CITY COUNCIL AGENDA REPORT
SEPTEMBER 18, 2006
9A
CRAIG ELDRED, STREET AND UTILITIES SUPERVISOR
CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING
CONSTRUCTION OF A BRINE ADDITION TO THE SAND/SALT STORAGE
BUILDING AT THE CITY'S MAINTENANCE FACILITY.
Introduction
The purpose of this agenda is to consider approval of a resolution authorizing
construction of a brine addition to the sand/salt storage building at the City's
Maintenance Facility.
Historv
Because of its effectiveness in snow and ice control, the City has been
substituting brine (water salt mixture) in lieu of more traditional salt or sand and
sand mixtures. To do so, requires an area to make the solution.
The brine production unit is currently housed in the Maintenance Center
garage which eliminates the use of two parking stalls. As a result, City
equipment which should be stored inside is not. Construction plans were
proposed for the brine production addition which would utilize a stick frame
structure and a metal exterior and brick fa<;ade to enhance construction
features. The 2006 Capital Improvement Program (CIP) authorized
$15,000.00 for construction of the addition that would be completed by City
staff.
Current Circumstances
As part of preliminary design meetings with the Planning and Building
departments, it was determined the brine production addition would need to
meet more stringent industrial park design standards. These increased
standards changed the sidewall standards from metal and a brick fa<;ade to full
block walls, and changed a shingled roof to a standing metal seam roof
material.
Conclusion
The required design changes decreased the amount of work City staff could
complete and increased costs substantially.
Meeting the current construction standards for the city business park, the cost
for materials and construction for the walls and roof has more than doubled the
initial estimates.
Staff obtained quotes from several vendors for each portion of the addition.
The quotes for each area of the brine production addition are as follows:
www.cityofpriorlake.com
Phone 952.4474230 / Fax 952.4474245
Overhead Doors:
Action Overhead Doors
Service Door:
Greene Doors
$ 3,144.951
$ 1,450.101-
Plumbing and Heating (In floor):
Temp Assure
Scherer
t
$ 2,896.80
$ 3,350.00
Electrical:
Hayes
Vesely
$ 5,500.00 j.
$ 5,750.00
Roof, Interior Supplies:
Monnens
C&H Carpenter
Westermann
$14,775.00
$12,860.34
$11,926.96 t
Block Walls Flat Concrete:
Greystone Construction
Greystone Masonry
Cervenka Masonry
TOTAL CONSTRUCTION COSTS
$28,000.00
$23,345.22 ~
$24.827.00
$48,264.03
The $15,000.00 Capital Improvement Program allocation was to be taken from
the Street Operating Budget. The remaining $33,300.00 is to be transferred
from the City Contingency fund to the Street Operating Budget. Public Works
staff has reviewed this funding with the Finance Director and the required
funding is available through the Contingency fund.
ALTERNATIVES:
1. Approve a resolution authorizing transfer of $35,000.00 from the
Contingency Fund to the Street Operation Budget and construction of the
brine production addition in an amount of $48,300.00.
2. Table this item for a specific reason.
3. Deny this item for a specific reason and provide staff with direction.
RECOMMENDED
MOTION:
Alternative #1.
ReVie(~ M
-.
Frank Boyles, vnag r
Steve Albrecht, Public Works Director/City Engineer
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
RESOLUTION 06-xx
A RESOLUTION AUTHORIZING CONSTRUCTION OF AN ADDITION TO THE SAND/SALT
BUILDING FOR BRINE PRODUCTION
Motion By:
Second By:
WHEREAS, City staff has identified the need for the expansion of a brine production addition to the
existing sand/salt storage building; and
WHEREAS, Increased cost to construct the addition are relevant to meet city building codes in the
current business park; and
WHEREAS, Costs associated to complete the addition have escalated to an amount not to exceed
$48,300.00; and
WHEREAS, The 2006 budget allocated $15,000.00 for the Brine Production addition; and
WHEREAS, An additional amount of $33,300.00 would be transferred from the Contingency Fund to
the current 2006 street budget to complete the brine production addition.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. City Council approves the construction of the brine production addition to the current sand/salt
storage building located at the Public Works Maintenance facility site at a cost not to exceed
$48,300.00.
3. City Council approves authorization to transfer $33,300.00 from the Contingency Fund to the 2006
street operating budget.
4. Funds for completing the brine production addition not to exceed $48,300.00 should be drawn from
the street operating fund.
PASSED AND ADOPTED THIS 18TH DAY OF SEPTEMBER 2006.
YES
NO
I Haugen
I Dornbush
I Erickson
I LeMair
I Millar
Haugen
Dornbush
Erickson
LeMair
Millar