HomeMy WebLinkAbout05(E) - Resolution to Accept the Feasibility Report for the 170th Street Improvement Project (2027-05) Report
CITY COUNCIL AGENDA REPOR
TE:5
MEETING DATNovember 24, 202
PREPARED BYChristine Watson, Public Works SupervisorAdministratio
PRESENTED BNick Monserud, Public Works Director/City Enginee
th
AGENDA ITEResolution to Accept the Feasibility Report for the 17Street
Improvement Project (20205
RECOMMENDED ACTIO
Adopt a resolution to accept the feasibility report for the 170th Street Improvement Project (202-
05)
BACKGROUND:
The City uses a Capital Improvement Program to plan its infrastructure improvements and the
financing for capital improvements. The proposed 170th Street Improvement Project seeks to
urbanize 170th Street from Marschall Road (CSAH 17) to Baseline Avenue (SA79) following
the successful annexation of the area that exists west of the current city limits
On March 24, 202the City Council authorized a work order with WSB LLC to prepare a feasibility
report for this project. The feasibility report is now complete and includes an opinion of probable
costs, proposed assessments, and proposed funding.
Based on the results of the feasibility study, the City has determined that the project is not
financially feasible to proceed as a Citled public improvement project. The attached letter was
sent to benefiting properties on October 30, 202describing the reason for the decision not to
proceed with this project
Staff recommend City Council accept the feasibility report at this time. No further action on this
project is needed
FINANCIAL IMPACT:
There is no financial impact at this timeathe project is not moving forwaras propose
ALTERNATIVES
1
Motion and second as part of the consent agenda to adopt a resolution to accept the
feasibility report for the 170th Street Improvement Project (20205).
2
Motion and second to remove this item from the consent agenda for additional
discussion.
ATTACHMENTS:
1Resolution
2Letter to Resident
3Feasibility Report
City of Prior Lake | 4646 Dakota Street SE | Prior Lake MN 5537
4646 Dakota Street S
Prior Lake, MN 5537
RESOLUTION
TH
A RESOLUTIOTACCEPT THE FEASIBILITY REPOT FOR THE 17STREET
IMPROVEMENT PROJECT (20205
Motion BySecond By
WHEREAS
ursuant tResolution 05approved oMarch 2, 20the City Council
ordered aeasibilityeport to be prepared under the direction of theCity
th
Engineewith reference to the17Street Improvement Projec; an
th
WHEREAS
he feasibilitreport for the17Street Improvement ProjecdatedNovember
24, 202, is complete ancontainsan engineeringreview and consideration of
project costs and assessable benefits and has determinethat the proposed
projectisnot financiallfeasiblas a Citledpublic improvementprojec; an
WHEREAS
staff recommend City Council accept the feasibility report at this time
NOTHEREFORBE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
,
MINNESOTA
as follows
1The recitals set forth above are incorporated herein
2The CitCouncil hereby accepts theeasibilityeport as submitted
th
Passedand adoptedby thePrior LakeCity Coucil thiday oNovembe20
VOT
BriggBraiChurchilLakHellie
Ay
?
Na
?
Abstai
?
Absen
?
_____________________________
Jason Wede, City Manage
Phone 952.447.9896 / www.PriorLakeMN.gov
17073 Adelmann Street SE
Prior Lake, MN 55372
October 30, 2026
RE: City of Prior Lake 170th Street Improvement Project
Dear Property Owner:
You are receiving this letter because you are a benefiting property of the proposed 170 th Street
Improvement Project. The City appreciates the time residents and property owners have taken
to attend meetings, ask questions, and share their perspectives. Following engineering
review and consideration of project costs and assessable benefits, the City has
determined that the project is not financially feasible to proceed as a City-led public
improvement project.
The City completed a Feasibility Study to estimate the project cost and determine the benefit to
adjacent properties. The total project cost, including engineering, land acquisition, roadway
construction, and utility improvements, is estimated at $11,719,678. The City's share would be
approximately $3,244,000 to cover the cost of upsizing utilities to accommodate future
connections. The remaining $8,474,346 would need to be assessed to benefiting properties.
Under Minnesota Statutes, Chapter 429, the amount a municipality assesses to a property
cannot exceed the increase in property value attributable to the improvement. The Feasibility
Study estimated the total benefit to benefiting properties at $4,147,680, approximately half of
the amount that would need to be assessed. As a result, the project does not meet the financial
feasibility requirements for the City to proceed as a public improvement project.
Because the City will not be advancing the project as a public improvement, no additional public
hearings, meetings, or project communications are planned at this time. The Feasibility Report
is available on the project website at www.170priorlake.com. The project website, phone line,
and email address will remain active through the end of the year.
Phone: 952-540-4657
Email: info@170priorlake.com
Website: www.170priorlake.com
Future development in this area may still occur. However, rather than the City leading or funding
infrastructure improvements at this time, streets and water and sewer systems will be
constructed and extended through private development projects as they arise. Until December
31, 2026, questions or comments may be directed to the project phone number or email
address listed above. After that date, please contact me directly using the information below.
Thank you again for your participation, feedback, and interest in this process.
Sincerely,
Nick Monserud, P.E.
Public Works Director/City Engineer
952.447.9834 | nmonserud@priorlakemn.gov
cc: Honorable Mayor and City Council (via e-mail)
Jason Wedel, City Manager (via e-mail)
Casey McCabe, Community Development Director (via e-mail)
Nicole Klekner, Finance Director (via e-mail)
Luke Schwarz, Assistant City Engineer (via e-mail)
Melissa Fonder, Accounting Specialist (via e-mail)
FEASIBILITY REPORT
170 th STREET IMPROVEMENT
PROJECT
CITY OF PRIOR LAKE | SCOTT COUNTY | MINNESOTA
November 24 , 2026
Prepared for:
City of Prior Lake
4646 Dakota Street SE
Prior Lake, MN 55372
CITY PROJECT NO. 2027 -05
WSB PROJECT NO. 035319 -000
November 24, 2026
Honorable Mayor and City Council
City of Prior Lake
4646 Dakota Street SE
Prior Lake, MN 55372
Re: Feasibility Report
170th Street Improvement Project
City of Prior Lake
WSB Project No. 035319-000
Dear Honorable Mayor and City Council Members:
Attached for your review is a feasibility report which addresses improvements associated with the
170th Street Improvement Project.
The project is proposed to be locally funded and will be assessed to benefitting properties in
accordance with Minnesota Statute 429 and the City’s Assessment Policy.
I am available at your convenience to discuss this report. If you have any questions, please do
not hesitate to call me at 952.737.4675.
Sincerely,
WSB
Monica Heil, PE
Senior Vice President, Municipal
Attachments
ar
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000
Table of Contents
Letter of Introduction
Table of Cont en ts
Certification
1. Executive Summary .................................................................................. 1
2. Introduction ............................................................................................. 2
2.1 Authorization ....................................................................................... 2
2.2 Scope ................................................................................................. 2
2.3 Data Available ...................................................................................... 2
3. Existing Conditions ................................................................................... 3
3.1 Surface ............................................................................................... 3
3.2 Utilities ............................................................................................... 3
3.2.1. Sanitary Sewer .............................................................................. 3
3.2.2. Watermain ..................................................................................... 3
3.2.3. Storm Sewer .................................................................................. 4
Private Utilities .............................................................................................. 4
4. Proposed Improvements ............................................................................ 5
4.1 Surface ............................................................................................... 5
4.2 Utilities ............................................................................................... 5
4.2.1. Sanitary Sewer .............................................................................. 5
4.2.2. Watermain ..................................................................................... 6
4.2.3. Storm Sewer .................................................................................. 7
4.3 ROW Acquisition .................................................................................. 8
5. Financing ............................................................................................... 12
5.1 Opinion of Probable Cost ..................................................................... 12
5.2 Funding .............................................................................................. 12
6. Project Schedule ..................................................................................... 14
Feasibility and Recommendation ....................................................................... 15
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Table of Contents
Appendix A
Figure 1 – Project Location Map
Figure 2 – Storm Sewer Layout
Figure 3 – Sanitary Sewer Annexation Areas
Appendix B
Opinion of Probable Cost
Appendix C
Assessment Map
Preliminary Assessment Roll
Appendix D
Geotechnical Report
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Certification
Certification Sheet
I hereby certify that this plan, specification, or report was prepared by me or under
my direct supervision and that I am a duly licensed professional engineer under the
laws of the State of Minnesota.
Monica Heil , PE
_______________________________________________
Date: November 24 , 20 26 Lic. No. 47497
Quality Control Review Completed By:
Eric Eckman , PE
_______________________________________________
Date: November 24 , 20 26 Lic. No. 49954
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 1
1. Executive Summary
The City of Prior Lake’s 170 t h Street Improvement Project includes the
urbanization of 170 t h Street from Baseline Avenue (C ounty Road 79) to Langford
Avenue. The proposed improvements include street-urbanization , the addition of
storm sewer, and the extension of sanitary and watermain along the corridor . The
design will meet State Aid Standards as 170 t h Street is assumed to be a future
county road turnback .
The proposed project will include right -of-way acquisition, a new two -lane
bituminous road with a shoulder section , curb and gutter on both sides, grading
for a future bituminous trail along the north side of 170 t h Stree t and a future
sidewalk along the south side of the roadway, sanitary sewer (including a lift
station), watermain, storm sewer , stormwater BMPs , and some wetland
restoration.
A map showing the project location can be found on Figure 1 in Appendix A .
The City has established a project number 2027 -05 for this project and this
feasibility report to identify potential layouts and costs associated with the
construction. The project is estimated to cost roughly $11,719,678.51 , which
includes a 15% contingency and 20% indirect costs (engineering, administration,
legal). The City will fund 100% of the cost of the improvements through Special
Assessments and vario us City funds including the Water Utilitly Fund, Sewer
Fund, and Stormwater/Water Quality Fund should the City advance the project .
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 2
2. Introduction
2.1 Authorization
The Prior Lake City Council ordered the preparation of this feasibility study for the
170 t h Street Improvement Project on March , 24, 2026. This project is to provide
public infrastructure in anticipation of future development.
2.2 Scope
The scope for this report includes the urbanization of 170 t h Street from Langford
Avenue to Baseline Avenue that will include street and trail improvements, sanitary
sewer extension, watermain extension, and storm sewer additions.
2.3 Data Available
City staff and WSB collaborated to acquire multiple forms of data to use in
determining the existing conditions and improvements needed for this project. The
data available includes:
• Pavement r ecommendations
• Utility r ecommendations
• Intersection location recommendations
• Utility coordination recommendations
• Right -of-way acquisition estimates
• Stormwater management needs
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 3
3. Existing Conditions
3.1 Surface
170 t h Street exists as a rural two -lane gravel roadway from Baseline Avenue to
Lang ford Avenue within a 6 6 -foot right -of-way . Adjacent to the corridor is
agricultural land and other undeveloped parcels. Any improvements to the roadway
will be needed to meet the requirements of State Aid Standards as 170 t h Street is
identified as a future c ountry r oad turnback to Scott County .
Between Langford Avenue and the westerly limits of the Springview Meadows
development, the developer of the adjacent Campbell Shores d evelopment is
required to urbanize and extend utilities to the intersection with Langford Avenue as
a part of their development.
Sixteen soil borings and sixteen hand augers were taken along the corridor to
determine the underlying soils withing the project area. The full geotechnical report
can be found in Appendix D .
3.2 Utilit ies
3.2.1. Sanitary Sewer
Sanitary s ewer is currently extended to the westerly limits of the Springview
Meadows d evelopment along 170 t h Street. The developer of Campbell Shores
development will extend 8-inch sanitary sewer to the intersection with
Langford Avenue as a part of their development improvements.
Existing properties along the corridor are currently served by Individual
Sanitary Treatment Systems (ISTS). However, none of those septic systems
were located within the City’s existing 66-foot prescriptive right for the
roadway and therefore were not located with the topographic survey collected
with this feasibility study. Prior to commencing final design for this project,
property owners will need to provide access to septic systems located on
private property for survey purposes , such that required separations from
watermain and storm sewer facilities are incorporated into the design of the
roadway and utility improvements.
3.2.2. Water m ain
Watermain is currently extended to the westerly limits of the Springview
Meadows development along 170 t h Street. The developer of Campbell Shores
development will extend 16-inch watermain to the intersection with Langford
Avenue as a part of their development improvements.
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 4
Private wells that exist within the corridor that serve each of the existing
parcels. However, none of those wells were located within the City’s existing
66-foot prescriptive right for the roadway and therefore were not located with
the topographic survey collected with this feasibility study. Prior to
commencing final design for this project, property owners will need to provide
access to wells located on private property for survey purposes such that
required separations from sanitary sewer and storm sewer facilities are
incorporated into the design of the roadway and utility improvements.
3.2.3. Storm Sewer
The existing road and adjacent areas that drain toward it drain to roadside
ditches. Driveway culverts convey stormwater through the ditches; there is not
any existing storm sewer through this section of 170 t h Street. The ditches
along the eastern portion of the existing road, approximately 1/3 of its length,
drain toward Campbell Lake. The ditches along the western portion of the
road, approximately 2/3 of its length, drain east toward Baseline Avenue and
offsite to existing low points on the adjacent landscape.
Private Utilities
This corridor of 170 t h Street has private utilities in the project area. An overhead
powerline is present on the north side of 170 t h St reet. A Centerpoint Energy gas line
is present on the south side of 170 t h St reet. A formal utility coordination meeting has
yet to be held.
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 5
4. Proposed Improvements
4.1 Surface
Proposed street improvements in this project include construction of a 7 -inch
bituminous pavement section with concrete curb and gutter, an 8 -inch aggregate
base section, and a 24-inch sand section over the top of an approved subgrade. The
proposed street layout consists of two 12-foot lanes with 8-inch shoulders on both
sides. A 5 -foot-wide concrete sidewalk will be bench graded as part of this project
on the south side of the roadway and then installed with future development. An 8-
foot -wide bituminous trail will be benched on the north side of 170 t h Street with this
project and installed in conjunction with future development.
It is proposed to acquire 44 feet of additional right -of-way along the length of the
corridor to match the existing right-of-way to the east of the proposed project ,
adjacent to the Springview Meadows development and as shown below:
The material below the section above is wet clay. It is proposed to excavate to a
depth of 2 feet below the proposed section to ensure structural stability of the road
in the future.
4.2 Utilit ies
4.2.1. Sanitary Sewer
A 16 -inch gravity s anitary s ewer is proposed to extend west from the
intersection of 170 t h St reet and Langford Avenue for approximately 2,220 feet.
The proposed sanitary sewer system will connect to the system installed as
part of the Campbell Shores development.
Additionally, a lift station and force main will be required to serve the portion
of the annexation area designated as SL-7 (shown in Figure 3 in Appendix A )
with sanitary sewer. The design flows and preliminary location for the lift
station are based on the data provided in the “Prior Lake Sanitary Study –
Orderly Annexation Area with Spring Lake Township” dated December 12,
2025. T he design flows are shown below in Table 1 .
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 6
Table 1: Average Day and Peak Flows from Area SL -7
Land Use Type (Medium (Low Industrial
Flow (GPM) 54.2 129.1 4.4
Total Flow (GPM) 187.7
Peaking Factor 3.7
Peaked Flow (GPM) 694.5
The proposed lift station includes an 8-foot diameter wet well, valve vault,
submersible pumps, controls, emergency generator, and appurtenances.
Terrain dictates an approximate 40 -foot-deep wet well.
Sanitary sewer flows from the SL-7 area will enter the lift station by way of a
12-inch pipe. A 2,000-foot-long force main will extend from the east side of
the lift station and pump sanitary sewer flows to the proposed sanitary sewer
gravity system. Stubs north and south across 170 t h Street will be provided for
future development.
The lift station will need to be located on a parcel outside of the right -of -way .
During final design, the specific locations should be assessed to determine
the optimal location for the lift station and easement needs associated with
the lift station .
If t he City would like existing properties to connect to the new sewer line,
installing individual sanitary sewer service extensions to each existing parcel
within the project corridor until such time as the parcel develops could be
considered . Properties between the lift station and discharge point can
connect grinder pumps directly to the proposed force main. The City would
coordinate with property owners wishing to connect to municipal sewer in
advance of development.
Property owners who do not wish to connect to municipal sanitary sewer can
continue to be served by their individual septic systems, provided:
1. The Minnesota Pollution Control Agency and Scott County have
approved continued use of the septic system, and
2. The existing septic system/drainfield locations do not conflict with
spacing requirements from the new right -of wa y , watermain , and storm
sewer improvements.
4.2.2. Water m ain
A 16-inch watermain is proposed to be extended along the 170 t h Street
corridor, as well as appropriately spaced hydrants, and 8-inch watermain
stubs for future development/street intersections .
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 7
The City can also consider the installation of individual water service
extensions to serve each existing parcel within the project corridor until such
time as the parcel develops. The City will coordinate with property owners
wishing to connect to municipal water in advance of development extension of
any necessary individual service extensions.
Property owners who do not wish to connect to municipal water can continue
to be served by their individual wells, provided:
1. The Minnesota Department of Health approved continued use of the
well, and
2. The existing well location does not conflict with spacing requirements
from the new right -of -way, sanitary sewer , and storm sewer
improvements.
4.2.3. Storm Sewer
Catch basins and s torm sewer are proposed for the improved road, designed
to meet State Aid maximum allowable spread for the 10 -year storm event, see
Figure 2 , Appendix A . This design assumes a future ADT over 5,000 and a
design speed of 45 mph.
Stormwater BMPS are required to satisfy rate control, water quality , and
volume requirements for the proposed impervious surface. Impervious
surfaces considered for the roadway improvements include: the proposed
roadway section and future trail and sidewalk sections within the right -of -way.
The soils throughout the project area are a mix of hydrologic soil group (HSG)
C and B/D. It is assumed that the soils at the locations of the proposed BMPs
will not be conducive to infiltration and that filtration basins will be required.
Soil borings should be completed during final design to verify this assumption.
The water quality volume (WQV) required is the larger of 1-inch over the net
new impervious surfaces or 0.5-inches over the new and fully reconstructed
impervious surfaces. In this case, the 1-inch requirement dictates. Because
filtration basins are propos ed, a 0.65 filtration factor is used per City
requirements.
The western portion of the road (approximately 2/3 of the improved road)
drains west to a proposed filtration basin at the intersection of 170 t h Street
and Baseline Avenue. The eastern portion (approximately 1/3 of improved
road) drains east to a filtration basin north of the intersection of 170 t h Street
and Langford Avenue. See Table 2 for the volumes and areas assumed for
these BMPs.
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 8
Table 2: Filtration Basin Sizing
WQV for Filtration (cf) 12,200 7,800
Volume for WQV and Rate Control (cf) 24,400 15,500
Area Required (ac) 0.28 0.18
The proposed project is within the hydrologic boundary of the Scott Watershed
Management Organization (Scott WMO). The eastern half of the project is
along the jurisdictional boundary between Scott WMO and the Prior Lake-
Spring Lake Watershed District (PLSLWD), although the runoff from this area
flows to Campbell Lake, which is within the Scott WMO.
4.3 ROW Acquisition
Comparable Vacant Land Analysis
A comparable vacant land analysis was conducted in the project area to
determine the cost of acquiring right-of -way (ROW) needed for the project.
The valuation analysis was based on vacant land sales occurring within the
Prior Lake market during the preceding 24 months. Because vacant land
values are influenced by parcel size, the comparable sales were categorized
into similar acreage ranges to identify market trends and provide a more
reliable basis for comparison.
The analysis indicated an inverse relationship between parcel size and unit
land value. Smaller parcels generally sold at higher prices per square foot,
while larger parcels sold at lower prices per square foot. This pattern reflects
market behavior, as purchasers of larger tracts typically benefit from
economies of scale, resulting in a lower unit price despite a higher overall
purchase price.
To account for these market-supported differences, sales were grouped by
size category and analyzed separately. This approach allowed for the
identification of appropriate price-per -square-foot ranges within each parcel -
size segment and reduced distortion that would occur if all sales were
analyzed together. The resulting value conclusions are based upon the
average price per square foot within each of the following categories:
1. Price per Square foot based on acreage size
a. 0-2 acres - $11.43/sf
b. 2-5 acres - $3.13/sf
c. 5-10 acres - $2.50/sf
d. 10+ acres - $2.18 /sf
*Price per square foot includes a 25% contingency cost.
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 9
2. Tree Values
a. Large, mature landscape trees = $,2400 each
b. Medium landscape trees = $1,600 each
c. Small landscape tree = $800 ea ch
*Cost doesn’t include compensation for anything within existing
ROW .
*Any additional improvements impacted would be valued at actual price .
In addition, the parcel on the far south end, where the home is affected may require
a total take. A total take would cause the owners of the property to become eligible
for relocation benefits under the Uniform Relocation Act. Estimated costs for the
total take are seen in Table 3 .
Table 3: Estimated Cost for Taking of Parcel 110950010
Cost
Purchase Price $ 600,000.00
Replacement Housing Supplement $ 500,000.00
Move Benefit $ 25,000.00
Closing Cost – Subject $ 18,000.00
Closing Cost - Replacement $ 33,000.00
Total Cost $1,176,000.00
*This is assuming they do not qualify for a mortgage interest rate differential –
that would be more.
Land Only ROW Acquisition costs for street construction, Storm Basin ROW
Acquisition costs, and Lift Station ROW Acquisition costs can be seen in Tables
4-6, respectively. The ROW Acquisition costs are summarized in Table 7 .
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 10
Table 4: ROW Acquired for Land Acquisition
Property ID Cost
119060060 25,620 $ 55,851.60
110960010 7,160 $ 17,900.00
110960020 7,530 $ 18,825.00
119060031 13,370 $ 29,146.60
119060094 5,710 $ 14,275.00
119060096 5,100 $ 12,750.00
119060098 4,700 $ 11,750.00
259060030 5,000 $ 15,650.00
259060040 1,130 $ 2,825.00
119060095 7,490 $ 18,725.00
119060092 7,590 $ 18,975.00
119060090 5,830 $ 18,247.90
119060097 5,610 $ 64,122.30
119070017 28,970 $ 72,425.00
119070150 7,160 $ 17,900.00
119070020 16,140 $ 35,185.20
119070021 35,420 $ 77,215.60
119070030 29,290 $ 63,852.20
Total Cost $ 565,621.40
*Cost values in Table 4 include 25% for indirec t costs
Table 5: Easement Acquired for Storm Basins
Property ID Cost
West 119060060 12,200 $ 26,596.00
East 259050250 7,840 $ 17,091.20
Total Cost $ 43,687.20
*Cost values in Table 5 include 25% for indirect costs
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 11
Table 6: Easement Acquired for Lift Station
Property ID Cost
Lift Station 119070030 12,200 $ 5,450.00
Total Cost $ 5,450.00
*Cost values in Table 6 include 25% for indirect costs
Table 7 : Summary of ROW /Easement Costs
Cost
Parcel 110950010 Acquisition Cost $ 1,176,000.00
Land ROW Acquisition Cost $ 565,621.40
Storm Basin ROW Acquisition Costs $ 43,687.20
Lift Station ROW Acquisition Costs $ 5,450.00
Total Cost $ 1,790,758.60
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 12
5. Financing
5.1 Opinion of Probable Cost
A detailed Opinion of Probable Cost can be found in Appendix B . The following costs
were prepared using anticipated 202 7 construction costs and are subject to change
depending on the final design of the project, bids received, and actual work
performed. The total project costs are estimated to be $11,719,678.51. Surface
Improvements, Drainage Improvements, Sanitary Sewer Improvements, and
Watermain Improvements include a 15% construction contingency and 20% indirect
costs including engineering, legal, and administrative costs for the project. ROW
acquisition costs include a 25% indirect cost .
The Opinion of Probable Cost is summarized in Table 7 below.
Table 7 : Opinion of Probable Cost Summary
Improvement Estimated Cost
Surface Improvements $ 4,488 ,062.91
Drainage Improvements $ 1,478,739.00
Sanitary Sewer Improvements $ 2,667,402.00
Watermain Improvements $ 1,294,716.00
ROW Acquisition for Roadway $ 1,741,621.40
Storm Basin Easement $ 43,687.20
Lift Station Easement $ 5,450.00
T otal $ 11,719,678.51
5.2 Funding
Assessments will be levied to the benefiting properties as outlined in Minnesota
Statute 429 and the City of Prior Lake’s Assessment Policy. A Special Benefit
Consultation by Patchin Messner Valuation Counselors was prepared for this project .
T his report analyzes the probable special benefit to the abutting properties derived
by the infrastructure improvements. The proposed assessment rolls are included in
Appendix D of this report, along with an assessment map identifying the benefiting
properties.
Based on the City assessment policy, S pecial Assessments to benefitting properties
are proposed to fund 72% of the street and utility improvements indentified in the
project with the remaining 28 % paid for with various City funds.
Based on the benefit analysis , S pecial Assessments to benefitting properties are
proposed to fund 35 % of the street and utility improvements indentified in the project
with the remaining 65% paid for with various City funds.
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 13
The Assessment Review Committee met on October 29 , 202 6, and reviewed the lot
area method as well as the Special Benefit Consultation Report . The special
assessment amounts for each property are provided in the proposed assessment
rolls in Appendix D .
Proposed assessments based on the City policy and the benefit analysis are shown
below in Table 8.
Table 8: Proposed Assessment Rates
Lot Fee Category Assessment Total
Proposed Assessment
(Based on City Assessment Policy) $ 8,474,346.31
$ 4,147,680.00
Other funding sources for the project include the Capital Improvement Fund, the
City Sewer Revenue Fund, and the City Water Revenue Fund. Easement
acquisition costs for stormwater basins are included in the Stormwater/Water
Quality Fund and the lift station easement costs are included in the Sewer Utility
Fund. Costs associated with the roadway ROW acquisition and the adjustment
between the City Assessment Poli cy and the Benefit Analysis are show as Tax
Levy in Tables 9 and 10.
The project funding is summarized in Table s 9 and 10 below.
Table 9 : Project Funding Summary
(Based on City Assessment Policy)
Funding Source Proposed Funding
Assessments $ 8,474,346.31
Trunk Water Utility Fund $ 744,082.20
Trunk Sewer Utility Fund $ 2,501,250.00
TOTAL $ 11,719,678.51
Table 10 : Project Funding Summary
(Based on Benefit Analysis)
Funding Source Proposed Funding
Special Assessments $4,147,680.00
Tax Levy $ 4,326,666.31
Trunk Water Utility Fund $ 74 4,082.20
Trunk Sewer Utility Fund $ 2,501,250.00
TOTAL $11,719,678.51
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 14
6. Project Schedule
The proposed schedule for this improvement is as follows:
Task
Number Task Description Completion Date
1 First Neighborhood Meeting August 19, 2026
2 October 2026
3 Assessment Review Committee October 29, 2026
4 Present Feasibility Report to the Council November 24, 2026
5 Order Public Hearing November 24, 2026
6 Second Neighborhood Meeting December 2026
7 Public Hearing December 2026
8 Order Project December 2026
9 Council Authorizes Final Design December 2026
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Page 15
Feasibility and Recommendation
This project consists of the urbanization of 170 t h St reet from Langford Avenue to
Baseline Avenue/CSAH 78 . It includes the extension of sanitary sewer (including a
lift station) and watermain, the addition of storm sewer, and the addition of
pedestrian facilities.
It is the recommendation of the C ity staff that this project is not financially
feasible. Assessments for the project do not meet the increase in land value
requirements of Minnesota Statute 429.
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Appendix
Appendix A
Figure 1 – Project Location Map
Figure 2 – Storm Sewer Layout
Figure 3 – Sanitary Sewer Annexation Areas
MAR
S
C
H
A
L
L
R
D
BA
S
E
L
I
N
E
A
V
E
LA
N
G
F
O
R
D
A
V
E
170TH ST E
WSB PROJECT NO.:
M:
\
0
3
5
3
1
9
-
0
0
0
\
C
a
d
\
E
x
h
i
b
i
t
s
\
0
3
5
3
1
9
P
r
o
j
e
c
t
L
o
c
a
t
i
o
n
M
a
p
.
d
w
g
9/
2
5
/
2
0
2
6
7
:
0
2
:
5
5
A
M
035319-000
170TH STREET IMPROVEMENT PROJECT
FIGURE 1 - PROJECT LOCATION MAP
CITY OF PRIOR LAKE, MN
N
SCALE IN FEET
0
H:
1250 2500
PROJECT LOCATION
B
a
s
e
l
i
n
e
A
v
e
170thSt W E 170th S t
E 1 70 t h S t
Campbell
Lake
L
angf
or
d
A
ve
E 1 7 0 t h S t
L
a
ngf
o
r
d
A
v
e
"""""""""
""""
"""""""""""
"
""""
"""
"
"
""
"
"
"
"
"
"
#
#
#
#
Do
c
u
m
e
n
t
P
a
t
h
:
M
:
\
0
3
5
3
1
9
-
0
0
0
\
G
I
S
\
W
o
r
k
i
n
g
\
P
L
1
0
7
t
h
F
e
a
s
i
b
i
l
i
t
y
\
8
,
5
x
1
1
_
l
a
n
d
s
c
a
p
e
b
o
r
d
e
r
1
D
a
t
e
S
a
v
e
d
:
9
/
2
5
/
2
0
2
6
¯1 inch = 600 feet
0 600
Feet
170th Street Improvement Project
City of Prior Lake
Figure 2 - Storm Sewer Layout
Proposed Storm Sewer
"Proposed Catch Basin
Proposed Filtration Basin
WSB PROJECT NO.:
M:
\
0
3
5
3
1
9
-
0
0
0
\
C
a
d
\
E
x
h
i
b
i
t
s
\
0
3
5
3
1
9
-
0
0
0
L
i
f
t
S
t
a
t
i
o
n
A
r
e
a
.
d
w
g
10
/
6
/
2
0
2
6
1
1
:
5
5
:
3
7
A
M
035319-000
170TH STREET IMPROVEMENT PROJECT
FIGURE 3 - SANITARY SEWER ANNEXATION AREAS
CITY OF PRIOR LAKE, MN
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Appendix
Appendix B
Opinion of Probable Cost
WSB Project:170th Street Improvement Project Design By:CSD
Project Location:Prior Lake Checked By:EME
City Project No.:0
WSB Project No:035319-000 Date:10/8/2026
ITEM
NO.
MNDOT
SPECIFICATION
NO.
DESCRIPTION UNIT
ESTIMATED
TOTAL
QUANTITY
ESTIMATED
UNIT PRICE
ESTIMATED TOTAL
COST
1 2021.501 MOBILIZATION LS 1 155,000.00$ 155,000.00$
2 2104.502 SALVAGE SIGN EACH 10 200.00$ 2,000.00$
3 2104.502 SALVAGE MAIL BOX SUPPORT EACH 10 110.00$ 1,100.00$
4 2104.503 SAWING BITUMINOUS PAVEMENT L F 25 4.00$ 100.00$
5 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 27 8.00$ 216.00$
6 2106.507 EXCAVATION - COMMON C Y 30211 20.00$ 604,220.00$
7 2106.507 EXCAVATION - SUBGRADE C Y 17912 25.00$ 447,802.50$
8 2106.507 SELECT GRANULAR EMBANKMENT (CV) C Y 31112 25.00$ 777,800.00$
9 2106.507 COMMON EMBANKMENT (CV) C Y 3971 25.00$ 99,275.00$
10 2106.601 DEWATERING LS 1 30,000.00$ 30,000.00$
11 2108.504 GEOTEXTILE FABRIC TYPE 9 S Y 23334 3.00$ 70,002.00$
12 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 40 150.00$ 6,000.00$
13 2130.523 WATER MGAL 100 100.00$ 10,000.00$
14 2211.507 AGGREGATE BASE (CV) CLASS 5 C Y 5186 50.00$ 259,300.00$
15 2360.509 TYPE SP 12.5 WEARING COURSE MIX (4;E) TON 3955 95.00$ 375,725.00$
16 2360.509 TYPE SP 19.0 NON WEAR COURSE MIX(4;C) TON 2967 95.00$ 281,865.00$
17 2540.602 INSTALL MAIL BOX SUPPORT EACH 10 200.00$ 2,000.00$
18 2564.502 INSTALL SIGN EACH 10 110.00$ 1,100.00$
19 2572.506 WATER GAL 50 25.00$ 1,250.00$
20 2573.501 STABILIZED CONSTRUCTION EXIT LS 1 5,000.00$ 5,000.00$
21 2573.502 STORM DRAIN INLET PROTECTION EACH 14 170.00$ 2,380.00$
22 2573.503 SILT FENCE; TYPE MS L F 100 2.00$ 200.00$
23 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F 10500 2.00$ 21,000.00$
24 2574.507 COMMON TOPSOIL BORROW C Y 519 20.00$ 10,380.00$
25 2575.504 SODDING TYPE LAWN S Y 4667 12.00$ 56,004.00$
26 2575.508 HYDRAULIC MULCH MATRIX LB 500 2.00$ 1,000.00$
27 2582.503 4" SOLID LINE MULTI COMP L F 10500 2.00$ 21,000.00$
28 2582.503 4" DBLE SOLID LINE MULTI COMP L F 5250 2.00$ 10,500.00$
CONSTRUCTION TOTAL 3,252,219.50$
CONTINGENCY TOTAL (15%) 487,832.93$
SUBTOTAL 3,740,052.43$
INDIRECT COST TOTAL (20%) 748,010.49$
TOTAL 4,488,062.91$
29 2021.501 MOBILIZATION LS 1 51,000.00$ 51,000.00$
30 2106.601 FILTRATION BASINS LS 1 399,000.00$ 399,000.00$
31 2501.502 18" RC PIPE APRON EACH 3 1,800.00$ 5,400.00$
32 2501.502 30" RC PIPE APRON EACH 1 2,500.00$ 2,500.00$
33 2503.503 15" RC PIPE SEWER DES 3006 CL V L F 2400 75.00$ 180,000.00$
34 2503.503 18" RC PIPE SEWER DES 3006 CL V L F 655 80.00$ 52,400.00$
35 2503.503 21" RC PIPE SEWER DES 3006 CL III L F 450 90.00$ 40,500.00$
36 2503.503 24" RC PIPE SEWER DES 3006 CL III L F 450 95.00$ 42,750.00$
37 2503.503 27" RC PIPE SEWER DES 3006 CL III L F 300 110.00$ 33,000.00$
38 2503.503 30" RC PIPE SEWER DES 3006 CL III L F 830 130.00$ 107,900.00$
39 2506.502 CASTING ASSEMBLY EACH 27 1,000.00$ 27,000.00$
40 2506.503 CONST DRAINAGE STRUCTURE DES 48-4020 L F 24 900.00$ 21,600.00$
41 2506.503 CONST DRAINAGE STRUCTURE DES 60-4020 L F 30 1,100.00$ 33,000.00$
41 2506.503 CONST DRAINAGE STRUCTURE DES 72-4020 L F 5 1,300.00$ 6,500.00$
42 2506.602 CONST DRAINAGE STRUCTURE DESIGN SPEC (2x3) EACH 14 3,500.00$ 49,000.00$
43 2506.602 CONST DRAINAGE STRUCTURE DESIGN SPEC 1 (OCS) EACH 2 10,000.00$ 20,000.00$
CONSTRUCTION TOTAL 1,071,550.00$
CONTINGENCY TOTAL (15%) 160,732.50$
SUBTOTAL 1,232,282.50$
INDIRECT COST TOTAL (20%) 246,456.50$
TOTAL 1,478,739.00$
44 2021.501 MOBILIZATION LS 1 92,000.00$ 92,000.00$
45 2503.503 16" PVC PIPE SEWER L F 2220 125.00$ 277,500.00$
46 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1 2,500.00$ 2,500.00$
47 2503.603 8" PVC FORCE MAIN L F 2000 80.00$ 160,000.00$
48 2506.601 LIFT STATION LS 1 1,400,000.00$ 1,400,000.00$
49 2506.603 CONSTRUCT 48" DIA SANITARY MANHOLE L F 2 450.00$ 900.00$
CONSTRUCTION TOTAL 1,932,900.00$
CONTINGENCY TOTAL (15%) 289,935.00$
SUBTOTAL 2,222,835.00$
INDIRECT COST TOTAL (20%) 444,567.00$
TOTAL 2,667,402.00$
A. Street Improvements
OPINION OF PROBABLE COST
B. Drainage Improvements
C. Sanitary Sewer Improvements
WSB Project:170th Street Improvement Project Design By:CSD
Project Location:Prior Lake Checked By:EME
City Project No.:0
WSB Project No:035319-000 Date:10/8/2026
ITEM
NO.
MNDOT
SPECIFICATION
NO.
DESCRIPTION UNIT
ESTIMATED
TOTAL
QUANTITY
ESTIMATED
UNIT PRICE
ESTIMATED TOTAL
COST
A. Street Improvements
OPINION OF PROBABLE COST
50 2021.501 MOBILIZATION LS 1 45,000.00$ 45,000.00$
51 2504.602 CONNECT TO EXISTING WATER MAIN EACH 1 1,800.00$ 1,800.00$
52 2504.602 INSTALL HYDRANT & VALVE EACH 9 3,500.00$ 31,500.00$
53 2504.602 8" GATE VALVE & BOX EACH 3 3,600.00$ 10,800.00$
54 2504.602 1" CURB STOP & BOX EACH 11 800.00$ 8,800.00$
55 2504.603 1" TYPE PE PIPE L F 550 20.00$ 11,000.00$
56 2504.603 16" PVC WATERMAIN L F 5250 150.00$ 787,500.00$
57 2504.608 DUCTILE IRON FITTINGS LB 2090 20.00$ 41,800.00$
CONSTRUCTION TOTAL 938,200.00$
CONTINGENCY TOTAL (15%) 140,730.00$
SUBTOTAL 1,078,930.00$
INDIRECT COST TOTAL (20%) 215,786.00$
TOTAL 1,294,716.00$
58 ROW ACQUISITION FOR ROADWAY LS 1 1,741,621.40$ 1,741,621.40$
59 STORM BASIN EASEMENT LS 1 43,687.20$ 43,687.20$
60 LIFT STATION EASEMENT LS 1 5,450.00$ 5,450.00$
TOTAL 1,790,758.60$
GRAND TOTAL 11,719,678.51$
DISCLAIMER:
In review of this Opinion of Probable Cost, the Client understands that the Consultant has no control over the availability of labor, equipment or materials, market conditions, or the
Contractor’s method of pricing. This Opinion of Probable Cost is made on the basis of the Consultant’s professional judgment and experience. The Consultant makes no warranty,
expressed or implied, regarding the ultimate bids or negotiated cost of the Work.
D. Watermain Improvements
E. Land Acquisitions
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Appendix
Appendix C
Assessment Map
Preliminary Assessment Roll
17
2 3 4
8
9
5 1067
14
16
18
15
13
12
11
19
1
LA
N
G
F
O
R
D
A
V
E
174 ST E
170 ST W
170 ST E
MAR
S
C
H
A
L
L
R
D
BA
S
E
L
I
N
E
A
V
E
Do
c
u
m
e
n
t
P
a
t
h
:
M
:
\
0
3
3
7
9
8
-
0
0
0
\
G
I
S
\
P
r
i
o
r
L
a
k
e
S
t
r
e
e
t
R
e
c
o
n
2
0
2
8
\
1
7
0
t
h
S
t
A
s
s
e
s
s
m
e
n
t
M
a
p
D
a
t
e
S
a
v
e
d
:
7
/
8
/
2
0
2
6
¯1 inch = 750 feet
0 750
Feet170th St. Street Improvement Map
Prior Lake, MN
Assessment Map
Project Location
Assessment Parcels
Date: 10/06/2026
WSB Project No.: 035319-000
1 119060060 MARVIN GEIS FAMILY TRUST 24426 RED WING AVE NEW PRAGUE , MN 56071 AGRICULTURE 40.44 0.13 1,123,474.99$ 799,180.00$
2 110960010 STRAND ARLENE M 401 N BLUEJAY CT GILBERT, AZ 85234 AGRICULTURE 10.00 0.03 277,812.81$ 90,000.00$
3 110960020 STRAND ARLENE M 401 N BLUEJAY CT GILBERT, AZ 85234 AGRICULTURE 10.00 0.03 277,812.81$ 90,000.00$
4 119060031 SAND JEFF & JILL 440 170TH ST E JORDAN, MN 55352 440 170TH ST E AGRICULTURE 20.00 0.07 555,625.61$ 145,000.00$
5 119060094 ROUGIER THOMAS J & SANDRA L 670 170TH ST E JORDAN, MN 55352 UNIMPROVED RES 10.00 0.03 277,812.81$ 45,500.00$
6 119060096 CERONSKY-THEIS NANCY J 580 170TH ST E JORDAN, MN 55352 580 170TH ST E SF RES 10.00 0.03 277,812.81$ 45,500.00$
7 119060098 KLENKE HAROLD L & LORETTA 602 170TH ST E JORDAN, MN 55352 602 170TH ST E SF RES 10.00 0.03 277,812.81$ 45,500.00$
8 259060030 SCHUMAN DARLENE E 626 170TH ST E JORDAN, MN 55352 626 170TH ST E SF RES 2.68 0.01 74,398.27$ 35,500.00$
9 259060040 SCHUMAN DARLENE E 626 170TH ST E JORDAN, MN 55352 SF RES 7.13 0.02 198,080.53$ 40,500.00$
10 119060095 JONDAL CHARLES E & JANE E 670 170TH ST E JORDAN, MN 55352 670 170TH ST E SF RES 10.00 0.03 277,812.81$ 45,500.00$
11 119060092 CANNY HOLDINGS 2 LLC 2335 ABBEY PT SHAKOPEE, MN 55379 726 170TH ST E SF RES 10.00 0.03 277,812.81$ 45,500.00$
12 119060090 DANIEL AND MARILYN BORCHARDT REVOCABLE TRUST 986 170TH ST E JORDAN, MN 55352 SF RES 2.87 0.01 79,732.28$ 35,500.00$
13 119060097 DANIEL AND MARILYN BORCHARDT REVOCABLE TRUST 986 170TH ST E JORDAN, MN 55352 986 170TH ST E SF RES 1.92 0.01 53,340.06$ 30,500.00$
14 119070017 LEZER LARRY L 697 170TH ST E JORDAN, MN 55352 697 170TH ST E SF RES 10.00 0.03 277,812.81$ 45,500.00$
15 119070150 RAVELING MARK S 615 170TH ST E JORDAN, MN 55352 615 170TH ST E SF RES 10.00 0.03 277,812.81$ 45,500.00$
16 119070020 JOSEPH P PIEPER FAMILY LP & C/O DAN PIEPER 7315 CASEY PKWY PRIOR LAKE, MN 55372 511 170TH ST E AGRICULTURE 55.00 0.18 1,527,970.44$ 937,500.00$
17 110950010 STANS CHARLES D & RITA M 591 170TH ST E JORDAN, MN 55352 591 170TH ST E SF RES 5.00 0.02 138,906.40$ 35,500.00$
18 119070021 JOSEPH P PIEPER FAMILY LP & C/O DAN PIEPER 7315 CASEY PKWY PRIOR LAKE, MN 55372 AGRICULTURE 40.00 0.13 1,111,251.23$ 795,000.00$
19 119070030 WILL FARMS LLC 17530 BASELINE AVE JORDAN, MN 55352 AGRICULTURE 40.00 0.13 1,111,251.23$ 795,000.00$
$8,474,346.31 $4,147,680.00
TOTAL AREA 13,287,455.28
TOTAL COST 8,474,346.31$
PROPOSED
APPRAISED
ASSESSMENT
AREA (AC)
AREA
ASSESSMENT
RATE
CITY OF PRIOR LAKE
170TH ST IMPROVEMENT PROJECT
FINAL ASSESSMENT ROLL
MAP ID PID FEE OWNER FEE OWNER ADDRESS CITY/STATE/ZIP PROPERTY ADDRESS USE DESCRIPTION
PROPOSED
CALCULATED
ASSESSMENT
Feasibility Report
170th Street Improvement Project
City of Prior Lake, MN
City Project No. 2027-05
WSB Project No. 035319-000 Appendix
Appendix D
Geotechnical Report
GEOTECHNICAL REPORT
PRIOR LAKE, MINNESOTA
September 3, 2026
Prepared for:
City of Prior Lake
4646 Dakota Street SE
Prior Lake, MN 55372
WSB PROJECT NO. 035319-000
GEOTECHNICAL REPORT
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000
170TH STREET IMPROVEMENTS PROJECT
FOR
PRIOR LAKE, MINNESOTA
September 3, 2026
GEOTECHNICAL REPORT
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000
CERTIFICATION
I hereby certify that this plan, specification, or report was prepared by me or
under my direct supervision and that I am a duly Licensed Professional
Engineer under the laws of the State of Minnesota.
Darin Hyatt, PE
Date: September 3, 2026 Lic. No. 41316
5
4
0
G
A
T
E
W
A
Y
B
L
V
D
|
B
U
R
N
S
V
I
L
L
E
,
M
N
|
5
5
3
3
7
|
9
5
2
.
7
3
7
.
4
6
6
0
|
W
S
B
E
N
G
.
C
O
M
September 3, 2026
Honorable Mayor and City Council
City of Prior Lake
4646 Dakota Street SE
Prior Lake, MN 55372
Re: Geotechnical Report
170th Street Improvements Project
City of Prior Lake, Minnesota
WSB Project No.: 035319-000
We have performed a geotechnical subsurface exploration program for the above-referenced
project. This report contains our soil boring logs, an evaluation of the conditions encountered in
the borings and our recommendations for dewatering, subgrade improvements, pavement design,
and other geotechnical-related design and construction considerations.
If you have questions concerning this report or our recommendations, or for construction material
testing for this project, please call us at 952.737.4660.
Sincerely,
WSB
Darin Hyatt, PE Mark Osborn, PE
Senior Geotechnical Engineer Senior Geotechnical Engineer
Attachment:
Geotechnical Report
DEH/ams
TABLE OF CONTENTS
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000
TITLE SHEET
CERTIFICATION SHEET
LETTER OF TRANSMITTAL
TABLE OF CONTENTS
1. INTRODUCTION ................................................................................................................................... 1
Project Location ......................................................................................................................... 1
Project Description .................................................................................................................... 1
Purpose and Project Scope of Services .................................................................................... 1
2. PROCEDURES ..................................................................................................................................... 3
2.1 Boring Layout and Soil Sampling Procedures ........................................................................... 3
2.2 Groundwater Measurements and Borehole Abandonment ....................................................... 3
2.3 Boring Log Procedures and Qualifications ................................................................................ 3
3. EXPLORATION RESULTS .................................................................................................................. 4
3.1 Site and Geology ....................................................................................................................... 4
3.2 Subsurface Soil and Groundwater Conditions .......................................................................... 4
3.3 Strength Characteristics ............................................................................................................ 6
3.4 Groundwater Conditions ............................................................................................................ 7
4. ENGINEERING ANALYSIS AND RECOMMENDATIONS .................................................................. 9
4.1 Discussion ................................................................................................................................. 9
4.2 Lift Station and Sanitary Sewer Manhole Bottom Preparations ................................................ 9
4.3 Lift Station and Sanitary Sewer Base Recommendations ....................................................... 10
4.4 Below-Grade Walls .................................................................................................................. 11
4.5 Backfill and Fill Selection and Compaction ............................................................................. 12
4.6 Pavement Subgrade Preparation and Stability ....................................................................... 12
4.7 Pavement Area ........................................................................................................................ 14
4.8 Utilities ..................................................................................................................................... 15
4.9 Dewatering............................................................................................................................... 16
4.10 Construction Considerations ................................................................................................... 16
4.11 Construction Safety ................................................................................................................. 16
4.12 Cold Weather Construction ..................................................................................................... 16
4.13 Field Observation and Testing................................................................................................. 16
4.14 Plan Review and Remarks ...................................................................................................... 17
5. STANDARD OF CARE ....................................................................................................................... 18
Appendix A
Soil Boring Exhibits
Logs of Test Borings
Symbols and Terminology on Test Boring Log
Notice to Report Users Boring Log Information
Unified Soil Classification System (USCS)
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 1
1. INTRODUCTION
Project Location
The site includes 170th Street from Baseline Avenue to about 1,250 feet west of Marschall Road in Prior
Lake, Minnesota. This section of 170th Street consists of a 10- to 12-foot wide, rural two-lane gravel road.
The approximate soil boring locations can be found on the Soil Boring Exhibit in Appendix A.
Project Description
The City of Prior Lake’s 170th Street Improvement Project includes the urbanization of 170th Street. The
proposed improvements include street improvements, the addition of storm sewer, and the extension of
sanitary and watermain along the corridor. The proposed construction will include a new 2-lane
bituminous road with a shoulder section, curb and gutter on both sides, sanitary sewer, watermain, storm
sewer with other BMP’s. Three sanitary sewer manholes and one lift station are also planned as part of
this project.
The proposed urban section for this project is illustrated below.
The storm pipe will consist of reinforced concrete (RCP), and generally be placed within 5 feet of grade,
the watermain pipe will be ductile iron (DIP) and be place about 7½ feet below grade while the sanitary
utility/force main will be placed about 15 to 20 feet below grade and consist of polyvinyl chloride pipe
(PVC). We understand the storm sewer system will be placed using cut and cover techniques while
trenchless techniques are being considered for the watermain and sanitary sewer system.
The sanitary sewer manhole base slabs as well as the lift station will be placed about 10 to 25 feet below
ground level.
We understand that the vertical and horizontal alignment of the roadway will remain similar to existing
conditions and the design will meet State Aid Standards.
WSB has developed recommendations for this project in consideration of the proposed layout as
understood at this time. When the designer develops additional information about final design structural
loadings, building configuration, or other significant factors, the recommendations presented herein may
no longer apply. WSB should be made aware of the revised or additional information in order to evaluate
the recommendations for continued applicability.
Purpose and Project Scope of Services
The City of Prior Lake authorized this scope of service. In order to assist the design team in preparing
plans and specifications, we have developed recommendations for designing utilities and pavements. As
such, we have completed a subsurface exploration program and prepared a geotechnical report for the
referenced site. This stated purpose was a significant factor in determining the scope and level of service
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 2
provided. Should the purpose of the report change the report immediately ceases to be valid and use of it
without WSB’s prior review and written authorization should be at the user’s sole risk.
Our authorized scope of work has been limited to:
1. Clearing underground utilities utilizing Gopher State One Call.
2. Mobilization / demobilization of a truck-mounted drill rig.
3. Drilling 16 standard penetration test (SPT) borings to about 15- to 30-foot depths.
4. Completing 16 hand auger borings (HABs) to a depth of about 5 feet each.
5. Sealing the borings per Minnesota Department of Health procedures.
6. Perform soil classification and analysis.
7. Review of available project information and geologic data.
8. Providing this geotechnical report containing:
a. Summary of our findings.
b. Discussion of subsurface soil and groundwater conditions and how they may affect the
proposed utilities and pavements.
c. Estimated allowable bearing capacity of the soils.
d. Estimated excavation depths to suitable soils.
e. Estimated R-value of the soils.
f. Recommended subgrade preparation and pavement section.
g. A discussion of soils for use as structural fill and site fill.
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 3
2. PROCEDURES
2.1 Boring Layout and Soil Sampling Procedures
WSB completed 16 SPT soil borings at the project site and 16 HABs. WSB geotechnical engineers
discussed the project with the municipal team and decided the number and locations of borings and hand
augers and their proposed depths. Our field crew staked the borings using the supplied site plan. The
borings were located with a handheld GPS device for horizontal locations. The approximate boring
locations are shown on the Soil Boring Exhibit in Appendix A which is an aerial photo. The ground
surface elevations at the borings were estimated by using Google Earth.
We completed the borings on June 22, 29, and July 2, 2026, with a truck-mounted CME-75 drill rig
operated by a two-person crew. The drill crew advanced the borings using continuous hollow stem
augers. The drilling information is provided on the boring logs.
Generally, the drill crew sampled the soil in advance of the auger tip at two and one-half (2 ½) foot
intervals to a depth of 15 feet and then at five (5) foot intervals thereafter to the termination depth of the
boring. The soil samples were obtained using a split-barrel sampler which was driven into the ground
during standard penetration tests in accordance with ASTM D 1586, Standard Method of Penetration Test
and Split-Barrel Sampling of Soils. The materials encountered were described on field logs and
representative samples were containerized and transported to our laboratory for further observation and
testing.
The samples were visually observed to estimate the distribution of grain sizes, plasticity, consistency,
moisture condition, color, presence of lenses and seams, and apparent geologic origin. We classified the
soils according to type using the Unified Soil Classification System (USCS). A chart describing the USCS
is included in Appendix A.
2.2 Groundwater Measurements and Borehole Abandonment
The drill crew observed the borings for free groundwater while drilling and after completion of the borings.
These observations and measurements are noted on the boring logs. The crew then backfilled the
borings to comply with Minnesota Department of Health regulations.
2.3 Boring Log Procedures and Qualifications
The subsurface conditions encountered by the borings are illustrated on the Logs of Test Borings in
Appendix A. Similar soils were grouped into the strata shown on the boring logs, and the appropriate
estimated USCS classification symbols were also added. The depths and thickness of the subsurface
strata indicated on the boring logs were estimated from the drilling results.
The transition between materials (horizontal and vertical) is approximate and is usually far more gradual
than shown. Information on actual subsurface conditions exists only at the specific locations indicated and
is relevant only to the time exploration was performed. Subsurface conditions and groundwater levels at
other locations may differ from conditions found at the indicated locations. The nature and extent of these
conditions would not become evident until exposed by construction excavation. These stratification lines
were used for our analytical purposes and, due to the aforementioned limitations, should not be used as a
basis of design or construction cost estimates.
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 4
3. EXPLORATION RESULTS
3.1 Site and Geology
The site/road was a rural gravel surface road with vegetated inslopes.
Boring elevations ranged from about 936 to 971 feet. The road is highest in the middle portion and has
its lowest area near Campbell Lake on the eastern end of the project.
Geologic origins can be difficult to determine solely from boring samples. We referenced online geologic
data of the area and used our experience to help determine geologic origin of the soils; however, only a
detailed geologic exploration would accurately determine the geologic history of the site.
The Scott County Geologic Atlas indicates the surficial geology of the area is mostly glacial till consisting
of a mixture of sandy and clayey soils.
3.2 Subsurface Soil and Groundwater Conditions
The SPT boring profile encountered in our borings generally consisted of a roadway section over fill
materials before encountering and terminating in glacial soils.
Roadway Section
Generally, the SPT borings encountered gravel surfacing, however, Borings B-14, B-15 and B-16, on the
east side of the project, encountered bituminous at the surface.
The gravel surfacing was about 5 to greater than 12 inches thick and appeared to consist of crushed
limestone. The bituminous was about 5 ½ to 12 inches thick and there was an apparent aggregate base
layer of about 6 inches beneath it.
Fills
All of the borings encountered fill beneath the roadway section. The fills encountered in the borings
generally consisted of a mixture of sand and clays and were encountered to depths of about 2 to 7 feet.
On the western side of the project (Borings B-1 to B-10) the fill consisted of or contained organics. That
fill consisted of organic clay and slightly organic lean clay that was generally dark brown to black and
moist to wet. It should be noted that the lean clay fill encountered in Boring B-3 was not considered
organic.
Based on the borings, the fill on the eastern side of the project (Borings B-11 to B-16) did not contain or
conceal detrimental amounts of organic matter. That fill consisted of sandy lean clay, clayey sand and
sand with clay that contained variable amounts of gravel, was light brown to dark brown and considered
moist.
Glacial Deposits
Beneath the fill materials, the borings encountered glacial till consisting of lean clay (with various amounts
of sand and gravel) and clayey silt, clayey sand that was varying shades of brown and gray and moist to
wet.
In contrast to the other borings, Boring B-15 encountered a buried layer of organic sandy lean clay that
was about 3 ½ feet thick.
Hand Auger Boring Profiles
A HAB was completed adjacent to each SPT boring and numbered accordingly e.g. HA-1 was completed
adjacent to Boring B-1 and HA-2 was completed adjacent to Boring B-2 and so on.
The HABs initially encountered topsoil dressing consisting of lean clay and clayey sand that was about 3
to 12 inches thick and locally about 2 feet thick. Beneath the topsoil dressing many of the HABs
encountered soils (fill or naturally deposited) containing or consisting of organics that were encountered
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 5
were about 2 to 4 feet in depth. The remaining fill consisted of lean clay and clayey sand that was brown
to dark brown and moist to wet. The naturally deposited soils encountered by the HABs were similar to
those encountered in the SPT borings.
It should be noted that Hand Auger HA-7 did not penetrate the organic clay at the borings 5 foot
termination depth.
Boring Subgrade Profiles
Table 1 below presents the existing roadway pavement section and subgrade profiles.
Table 1: Existing Profiles
Boring
No.
Bituminous
Thickness
(inches)
Surfacing/Base
Thickness
Topsoil
Thickness
(inches)
Subgrade Soils
(Upper 4 feet)
B-1 --- 12+
HA-1 --- --- 12+
B-2 --- 12+ ---
HA-2 --- --- 24 Lean Clay
B-3 --- 8 ---
HA-3 --- --- 8 Lean Clay with Sand
B-4 --- 12 ---
HA-4 --- --- 6
B-5 --- 12 ---
HA-5 --- --- 6
B-6 --- 12 --- Organic Lean Clay, Sandy Lean Clay
HA-6 --- --- 6
B-7 --- 12 --- Organic Lean Clay, Lean Clay
HA-7 --- --- 6
B-8 --- 5 --- Sandy Lean Clay, Organic Lean Clay
HA-8 --- --- 6
B-9 --- 6 --- Sandy Lean Clay with gravel
HA-9 --- --- 12
B-10 --- 6 --- Lean Clay with sand slightly organic
HA-10 --- --- 6 Clay, Lean Clay slightly organic,
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 6
Boring
No.
Bituminous
Thickness
(inches)
Surfacing/Base
Thickness
Topsoil
Thickness
(inches)
Subgrade Soils
(Upper 4 feet)
B-11 --- 5 ---
HA-11 --- --- 12
B-12 --- 10 ---
HA-12 --- --- 6
B-13 4 ½ 5 ---
HA-13 --- --- 6 Sand with clay, Clayey Sand with a
B-14 12 6 ---
HA-14 --- --- 3 Sand with Gravel, Clayey Sand,
B-15 5 ½ 6 ---
HA-15 --- --- 3 Lean Clay little grave, Clayey Sand
B-16 10 6 ---
HA-16 --- --- 3 Sand little gravel and roots, Sandy
3.3 Strength Characteristics
The penetration resistance N-values of the materials encountered were recorded during drilling and are
indicated as blows per foot (BPF). Those values provide an indication of soil strength characteristics and
are located on the boring log sheets. Also, visual-manual classification techniques and apparent moisture
contents were also utilized to make an engineering judgment of the consistency of the materials.
Table 2 presents a summary of the penetration resistances (N-value which are indicated by Blows Per
Foot BPF) in the soils for the borings completed and remarks regarding the material strengths of the soils.
Table 2: Penetration Resistances
Soil Type Classification Remarks
Fill SP, CL, SC 6 to 20 BPF Poorly to well compacted
Organic Soils (Fill/Native) OL 5 to 14 BPF
Native CL, ML, SC 2 to 20 BPF medium dense; Generally soft
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 7
Boring B-15 encountered cobbles at a depth of about 13 feet and N-values were in excess of 50 blows
per foot.
The preceding is a generalized description of soil conditions at this site. Variations from the generalized
profile exist and should be assessed from the boring logs, the normal geologic character of the deposits,
and the soils uncovered during site excavation.
3.4 Groundwater Conditions
WSB took groundwater level readings in the exploratory borings, reviewed the data obtained, and
discussed its interpretation of the data in the text of the report. Note that groundwater levels may
fluctuate due to seasonal variations (e.g., precipitation, snowmelt, and rainfall) and/or other factors not
evident at the time of measurement.
Table 3 below summarizes observations used to evaluate potential shallow groundwater conditions,
including ground surface elevations, estimated depths to gray-colored soils, and average moisture
contents in the upper 6 feet of the boring profiles.
Table 3: Groundwater Evaluation Summary
Boring
No.
Ground Surface
Elevation
Estimated Depth of Gray
Colored Soils
Average Moisture
Content (%)*
B-1 942.9 4 24
HA-1 942.9 4.5 30
B-2 946.7 1 24
HA-2 946.2 4 22
B-3 945.5 4.5 22
HA-3 945.6 2 24
B-4 947.3 4.5 26
HA-4 946.6 1 23
B-5 951.8 3 19
HA-5 951.7 2.5 21
B-6 954.0 4.5 18
HA-6 953.8 4 21
B-7 962.3 4.5 26
HA-7 962.4 --- 21
B-8 970.9 7 32
HA-8 970.9 3 20
B-9 960.0 9.5 27
HA-9 960.2 --- 19
B-10 953.6 7 23
HA-10 953.2 4 23
B-11 947.2 7 22
HA-11 947.4 --- 23
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 8
Boring
No.
Ground Surface
Elevation
Estimated Depth of Gray
Colored Soils
Average Moisture
Content (%)*
B-12 937.5 7 16
HA-12 937.1 --- 17
B-13 946.4 4.5 25
HA-13 946.6 1.5 23
B-14 943.2 12 25
HA-14 943.5 --- 18
B-15 936.3 9 19
HA-15 935.3 1 17
B-16 938.9 7.5 24
HA-16 938.9 2 19
* Average moisture contents were calculated from available moisture-content test results within the upper 6
feet of each boring profile.
No groundwater was encountered during the drilling process; however, the bore holes were only left open
for a short period of time, and groundwater levels may not have had time to enter the boreholes. It should
be noted that groundwater readings are difficult to obtain in cohesive soils such as the lean clays
indicated in the boring logs. These soils have a low permeability and take a long period of time to obtain
groundwater readings in.
Nevertheless, wet soils were noted, and gray colored soils were encountered in many of the borings.
Gray colored soils can be an indication of long-term saturation conditions and may indicate zones of long-
term or seasonal saturation. In addition, the moisture contents of the soils in the upper 6 feet of the
boring profiles generally appear to be above their anticipated optimum moisture contents, and we would
expect that water – given time – would have entered the boreholes.
It is our opinion that the groundwater level should not be interpreted solely from the lack of free
groundwater observed during drilling. Based on the wet soil conditions, gray-colored soils encountered in
many of the borings, and moisture contents in the upper soil profile, perched groundwater and/or
seasonally elevated groundwater conditions should be anticipated within the project corridor. For design
and construction planning, groundwater should be considered variable and may be encountered within
utility excavations, particularly following periods of precipitation, snowmelt, or elevated lake levels.
Potential shallow or perched groundwater could affect excavation stability, dewatering needs, and
placement of utilities and backfill.
Campbell Lake is located near the east end of the project. Online data from the Minnesota Department of
Natural Resources indicate an ordinary high-water level of 925.5 feet. Only three borings extended below
this elevation; therefore, the exploration provides limited information regarding groundwater conditions at
or below the lake ordinary high-water level.
If more accurate subsurface water levels are needed, we recommend piezometers be installed to
determine the groundwater level over several months. Monitoring of the groundwater table elevation
could occur up to the time of construction. This work was outside our scope of services.
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 9
4. ENGINEERING ANALYSIS AND RECOMMENDATIONS
4.1 Discussion
Based on the borings, the existing subgrade soils within the upper approximately 4 feet of the roadway
profile are generally considered poor pavement subgrade materials due to their soft to variable
consistency, elevated moisture contents, and localized organic contents. Where these materials are
present below the proposed pavement section, full or partial excavation and replacement with engineered
fill is warranted to improve subgrade stability and long-term pavement performance. In addition, the use
of a geotextile placed at the bottom of the roadway subgrade will provide separation from the sand
subbase and the fine-grained subgrade soils and it will also provide strength to the subgrade.
The wet clayey soils encountered in the borings will likely remain wet when excavated and may require
moisture conditioning before reuse as structural backfill or engineered fill. Drying these soils generally
requires disking, aeration, time, favorable weather, and adequate space to spread the material. Because
utility trenches must typically be backfilled shortly after pipe placement, reuse of wet clayey soils may not
be practical in all areas. Where adequate drying cannot be achieved, partial removal and replacement
with engineered fill should be anticipated. Contractors should provide a soil moisture conditioning and
reuse plan, and the project should include bid provisions for removal and replacement of unsuitable wet
clayey soils.
Based on the proposed utility depths and the boring results, storm sewer placed within the upper
approximately 5 feet should be expected to encounter existing fill, organic or slightly organic clay soils,
wet clayey soils, and locally clayey sand or sandy lean clay. These soils may be soft, wet, and difficult to
compact, and may require replacement with suitable bedding and backfill. Watermain placed at about 7.5
feet below grade is anticipated to encounter a transition from fill and poor near-surface soils into native
glacial soils consisting primarily of lean clay, sandy lean clay, clayey sand, and locally clayey silt.
Sanitary sewer placed at depths of about 15 to 20 feet will generally be within native glacial soils, but may
encounter wet, gray-colored cohesive soils, clayey silt, clayey sand, and localized organic soils. Utility
excavations should be expected to encounter variable soil and moisture conditions, and provisions should
be included for subgrade stabilization, bedding, dewatering, and replacement of unsuitable trench soils
where encountered. It is our understanding that consideration is being given to using trenchless
techniques to install the watermain and the sanitary sewers.
There is one lift station planned near Borings B-2 and B-3 while three sanitary sewer manholes are
planned near Borings B-8, B-12 and B-15. The lift station base is anticipated to be deeper than the
nearest borings. Nevertheless, based on the borings we anticipate wet lean clay soils to be present in the
lift station excavation. Near Boring B-8 the base slab will be about 10 feet below grade, where the boring
encountered wet lean clay. Near Boring B-12, the base slab is anticipated to be about 15 feet below
grade, where the boring encountered wet sandy lean clay with silt and sandy lean clay within the
anticipated foundation zone. Near Boring B-15, the base slab is anticipated to be about 25 feet below
grade, where the boring encountered sandy lean clay over clayey sand; however, a buried organic sandy
lean clay layer was encountered above the planned slab elevation from about 14.5 to 18 feet below
grade. Wet cohesive soils, localized organic soils, and variable native glacial soils should be expected in
these excavations. Lift station and manhole excavations should be observed by a geotechnical
representative, and provisions should be included for removal of unsuitable or organic soils, groundwater
control, subgrade stabilization, geotextile separation, clean crushed rock or granular working mats, and
replacement with engineered fill or lean concrete where wet, soft, loose, organic, or disturbed soils are
encountered.
The soils encountered would generally be considered corrosive to metal conduits.
4.2 Lift Station and Sanitary Sewer Manhole Bottom Preparations
It should be noted that the borings completed for evaluation of the lift station and manholes were
completed on the roadway as the locations of the manholes were not available to drill at, therefore the
subsurface conditions found in our borings may not represent those at the actual manhole locations.
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 10
Based on the borings completed near the proposed lift station and manhole locations, subsurface
conditions at the planned base slab elevations are expected to consist primarily of native glacial soils with
variable moisture and consistency.
Near Boring B-8 where the manhole base slab is anticipated to be about 10 feet below grade, we
encountered wet sandy lean clays. These soils had N-values of about 10, indicating firm cohesive soil
conditions; however, the wet moisture conditions may make the subgrade sensitive to disturbance during
excavation and construction.
Near Boring B-12 where the manhole base slab is anticipated to be about 15 feet below grade, we
encountered wet sandy lean clays with silt and sandy lean clays. These soils had N-values generally in
the low teens to upper teens, indicating medium-stiff to very stiff cohesive soil conditions; however, the
wet moisture condition may make the subgrade sensitive to disturbance during excavation and
construction.
Near Boring B-15, the lift manhole base slab is anticipated to be about 25 feet below grade. At this depth,
the boring encountered gray sandy lean clay and underlying clayey sand. The clay soils above and near
the planned slab elevation had relatively low to moderate N-values, generally indicating soft cohesive soil
conditions, while the deeper clayey sand encountered near the bottom of the boring had an N-value of
about 14, indicating medium-dense granular soil conditions. Boring B-15 also encountered a buried
organic sandy lean clay layer from about 14.5 to 18 feet below grade, above the anticipated slab
elevation, which should not remain within the manhole support or engineered backfill zone.
Manhole excavations should therefore be expected to encounter wet cohesive soils, localized organic
soils, and variable native glacial soils, and provisions should be included for excavation observation,
removal of unsuitable or organic soils, groundwater control, subgrade stabilization, and replacement with
engineered fill, clean crushed rock, or lean concrete where wet, soft, loose, organic, or disturbed soils are
encountered.
Based on the borings, it appears that the on-site soil can generally be reused as structural backfill
provided it is moisture conditioned and can be compacted to project specifications. However, clay soils
will be difficult to place and compact especially when wet. We recommend they be used in landscaped
areas.
The site should be graded to prevent water from ponding on silty and clayey soils and potentially
softening them.
4.3 Lift Station and Sanitary Sewer Base Recommendations
We recommend that the manholes be supported on conventional spread footings bearing on naturally
occurring clay soils or on engineered fill (MnDOT 2106.2.B.1). Any subexcavations should be oversized
as illustrated below.
Based on the borings, it is our opinion the footings may be designed for a net allowable soil bearing
pressure not to exceed 2,000 pounds per square foot (psf).
The factor of safety against shear or bearing capacity failure for this footing design would be three (3) or
greater. If the site is prepared as recommended, we estimate that total and differential settlements
(across a 30-foot span) corresponding to our assumed structural loads would be less than one inch (1”)
and one-half inch (1/2”), respectively, provided the bearing soils are not frozen or disturbed at the time of
construction.
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 11
Figure 1 below indicates a graphical representation of a typical footing excavation oversizing.
FIGURE 1
4.4 Below-Grade Walls
To help prevent post construction water seepage from entering the manholes we recommend they be
waterproofed.
To assist in below-grade wall design Table 4 below presents estimated soil parameters for common
backfill soils. The coefficients presented below assume a near level or slightly sloping away backfill
(<5%) at the top of wall. If the backfill is sloped greater than that, these values may change moderately.
Silt (ML) is not recommended as backfill for walls.
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 12
Table 4: Estimated Soil Parameters for Below Grade/Retaining Wall Design
Soil Type Weight Cohesion Adhesion Internal Active Passive At-Rest
SP, SP-SM 120 --- --- 32 35 400 55
SM, SC 125 --- --- 30 40 375 65
CL 120 1000 700 24 50 280 70
* - Parameters do not include safety factors.
EFW = Equivalent Fluid Weight
4.5 Backfill and Fill Selection and Compaction
The on-site non-organic soils are likely suitable for reuse as backfill and fill provided they are moisture
conditioned and can be compacted to their specified densities and meet the final design specifications.
Wet soils that are excavated would need to be dried before reuse as an engineered fill if they meet
MnDOT 2106.2.B.1. We recommend using a minimum of 2 feet of clean rock or clean coarse sand with
less than 50 percent passing the #40 sieve and less than 5 percent passing the #200 sieve when
backfilling the bottom of a wet excavation. A clean rock would also be acceptable.
Gravel or cobbles larger than 2 inches in diameter should not be placed within 2 feet of grading grade or
utilities. We recommend that clayey soils be moisture conditioned to within +/-2 percent of the optimum
moisture content as determined from their standard Proctor tests (ASTM D-698). Granular fills should be
moisture conditioned to between -4% and +2% of the optimum moisture content. Typical loose lift
thicknesses are 4 inches for “jumping jack” and plate compactors, 6 inches for small self-propelled
equipment, and 8 inches for large self-propelled equipment.
Engineered fill should meet MnDOT 2106.2.B.1 specifications.
Table 5 provides the recommended compaction levels.
Table 5: Recommended Level of Compaction for Backfill and Fill
Area
Pavement: Within 3 feet of bottom of aggregate base and
any area where total depth of fill exceeds 10 feet 100
Pavement: Greater than 3 feet below aggregate base 95
Utility Trench and Utility Structure Backfill 100
Landscaping (non-structural) 90
In greenspace areas, where no permanent structures / slabs are planned, the requirements are typically to
ensure that settlements of the fill area do not alter the drainage paths.
4.6 Pavement Subgrade Preparation and Stability
We recommend excavation of unsuitable soils below the pavement areas. Table 6 below presents
estimated excavation depths, however onsite field observations will be required to determine actual
depths.
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 13
Table 6: Estimated Excavation Depths to Remove Organic Soils
Boring
Surface
Elevation
Remove Organic
Estimated Bottom
of Excavation (feet)
Approximate Depth
Below Top of
B-1 942.9 4 939 ¾
HA-1 942.9 4 939 ¾
B-2 946.7 4 943 ¾
HA-2 946.2 2 944 ---
B-3 945.5 --- --- ---
HA-3 945.6 0.5 945 ---
B-4 947.3 4.5 942 ½ 1 ¼
HA-4 946.6 1 945 ½ ---
B-5 951.8 3 948 ½ ---
HA-5 951.7 1 950 ½ ---
B-6 954.0 4.5 949 ½ 1 ¼
HA-6 953.8 4 949 ½ ¾
B-7 962.3 4.5 957 ½ 1 ¼
HA-7 962.4 5+ 957+ 1 3/4+
B-8 970.9 5 965 ½ 1 ¾
HA-8 970.9 2 968 ½ ---
B-9 960.0 7 952 ½ 3 ¾
HA-9 960.2 2.5 957 ½ ---
B-10 953.6 5.25 948 2
HA-10 953.2 4 949 ¾
B-11 947.2 --- --- ---
HA-11 947.4 3 944 ---
B-12 937.5 --- --- ---
HA-12 937.1 1.5 935 ½ ---
B-13 946.4 --- --- ---
HA-13 946.6 3 943 ½ ---
B-14 943.2 --- --- ---
HA-14 943.5 2 941 ½ ---
B-15 936.3 -- --- ---
HA-15 935.3 4.5 930 ½ 2 ¼
B-16 938.9 --- --- ---
HA-16 938.9 2 936 ½ ---
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 14
* - Top of Subgrade assumed to be 39 inches from the top of the borings completed on the road
i.e. borings with a “B” prefix.
At HA-7, organic soils extended to the termination depth of the hand auger boring; therefore, the full
depth of unsuitable organic soil was not determined at that location.
The soils at the bottom of the excavations should be prepared in accordance with MnDOT Specification
2112, Subgrade Preparation. Before placement of fills, the final subgrade should have proper stability
within three vertical feet of grading grade (grade which contacts the bottom of the sand subbase). This
will generally be achieved in fill areas with proper compaction of embankment materials and in cut areas
through proper subgrade preparation. The stability of the pavement subgrade should be evaluated prior
to placement of the sand subbase using the test roll procedure (MnDOT 2111), except a fully loaded
tandem axle dump truck or a full water truck should be utilized for the test roll. If unstable soils are found
under the test roll, these soils should be improved by means of scarification, moisture conditioning, and
re-compaction, by subcutting and replacement, geogrids, or cement/lime stabilization.
We recommend the use of a MnDOT Specification 3733 Type 9 geotextile be placed at the bottom of the
road subgrade prior to placement of backfill or fill.
Widened Areas
We recommend removal of all organic soils in the widening areas. MnDOT 2106.3.D recommends that
when embankment slopes are steeper than 1:4 (V:H), construct steps before placing embankment
material. The steps should be constructed with a minimum width of 12 inches and a maximum height of
24 inches.
Fills placed to raise the widened embankment area to grade should consist of soils similar to the soils that
will be below the existing pavement section. This will allow for similar frost heave movements and reduce
the potential for differential settlements between the existing roadway and the new widened shoulders.
4.7 Pavement Area
Once the site has been prepared as recommended, we anticipate the prepared subgrade soils will consist
mostly of compacted silty and clayey soils. Based on the MnDOT Flexible Pavement Guide from 2020,
the R-values of the subgrade soils would range between 15 and 70. For our design check, we used an
R-value of 15 for the roadway, a growth percentage of 2.5 and a traffic speed of 40 miles per hour (MPH).
There are no available traffic counts for this roadway. We used the City’s proposed roadway section,
outlined in the table below, to determine the Equivalent Single Axle Loads (ESALs) that this section would
support. Our analysis is based on a standard twenty (20) year design life of the urban pavement section
and a 10-ton road design. Based on our analysis using MnPAVE 7.106, the proposed pavement section
is suitable for ESAL’s of up to 7 million. It is our opinion that the proposed pavement section is adequate
for this project.
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 15
Table 7: Proposed Flexible Pavement Section
Bituminous Course, MnDOT 2360 SPWEB440E 2
Bituminous Course, MnDOT 2360 SPWEB440E 2
Bituminous Course, MnDOT 2360 SPNWC430B 3
Aggregate Base, MnDOT 3138 (Class 5) 8
Select Granular, MnDOT 3149.2.B 24
Geotextile Fabric, MnDOT 3733.1, Type 9 Yes
Subgrade Preparation, MnDOT 2112 Yes
TOTAL -
Aggregate base placement for pavement support should meet the gradation and quality requirements for
Class 5 per MnDOT specification 3138. Aggregate base material should be compacted to 100 percent of
its standard Proctor maximum dry density.
Within several years after initial paving, some thermal shrinkage cracks will develop. We recommend
routine maintenance be performed to improve pavement performance and increase pavement life.
Pavement should be sealed with a liquid bitumen sealer to retard water intrusion into the base course and
subgrade. Localized patch failures may also develop where trucks or buses turn on the pavement. When
these occur, they should be cut out and patch repaired. We recommend following MnDOT special
provision 2331 Bituminous Pavement Crack Treatment.
The pavement sections above provide options to meet the assumed ESALs. Other pavement design
options would be acceptable if they meet the minimum requirements for bituminous thickness, aggregate
base thickness, and can meet the ESALs.
Drainage of the sand subbase is recommended. Drainage of the sand subbase may be accomplished by
daylighting to adjacent ditches or the use of drain tile. Drain tile wrapped in a sock should be placed at
the base of the sand subbase and tied into catch basins.
4.8 Utilities
Invert elevations for the storm culverts are anticipated to be within 5 feet of existing grades, and invert
elevations for the watermain and sanitary sewer are anticipated to be between 8 and 20 feet below grade.
Underground utilities are expected to be installed by backhoes completing the excavations and placing
fills. Soil compactors should be used to compact the fill in even lifts to the specified densities.
Because the watermain and sanitary sewer are anticipated to be placed below the poorest near-surface
soils, trenchless installation techniques may provide constructability advantages compared to
conventional open-cut excavation and backfill. The borings generally encountered wet, soft to variable
cohesive soils and localized organic soils that may be difficult to maintain in open trenches and difficult to
reuse as compacted trench backfill without substantial moisture conditioning. Using trenchless methods
would reduce the volume of wet clayey soils excavated, limit the need for drying and handling of
unsuitable trench spoil, reduce open-trench stability concerns, and decrease the amount of replacement
backfill required. The boring logs indicate cobbles were noted only in Boring B-15, and boulders were not
reported in the borings; therefore, based on the available exploration, widespread obstructions to
trenchless installation are not anticipated. However, localized cobbles, gravel, variable fill, and changes in
soil consistency should still be considered in selecting trenchless equipment and means and methods.
Clayey soils are considered corrosive to metallic pipes. Where such soils exist along the alignment, we
recommend mitigation measures to help reduce corrosion potential. A common option would be to utilize
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 16
a granular bedding around the pipe. Another option would be for polyethylene encasement for the metal
pipes. Trench backfill above this point may consist of the non-organic excavated soils once moisture
conditioned as recommended.
4.9 Dewatering
Wet and water-bearing soils were encountered at shallow depths in the borings, and groundwater could
enter excavations. Dewatering may be accomplished with sumps and pumps placed at low points in
excavations where seepage is limited. If groundwater inflow is greater than anticipated, or if excavations
become unstable, additional dewatering or subgrade stabilization measures may be required.
4.10 Construction Considerations
Good surface drainage should be maintained throughout the work so that the site is not vulnerable to
ponding during or after a rainfall. If water enters the excavations, it should be promptly removed prior to
further construction activities. Under no circumstances should fill or concrete be placed into standing
water.
Soil corrections at this site for foundations and pavement subgrades may not be continuous. We
recommend tapering the fills back to native soils at a ten to one (10:1) slope.
It is important to review the fill limits and total depth of fill when placing structures upon compacted
materials and when filling the excavation. The location of the footings should allow for at least a one to
one (1:1) slope from the bottom of the footing to the outside limits of the engineered fill.
It is important to check this at the time of construction that during filling, unsuitable soils do not encroach
within the one to one (1:1) slope limits and extending downward and outward from future footings.
4.11 Construction Safety
All excavations should comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P
“Excavations and Trenches”. This document states that excavation safety is the responsibility of the
contractor. Reference to this OSHA requirement should be included in the job specifications.
The responsibility to provide safe working conditions on this site, for earthwork, building construction, or
any associated operations is solely that of the contractor. This responsibility is not borne in any manner
by WSB.
4.12 Cold Weather Construction
It is our understanding that construction is unlikely to occur during the winter months. However, if the
construction continues into the winter months we recommend the following guidelines.
Roadbeds should not be constructed during periods when the material freezes while being placed and
compacted, nor should material be placed on soil that is frozen to a depth greater than 4 inches. When
the soils are frozen to a depth exceeding 4 inches, at a time when weather conditions are such that
construction could be continued without the material freezing as it is being placed and compacted, the
contractor may be permitted to excavate the frozen soil and proceed with the construction for so long as
the weather will permit. The frozen soils should be pulverized or replaced with other suitable soils. Only
unfrozen fill should be used.
Placement of fill and/or foundation concrete should not be permitted on frozen soil, and the bearing soils
under footings or under the floor slab should not be allowed to freeze after concrete is placed, because
excessive post-construction settlement could occur as the frozen soils thaw.
4.13 Field Observation and Testing
The soil conditions illustrated on the Logs of Test Borings in Appendix A are indicative of the conditions
only at the boring locations. For this reason, we recommend that excavations at this site be observed by
a soil engineer or technician prior to fill or backfill placement or construction of foundation elements to
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 17
determine if the soils are capable of supporting the fill, backfill and/or foundation loads. These
observations are recommended to judge if the unsuitable materials have been removed from within the
planned construction area and an appropriate degree of lateral oversize has been provided.
WSB also recommends a representative number of field density tests be taken in engineered fill and
backfill placed to aid in judging its suitability. Fill placement and compaction should be monitored and
tested to determine that the resulting fill and backfill conforms to specified density, strength, or
compressibility requirements. We recommend at least one compaction test for every 2,000 square feet of
building area at vertical intervals not exceeding two (2) feet, and one compaction test for every 150 feet of
utility trench at a vertical interval of two (2) feet. Prior to use, proposed fill and backfill material should be
submitted to the WSB laboratory for testing to verify compliance with recommendations and project
specifications.
Dynamic Cone Penetrometer (DCP) tests can be completed in the aggregate base in lieu of density
testing. We recommend following MnDOT Specification 2211.3.D.2.c.
WSB would be pleased to provide the advised field observation, monitoring, and testing services during
construction.
4.14 Plan Review and Remarks
The observations, recommendations and conclusions described in this report are based primarily on
information provided to WSB, obtained from our subsurface exploration, our experience, several
assumptions, and the scopes of service developed for this project and are for the sole use of our client.
We recommend that WSB be retained to perform a review of final design drawing and specifications to
evaluate that the geotechnical engineering report has not been misinterpreted. Should there be changes
in the design or location of the structures related to this project or if there are uncertainties in the report
we should be notified. We would be pleased to review project changes and modify the recommendations
in this report or provide clarification in writing.
The entire report should be kept together; for example, boring logs should not be removed and placed in
the specifications separately.
The boring logs and related information included in this report are indicators of the subsurface conditions
only at the specific locations indicated on the Soil Boring Exhibit and times noted on the Logs of Test
Boring sheets in Appendix A. The subsurface conditions, including groundwater levels, at other
locations on the site may differ significantly from conditions that existed at the time of sampling and at the
boring locations.
The test borings were completed by WSB solely to obtain indications of subsurface conditions as part of a
geotechnical exploration program. No services were performed to evaluate subsurface environmental
conditions.
WSB has not performed observations, investigations, explorations, studies or testing that are not
specifically listed in the scope of service. WSB should not be liable for failing to discover any condition
whose discovery required the performance of services not authorized by the Agreement.
Geotechnical Report
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000 Page 18
5. STANDARD OF CARE
The recommendations and opinions contained in this report are based on our professional judgment. The
soil testing and geotechnical engineering services performed for this project have been performed with
the level of skill and diligence ordinarily exercised by reputable members of the same profession under
similar circumstances, at the same time and in the same or a similar locale. No warranty, either
expressed or implied, is made.
Geotechnical Report Appendix A
170th Street Improvements Project
Prior Lake, MN
WSB Project No. 035319-000
APPENDIX A
Soil Borings Exhibit
Logs of Test Borings
Symbols and Terminology on Test Boring Log
Notice to Report Users Boring Log Information
Unified Soil Classification Sheet (USCS)
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-1
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703213
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.520525
LOCATION 170th Street, Prior Lake ELEVATION ~942.9'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
942.9
940
935
930
938.94
941.94
933.44
929.94
935.94
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
1
4
7
9.5
13
14.5
12"+ BASE: crushed limestone
ORGANIC LEAN CLAY WITH SAND, dark brown, wet,
[fill]
[Organic Content = 5.8%]
CL - LEAN CLAY, dark brown with gray, wet, soft, [glacial
Till]
CL - LEAN CLAY WITH SAND, gray with reddish brown
and dark brown, wet, soft.
CL - LEAN CLAY WITH SAND, gray with reddish brown,
wet, soft.
CL - LEAN CLAY WITH SAND AND LITTLE GRAVEL,
brown with gray, wet, soft.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
7-4-5
(9)
3-3-4
(7)
2-3-3
(6)
2-3-3
(6)
2-2-3
(5)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
21
27
27
%
Fi
n
e
s
87
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
9
7
6
6
5
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-1
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703242
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.520527
LOCATION 170th Street, Prior Lake ELEVATION ~942.9'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
942.9
940
941.92
938.92
938.42
939.92
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
1
3
4
4.5
5
OL - 12" TOPSOIL: lean clay, slightly organic, brown,
moist.
CL - LEAN CLAY, dark brown with brown, wet, [glacial
Till]
CL - LEAN CLAY, slightly organic, dark brown, wet.
CL - LEAN CLAY, dark brown with brown, wet.
CL - LEAN CLAY, grayish brown, wet.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
23
34
33
31
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-2
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703231
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.518805
LOCATION 170th Street, Prior Lake ELEVATION ~946.7'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
946.7
945
940
935
939.71
945.71
933.71
942.71
937.21
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
1
4
7
9.5
13
14.5
12"+ BASE: crushed limestone
ORGANIC LEAN CLAY,, dark brown with gray, moist,
[fill]
[Organic Content = 7.1%]
CL - SANDY LEAN CLAY, grayish brown with reddish
brown, wet, very soft, [glacial Till]
CL - SANDY LEAN CLAY, grayish brown with reddish
brown and gray, wet, very soft.
CL - SANDY LEAN CLAY, grayish brown with reddish
brown and gray, wet, soft.
CL - SANDY LEAN CLAY, brown, wet, soft.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
3-4-4
(8)
1-2-2
(4)
1-2-2
(4)
1-3-5
(8)
2-3-4
(7)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
23
24
25
%
Fi
n
e
s
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
8
4
4
8
7
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-2
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703211
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.518804
LOCATION 170th Street, Prior Lake ELEVATION ~946.2'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
946.2
945
941.69
944.19
942.19
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
2
4
4.5
5
OL - 24" TOPSOIL: slightly organic, sandy lean clay,
brown, moist.
CL - SANDY LEAN CLAY, brown with reddish brown,
moist, [glacial Till]
CL - LEAN CLAY, brown with grayish brown and reddish
brown, wet.
CL - LEAN CLAY, brown with grayish brown and reddish
brown, wet.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
19
24
%
Fi
n
e
s
65
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-3
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703326
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.517232
LOCATION 170th Street, Prior Lake ELEVATION ~945.5'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
945.5
945
940
935
940.99
943.49
938.99
932.49
944.82
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.67
2
4.5
6.5
13
14.5
8" BASE: clayey sand with gravel, brown, moist.
SANDY LEAN CLAY WITH GRAVEL, dark brown and
brown, moist, [fill]
CL - LEAN CLAY WITH SAND, brown, moist, soft.,
[glacial Till]
CL - SANDY LEAN CLAY, brown with reddish brown and
grayish brown, wet, soft.
CL - SANDY LEAN CLAY WITH GRAVEL, brown with
reddish brown and gray, wet, soft.
CL - SANDY LEAN CLAY, grayish brown with reddish
brown, wet, soft.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
2-2-3
(5)
1-2-3
(5)
2-2-4
(6)
1-3-4
(7)
2-3-4
(7)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
22
21
%
Fi
n
e
s
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
5
5
6
7
7
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-3
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703347
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.517233
LOCATION 170th Street, Prior Lake ELEVATION ~945.6'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
945.6
945
943.59
945.09
942.59
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
2
3
5
OL - 6" TOPSOIL: slightly organic, sandy lean clay,
brown, moist.
CL - LEAN CLAY WITH SAND, brown with reddish brown
and dark brown, wet, [glacial Till]
CL - LEAN CLAY WITH SAND, brown with reddish brown
and grayish brown, wet.
CL - LEAN CLAY WITH SAND, brown with grayish brown
and reddish brown, wet.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
22
25
24
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-4
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703338
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.515763
LOCATION 170th Street, Prior Lake ELEVATION ~947.3'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
947.3
945
940
935
937.77
946.27
934.27
942.77
940.27
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
1
4.5
7
9.5
13
14.5
12" BASE: clayey sand with gravel, brown, moist.
OL - ORGANIC LEAN CLAY WITH SAND, dark brown,
wet, soft, [swamp Deposit]
[Organic Content = 6.7%]
CL - SANDY LEAN CLAY, brown with reddish brown and
grayish brown, wet to saturated, very soft, [glacial
Till]
CL - LEAN CLAY WITH SAND, brown with reddish brown
and grayish brown, wet, soft.
CL - SANDY LEAN CLAY, brown with reddish brown,
moist, soft.
CL - SANDY LEAN CLAY WITH LITTLE GRAVEL, grayish
brown, wet, firm.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
2-2-4
(6)
1-1-3
(4)
2-3-5
(8)
2-3-5
(8)
1-4-7
(11)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
26
25
23
23
%
Fi
n
e
s
63
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
6
4
8
8
11
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-4
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703320
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.515762
LOCATION 170th Street, Prior Lake ELEVATION ~946.6'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
946.6
945
943.59
945.59
946.09
942.59
942.09
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
1
3
4
4.5
5
OL - 6" TOPSOIL: slightly organic, sandy lean clay,
brown, moist.
CL - SANDY LEAN CLAY, slightly organic, dark brown,
moist, [swamp Deposit]
CL - LEAN CLAY WITH SAND, brown with grayish brown
and dark brown, wet, [glacial Till]
CL - LEAN CLAY WITH SAND, dark brown, wet.
CL - LEAN CLAY WITH SAND, dark brown with gray,
wet.
CL - LEAN CLAY, grayish brown, wet.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
22
23
24
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-5
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703470
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.513665
LOCATION 170th Street, Prior Lake ELEVATION ~951.8'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
951.8
950
945
940
950.77
947.27
948.77
938.77
942.27
944.77
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
1
3
4.5
7
9.5
13
14.5
12" BASE: crushed limestone
SLIGHTLY ORGANIC LEAN CLAY, dark brown, moist,
[fill]
[Organic Content = 4.1%
CL - LEAN CLAY, gray with dark brown, moist, soft,
[glacial Till]
CL - SANDY LEAN CLAY, gray with brown, moist,
soft.
CL - SANDY LEAN CLAY, reddish brown with gray, moist,
soft.
CL - SANDY LEAN CLAY, grayish brown with brown,
moist, soft.
CL - SANDY LEAN CLAY WITH LITTLE GRAVEL, gray,
moist, soft.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
2-2-3
(5)
2-2-3
(5)
1-4-4
(8)
2-3-4
(7)
2-3-5
(8)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
18
20
18
17
%
Fi
n
e
s
61
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
5
5
8
7
8
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-5
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703480
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.513730
LOCATION 170th Street, Prior Lake ELEVATION ~951.7'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
951.7
950
949.7
949.2
946.7
950.7
948.7
951.2
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
1
2
2.5
3
5
5.5
OL - 6" TOPSOIL: slightly organic, clayey sand, brown,
moist.
CL - SANDY LEAN CLAY WITH ROOTS, slightly organic,
dark brown, wet, [swamp Deposits]
CL - SANDY LEAN CLAY, dark brown with brown, wet,
[glacial Till]
CL - SANDY LEAN CLAY, gray, wet.
CL - SANDY LEAN CLAY, gray, wet.
CL - LEAN CLAY WITH SAND, gray with reddish brown,
wet.
CL - LEAN CLAY WITH SAND, light gray with reddish
brown, wet.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
7
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
16
18
26
23
%
Fi
n
e
s
55
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-6
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703460
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.512442
LOCATION 170th Street, Prior Lake ELEVATION ~954.0'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
954
950
945
940
947.05
953.05
944.55
949.55
941.05
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
1
4.5
7
9.5
13
14.5
1
12" BASE: crushed limestone
ORGANIC LEAN CLAY, dark brown, moist, [fill]
[Organic Content = 5.7%]
CL - SANDY LEAN CLAY, grayish brown with dark brown,
wet, very soft, [glacial Till]
CL - SANDY LEAN CLAY, brown with reddish brown and
gray, wet, very soft.
CL - SANDY LEAN CLAY, brown with reddish brown and
gray, moist, soft.
CL - SANDY LEAN CLAY WITH LITTLE GRAVEL, gray,
wet, soft.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
4-6-5
(11)
2-2-2
(4)
2-1-3
(4)
2-3-4
(7)
4-3-5
(8)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
16
20
21
19
%
Fi
n
e
s
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
11
4
4
7
8
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-6
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703440
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.512442
LOCATION 170th Street, Prior Lake ELEVATION ~953.8'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
953.8
950949.77
953.27
952.77
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
1
4
5
OL - 6" TOPSOIL: slightly organic, sandy lean clay,
brown, moist.
CLAYEY SAND WITH GRAVEL, slightly organic, brown,
moist, [fill]
CL - SANDY LEAN CLAY, slightly organic, dark brown,
wet, [swamp Deposit]
CL - LEAN CLAY, grayish brown, wet, [glacial Till]
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
22
20
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-7
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703559
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.510691
LOCATION 170th Street, Prior Lake ELEVATION ~962.3'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
962.3
960
955
950
955.26
961.26
957.76
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
1
4.5
7
14.5
1
12" BASE: crushed limestone
ORGANIC LEAN CLAY, dark brown, moist, [fill]
[Organic Content = 6.8%]
CL - LEAN CLAY, dark brown with grayish brown, wet,
very soft, [glacial Till]
CL - SANDY LEAN CLAY WITH LITTLE GRAVEL, grayish
brown with brown and reddish brown, moist, soft.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
4-3-4
(7)
1-1-1
(2)
1-2-4
(6)
1-3-5
(8)
2-2-4
(6)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
25
27
20
19
%
Fi
n
e
s
56
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
44-20-24
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
7
2
6
8
6
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-7
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703581
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.510687
LOCATION 170th Street, Prior Lake ELEVATION ~962.4'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
962.4
960959.87
961.87
958.37
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
2.5
4
5
OL - 6" TOPSOIL: slightly organic, clayey sand with
gravel,, brown, moist.
CL - LEAN CLAY WITH SAND AND ROOTS, slightly
organic, dark brown, moist
CL - LEAN CLAY WITH SAND, slightly organic, dark
brown, wet.
OL - ORGANIC LEAN CLAY WITH SAND, dark brown,
wet.
[Organic Content = 5.6%]
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
15
23
26
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-8
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703575
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.508978
LOCATION 170th Street, Prior Lake ELEVATION ~970.9'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
970.9
970
965
960
959.36
970.46
965.86
963.86
968.61
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.4
2.25
5
7
11.5
14.5
5" BASE: crushed limestone
SANDY LEAN CLAY, dark brown, moist, [fill]
HIGHLY ORGANIC LEAN CLAY, dark brown, wet.
[Organic Content = 10.8%]
CL - LEAN CLAY WITH SAND, brown, wet, firm, [glacial
Till]
CL - SANDY LEAN CLAY, brown with reddish brown and
grayish brown, wet, soft.
CL - SANDY LEAN CLAY, grayish brown with reddish
brown, wet, firm.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
4-6-8
(14)
4-5-7
(12)
3-3-5
(8)
3-4-4
(8)
3-4-6
(10)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
34
29
21
21
%
Fi
n
e
s
84
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
14
12
8
8
10
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-8
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703562
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.508977
LOCATION 170th Street, Prior Lake ELEVATION ~970.9'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
970.9
970
970.36
967.86
968.86
966.86
969.86
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
1
2
3
4
5
OL - 6" TOPSOIL: slightly organic, sandy lean clay with
gravel, brown, moist.
CL - SANDY LEAN CLAY WITH ROOTS, brown with dark
brown, wet, [glacial Till]
CL - LEAN CLAY WITH ROOTS, brown, moist.
CL - LEAN CLAY, brown, moist.
CL - LEAN CLAY, brown with reddish brown and grayish
brown, wet.
CL - LEAN CLAY, brown with reddish brown and grayish
brown, wet.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
18
14
28
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-9
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703617
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.506222
LOCATION 170th Street, Prior Lake ELEVATION ~960.0'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
960
955
950
952.95
959.45
950.45
947.95
955.45
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
4.5
7
9.5
12
14.5
6" BASE: crushed limestone
SANDY LEAN CLAY WITH GRAVEL, dark brown with
brown, moist, [fill]
SANDY LEAN CLAY WITH LITTLE GRAVEL, pieces of
wood, slightly organic, brown and dark brown,
moist.
CL - LEAN CLAY, brown, wet, soft, [glacial Till]
ML - CLAYEY SILT, brown with reddish brown and gray,
wet, loose
ML - CLAYEY SILT, grayish brown with reddish brown,
wet, loose
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
5-7-7
(14)
3-3-5
(8)
2-3-4
(7)
3-3-3
(6)
1-2-3
(5)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
27
41
37
%
Fi
n
e
s
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
46-29-17
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
14
8
7
6
5
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-9
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703636
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.506221
LOCATION 170th Street, Prior Lake ELEVATION ~960.2'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
960.2
955.43
957.68
958.18
956.68
955.68
959.18
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
1
2
2.5
3.5
4.5
4.75
5
OL - 12" TOPSOIL: sandy lean clay with gravel, slightly
organic, brown, moist.
CL - LEAN CLAY WITH ROOTS, dark brown, moist,
[glacial Till]
CL - LEAN CLAY WITH ROOTS, brown with dark brown,
moist.
CL - LEAN CLAY, brown, wet.
CL - LEAN CLAY, brown, wet.
SC - CLAYEY SAND, fine to coarse grained, brown,
moist.
SC - CLAYEY SAND, fine to medium grained, dark brown,
moist.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
7
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
18
20
21
23
15
16
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-10
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703591
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.504120
LOCATION 170th Street, Prior Lake ELEVATION ~953.6'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
953.6
950
945
940
944.05
946.55
948.3
953.05
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
5.25
7
9.5
14.5
6" BASE: crushed limestone
SLIGHTLY ORGANIC LEAN CLAY WITH SAND, dark
brown with brown, wet, [fill]
[Organic Content = 5.0%]
SC - CLAYEY SAND, fine to coarse grained, brown, wet,
loose, [glacial Till]
SC - CLAYEY SAND, fine to coarse grained, gray with
reddish brown, saturated, loose.
CL - SANDY LEAN CLAY, gray with reddish brown, moist,
soft to firm.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
4-5-4
(9)
4-4-5
(9)
3-2-4
(6)
1-3-4
(7)
2-4-6
(10)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
23
22
17
%
Fi
n
e
s
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
9
9
6
7
10
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-10
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703571
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.504119
LOCATION 170th Street, Prior Lake ELEVATION ~953.2'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
953.2
950950.15
949.15
952.65
952.15
951.15
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
1
2
3
4
5
OL - 6" TOPSOIL: clayey sand, slightly organic, brown,
wet.
CL - LEAN CLAY WITH SAND, brown with dark brown,
wet.
OL - ORGANIC LEAN CLAY, dark brown, wet, [swamp
Deposits]
[Organic Content = 5.7%]
CL - LEAN CLAY, brown with dark brown, wet, [glacial
Till]
CL - SLIGHTLY ORGANIC LEAN CLAY WITH SAND, dark
brown, wet.
[Organic Content = 3.7%]
CL - LEAN CLAY, gray, wet.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
25
24
21
21
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-11
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703650
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.502305
LOCATION 170th Street, Prior Lake ELEVATION ~947.2'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
947.2
945
940
935
937.68
946.78
945.18
940.18
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.4
2
7
9.5
14.5
5" BASE: crushed limestone
SANDY LEAN CLAY WITH LITTLE GRAVEL, dark brown
with brown, moist, [fill]
SC - CLAYEY SAND WITH LITTLE GRAVEL, fine to coarse
grained, brown, moist, medium dense., [glacial Till]
CL - SANDY LEAN CLAY, brown with gray and reddish
brown, moist, hard.
CL - SANDY LEAN CLAY, brown, moist, firm.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
7-5-8
(13)
5-7-13
(20)
7-8-8
(16)
4-6-7
(13)
5-6-8
(14)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
22
13
16
%
Fi
n
e
s
36
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
13
20
16
13
14
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-11
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703670
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.502304
LOCATION 170th Street, Prior Lake ELEVATION ~947.4'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
947.4
945
943.91
946.41
944.41
945.91
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
1
1.5
3
3.5
5
OL - 12" TOPSOIL: sandy lean clay, slightly organic, light
brown, moist.
CL - LEAN CLAY, brown with dark brown, wet, [glacial
Till]
CL - SLIGHTLY ORGANIC LEAN CLAY, dark brown,
wet.
[Organic Content = 3.7%]
CL - LEAN CLAY WITH SAND, brown with dark brown,
wet.
CL - LEAN CLAY WITH SAND, brown, wet.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
25
21
23
%
Fi
n
e
s
83
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-12
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703656
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.500556
LOCATION 170th Street, Prior Lake ELEVATION ~937.5'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN 12.0'
De
p
t
h
(
f
t
)
5
10
15
20
El
e
v
a
t
i
o
n
(
f
t
)
937.5
935
930
925
920
936.7
932.5
930.5
928
919
935
923
925.5
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.8
2.5
5
7
9.5
12
14.5
18.5
21
10" BASE: crushed limestone
SANDY LEAN CLAY, brown, moist, [fill]
CLAYEY SAND WITH GRAVEL, brown, moist, [fill]
LEAN CLAY WITH LITTLE GRAVEL, dark brown and
reddish brown, wet, [fill]
CL - LEAN CLAY WITH SAND, gray with dark brown and
reddish brown, wet, soft., [glacial Till]
CL - SANDY LEAN CLAY, brown, wet, firm
CL - SANDY LEAN CLAY WITH SILT, light brown with
gray, moist, firm
[Dry Density = 111.1 pcf]
CL - SANDY LEAN CLAY, grayish brown with reddish
brown, moist, hard
[Dry Density = 112.4 pcf]
CL - SANDY LEAN CLAY, grayish brown with reddish
brown, moist, firm
[Dry Density = 108.5 pcf]
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
7
8
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
11-8-7
(15)
5-7-6
(13)
3-4-4
(8)
3-5-6
(11)
3-5-7
(12)
5-8-9
(17)
4-5-6
(11)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
18
10
21
25
22
18
16
19
%
Fi
n
e
s
56
54
60
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
15
13
8
11
12
17
11
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-12
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703672
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.500519
LOCATION 170th Street, Prior Lake ELEVATION ~937.1'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
937.1
935
935.62
936.12
936.62
934.62
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
1
1.5
2.5
5
OL - 6" TOPSOIL: clayey sand, slightly organic, brown,
moist.
CL - SANDY LEAN CLAY, brown with dark brown, moist,
[glacial Till]
CL - SLIGHTLY ORGANIC SANDY LEAN CLAY, dark
brown with reddish brown, moist.
[Organic Content = 3.5%]
CL - SANDY LEAN CLAY, dark brown with brown and
reddish brown, moist.
CL - SANDY LEAN CLAY, light brown with dark brown,
moist.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
16
18
19
16
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-13
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703659
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.498901
LOCATION 170th Street, Prior Lake ELEVATION ~946.4'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
946.4
945
940
935
937.41
939.41
946.01
944.41
934.41
945.61
941.91
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.4
0.8
2
4.5
7
9
12
14.5
4.5" BITUMINOUS
5" BASE: sand with gravel, dark brown, moist.
SAND WITH CLAY AND GRAVEL, dark brown, moist,
[fill]
CL - SANDY LEAN CLAY, brown, wet, soft., [glacial
Till]
CL - SANDY LEAN CLAY, grayish brown, moist, soft
CL - SANDY LEAN CLAY, brown with reddish brown and
gray, wet, firm.
SC - CLAYEY SAND, fine to coarse grained, brown with
grayish brown, moist, medium dense.
SC - CLAYEY SAND, fine to coarse grained, brown with
reddish brown, moist, medium dense.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
6-4-4
(8)
2-3-4
(7)
3-6-6
(12)
3-5-8
(13)
4-6-8
(14)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
19
30
17
%
Fi
n
e
s
58
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
32-19-13
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
8
7
12
13
14
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-13
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703640
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.498900
LOCATION 170th Street, Prior Lake ELEVATION ~946.6'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
El
e
v
a
t
i
o
n
(
f
t
)
946.6
945
946.13
945.13
944.13
942.63
943.63
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
1.5
2.5
3
4
4.5
OL - 6" TOPSOIL: clayey sand, slightly organic, brown,
moist.
SAND WITH CLAY AND GRAVEL, brown, wet, [fill]
GRAVELLY SAND WITH CLAY, grayish brown, wet,
[fill]
CLAYEY SAND WITH LITTLE GRAVEL, dark brown, wet,
[fill]
CL - SANDY LEAN CLAY, brown, wet, [glacial Till]
CL - SANDY LEAN CLAY, brown, wet.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
16
25
28
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-14
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703667
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.497832
LOCATION 170th Street, Prior Lake ELEVATION ~943.2'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
943.2
940
935
930
942.25
936.25
941
938.5
941.75
931.25
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
1
1.5
2.25
4.75
7
12
14.5
12" BITUMINOUS
6" BASE: sand with gravel, dark brown, moist.
SAND WITH CLAY AND GRAVEL, dark brown, moist,
[fill]
CL - LEAN CLAY WITH SAND, brown with reddish brown
and dark brown, moist, soft, [glacial Till]
CL - LEAN CLAY WITH SAND, brown with reddish brown,
wet, very soft.
CL - SANDY LEAN CLAY, brown with reddish brown, wet,
soft.
CL - SANDY LEAN CLAY, grayish brown with reddish
brown, moist, firm.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
2-4-3
(7)
2-1-2
(3)
1-3-2
(5)
2-3-2
(5)
2-5-8
(13)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
25
20
18
%
Fi
n
e
s
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
31-20-11
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
7
3
5
5
13
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-14
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703688
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.497832
LOCATION 170th Street, Prior Lake ELEVATION ~943.5'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
943.5
940940.05
942.55
940.55
941.55
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.25
1
2
3
3.5
5
OL - 3" TOPSOIL: silty sand, slightly organic, brown,
moist.
SAND WITH SILT AND GRAVEL, brown, moist, [fill]
CLAYEY SAND WITH GRAVEL, brown and dark brown,
wet, [fill]
SC - CLAYEY SAND, fine to coarse grained, brown,
moist, [glacial Till]
SC - CLAYEY SAND, fine to coarse grained, brown,
wet.
CL - SANDY LEAN CLAY, brown, wet.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
16
11
19
24
%
Fi
n
e
s
14
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-15
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703664
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.496733
LOCATION 170th Street, Prior Lake ELEVATION ~936.3'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN 12.0'
De
p
t
h
(
f
t
)
5
10
15
20
25
30
El
e
v
a
t
i
o
n
(
f
t
)
936.3
935
930
925
920
915
910
921.83
905.83
924.33
918.33
927.33
929.83
935.33
933.83
931.33
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.5
1
2.5
5
6.5
9
12
14.5
18
30.5
31
5.5" BITUMINOUS
6" BASE: clayey sand with gravel, brown, moist
CLAYEY SAND WITH GRAVEL, brown, moist, [fill]
SANDY LEAN CLAY, light brown, moist, [fill]
SANDY LEAN CLAY WITH GRAVEL, brown and dark
brown, wet, [fill]
CL - SANDY LEAN CLAY, brown, moist, very soft, [glacial
Till]
CL - SANDY LEAN CLAY, gray and dark brown, wet
[Dry Density = 108.5 pcf]
[Lens of organics between 12 and 13.5 feet]
CL - LEAN CLAY, gray with dark brown, wet, very
dense.
[Cobbles at 13.5 feet]
OL - ORGANIC SANDY LEAN CLAY, dark gray, wet, soft,
[swamp Deposit]
[Organic Content = 10.1%]
[Dry Density = 74.3 pcf]
CL - SANDY LEAN CLAY, gray, wet, soft to firm, [glacial
Till]
[Dry Density = 105.0 pcf]
CLAYEY SAND, fine to coarse grained, grayish brown,
moist, medium dense SC
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
7
8
9
10
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
3-4-4
(8)
2-3-3
(6)
1-2-1
(3)
2-3-50/0.5'
(50/4)
2-3-4
(7)
2-3-3
(6)
1-2-4
(6)
3-5-9
(14)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
16
25
16
20
25
42
21
23
17
%
Fi
n
e
s
58
62
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
39-19-20
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
8
6
3
50/4/1'
7
6
6
14
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-15
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703685
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.496731
LOCATION 170th Street, Prior Lake ELEVATION ~935.3'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
935.3
932.27
933.27
934.27
931.27
930.77
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.25
1
2
3
4
4.5
5
OL - 3" TOPSOIL: silty sand, slightly organic, dark brown,
moist.
SAND WITH CLAY AND GRAVEL, brown and reddish
brown, moist, [fill]
SANDY LEAN CLAY WITH LITTLE GRAVEL, brown with
grayish brown and reddish brown, moist, [fill]
SANDY LEAN CLAY WITH LITTLE GRAVEL, pieces of
bituminous, brown and dark brown, moist, [fill]
SANDY LEAN CLAY, light brown and brown, moist,
[fill]
CLAYEY SAND WITH GRAVEL, pieces of bituminous,
dark brown with brown, moist, [fill]
CL - SANDY LEAN CLAY, brown with reddish brown,
moist, [glacial Till]
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
7
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
17
17
18
13
16
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
SOIL BORING
B-16
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703612
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.495817
LOCATION 170th Street, Prior Lake ELEVATION ~938.9'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
10
El
e
v
a
t
i
o
n
(
f
t
)
938.9
935
930
925
938.07
936.87
931.37
929.37
926.87
937.54
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.8
1.33
2
7.5
9.5
12
14.5
10" BITUMINOUS
6" BASE: sand with gravel, dark brown, moist, [fill]
SAND WITH GRAVEL, dark brown, moist.
CL - SANDY LEAN CLAY, brown with reddish brown, wet,
very soft, [glacial Till]
CL - LEAN CLAY, brown with gray, wet, soft.
CL - SILTY LEAN CLAY, light gray with reddish brown,
wet, soft.
CL - SILTY LEAN CLAY WITH SAND, grayish brown, wet,
soft.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Bl
o
w
C
o
u
n
t
s
(N-
V
a
l
u
e
)
3-1-2
(3)
2-2-2
(4)
2-3-9
(12)
3-3-3
(6)
4-2-3
(5)
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
23
25
28
29
%
Fi
n
e
s
63
At
t
e
r
b
e
r
g
L
i
m
i
t
s
(L
L
-
P
L
-
P
I
)
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
3
4
12
6
5
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field
WSB | 540 Gateway Boulevard | Burnsville, MN | 1 952.737.4660 | wsbeng.com
Bo
r
e
D
M
T
e
m
p
l
a
t
e
:
Bo
r
e
D
M
S
t
a
n
d
a
r
d
:
G
e
o
t
e
c
h
n
i
c
a
l
(
W
S
B
-
M
N
M
o
d
i
f
i
e
d
)
|
D
a
t
e
P
r
i
n
t
e
d
:
S
e
p
t
e
m
b
e
r
0
3
,
2
0
2
6
HAND AUGER
HA-16
PROJECT NAME 170th Street Improvements PROJECT NO.035319-000
CLIENT City of Prior Lake LATITUDE 44.703599
PROJECT LOCATION 170th Street, Prior Lake LONGITUDE -93.495817
LOCATION 170th Street, Prior Lake ELEVATION ~938.9'
DRILLER N Thao LOGGED BY A Wacek
DRILLING METHOD Hand Auger -DATE 07/01/2026
DEPTH TO-WATER ATD N/A AFTER DRILLING N/A CAVE IN N/A
De
p
t
h
(
f
t
)
5
El
e
v
a
t
i
o
n
(
f
t
)
938.9
935
938.13
934.88
936.88
937.38
Gr
a
p
h
i
c
L
o
g
Visual Classification and Remarks
0.25
0.75
1.5
2
4
5
OL - 3" TOPSOIL: clayey sand, slightly organic, dark
brown, moist.
SAND WITH CLAY AND GRAVEL, brown, moist, [fill]
CLAYEY SAND WITH LITTLE GRAVEL AND ROOTS, dark
brown, moist, [fill]
SANDY LEAN CLAY, brown and dark brown, wet,
[fill]
CL - SANDY LEAN CLAY, brown with reddish brown and
grayish brown, wet, [glacial Till]
CL - LEAN CLAY, brown with reddish brown and grayish
brown, wet.
End of Boring
Samples
Wa
t
e
r
L
e
v
e
l
s
Sa
m
p
l
e
G
r
a
p
h
i
c
Sa
m
p
l
e
N
u
m
b
e
r
1
2
3
4
5
6
Lab
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
(
%
)
9
21
22
24
%
Fi
n
e
s
Pen. Resistance
Raw N-Value Blows
10 20 30 40
Lab Data
PL-MC-LL Percent Fines
20 40 60 80
NOTES Boring backfilled in general accordance with MDH guidlines
Text Field