% 3.4% 3.4% 3.4% Medium Volume Customer (12,000 gallons)7.3% 4.5% 3.4% 3.4% 4.0% 4.0% 3.4% 3.4% 3.4% 3.4% Low Volume Customer (7,000 gallons)7.7% 4.4% 3.4% 3.4% 4.0% 4.0% 3.4% 3.4% 3.4% 3.4% Average Annual % Increase for Fees and Charges 8. DRAFT Sewer Fund Capital Improvement Plan Sewer Fund Estimate Project Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Capital Outlay Transportation Plan 1,631,900 1,059,000 1,533,000 2,120,000 - - - 1,161,000 2,581,000 1,631,000 Sewer Lining - Inflow/Infiltration Prevention 468,000 482,000 496,000 511,000 526,000 542,000 558,000 575,000 592,000 610,000 Lift Station Rehabilitation 720,000 545,000 900,000 750,000 1,000,000 1,000,000 1,000,000 1,000,000 1,500,000 1,000,000 Technology Plan - SCADA 500,000 500,000 500,000 500,000 10,000 10,500 11,025 11,576 12,155 12,763 Generator/Equipment - - 125,000 250,000 845,000 85,000 - 160,000 - - Total Capital Outlay 3,319,900 2,586,000 3,554,000 4,131,000 2,381,000 1,637,500 1,569,025 2,907,576 4,685,155 3,253,763 Source of Funds Bond Proceeds - - 5,150,000 - - 6,815,000 - 6,188,400 - - Current revenue / use of cash in fund 3,319,900 2,586,000 (1,596,000) 4,131,000 2,381,000 (5,177,500) 1,569,025 (3,280,824) 4,685,155 3,253,763 Total Source of Funds 3,319,900 2,586,000 3,554,000 4,131,000 2,381,000 1,637,500 1,569,025 2,907,576 4,685,155 3,253,763 8.6 DRAFT Debt Analysis and Tax Impact In reviewing the 2027-2031 Capital Improvement Program, the City Council should consider the level of debt as well as the annual tax impact of the scheduled projects. The 2027-2031 CIP includes projects that are planned to be funded by bond proceeds/debt. Bonds are issued for the project costs that the City is funding through tax levies as well as the costs that are specially assessed to property owners. As of 12/31/2025, the City of Prior Lake had $24.0M in debt. The following chart reflects the type of debt. One-third of the debt is for facilities: Water Treatment Plant (through 2030), Fire Station #2, City Hall, and the Police Station (through 2031). The 2027-2031 CIP anticipates the following bonding (debt issuance) needs: •The Equipment Replacement Plan includes $3,810,000 of bonding for major equipment replacement expenditures primarily for fire truck replacements (ladder truck in 2027 and pumper truck in 2028). •Bonding of $3,500,000 for major park replacement expenditures includes the replacement for the four Ponds Parking Lots and entrance road in 2028. •The Facilities Plan includes $11,230,000 of bonding for major facility repairs for City Hall and Police Station replacement of membrane roofing and heating, ventilation, and air conditioning (HVAC) updates, addition of dormitories at Fire Station #2, and parking/safety enhancements. Debt Type Amount as of December 31, 2025 Purpose G.O. Special Assessments 7,055,000 Street Improvement Projects G.O. TIF Bonds 0 Tax Increment Project G.O. Bonds (MV)1,565,000 Referendum Project (Fire Station #2) G.O. Bonds 2,965,000 Street Reconstruction Projects G.O. Bonds 3,760,000 Public Works Building and CIP Projects G.O. Bonds 520,000 Equipment G.O. Revenue Bonds 5,555,000 Maintenance Facility, Water Treatment Facility & Utility Replacement Projects G.O. Capital Improvement Bonds 2,625,000 City Hall & Police Station Energy Lease Loan Payable (GESP)0 Guaranteed Energy Savings Program Projects Total 24,045,000 9.1 DRAFT •The Pavement Management Plan includes bonding of $12,900,000 for transportation plan projects and street mill & overlay projects. The repayment sources for this bonding include: o Tax levy o Project Special Assessment (The city provides the upfront funding for the special assessment portion via bonding) •The Sewer Fund includes bonding of $11,970,000 for planned expenditures for sewer replacement costs on street reconstruction projects as well as lift station rehab, sewer lining, and SCADA software update. The table below summarizes the proposed bonding by fund and year: Summary of Projected Debt Balances The following tables reflect all bonding requirements referenced in the CIP, Pavement Management Plan, Facilities Management Plan, and Equipment Replacement Plan. Based on the proposed projects in the CIP, debt is projected to increase from $24.0M at the end of 2025 to $44.0M at the end of 2031. Fund Name 2027 2028 2029 2030 2031 Revolving Equip Fund F410 2,265,000 1,545,000 - - - Revolving Park Equip Fund F430 - 3,500,000 - - - Facilities Mgmt Fund F440 515,000 3,915,000 2,165,000 2,060,000 2,575,000 PIR Revolving Fund F450 - - - 710,000 - Construction Fund F501 2,895,000 2,810,000 4,215,000 1,575,000 695,000 - Governmental Funds Subtotal 5,675,000 11,770,000 6,380,000 4,345,000 3,270,000 Water Fund - - - - - Stormwater Fund - - - - - Sanitary Sewer Fund - 5,150,000 - - 6,815,000 Utility Funds Subtotal -5,150,000 - - 6,815,000 City total Debt Issuance - All funds 5,675,000 16,920,000 6,380,000 4,345,000 10,085,000 Long-Term Financial Planning Bond Proceeds for Capital Projects Projected Bonding by Year 2026 2027 2028 2029 2030 2031 Total Debt Outstanding (Existing & Planned) Governmental Funds Debt Outstanding 20,980,000 22,550,000 30,225,000 32,030,000 32,680,000 32,505,000 Enterprise Funds Debt Outstanding 3,585,000 2,735,000 6,995,000 6,245,000 5,460,000 11,460,000 Total Debt Outstanding (Existing & Planned)24,565,000 25,285,000 37,220,000 38,275,000 38,140,000 43,965,000 Long-Term Financial Planning Projected Change in Debt Outstanding 9. DRAFT Projected Debt per Capita: Projected debt per capita based on the current capital projects planned is shown in the table below. The city is working to manage its debt load while providing needed capital replacement projects in a growing city. Bond Repayment through Debt Service Tax Levy: The table below is a summary of the annual projected total CIP tax levy by component. Bond Repayment Debt Service supported by Utility Fund Revenues: •The projected annual debt service for the utility funds is shown below: CIP Impact on Long Range Financial Plan: The financial plan incorporates the debt and tax levy impacts of the Capital Improvement Program. Approval of the CIP does not obligate the city to complete the proposed projects or purchases. The 2027 projects/proposed purchases will be incorporated into the 2027 budget requests for budgeted funds. Further Council approvals may be necessary to comply with state statutes and the city’s purchasing policy. The city’s financial planning reflects funding general operations, future planned capital improvements, including related debt service on planned bond issuance to support capital 2026 2027 2028 2029 2030 2031 Debt Per Capita (assumes population growth) Debt Per Capita 868 890 1,304 1,328 1,311 1,497 Long-Term Financial Planning Projected 2027 2028 2029 2030 2031 Debt Service Levy 3,454,655 3,889,440 4,390,759 4,060,724 3,530,139 Equipment Revolving Fund 1,025,000 1,075,000 1,075,000 1,150,000 1,200,000 Revolving Park Equip Fund 655,000 705,000 705,000 750,000 800,000 Facilities Management Fund 355,000 405,000 555,000 600,000 650,000 PIR Fund - - - - - Total CIP Tax Levies 5,489,655 6,074,440 6,725,759 6,560,724 6,180,139 CIP Tax Levies:Projected CIP Tax Levy 2027 2028 2029 2030 2031 Water 801,700 810,450 645,350 652,650 659,200 Sewer 165,500 168,000 497,325 394,550 391,900 Stormwater 87,650 90,650 88,400 91,150 88,650 2027-2031 CIP Projected Debt Service (funded by Utility Fund Revenues) 9. DRAFT improvements for streets, equipment replacement and facilities capital maintenance projects. Debt repayment is based on level annual debt service payments. Funding for proposed projects in the CIP results in an estimated 10-year average tax levy increase of 6.8% and an estimated 10-year average tax rate increase of 3.0%. This is in line with the parameters established in the city’s 2023 long range financial planning study. The estimated tax levies and tax rate projections for the city’s five-year financial plan are shown below. CITY OF PRIOR LAKE CITY PROPERTY TAX PROJECTION 2026 2027 2028 2029 2030 2031 TAX LEVIES General Fund Levy - Tax Capacity 16,267,024 16,864,136 18,032,656 19,595,626 20,819,085 22,357,525 General Fund Levy - Market Value 265,888 273,988 281,638 283,838 290,738 277,888 Debt Service Fund 2,979,220 3,454,655 3,889,440 4,390,759 4,060,724 3,530,139 CIP Funds 1,825,000 2,035,000 2,185,000 2,335,000 2,500,000 2,650,000 Total Tax Levies 21,337,132 22,627,779 24,388,735 26,605,223 27,670,547 28,815,553 Annual $ Change 1,485,227 1,290,646 1,760,956 2,216,489 1,065,324 1,145,006 TOTAL % CHANGE IN TAX LEVIES 7.5%6.0%7.8%9.1%4.0%4.1% CITY TAX CAPACITY TAX RATE 32.03% 33.54%35.45%35.77%36.05% Annual % Change 2.07%4.72%5.69%0.92%0.77% Debt per Capita 868 890 1,304 1,328 1,311 1,497 Bonds Outstanding 24,565,000 25,285,000 37,220,000 38,275,000 38,140,000 43,965,000 Change in Bonds Outstanding 720,000 11,935,000 1,055,000 (135,000) 5,825,000 Five Year Planning Period 9.4 DRAFT Financial Management Plan 2027-2031 August 12, 2026 10.1 DRAFT The City’s Financial Management Plan is intended to serve as a planning tool providing the Council and the public with the insight required to address issues that impact the City’s financial condition. The financial plan is presented to the City Council annually. The financial plan discusses and views City finances from a wider perspective and serves as a preliminary step in the annual budget and capital improvement planning processes to aid in determining the annual needs of the City. The City’s financial plan reflects funding for the following needs: •General operations •Future planned capital improvements •Debt service on planned bond issuance to support capital improvements for streets, equipment replacement, facilities capital maintenance projects and park improvements. •Water/Sewer/Storm Water Utility operations and capital needs Trend Analysis The City’s financial trends and planning assumptions are analyzed annually with many factors utilized to understand the financial condition of the City. These factors include: •Property Types •Market Value, Tax Capacity, Adjustments •Levy Components, Taxes, Tax Rates •Population •Staffing per the City’s five-year Personnel Plan •Labor Relations •Economy •Growth including residential and commercial development •Non-tax revenue sources •Inflation factors •Unfunded mandates The City’s financial plan incorporates the trends and planning assumptions to model the current and anticipated financial condition of the City including: •Tax Levy and Tax Rate Projections •General Fund Projections •Capital Improvement Program Projections and Levy Impacts •Utility Services Financial Management Plan •Debt and Debt Levy Projections Tax Levy and Tax Rate Projections The City’s financial plan models and projects the property tax levy needed to fund the City’s needs and the resulting City tax rate that will be applied to a property based on valuation factors. 10. DRAFT General Fund Projections: General Fund Projections provide an assessment and impact of anticipated staffing needs, inflationary changes, and unfunded mandates on the City’s operations and estimated impact on property taxes and rates. Capital Improvement Program Projections: The Capital Improvement Program (CIP) is one of the City’s long-term financial planning tools. The CIP is updated on an annual basis. The CIP is designed to identify infrastructure improvements and the associated funding sources needed due to ongoing maintenance, repair, and community growth. The following long-term planning documents are part of the CIP: Pavement Management Plan, Equipment Replacement Plan, Park Equipment Replacement Plan, Technology Plan, Facilities Management Plan and financial management plans for each of the three enterprise funds including Water, Sewer, and Storm Water. The financial plan incorporates the debt and tax levy impacts of the Capital Improvement Program. Utility Services Financial Management Plans: The financial management plans for water, sewer and stormwater utility services are updated as part of the CIP and achieve the following goals: •Rate Calculation: Provide a rate calculation that results in equitable and competitive fixed versus variable portion charge to customers and considers conservation impact of tiers and block rates. •Revenue Sufficiency: Focus on revenue sufficiency to provide cash balances that support the following objectives: o Revenue to meet current and future obligations. o Avoid future debt issuance consistent with City objectives. o Cash on-hand to provide: •Three-months of operating expense •Following-year debt service payments •Following year capital acquisition (planned to be paid from cash) •Reserves for replacement of infrastructure located under private streets. •Reserves for future capital improvements Debt Management Plan Debt and Debt Levy Projections: Based on current and planned projects in the City’s capital improvement plan, debt and debt service tax levy are projected. The projected debt issuance is for capital improvements for streets, equipment replacement, facilities capital maintenance projects, and park improvements as planned in the CIP. 10. DRAFT Table of Contents City Property Tax Projection …..……………………………………………………. 1-2 Summary Tax Levy …………………………………………………………………………. 3 Summary Tax Rate …………………………………………………………………………. 4 General Fund Summary ……………………………………………………………………. 5 Chart Data through 2031: Chart 1 Debt Service Tax Levy ……………………………………………………………. 6 Chart 2 General Fund Ending Fund Balance ……………………………………………... 7 Chart 3 City Tax Rate (Tax Capacity Rate) ……………………………………………...... 8 Chart 4 Total Tax Capacity (TC) Levy and Annual % Change in TC Levy and TC Tax Rate …………... 9 Chart 5 Total Market Value (MV) Levy and Annual % Change in MV Levy and MV Tax Rate ………. 10 Chart 6 Example Residential Properties City Property Taxes ……………………......... 11 Chart 7 Example Commercial Properties City Property Taxes ……………………....... 12 10.4 DRAFT CITY OF PRIOR LAKE PROPERTY TAX PROJECTION SUMMARY - CITY ONLY Adopted Budget 2026 Proposed Budget 2027 Projected 2028 Projected 2029 Projected 2030 Projected 2031 CITY TAX LEVIES (TAX CAPACITY AND REFERENDUM LEVIES) General Fund Levy - Tax Capacity 16,267,024 16,864,136 18,032,656 19,595,626 20,819,085 22,357,525 General Fund Levy - Market Value 265,888 273,988 281,638 283,838 290,738 277,888 Debt Service Fund 2,979,220 3,454,655 3,889,440 4,390,759 4,060,724 3,530,139 Revolving Equip Fund F410 925,000 1,025,000 1,075,000 1,075,000 1,150,000 1,200,000 Revolving Park Equip Fund F430 595,000 655,000 705,000 705,000 750,000 800,000 Facilities Mgmt Fund F440 305,000 355,000 405,000 555,000 600,000 650,000 PIR Revolving Fund F450 - - - - - - Construction Fund F501 - - - - - - Trunk Fund F502 - - - - - - Street Oversizing Fund F503 - - - - - - EDA Fund - - - - - - TOTAL % CHANGE IN TAX LEVIES 7.5%6.05%7.8%9.1%4.0%4.1% CITY TAX CAPACITY TAX RATE 31.38%32.03%33.54%35.45%35.77%36.05% Annual % Change - City Only Excludes EDA 2.90%2.07%4.72%5.69%0.92%0.77% CITY MARKET VALUE TAX RATE 0.00451%0.00448%0.00442%0.00429%0.00422%0.00388% Annual % Change -2.79%-0.82%-1.16%-3.10%-1.51%-8.10% EDA TAX CAPACITY TAX RATE 0.60%0.60%0.59%0.59%0.59%0.59% Annual % Change -4.67%-0.78%-0.23%-0.58%-0.09%-0.44% 10.5 DRAFT CITY OF PRIOR LAKE PROPERTY TAX PROJECTION SUMMARY 2026 2027 2028 2029 2030 2031 Adopted Preliminary Budget Projected Projected Projected Projected PRIOR YEAR TAX LEVIES General Fund 14,848,732 16,267,024 16,864,136 18,032,656 19,595,626 20,819,085 Debt Service Fund 3,188,173 3,245,108 3,728,643 4,171,078 4,674,597 4,351,462 Capital Park Fund F225 - - - - - - Revolving Equip Fund F410 1,025,000 925,000 1,025,000 1,075,000 1,075,000 1,150,000 Revolving Park Equip Fund F430 535,000 595,000 655,000 705,000 705,000 750,000 Facilities Mgmt Fund F440 255,000 305,000 355,000 405,000 555,000 600,000 PIR Revolving Fund F450 - - - - - - Construction Fund F501 - - - - - - Trunk Fund F502 - - - - - - Street Oversizing Fund F503 - - - - - - EDA Fund 405,000 405,000 418,296 430,845 443,770 457,083 Grand Total 20,256,905 21,742,132 23,046,074 24,819,579 27,048,993 28,127,630 SUMMARY OF CHANGE IN TAX LEVIES GENERAL FUND Revenue Changes MV Debt Service Levy (3,400) (8,100) (7,650) (2,200) (6,900) 12,850 Non Tax Revenues (396,529) (866,152) 26,627 (71,940) (330,208) 35,382 Net Change Non Tax Revenues (399,929) (874,252) 18,977 (74,140) (337,108) 48,232 Expense Changes Current expenditures (2,664) 474,681 268,297 279,029 290,190 301,797 Other financing uses - - - - - - Personnel 1,283,557 947,583 999,397 1,172,081 1,260,477 1,175,261 Capital Outlay (57,610) (40,000) 4,000 - - - Capital Outlay - Technology 132,000 (49,000) 200 (66,200) 3,000 1,000 Transfer out to DS fund 3,400 138,100 (122,350) 2,200 6,900 (12,850) Transfer out to other funds - - - - - - Non-recurring mid-year adjustments - - - - - - Net Change Expenses 1,358,683 1,471,364 1,149,543 1,387,110 1,560,567 1,465,209 Other Changes Other source (use) of General Fund Reserves not included in original adopted budget - - - Budgeted source (use) of General Fund Reserves 459,538 - - 250,000 - 25,000 Net Other Changes 459,538 - - 250,000 - 25,000 GENERAL FUND 1,418,292 597,112 1,168,520 1,562,969 1,223,459 1,538,441 DEBT SERVICE FUNDS Existing Debt 53,535 475,434 (218,067) (885,393) (579,590) (838,515) Proposed Debt - - 652,852 1,386,712 249,555 307,930 MV Debt 3,400 8,100 7,650 2,200 6,900 (12,850) DEBT SERVICE FUNDS 56,935 483,534 442,436 503,519 (323,135) (543,435) OTHER FUNDS Capital Park Fund F225 - - - - - - Revolving Equip Fund F410 (100,000) 100,000 50,000 - 75,000 50,000 Revolving Park Equip Fund F430 60,000 60,000 50,000 - 45,000 50,000 Facilities Mgmt Fund F440 50,000 50,000 50,000 150,000 45,000 50,000 PIR Revolving Fund F450 - - - - - - Construction Fund F501 - - - - - - Trunk Fund F502 - - - - - - Street Oversizing Fund F503 - - - - - - EDA Fund - 13,296 12,549 12,925 13,313 13,712 OTHER FUNDS 10,000 223,296 162,549 162,925 178,313 163,712 TOTAL CHANGE IN TAX LEVIES 1,485,227 1,303,942 1,773,505 2,229,414 1,078,637 1,158,718 ALL CITY PLUS EDA TAX LEVIES General Fund 16,267,024 16,864,136 18,032,656 19,595,626 20,819,085 22,357,525 Debt Service Fund 3,245,108 3,728,643 4,171,078 4,674,597 4,351,462 3,808,027 Capital Park Fund F225 - - - - - - Revolving Equip Fund F410 925,000 1,025,000 1,075,000 1,075,000 1,150,000 1,200,000 Revolving Park Equip Fund F430 595,000 655,000 705,000 705,000 750,000 800,000 Facilities Mgmt Fund F440 305,000 355,000 405,000 555,000 600,000 650,000 PIR Revolving Fund F450 - - - - - - Construction Fund F501 - - - - - - Trunk Fund F502 - - - - - - Street Oversizing Fund F503 - - - - - - EDA Fund 405,000 418,296 430,845 443,770 457,083 470,796 Grand Total 21,742,132 23,046,074 24,819,579 27,048,993 28,127,630 29,286,348 CURRENT YEAR TAX LEVIES ANNUAL % CHANGE General Fund 9.6%3.7%6.9%8.7%6.2%7.4% Debt Service Fund 1.8%14.9%11.9%12.1%-6.9%-12.5% Capital Park Fund F225 Revolving Equip Fund F410 -9.8%10.8%4.9%0.0%7.0%4.3% Revolving Park Equip Fund F430 11.2%10.1%7.6%0.0%6.4%6.7% Facilities Mgmt Fund F440 19.6%16.4%14.1%37.0%8.1%8.3% PIR Revolving Fund F450 Construction Fund F501 Trunk Fund F502 Street Oversizing Fund F503 EDA Fund 0.0%3.3%3.0%3.0%3.0%3.0% Grand Total 7.33%6.00%7.70%8.98%3.99%4.12% CURRENT YEAR TAX CAPACITY TAX LEVIES General Fund 16,267,024 16,864,136 18,032,656 19,595,626 20,819,085 22,357,525 Debt Service Fund 2,979,220 3,454,655 3,889,440 4,390,759 4,060,724 3,530,139 Capital Park Fund F225 - - - - - - Revolving Equip Fund F410 925,000 1,025,000 1,075,000 1,075,000 1,150,000 1,200,000 Revolving Park Equip Fund F430 595,000 655,000 705,000 705,000 750,000 800,000 Facilities Mgmt Fund F440 305,000 355,000 405,000 555,000 600,000 650,000 PIR Revolving Fund F450 - - - - - - Construction Fund F501 - - - - - - Trunk Fund F502 - - - - - - Street Oversizing Fund F503 - - - - - - EDA Fund 405,000 418,296 430,845 443,770 457,083 470,796 Grand Total 21,476,244 22,772,086 24,537,941 26,765,155 27,836,892 29,008,460 Annual % Change 7.41%6.03%7.75%9.08%4.00%4.21% CURRENT YEAR REFERENDUM TAX LEVIES General Fund Debt Service Fund 265,888 273,988 281,638 283,838 290,738 277,888 Capital Park Fund F225 Revolving Equip Fund F410 Revolving Park Equip Fund F430 Facilities Mgmt Fund F440 PIR Revolving Fund F450 Construction Fund F501 Trunk Fund F502 Street Oversizing Fund F503 EDA Fund Grand Total 265,888 273,988 281,638 283,838 290,738 277,888 Annual % Change 1.30%3.05%2.79%0.78%2.43%-4.42% 10.6 DRAFT CITY OF PRIOR LAKE PROPERTY TAX LEVY, TAX CAPACITY, AND TAX RATE 2026 2027 2028 2029 2030 2031 Certified Preliminary Budget Projected Projected Projected Projected TAX LEVY (TAX CAPACITY) General Fund 16,267,024 16,864,136 18,032,656 19,595,626 20,819,085 22,357,525 Debt Service Fund 2,979,220 3,454,655 3,889,440 4,390,759 4,060,724 3,530,139 Capital Park Fund F225 - - - - - - Revolving Equip Fund F410 925,000 1,025,000 1,075,000 1,075,000 1,150,000 1,200,000 Revolving Park Equip Fund F430 595,000 655,000 705,000 705,000 750,000 800,000 Facilities Mgmt Fund F440 305,000 355,000 405,000 555,000 600,000 650,000 PIR Revolving Fund F450 - - - - - - Construction Fund F501 - - - - - - Trunk Fund F502 - - - - - - Street Oversizing Fund F503 - - - - - - EDA Fund - - - - - - Total Tax Levies 21,071,244 22,353,791 24,107,097 26,321,385 27,379,809 28,537,665 Annual % Change 7.56%6.09%7.84%9.19%4.02%4.23% Fiscal Disparities Distribution 1,281,579 1,281,579 1,281,579 1,281,579 1,281,579 1,281,579 Net Tax Levy 19,789,665 21,072,212 22,825,518 25,039,806 26,098,230 27,256,086 Annual % Change 8.07%6.48%8.32%9.70%4.23%4.44% TAX CAPACITY Total Tax Capacity (TC) Before New Construction 65,476,476 67,955,915 70,130,504 72,374,680 74,690,670 77,304,844 TC from Projected New Construction - 379,607 465,938 805,625 807,813 810,000 Total TC with Projected New Construction 65,476,476 68,335,522 70,596,442 73,180,305 75,498,483 78,114,844 Fiscal Disparities TC Contribution 2,305,933 2,444,101 2,444,101 2,444,101 2,444,101 2,444,101 TIF TC 108,272 101,461 101,461 101,461 101,461 63,045 Net Tax Capacity (NTC)63,062,271 65,789,960 68,050,880 70,634,743 72,952,921 75,607,698 Annual % Change 5.03%4.33%3.44%3.80%3.28%3.64% TAX CAPACITY TAX RATE 31.381%32.030%33.542%35.450%35.774%36.049% Annual % Change 2.90%2.07%4.72%5.69%0.92%0.77% TAX LEVY (REFERENDUM)265,888 273,988 281,638 283,838 290,738 277,888 Annual % Change 3.05%2.79%0.78%2.43%-4.42% MARKET VALUE (REFERENDUM)5,890,823,445 6,120,171,910 6,364,978,786 6,619,577,938 6,884,361,055 7,159,735,498 MARKET VALUE TAX RATE 0.004514%0.00448%0.004425%0.004288%0.004223%0.003881% Annual % Change -2.79%-0.82%-1.16%-3.10%-1.51%-8.10% 10.7 DRAFT CITY OF PRIOR LAKE General Fund 2025 2026 2027 2028 2029 2030 2031 Actual Forecast Preliminary Budget Projected Projected Projected Projected REVENUE AND OTHER SOURCES Current tax 13,570,416 14,985,445 15,582,557 16,944,935 18,507,905 19,728,503 21,265,472 MV Tax Levy in General Fund 262,488 265,888 273,988 281,638 283,838 290,738 277,888 Fiscal disparities distribution 1,278,316 1,281,579 1,281,579 1,087,721 1,087,721 1,087,721 1,087,721 Property Tax 15,111,220 16,532,912 17,138,124 18,314,294 19,879,464 21,106,962 22,631,081 Special assessments 4,611 4,000 4,000 4,000 4,000 4,000 4,000 Franchise fees 518,830 528,000 513,500 513,500 513,500 513,500 513,500 Charges for services 1,267,227 1,325,329 1,437,359 1,416,711 1,431,386 1,446,390 1,470,491 Fines & forfeitures 99,753 108,000 108,000 109,080 110,171 111,273 112,385 Intergovernmental revenue 4,069,215 4,033,388 4,413,930 4,422,876 4,452,388 4,735,969 4,630,819 Licenses & permits 622,493 472,710 708,790 718,515 723,453 732,343 748,394 Miscellaneous revenues 1,005,624 420,800 515,800 556,309 558,271 559,546 567,084 Other financing sources - - - - - - - Property tax other (39,442) - - - - - - Sale of property and capital assets 22,634 - - - - - - Transfer in from other funds 626,975 668,000 725,000 658,760 678,523 698,879 719,845 Total Revenues and Other Fund Sources 23,309,140 24,093,139 25,564,503 26,714,046 28,351,156 29,908,862 31,397,599 EXPENDITURES AND OTHER USES Current expenditures - (6,232,737) (6,707,418) (6,975,715) (7,254,743) (7,544,933) (7,846,730) Other financing uses - -- - - - - Personnel (21,608,394) (17,396,514) (18,344,097) (19,343,494) (20,515,575) (21,776,052) (22,951,313) Capital Outlay (157,224) (66,000) (26,000) (30,000) (30,000) (30,000) (30,000) Capital Outlay - Technology - (132,000) (83,000) (83,200) (17,000) (20,000) (21,000) Transfer out to DS fund (262,488) (265,888) (403,988) (281,638) (283,838) (290,738) (277,888) Transfer out to other funds (290,257) - - - - - - Overhead Allocation to Enterprise Funds - - - - - - - Total Expenditures and Other Uses (22,318,363) (24,093,139) (25,564,503) (26,714,046) (28,101,156) (29,661,723) (31,126,931) CHANGE IN FUND BALANCE 990,777 - - - 250,000 247,139 270,668 Explanation of Total Revenue Over Expense: Budgeted source (use) of fund balance - - 250,000 250,000 275,000 Other revenue over (under) expense 990,777 - - Beginning Fund Balance 13,411,569 14,402,346 14,402,346 14,402,346 14,402,346 14,652,346 14,899,485 Ending Fund Balance 14,402,346 14,402,346 14,402,346 14,402,346 14,652,346 14,899,485 15,170,153 Ending Fund Balance as % of Expense 60%56%54%51%49%48%47% 10.8 DRAFT $0.0 $0.5 $1.0 $1.5 $2.0 $2.5 $3.0 $3.5 $4.0 $4.5 $5.0 2025 2026 2027 2028 2029 2030 2031 Mi l l i o n s Debt Service Tax Levy All City Funds New Existing Ref Existing 10.9 DRAFT 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% $0.0 $2.0 $4.0 $6.0 $8.0 $10.0 $12.0 $14.0 $16.0 2025 2026 2027 2028 2029 2030 2031 To t a l E n d i n g F u n d B a l a n c e a s % o f E x p e n s e En d i n g G e n e r a l F u n d B a l a n c e Mi l l i o n s General fund Ending Fund Balance Ending Fund Balance Ending Fund Balance as % of Expense Fund Balance Target 10.10 DRAFT 30.46% 28.10% 30.28%30.50%31.38%32.03%33.54% 35.45%35.77%36.05% 0.0% 5.0% 10.0% 15.0% 20.0% 25.0% 30.0% 35.0% 40.0% 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 City Tax Rate Tax Capacity Rate 10.11 DRAFT 0.0% 1.0% 2.0% 3.0% 4.0% 5.0% 6.0% 7.0% 8.0% 9.0% 10.0% $0.0 $5.0 $10.0 $15.0 $20.0 $25.0 $30.0 2025 2026 2027 2028 2029 2030 2031 An n u a l % C h a n g e i n T o t a l T a x L e v y a n d T a x R a t e To t a l T a x L e v y Mi l l i o n s Total Tax Capacity (TC) Levy and Annual % Change in TC Levy and TC Tax Rate Total Tax Levy (Spread on Tax Capacity)Annual % Change in Total Tax Levy Annual % Change in Tax Rate 10.12 DRAFT -10.0% -8.0% -6.0% -4.0% -2.0% 0.0% 2.0% 4.0% $0.2 $0.3 $0.3 $0.3 $0.3 $0.3 $0.3 $0.3 $0.3 $0.3 $0.3 2025 2026 2027 2028 2029 2030 2031 An n u a l % C h a n g e i n T o t a l T a x L e v y a n d T a x R a t e To t a l T a x L e v y Mi l l i o n s Total Market Value (MV) Levy and Annual % Change in MV Levy and MV Tax Rate Total Tax Levy (Spread on Market Value)Annual % Change in Total Tax Levy Annual % Change in Tax Rate 10.13 DRAFT 3.8% 3.9% 4.0% 4.1% 4.2% 4.3% 4.4% 4.5% $0 $1,000 $2,000 $3,000 $4,000 $5,000 $6,000 $7,000 $8,000 $9,000 2026 2027 2028 2029 2030 2031 % C h a n g e i n M a r k e t V a l u e Ci t y P r o p e r t y T a x e s Example Residential Properties City Property Taxes Residential $433,600 Residential $600,000 Residential $844,595 Residential $1,500,000 Percent Change in Market Value of Example Properties: Note: The change in City Property Taxes reflects the impact of projected change in City Tax Rate and the impact of projected change in estimated taxable market value of the example properties. 10.14 DRAFT 3.8% 3.9% 4.0% 4.1% 4.2% 4.3% 4.4% 4.5% $0 $5,000 $10,000 $15,000 $20,000 $25,000 $30,000 $35,000 $40,000 2026 2027 2028 2029 2030 2031 % C h a n g e i n M a r k e t V a l u e Ci t y P r o p e r t y T a x e s Example Commercial Properties City Property Taxes Commercial $1,000,000 Commercial $2,000,000 Commercial $3,000,000 Commercial $4,000,000 Percent Change in Market Value of Example Properties: Note: The change in City Property Taxes reflects the impact of projected change in City Tax Rate and the impact of projected change in estimated taxable market value of the example properties. 10.15 DRAFT PriorLakeMN.gov August 12, 2026 PUBLIC HEARINGIMPROVEMENT PROGRAM 2031 CAPITAL -2027 PriorLakeMN.gov Purpose majority (4 of 5 council members) for approval. Approval of the Street Reconstruction Plan requires a super simple majority (3 of 5 council members) for approval.Approval of the Capital Improvement Plan for facilities requires a facilities capital and street reconstruction bondsPublic hearing required by state statute when planning to issue Improvement Plan and Street Reconstruction Plan2031 Capital Improvement Program, Facilities Capital -2027Conduct a public hearing on the proposed projects within the  PriorLakeMN.gov What is the CIP?sources.plan that includes estimated project costs and funding year -year planning document. It is a five-The CIP is a multiThe CIP is the Capital Improvement Program PriorLakeMN.gov4 2031 CIP-August 12: Public Hearing and Adopt 2027•July 28: Utility Financial Plans Review and Financial Impacts•June 23: Capital Plans Review•2031 CIP Schedule-2027 PriorLakeMN.gov5 Water Quality Financial Plan8)Sanitary Sewer Financial Plan7)Water Financial Plan6)Technology Plan5)Facilities Management Plan4)Park Plan3)Equipment Replacement Plan2)Pavement Management Plan1)Year Plans Included in the CIP-Multi Pavement ManagementPlan PriorLakeMN.gov7 Pavement Management Plan Map PriorLakeMN.gov.sizesmeterandusagetheironbasedpayindustrialandCommercial.electric)60.5$andgas60.5$(monthper20.11$isfee2027-2025The•.(CCI)IndexConstructionCommercialtheperincreasesinflationaryaddresst o”2025“payforupdatedwereThey.yearsthreeeveryreviewedarefeefranchiseThe.CIPyear-fivetheforM/year5.1$aboutofrevenuefeefranchiseelectricandgasannualincludesmanagementpavementforFunding•8 Pavement Management Plan PriorLakeMN.gov9 An incremental tax levy increase to accommodate our replacement needs•additional street maintenance trucks.replacements (ladder truck in 2027 and pumper truck in 2028) and The updated financing plan includes debt issuance of $3.8M for fire truck •The annualized cost of the equipment replacement is $1.7M. •Shifted replacement years whenever possible to smooth the levy impact•Updated vehicle costs and inflationary factors•Reviewed equipment for condition, safety and functionality•Equipment Replacement Plan PriorLakeMN.gov10 Equipment Replacement Plan PriorLakeMN.gov11 capital maintenance and replacement needs.The plan includes a phased increase in the tax levy to accommodate our •Parks funding discussions are ongoing•city’s future needs and location of new parks. plan includes current parks and proposed changes/updates as well as the Council approval of the Park and Trail System Plan on March 12, 2024. This •Park Plan PriorLakeMN.gov12 Capital Park and Revolving Park Funds PriorLakeMN.gov13 Year)-Park Plan (5 PriorLakeMN.gov14 ParkRyanThomasatremodelBathroom•enhancementsParking/safety•updatesHVAC•roofingMembrane•:includerepairsThese.LibraryandStationPoliceHall,CityforrepairsfacilitymajorforCIPyear-fivethe overM2.11$ofBondsIssue•facility maintenance and replacement needsThe plan includes a phased increase in the tax levy to accommodate our •Plans for major maintenance and replacements•Facilities Management Plan PriorLakeMN.gov15 Facility Management Plan PriorLakeMN.gov16 Technology Plan PriorLakeMN.gov 3.0%–Stormwater 4.5% (includes MCES increase)–Sewer 4.0%–Water follows:Proposed rate changes for 2027 are as $1,461,270-2033 •Stormwater fund:$6,178,730-2033 •$6,815,000-2031 •$5,150,000-2028 •Sewer fund:no debt issuance–Water fund year plan as follows: -tenfinancial model reflects debt issuance in the rates charged and/or debt issuance. The Funding for utility funds is achieved through and stormwater respectively. $6.8M, $5.3M and $2.7M for water, sewer, projects: management plan street reconstruction funding needs to support the pavement year total Water/Sewer/Stormwater -The 5 17 PlanUtility Funds Financial Management PriorLakeMN.gov Monthly Utility Bill:-Sample Bi 18 All Funds–Utility Bill Combined Impact PriorLakeMN.gov in 2032for the maintenance center expansion year plan reflects $37M in bonds -10$44.0M at the end of 2031.from $24.0M at the end of 2025 to the CIP, debt is projected to increase Based on the proposed projects in 19 PriorLakeMN.gov20 City Property Tax Projection PriorLakeMN.gov to be ~$1,500per Capita projected 2031 Prior Lake Debt 2025End-Per Capita as of YearBar Chart: G.O. Debt 21 Debt Per Capita Projection PriorLakeMN.gov22 Approve Issuance of Street Reconstruction Bonds and Adopt the Street Reconstruction Plan 3)Approve Issuance of CIP Bonds and Adopt Facilities Capital Improvement Plan 2)2031 Capital Improvement Program (CIP) -Approve the 2027 1)Three Resolutions:-Plan Adoption Public Hearing Questions/Discussion