Loading...
HomeMy WebLinkAbout05(D) - Resolution Authorizing Change Orders and Final Payment for the Ponds Park Phase 2 Project (2024-06) Report ITEM: 5D CITY COUNCIL AGENDA REPORT MEETING DATE: August 25, 2026 PREPARED BY: Steve Hart, Parks and Recreation Manager PRESENTED BY: Nick Monserud, Public Works Director/City Engineer AGENDA ITEM: Resolution Authorizing Change Orders and Final Payment for the Ponds Park Phase 2 Project (2024-06) RECOMMENDED ACTION: Adopt a resolution authorizing change orders and final payment for the Ponds Park Phase 2 project (2024-06). BACKGROUND: On March 11, 2025, the City Council awarded the Ponds Park Phase 2 contract in the amount of $1,076,942.90 to K.A. Witt Construction. All work has now been completed in accordance with the contract. The project required the following three change orders: • Change order 1 (add $28,849.24): Address items unknown until work began (soil corrections, private utility repairs, conditions requiring additional support or restoration). Many of these changes required decisions in the field during construction, and were supported by the City’s design and engineering consultants on the project. • Change order 2 (add $9,450): Request from P.L.A.Y. to expand the infield of fields 5 and 6. This second change order was a pass-though cost for the City, as P.L.A.Y. has already reimbursed the city for the $9,450 for this work. • Change order 3 (subtract $3,170): Reduction in quantities of materials used on the project, lowering the total cost of the project by $3,170. The final payment amount is $25,989.33. With this payment, the total amount paid to K.A. Witt Construction is $1,112,072.14, which is 3.3% above the original contract price of $1,076,942.90. The contractor delivered a quality project and has addressed all outstanding work items. HKGi, the City’s design and construction administration consultant on this project, has reviewed these documents and approves of the change orders and final pay application. FINANCIAL IMPACT: The change orders resulted in a net increase to the project of $35,129.24. The entirety of this project is funded through F430 – Parks Capital and Equipment. ALTERNATIVES: 1. Motion and second as part of the consent agenda to adopt a resolution authorizing change orders and final payment for the Ponds Park Phase 2 project (2024-06). 2. Motion and second to remove this item from the consent agenda for further discussion. City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 55372 Item 5D Page | 2 ATTACHMENTS: 1. Resolution 2. Change Orders 3. Final Pay Application Change Order : #1 OWNER: City of Prior Lake PROJECT: Ponds Park Ballfield Improvements Phase 2 CHANGE ORDER NUMBER: 1 .DATE:03.19.2026 CITY PROJECT NO:2024-06 TO CONTRACTOR:CONTRACT DATE:03.25.2025 . The Contract is changed as follows: The original (Contract Sum) was 1,076,942.90$ Net change by previously authorized Change Orders -$ 1,076,942.90$ 28,849.24$ 1,105,792.14$ . The date of Substantial Completion as of the date of this Change Order therefore is 31-Oct-25 . The date of Final (punch and move in ) Completion as of the date of this Change Order therefore is 1-Mar-26 . SIGNATURES: Signature:Signature:Signature: Type name: Amy Bower, PLA Type name:Type name: Date: 03.19.2026 Date:Date: LANDSCAPE ARCHITECT: HKGI CONTRACTOR: KA WITT OWNER: CITY OF PRIOR LAKE The (Contract Sum) prior to this Change Order was The (Contract Sum) will be INCREASED by the Change Order in the amount of The new (Contract Sum) including this Change Order will be Not valid until signed by the Landscape Architect and Contractor and Owner. THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. CONTRACTOR: KA Witt Construction LANDSCAPE ARCHITECT: HKGI KA WITT CONSTRUCTION (see following pages for Change Order details) . 1530 280TH STREET WEST, NEW PRAGUE, MN 56071 Note: This summary does not reflect changes in the Contract Sum, or Contract Time which have been authorized by Construction Change Directive. 4646 DAKOTA STREET SE, PRIOR LAKE, MN 55372 1530 280TH STREET WEST, NEW PRAGUE, MN 56071 The Contract Time will be (HAS NOT CHANGED) from Oct 31, 2025 800 Washington Ave. N., Suite 207. Minneapolis, Minnesota 55401 Change Order 1 of 2 Taylor Witt March 19, 2026 Steve Hart 3/20/2026 Summary of Change Order #1 You are directed to make the following changes in the Contract Documents: Descriptions:Unit Qty UnitCost Total 1 Metal shade structure footing size increase based on supplier Enginneering review LS 1 6,000.00$ 6,000.00$ 2 Removing fabric shade structure footings encased irr line LS 1 700.00$ 700.00$ 3 Soil corrections under pavements (78.4 ton) LS 1 3,688.32$ 3,688.32$ 4 Add water shut off valve at connection to ex. System LS 1 950.00$ 950.00$ 5 Add stainles steel shelter counter wrap LS 1 4,200.00$ 4,200.00$ 6 Repair hit irrigationlines - 11 LS 1 10,290.92$ 10,290.92$ 7 Move 2 power outlets closer to batting cages LS 1 2,250.00$ 2,250.00$ 8 Patch bituminous street at new ped ramp curb LS 1 1,850.00$ 1,850.00$ 9 Biolog QTY change LF 1463 5.00$ $7,315.00 10 Silt fencing QTY change LF -1365 3.00$ ($4,095.00) 11 Bit patching for utility work QTY change TON -20 215.00$ ($4,300.00) Net Contract change for Change Order 28,849.24$ Change Order 2 of 2 Change Order : #2 OWNER: City of Prior Lake PROJECT: Ponds Park Ballfield Improvements Phase 2 CHANGE ORDER NUMBER:1 .DATE:06.09.2026 CITY PROJECT NO:2024-06 TO CONTRACTOR:CONTRACT DATE:03.25.2025 . The Contract is changed as follows: The original (Contract Sum) was 1,076,942.90$ Net change by previously authorized Change Orders 28,849.24$ 1,105,792.14$ 9,450.00$ 1,115,242.14$ . The date of Substantial Completion as of the date of this Change Order therefore is 31-Oct-25 . The date of Final (punch and move in ) Completion as of the date of this Change Order therefore is 1-Mar-26 . SIGNATURES: Signature:Signature:Signature: Type name: Amy Bower, PLA Type name:Type name: Date: 06.09.2026 Date:Date: LANDSCAPE ARCHITECT: HKGI CONTRACTOR: KA WITT OWNER: CITY OF PRIOR LAKE (see following pages for Change Order details) . 1530 280TH STREET WEST, NEW PRAGUE, MN 56071 Note: This summary does not reflect changes in the Contract Sum, or Contract Time which have been authorized by Construction Change Directive. 4646 DAKOTA STREET SE, PRIOR LAKE, MN 55372 1530 280TH STREET WEST, NEW PRAGUE, MN 56071 The Contract Time will be (HAS NOT CHANGED) from Oct 31, 2025 800 Washington Ave. N., Suite 207. Minneapolis, Minnesota 55401 The (Contract Sum) prior to this Change Order was The (Contract Sum) will be INCREASED by the Change Order in the amount of The new (Contract Sum) including this Change Order will be Not valid until signed by the Landscape Architect and Contractor and Owner. THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. CONTRACTOR: KA Witt Construction LANDSCAPE ARCHITECT: HKGI KA WITT CONSTRUCTION Change Order 1 of 2 Steve Hart 8/11/2026 Summary of Change Order #2 You are directed to make the following changes in the Contract Documents: Descriptions:Unit Qty UnitCost Total 1 Infield Expansion(expand ag lime area) and adjust associated irrigation LS 1 9,450.00$ 9,450.00$ 2 3 4 5 6 7 8 9 10 11 Net Contract change for Change Order 9,450.00$ Change Order 2 of 2 Change Order : #3 OWNER: City of Prior Lake PROJECT: Ponds Park Ballfield Improvements Phase 2 CHANGE ORDER NUMBER: 3 .DATE:08.10.2026 CITY PROJECT NO:2024-06 TO CONTRACTOR:CONTRACT DATE:03.25.2025 . The Contract is changed as follows: The original (Contract Sum) was 1,076,942.90$ Net change by previously authorized Change Orders 38,299.24$ 1,115,242.14$ (3,170.00)$ 1,112,072.14$ . The date of Substantial Completion as of the date of this Change Order therefore is 31-Oct-25 . The date of Final (punch and move in ) Completion as of the date of this Change Order therefore is 1-Mar-26 . SIGNATURES: Signature:Signature:Signature: Type name: Amy Bower, PLA Type name:Type name: Date: 08.10.2026 Date:Date: LANDSCAPE ARCHITECT: HKGI CONTRACTOR: KA WITT OWNER: CITY OF PRIOR LAKE (see following pages for Change Order details) . 1530 280TH STREET WEST, NEW PRAGUE, MN 56071 Note: This summary does not reflect changes in the Contract Sum, or Contract Time which have been authorized by Construction Change Directive. 4646 DAKOTA STREET SE, PRIOR LAKE, MN 55372 1530 280TH STREET WEST, NEW PRAGUE, MN 56071 The Contract Time will be (HAS NOT CHANGED) from Oct 31, 2025 800 Washington Ave. N., Suite 207. Minneapolis, Minnesota 55401 The (Contract Sum) prior to this Change Order was The (Contract Sum) will be DECREASED by the Change Order in the amount of The new (Contract Sum) including this Change Order will be Not valid until signed by the Landscape Architect and Contractor and Owner. THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. CONTRACTOR: KA Witt Construction LANDSCAPE ARCHITECT: HKGI KA WITT CONSTRUCTION Change Order 1 of 2 Taylor Witt August 11, 2026 Steve Hart 8/11/2026 Summary of Change Order #3 You are directed to make the following changes in the Contract Documents: Descriptions:Unit Qty UnitCost Total 1 DEDUCT -SILT FENCE, TYPE MS LF -1365 3.00$ (4,095.00)$ 2 ADDITIONAL- BIOLOG LF 1365 5.00$ 6,825.00$ 3 DEDUCT-CLASS 5 AGGREGATE BASE CY -40 40.00$ (1,600.00)$ 4 DEDUCT- BITUMINOUS PATCHING (3" SPWEA240C) TN -20 215.00$ (4,300.00)$ Net Contract change for Change Order (3,170.00)$ Change Order 2 of 2 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 26- A RESOLUTION AUTHORIZING CHANGE ORDERS AND FINAL PAYMENT FOR PONDS PARK PHASE 2 (2024-06) Motion By: Second By: WHEREAS, on March 11, 2025 the City Council received bids and awarded a construction contract in the amount of $1,076,942.90 for Ponds Park Phase 2; and WHEREAS, the contract outlined the improvements K.A. Witt Construction was responsible for completing; and WHEREAS, changes during the project resulted in a net increase of $35,129.24 to the project, as detailed in the report; and WHEREAS, these improvements and all other contract responsibilities are now complete to the satisfaction of the city; and WHEREAS, the City’s consulting engineer, HKGi, has reviewed the improvements and provided all close out documentation to support final payment for this project. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The City Council hereby accepts the improvements for Ponds Park Phase 2 project. 3. Final payment will be made to K.A. Witt Construction in the amount of $25,989.33. th Passed and adopted by the Prior Lake City Council this 25 day of August 2026. VOTE Briggs Braid Churchill Lake Hellier Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Jason Wedel, City Manager 8.11.26$ 25,989.33 Page 2 CONTRACTOR: K.A. Witt Construction, Inc.Payment Request: 6 1530 280th St. W Application Date: 8/10/2026 New Prague, MN 56071 Period To: 8/10/2026 Item Description Units Quantity Unit Price Scheduled Value Quantity to Date Value to Date Quantity this Period Value this Period Total Completed and Stored to Date Balance to Finish 1 MOBILIZATION LS 1 30,000.00$ 30,000.00$ 1 30,000.00$ 0 -$ 30,000.00$ -$ 2 INLET PROTECTION EA 1 300.00$ 300.00$ 1 300.00$ 0 -$ 300.00$ -$ 3 SILT FENCE, TYPE MS LF 1365 3.00$ 4,095.00$ 0 -$ 0 -$ -$ 4,095.00$ 4 BIOLOG LF 100 5.00$ 500.00$ 1465 7,325.00$ 0 -$ 7,325.00$ (6,825.00)$ 5 REMOVE 20FT TALL SAFTY NETTING BEHIND SOUTH FIELDS LS 1 2,750.00$ 2,750.00$ 1 2,750.00$ 0 -$ 2,750.00$ -$ 6 REMOVE CONCRETE AND BITUMINOUS PAVEMENTS SY 1325 4.50$ 5,962.50$ 1325 5,962.50$ 0 -$ 5,962.50$ -$ 7 REMOVE ALL BALLFIELD FENCING AND FOUL POLES EA 2 4,000.00$ 8,000.00$ 2 8,000.00$ 0 -$ 8,000.00$ -$ 8 ADJUST IRRIGATION SYSTEM LS 1 29,000.00$ 29,000.00$ 1 29,000.00$ 0 -$ 29,000.00$ -$ 9 EXCAVATION - COMMON (EV)CY 3100 12.00$ 37,200.00$ 3100 37,200.00$ 0 -$ 37,200.00$ -$ 10 AGGREGATE BASE CLASS 5 TN 1710 22.30$ 38,133.00$ 1710 38,133.00$ 0 -$ 38,133.00$ -$ 11 SALVAGE AG LIME STRIP, STOCKPILE CY 250 12.00$ 3,000.00$ 250 3,000.00$ 0 -$ 3,000.00$ -$ 12 ADJUST FRAME AND RING CASTING (STORM)EA 1 400.00$ 400.00$ 1 400.00$ 0 -$ 400.00$ -$ 13 ADA PED RAMP TRUNCATED DOMES LS 1 2,000.00$ 2,000.00$ 1 2,000.00$ 0 -$ 2,000.00$ -$ 14 CONCRETE WALK - all 6" driveable SF 16830 8.55$ 143,896.50$ 16830 143,896.50$ 0 -$ 143,896.50$ -$ 15 CONCRETE BACKSTOP CURBING LF 160 44.25$ 7,080.00$ 160 7,080.00$ 0 -$ 7,080.00$ -$ 16 CURB AT CENTER EX. CB LF 50 35.00$ 1,750.00$ 50 1,750.00$ 0 -$ 1,750.00$ -$ 17 4" PVC CONDUIT, SCHEDULE 40, WITH END CAPS AND MARKING POSTS LF 240 13.00$ 3,120.00$ 240 3,120.00$ 0 -$ 3,120.00$ -$ 18 BITUMINOUS TRAIL SF 6360 3.95$ 25,122.00$ 6360 25,122.00$ 0 -$ 25,122.00$ -$ 19 24FT NETING BACKSTOP SYSTEM 30-20-30 EA 2 43,000.00$ 86,000.00$ 2 86,000.00$ 0 -$ 86,000.00$ -$ 20 8FT CHAIN LINK FENCING AND GATES AT DUGOUTS LF 284 49.50$ 14,058.00$ 284 14,058.00$ 0 -$ 14,058.00$ -$ 21 4FT CHAIN LINK FENCE - WINGS LF 396 34.80$ 13,780.80$ 396 13,780.80$ 0 -$ 13,780.80$ -$ 22 6FT CHAIN LINK FENCE - DUG OUT TO KINK LF 160 45.50$ 7,280.00$ 160 7,280.00$ 0 -$ 7,280.00$ -$ 23 8FT CHAIN LINK FENCE - AT SOUTH OUTFIELDS LF 669 50.20$ 33,583.80$ 669 33,583.80$ 0 -$ 33,583.80$ -$ 24 12FT GATES IN 6FT FENCING EA 4 1,350.00$ 5,400.00$ 4 5,400.00$ 0 -$ 5,400.00$ -$ 25 SALVAGED AG LIME PLACED 4 INCH DEPTH LS 1 2,650.00$ 2,650.00$ 1 2,650.00$ 0 -$ 2,650.00$ -$ 26 PLAYERS BENCH EA 4 2,750.00$ 11,000.00$ 4 11,000.00$ 0 -$ 11,000.00$ -$ 27 FOUL POLE EA 4 6,250.00$ 25,000.00$ 4 25,000.00$ 0 -$ 25,000.00$ -$ 28 FENCE TOPPER LF 2436 3.80$ 9,256.80$ 2436 9,256.80$ 0 -$ 9,256.80$ -$ 29 DUGOUT ROOFS AND ASSOCIATED POSTS EA 4 20,900.00$ 83,600.00$ 4 83,600.00$ 0 -$ 83,600.00$ -$ 30 RELOCATED EXISTING FABRIC BLEACHER STRUCTURE EA 2 7,000.00$ 14,000.00$ 2 14,000.00$ 0 -$ 14,000.00$ -$ 31 HYDRAULIC BONDED FIBER MATRIX LB 6421 2.00$ 12,842.00$ 6421 12,842.00$ 0 -$ 12,842.00$ -$ 32 SEED 25-131 LB 286 10.00$ 2,860.00$ 286 2,860.00$ 0 -$ 2,860.00$ -$ 33 FERTILIZER TYPE 3, SLOW RELEASE LB 650 1.80$ 1,170.00$ 650 1,170.00$ 0 -$ 1,170.00$ -$ 34 DECIDUOUS TREE 2.5" CAL B&B EA 42 955.00$ 40,110.00$ 42 40,110.00$ 0 -$ 40,110.00$ -$ 35 PREPARE LANDSCAPE BED - TOPSOIL, WOOD MULCH SF 6170 2.90$ 17,893.00$ 6170 17,893.00$ 0 -$ 17,893.00$ -$ 36 #5 CONT. DECIDUOUS SHRUB EA 328 87.50$ 28,700.00$ 328 28,700.00$ 0 -$ 28,700.00$ -$ SUB TOTAL:751,493.40$ -$ 754,223.40$ (2,730.00)$ 37 SINGLE NET BATTING TUNNEL SYSTEM WITH AG. LIME SURFACING EA 2 24,000.00$ 48,000.00$ 2 48,000.00$ 0 -$ 48,000.00$ -$ ALTERNATE #1 SUB TOTAL:48,000.00$ -$ 48,000.00$ -$ 38 8FT CHAIN LINK FENCE AND TOPPER- REPLACE OUTFIELD AT NORTH OUTFIELDS LF 470 56.50$ 26,555.00$ 470 26,555.00$ 0 -$ 26,555.00$ -$ ALTERNATE #2 SUB TOTAL:26,555.00$ -$ 26,555.00$ -$ 39 METAL SHADE STRUCTURE EA 1 103,000.00$ 103,000.00$ 1 103,000.00$ 0 -$ 103,000.00$ -$ ALTERNATE #3 SUB TOTAL:103,000.00$ -$ 103,000.00$ -$ 40 WOOD FENCE ENCLOSURE FOR PORTA POTTIES LS 1 9,000.00$ 9,000.00$ 1 9,000.00$ 0 -$ 9,000.00$ -$ ALTERNATE #4 SUB TOTAL:9,000.00$ -$ 9,000.00$ -$ 41 LANDSCAPE STONE BENCH - CLASS 3 EA 21 2,900.00$ 60,900.00$ 21 60,900.00$ 0 -$ 60,900.00$ -$ ALTERNATE #5 SUB TOTAL:60,900.00$ -$ 60,900.00$ -$ 42 SERVICE CABINET EA 1 15,300.00$ 15,300.00$ 1 15,300.00$ 0 -$ 15,300.00$ -$ 43 50 AMP RECP FOOD TRUCK EA 2 895.00$ 1,790.00$ 2 1,790.00$ 0 -$ 1,790.00$ -$ 44 20 AMP RECP BATTING CAGE EA 4 1,580.00$ 6,320.00$ 4 6,320.00$ 0 -$ 6,320.00$ -$ 45 20 AMP SHELTER RECPT EA 2 175.00$ 350.00$ 2 350.00$ 0 -$ 350.00$ -$ 46 SHELTER LIGHT EA 1 500.00$ 500.00$ 1 500.00$ 0 -$ 500.00$ -$ 47 1-1/2" PVC CONDUIT LF 90 7.50$ 675.00$ 90 675.00$ 0 -$ 675.00$ -$ 48 1" PVC CODNUIT LF 569 6.00$ 3,414.00$ 569 3,414.00$ 0 -$ 3,414.00$ -$ 49 3/4" PVC CONDUIT LF 270 3.50$ 945.00$ 270 945.00$ 0 -$ 945.00$ -$ 50 3/4" RMC CONDUIT LF 10 25.50$ 255.00$ 10 255.00$ 0 -$ 255.00$ -$ 51 1/2" RMC CONDUIT LF 30 11.00$ 330.00$ 30 330.00$ 0 -$ 330.00$ -$ 52 1-1/C#2 LF 270 4.15$ 1,120.50$ 270 1,120.50$ 0 -$ 1,120.50$ -$ 53 1-1/C#6 LF 90 3.55$ 319.50$ 90 319.50$ 0 -$ 319.50$ -$ 54 1-1/C#10 LF 2950 1.10$ 3,245.00$ 2950 3,245.00$ 0 -$ 3,245.00$ -$ 55 1-1/C#12 LF 890 0.75$ 667.50$ 890 667.50$ 0 -$ 667.50$ -$ 56 HANDHOLE EA 1 1,750.00$ 1,750.00$ 1 1,750.00$ 0 -$ 1,750.00$ -$ 57 ELECT MOBILIZATION EA 1 1,100.00$ 1,100.00$ 1 1,100.00$ 0 -$ 1,100.00$ -$ ALTERNATE #6 SUB TOTAL:38,081.50$ -$ 38,081.50$ -$ 58 SANITARY MANHOLE, DES. 4007-48"EA 1 9,000.00$ 9,000.00$ 1 9,000.00$ 0 -$ 9,000.00$ -$ 59 CONNECT TO EXISTING WATER SYSTEM EA 1 400.00$ 400.00$ 1 400.00$ 0 -$ 400.00$ -$ 60 CONNECT TO EXISTING SANITARTY SYSTEM EA 1 400.00$ 400.00$ 1 400.00$ 0 -$ 400.00$ -$ 61 1.5" DIRECTIONALLY DRILLED ID HDPE WATER SERVICE LF 455 24.60$ 11,193.00$ 455 11,193.00$ 0 -$ 11,193.00$ -$ 62 2" DIRECTIONALLY DRILLED ID HDPE SANITARY FORCEMAIN LF 445 26.00$ 11,570.00$ 445 11,570.00$ 0 -$ 11,570.00$ -$ 63 WATER SERVICE BLOWOFF ASSEMBLY EA 1 1,450.00$ 1,450.00$ 1 1,450.00$ 0 -$ 1,450.00$ -$ 64 CLASS 5 AGGREGATE BASE CY 40 40.00$ 1,600.00$ 0 -$ 0 -$ -$ 1,600.00$ 65 BITUMINOUS PATCHING (3" SPWEA240C)TN 20 215.00$ 4,300.00$ 0 -$ 0 -$ -$ 4,300.00$ ALTERNATE #7 SUB TOTAL:39,913.00$ -$ 34,013.00$ 5,900.00$ 1,073,772.90$ Item Description Units Quantity Unit Price Scheduled Value Quantity to Date Value to Date Quantity this Period Value this Period Total Completed and Stored to Date Balance to Finish 1 Change order #1 LS 1 $28,849.24 $28,849.24 1 $28,849.24 0 $0.00 $28,849.24 $0.00 Change order #2 LS 1 $9,450.00 $9,450.00 0 $0.00 1 $9,450.00 $9,450.00 $0.00 Change order #3 LS 1 -$3,170.00 -$3,170.00 0 $0.00 1 -$3,170.00 -$3,170.00 $0.00 SUB TOTAL $35,129.24 $6,280.00 $35,129.24 $0.00 Total COs: $35,129.24 Change Orders Ponds Park Ballfield Improvements - Phase 2 ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 ALTERNATE #5 ALTERNATE #6 ALTERNATE #7 Total completed & stored to date: