CITY COUNCIL AGENDA REPORT
SEPTEMBER 5, 2006
5B
BILL O'ROURKE
CHIEF OF POLICE
CONSIDER APPROVAL OF CHANGE ORDER #4 TO THE POLICE
STATION/CITY HALL CONSTRUCTION PROJECT.
Introduction
The purpose of this agenda item is to receive authorization for Change Order
#4 for the police station/city hall construction project.
Historv
Modifications to the original construction contract are made for various reasons
throughout the project. Change order #1 authorized $125,000.00 for sales tax;
thereby increasing the total construction contract sum to $11,282,800.00. The
modifications approved by change order #2 resulted in a reduction to that
number of $34,088.00, bring the total contract sum at that time down to
$11,248,712.00. And finally, the twenty-one changes authorized by change
order #3 in June increased the construction contract sum by $12,582.00; for a
total of $11,261,294.00.
Current Circumstances
A copy of the change order showing an itemized listing of the modifications is
attached to the agenda report. This change order consists of seventeen (17)
changes, thirteen (13) of which are increases and four (4) reductions to
previous plans.
Taken together the seventeen (17) modifications result in a $23,055.00
increase to the total construction contract, bringing that contract total to
$11,284,349.00.
1) Approve Change Order #4.
2) Deny approval and direct staff to prepare additional information.
Alternative #1.
Rev~~:( ~
Frank COYle~ M mager
www.cityofpriorlake.com
2oo"h8ft~~~~4Ji~~0 / Fax 952.447.4245
08/25/06
-T-
13:26 FAX 6512235646
lllDLD
ST. C'^UL, MN
ELGIN, It
TROY, MI
DENliU. CO
WOLD
E M 0 RAN DUM
TO: Bill Wolters
FROM: John McNamara V
DAfl2:
COMM. NO:
SUBJECT:
August 15, 2006
042181
City of Prior Lake - Prior Lake Police / City Hall
I4J 002/005
MINNESOTA OFFICE.
305 5". Pl!UR STI1.F-tT
ST. PAUL, MIN"'U~OT^ 55102
651.221.1773
FAX. 651.2Z3.5('46
WW'\1l'."'(l1.0^~.r~(.lM
MAJL~"''''OI.I)^~.C'~M
The following are recommended contract changes for the New Prior Lake Police and
City Hall project. The approved coste; have been reviewed and represent a fair value
for the work performed.
Item
Descriution
PR #33
Steel angles were added at roof deck edges at
City Hall
PR #34
Two flush floor box receptacle!) were added to
the Council Chambers for the spectator seating
area.
An additional 3" conduit stub out of the Police
was added fot' Integra.
Six-inch drain tile near the entry of City Hall
can be eliminated because there is drain tile
below at the basement footing. This resulted in
a credit.
PR #35
PR #36R
The coiling door jambs at the transaction
counters in City Hall have been framed with
steel studs in lieu of tube steel columns,
resulting in a credit.
There were changes made to City Hall offices,
resulting in changes to the location oftackwal1.
Revisions to soffit in the Police Lunch room,
due to mechanical equipment layout, resulted in
a cost.
PR #37
PR #38
PR #40
Clarifications to the framing at the City Hall
cllrtainwal1 resulted in a cost.
PR #45
Conference room C204 and office C209
swapped locations, resulting in a cost
PR #47
Six-inch drain tile at Police can be eliminated
because there is drain tile below at the basement
footmg. This resulted in a credit.
WOLD AR.CHITECTS ANO ENG!N~ER$
Annroved Cost
$ 1,282
$ 4,234
($ 1,307)
($ 218)
$ 295
$ 3,240
$ 777
$ 7,180
($ 1,398)
08/25/06 13:27 FAX 6512235646
WOLD
~ 003/005
r
_~lU
5". P.\UL. MN
ELc'I<.IL
TROY. MI
DnlVF.J. CO
'_0'"
City ofPlior Lake - Prior Lake Police / City Hall
Page 2
-
SJ #20.1 R5 Clarifications of the ceiling structure in C 123 $4,000
and C124 resulted 1n a cost.
SI#45 A credit was offered to use used generators in ($13,350)
lieu of new generators at both buildings.
SI #99R Door hardware changes at electrical rooms in $ 1,980
City Hall and Police resulted in a cost.
SI#107R.l Revisions to storm drain piping at Polices $ 2,677
resulted in a cost.
SI #113R Sprinkler changes in the Police Lunch Room $199
ceiling resulteo in a cost.
S1 #136 Door hardware changes resulted in a cost. $ 6,105
SI #139R There was a cost for added gyp. board and $ 4,803
cau11cing to obtaln a I-hour flre rating in Police.
SI #142 Clarifications to the soffits in the open office $ 2,556
area at Police resulted in a cost.
Total $ 23,055
Upon approval by City Council, we will issue Change Order #4 for the project.
Please call me with any questions.
cc; Bill O'Rourke, Police C.hief
Michael Cox, Wold
Aimee LaLone, Wold
PYJCI_Prior(..11cei042] 81/aug06
W 0 t. [) ARC Ii I T r. C T S ^ N DEN GIN F. F. R S
08/25/06 13:27 FAX 6512235646
WOLD
,-=>~AIA
Document G701™
Change Order
-PROJECT (Name and addren):
City ofPnoT Lake - New City H:Jll
Polia: Station
Dakota and Arcadia Streets
Prior J..ake.. Minnesota 5372
CI-lANGE ORDER NUMBER: Four (4)
DATE: August 2S. 2006
TO CONTRACTOR (Namc and uddrm):
SluIw-Lun~ui't Assooiate;,lnc.
2757 Well: Service R.oad
Sl Paul, Minnesota 55121
ARCHITECT'S PROJECT NUMBER: 042181
CONTRACT DATE: SeplelJlber 19. 2006
CONTRACT FOR: General. ConS1l'Uction
-
2001
~ 0041005
OWNER: 0
ARCHITECT: 0
CONTRACTOR: 0
FIELD: 0
OTHER: 0
THE CONTRACT IS CHANGED AS FOLLOWS:
(JncIude, whcre appliCtlble. arry undisputed amount attribulublt ro previoll:tty Ul!cuted COfUtrllction Change Dirutives)
PR #33 Steel change at City Iiall Add $ 1,282.00
PR#34 Add floor ........I:'....c1cs in Council Chambers and add 3" conduit
at Police Station
E1i.min~ extra drain tile at City Hall
Change fnm.iJ1g at City Hsll ~iling doors
Ch:mgc 1l1lltkerboaIds and rackwall nl. City Hail
Soffit changes at Police LunchTOOm
Steel clumges :It City Hall
Offi~ and Confere.occ: Room changes at City Hall
ElimiJlate elttr:l drain tile at Polioe Station
Ce.iling strUcture change at City Hall
Change from new.to u~ed generator.!
Ch:m~ door hudwOlJ'e at electrical rooms
Change S!orm drain at Po lice Station
Mcdlanical changes at Police Lunchroom
ClwIges to door h:1rdwIIC
l.fIR wall framing change in Police Station
Soffit changadn Police Stalion
PR #35
PR #36R
PR#37
PR ~38
PR #40
PR#45
PR#41
SI #20.1
51 #45
SI'/I99R
51 #J07R.l
SI #1l3R
51 #136
ST#139R
51#142
TOTAL FOR CHANGE ORDER NO.4
Add
Deduct
Deduct
Add
Add
Add
Add
Deduct
Add
Deduct
Add
Add
Add
Add
Add
Add
ADD
The original Conlr3ct5um wa~
The nc:L cbangc by previously authorized Change Orden
The Contrad Sum .prior [0 this Change Order was
The Contrsct Sum wiLl be inCl'e3Sed by this Change Order in thc amount of
The new ContnlCt Sum includin~ this Cban~e Order win be
The Contract Time will be unchanged by Zero ( 0 ) days.
The date of Subst:mtial Completion :Ill of the dale of this Change Order therefote is Augu.~t 31. 2006
$ 4.234.00
($ 1,307 .00)
($ 218.00)
$ 295.00
$ 3.240.00
$ 777.00
$ 1.180.00
($ 1,398.00)
$ 4,000.00
($13,350.00)
$ 1.980.00
$ 2,677.00
$ 199.00
$ 6.105.00
$ 4,803.00
$ 2,556.00
$23,055.00
$
$
$
$
$
11,157.800.00
103,494.00
11.261.294.00
23,055.00
11,284.349.00
NOTE: This ChaJJge Order docs not includc changes in the Contract SUJ:Tl, Contr.\ct Time or Gullnlllreed Maximum Price which
have been authorized by Construction Change Directive until the co~ and time Iuve becn agreed upon by both the Owner and
Conuactor. in which case a Change Order is C;ltt:cuted to supeuede the Construction Change Dira:tivc.
AlA Document G101'" _ ~,. copyright ~ 1979. 1!lB7, 2000 and 2001 by The American In6tilut<:: 01 Architucl$. All rights reserved. WAl'lJoltNG: Thl!l
A1A'~ DocumclIll!l protecled by U.s. copyright Wow and l"t"""stlollQl Tre....lles. Unauthorlzed reproduction or dl!lvibulicn 01 till!; AlA" DOcumenl, 1
or any porlioll 01 it, m:loY result in $t!veru civil :lond cr;I'1inl1l penallicls. :ll'Id will be prosecuted to the mawlmum Dlltent possible under 1M 1:0"'. This
document was llfOduced by AlA ~oftware at 1a:SB:23 on 08/2512006 under Ordel No.IOO021B721...1 which expires on 1/3012007, end is no1 lor resale.
U!ler Nole!:: (24aB.9~417)
08/25/06 13:27 FAX 6512235646
WOLD
__ ___,. _'M -_.-
III 005 /005
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Wold An:hitccL~ and EnJl:inecrs Shaw-lundquist Associatcs, Tne. Ciry of Prior Lalc:e
ARCHITECT (Fim name) CONTRACTOR (Firm name) OWNER (Firm name)
305 St. Peter Street, St. Paul, Minnesota
55102
ADDRESS ADDRESS ADDRESS
BY (Sig1l/lIurt) BY (Signature) BY (Signa.ture)
(Typed name) (Typed name) (Typl!d name)
DATE DATE DATE
AlA Document G70, N _ 2001. CDpyrlghl C 1919, 1987, 2000 and 2001 by The American II1&~tute of Art:hileGlS. All rights reserved. WARNING: This
AlA" ODCuMent i5 llrotecled by US. CoPVrlght I.;!W and tnternallonal Trc:rtlee. Un:sLl1hOrized reproduction or di$lribullon of thi!< AlA" Doeumonl, 2
Dr a"v portio" of it. "",y resull in !Jl!vere eiviland criminal pen.lli~s. and will be prosecuted to the maximum eXlent posslblo under the loow. This
. document was produced by AlP. software at 12:58:23 on 08/25/2006 under Order No.1 0002'872'_' which expirss en 1130r.l007, and is nOllor res;)le
U$er NoIe!:; (2496329417)