Loading...
HomeMy WebLinkAbout5B - Police Station Change Order #4 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 MEETING DATE: AGENDA #: PREPARED BY: AGENDA ITEM: DISCUSSION: FINANCIAL IMPACT: ALTERNATIVES: RECOMMENDED MOTION: CITY COUNCIL AGENDA REPORT SEPTEMBER 5, 2006 5B BILL O'ROURKE CHIEF OF POLICE CONSIDER APPROVAL OF CHANGE ORDER #4 TO THE POLICE STATION/CITY HALL CONSTRUCTION PROJECT. Introduction The purpose of this agenda item is to receive authorization for Change Order #4 for the police station/city hall construction project. Historv Modifications to the original construction contract are made for various reasons throughout the project. Change order #1 authorized $125,000.00 for sales tax; thereby increasing the total construction contract sum to $11,282,800.00. The modifications approved by change order #2 resulted in a reduction to that number of $34,088.00, bring the total contract sum at that time down to $11,248,712.00. And finally, the twenty-one changes authorized by change order #3 in June increased the construction contract sum by $12,582.00; for a total of $11,261,294.00. Current Circumstances A copy of the change order showing an itemized listing of the modifications is attached to the agenda report. This change order consists of seventeen (17) changes, thirteen (13) of which are increases and four (4) reductions to previous plans. Taken together the seventeen (17) modifications result in a $23,055.00 increase to the total construction contract, bringing that contract total to $11,284,349.00. 1) Approve Change Order #4. 2) Deny approval and direct staff to prepare additional information. Alternative #1. Rev~~:( ~ Frank COYle~ M mager www.cityofpriorlake.com 2oo"h8ft~~~~4Ji~~0 / Fax 952.447.4245 08/25/06 -T- 13:26 FAX 6512235646 lllDLD ST. C'^UL, MN ELGIN, It TROY, MI DENliU. CO WOLD E M 0 RAN DUM TO: Bill Wolters FROM: John McNamara V DAfl2: COMM. NO: SUBJECT: August 15, 2006 042181 City of Prior Lake - Prior Lake Police / City Hall I4J 002/005 MINNESOTA OFFICE. 305 5". Pl!UR STI1.F-tT ST. PAUL, MIN"'U~OT^ 55102 651.221.1773 FAX. 651.2Z3.5('46 WW'\1l'."'(l1.0^~.r~(.lM MAJL~"''''OI.I)^~.C'~M The following are recommended contract changes for the New Prior Lake Police and City Hall project. The approved coste; have been reviewed and represent a fair value for the work performed. Item Descriution PR #33 Steel angles were added at roof deck edges at City Hall PR #34 Two flush floor box receptacle!) were added to the Council Chambers for the spectator seating area. An additional 3" conduit stub out of the Police was added fot' Integra. Six-inch drain tile near the entry of City Hall can be eliminated because there is drain tile below at the basement footing. This resulted in a credit. PR #35 PR #36R The coiling door jambs at the transaction counters in City Hall have been framed with steel studs in lieu of tube steel columns, resulting in a credit. There were changes made to City Hall offices, resulting in changes to the location oftackwal1. Revisions to soffit in the Police Lunch room, due to mechanical equipment layout, resulted in a cost. PR #37 PR #38 PR #40 Clarifications to the framing at the City Hall cllrtainwal1 resulted in a cost. PR #45 Conference room C204 and office C209 swapped locations, resulting in a cost PR #47 Six-inch drain tile at Police can be eliminated because there is drain tile below at the basement footmg. This resulted in a credit. WOLD AR.CHITECTS ANO ENG!N~ER$ Annroved Cost $ 1,282 $ 4,234 ($ 1,307) ($ 218) $ 295 $ 3,240 $ 777 $ 7,180 ($ 1,398) 08/25/06 13:27 FAX 6512235646 WOLD ~ 003/005 r _~lU 5". P.\UL. MN ELc'I<.IL TROY. MI DnlVF.J. CO '_0'" City ofPlior Lake - Prior Lake Police / City Hall Page 2 - SJ #20.1 R5 Clarifications of the ceiling structure in C 123 $4,000 and C124 resulted 1n a cost. SI#45 A credit was offered to use used generators in ($13,350) lieu of new generators at both buildings. SI #99R Door hardware changes at electrical rooms in $ 1,980 City Hall and Police resulted in a cost. SI#107R.l Revisions to storm drain piping at Polices $ 2,677 resulted in a cost. SI #113R Sprinkler changes in the Police Lunch Room $199 ceiling resulteo in a cost. S1 #136 Door hardware changes resulted in a cost. $ 6,105 SI #139R There was a cost for added gyp. board and $ 4,803 cau11cing to obtaln a I-hour flre rating in Police. SI #142 Clarifications to the soffits in the open office $ 2,556 area at Police resulted in a cost. Total $ 23,055 Upon approval by City Council, we will issue Change Order #4 for the project. Please call me with any questions. cc; Bill O'Rourke, Police C.hief Michael Cox, Wold Aimee LaLone, Wold PYJCI_Prior(..11cei042] 81/aug06 W 0 t. [) ARC Ii I T r. C T S ^ N DEN GIN F. F. R S 08/25/06 13:27 FAX 6512235646 WOLD ,-=>~AIA Document G701™ Change Order -PROJECT (Name and addren): City ofPnoT Lake - New City H:Jll Polia: Station Dakota and Arcadia Streets Prior J..ake.. Minnesota 5372 CI-lANGE ORDER NUMBER: Four (4) DATE: August 2S. 2006 TO CONTRACTOR (Namc and uddrm): SluIw-Lun~ui't Assooiate;,lnc. 2757 Well: Service R.oad Sl Paul, Minnesota 55121 ARCHITECT'S PROJECT NUMBER: 042181 CONTRACT DATE: SeplelJlber 19. 2006 CONTRACT FOR: General. ConS1l'Uction - 2001 ~ 0041005 OWNER: 0 ARCHITECT: 0 CONTRACTOR: 0 FIELD: 0 OTHER: 0 THE CONTRACT IS CHANGED AS FOLLOWS: (JncIude, whcre appliCtlble. arry undisputed amount attribulublt ro previoll:tty Ul!cuted COfUtrllction Change Dirutives) PR #33 Steel change at City Iiall Add $ 1,282.00 PR#34 Add floor ........I:'....c1cs in Council Chambers and add 3" conduit at Police Station E1i.min~ extra drain tile at City Hall Change fnm.iJ1g at City Hsll ~iling doors Ch:mgc 1l1lltkerboaIds and rackwall nl. City Hail Soffit changes at Police LunchTOOm Steel clumges :It City Hall Offi~ and Confere.occ: Room changes at City Hall ElimiJlate elttr:l drain tile at Polioe Station Ce.iling strUcture change at City Hall Change from new.to u~ed generator.! Ch:m~ door hudwOlJ'e at electrical rooms Change S!orm drain at Po lice Station Mcdlanical changes at Police Lunchroom ClwIges to door h:1rdwIIC l.fIR wall framing change in Police Station Soffit changadn Police Stalion PR #35 PR #36R PR#37 PR ~38 PR #40 PR#45 PR#41 SI #20.1 51 #45 SI'/I99R 51 #J07R.l SI #1l3R 51 #136 ST#139R 51#142 TOTAL FOR CHANGE ORDER NO.4 Add Deduct Deduct Add Add Add Add Deduct Add Deduct Add Add Add Add Add Add ADD The original Conlr3ct5um wa~ The nc:L cbangc by previously authorized Change Orden The Contrad Sum .prior [0 this Change Order was The Contrsct Sum wiLl be inCl'e3Sed by this Change Order in thc amount of The new ContnlCt Sum includin~ this Cban~e Order win be The Contract Time will be unchanged by Zero ( 0 ) days. The date of Subst:mtial Completion :Ill of the dale of this Change Order therefote is Augu.~t 31. 2006 $ 4.234.00 ($ 1,307 .00) ($ 218.00) $ 295.00 $ 3.240.00 $ 777.00 $ 1.180.00 ($ 1,398.00) $ 4,000.00 ($13,350.00) $ 1.980.00 $ 2,677.00 $ 199.00 $ 6.105.00 $ 4,803.00 $ 2,556.00 $23,055.00 $ $ $ $ $ 11,157.800.00 103,494.00 11.261.294.00 23,055.00 11,284.349.00 NOTE: This ChaJJge Order docs not includc changes in the Contract SUJ:Tl, Contr.\ct Time or Gullnlllreed Maximum Price which have been authorized by Construction Change Directive until the co~ and time Iuve becn agreed upon by both the Owner and Conuactor. in which case a Change Order is C;ltt:cuted to supeuede the Construction Change Dira:tivc. AlA Document G101'" _ ~,. copyright ~ 1979. 1!lB7, 2000 and 2001 by The American In6tilut<:: 01 Architucl$. All rights reserved. WAl'lJoltNG: Thl!l A1A'~ DocumclIll!l protecled by U.s. copyright Wow and l"t"""stlollQl Tre....lles. Unauthorlzed reproduction or dl!lvibulicn 01 till!; AlA" DOcumenl, 1 or any porlioll 01 it, m:loY result in $t!veru civil :lond cr;I'1inl1l penallicls. :ll'Id will be prosecuted to the mawlmum Dlltent possible under 1M 1:0"'. This document was llfOduced by AlA ~oftware at 1a:SB:23 on 08/2512006 under Ordel No.IOO021B721...1 which expires on 1/3012007, end is no1 lor resale. U!ler Nole!:: (24aB.9~417) 08/25/06 13:27 FAX 6512235646 WOLD __ ___,. _'M -_.- III 005 /005 NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Wold An:hitccL~ and EnJl:inecrs Shaw-lundquist Associatcs, Tne. Ciry of Prior Lalc:e ARCHITECT (Fim name) CONTRACTOR (Firm name) OWNER (Firm name) 305 St. Peter Street, St. Paul, Minnesota 55102 ADDRESS ADDRESS ADDRESS BY (Sig1l/lIurt) BY (Signature) BY (Signa.ture) (Typed name) (Typed name) (Typl!d name) DATE DATE DATE AlA Document G70, N _ 2001. CDpyrlghl C 1919, 1987, 2000 and 2001 by The American II1&~tute of Art:hileGlS. All rights reserved. WARNING: This AlA" ODCuMent i5 llrotecled by US. CoPVrlght I.;!W and tnternallonal Trc:rtlee. Un:sLl1hOrized reproduction or di$lribullon of thi!< AlA" Doeumonl, 2 Dr a"v portio" of it. "",y resull in !Jl!vere eiviland criminal pen.lli~s. and will be prosecuted to the maximum eXlent posslblo under the loow. This . document was produced by AlP. software at 12:58:23 on 08/25/2006 under Order No.1 0002'872'_' which expirss en 1130r.l007, and is nOllor res;)le U$er NoIe!:; (2496329417)