Loading...
HomeMy WebLinkAbout5J - Construction of Pike Lake Trail STAFF AGENDA REPORT DATE: 5J GREG ILKKA, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER CONSIDER APPROVAL OF CHANGE ORDER NO. 1 TO THE CONTRACT FOR CONSTRUCTION OF PIKE LAKE TRAIL TO ELIMINATE A RETAINING WALL. MARCH 16, 1998 AGENDA #: PREPARED BY: SUBJECT: BACKGROUND: The improvement of Pike Lake Trail was in the 1997 C.I.P. (Capital Improvement Program). Plans and specifications were prepared and bids were opened on August 4, 1997. As part of the design a retaining wall was required on the west side of Pike Lake Trail. After construction began Herb Wensmann. owner of both parcels on the west side of Pike Lake Trail. approached the City with draft plans to develop one site on the southerly most part of the property and requested an access directly to Pike Lake Trail for this site. The engineering staff met with Wensmann and his engineer to discuss this concept. He can pursue building on this site with a building permit. Further development of the parcel would require platting. Pike Lake Trail is a Minor Collector, and the request for an access at the proposed location is consistent with a Minor Collector. Due to the topography of the site an access at the requested location required significant fill. Wensmann offered the use of material from his parcel. With placement of the fill the need for a retaining wall as contemplated in the approved project plans to support Pike Lake Trail was eliminated. The need for a guard rail was eliminated as well. By the time Wensmann brought his request to the City the retaining wall sub-contractor had incurred costs of engineering, mobilization, and freight. Additionally, he incurred a re-stocking charge to return the blocks. The utility sub-contractor incurred a re-mobilization cost to return to the " 0 16200CE~ Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER FISCAL IMPACT: ALTERNATIVES: RECOMMENDATION: ACTION REQUIRED: PLTCOI.DOC .... I project and make required watermain modifications to accomodate the slope vs. retaining wall. This project was assessed to abutting properties and Wensmann was assessed $187,612 for street costs. Included with this change order is the cost for the utility sub- contractor to provide a water service stub to one of the parcels in the Maple Hill Plat. This water service was not originally contemplated in this contract but the homeowner requested it during construction. The property was assessed for water, thus recovering this cost for the City. The change in contract cost is summarized on the attached sheet and totals a deduction of $72,632. There are two alternatives for the City Council to consider: 1. Approve Change Order NO.1 to Pike Lake Trail to eliminate a retaining wall. 2. Deny this item and provide staff with direction. On October 13, 1997, the City Council reviewed and concurred with this change at a work session with the formal change order to be presented at a later date once final costs/deductions were determined. The contractor has finalized his costs and a formal change order is attached for Council approval. Alternative No. 1 Motion and second to pprove recommended alternative. ~J REVIEWED MAR-10-S8 TUE 14:28 03/10/96 09:4$ TO: FOR: OWNER: ~4X 612 447 4245 MCNAMARA CONTRACTING INC Cln' PRIOR LAKE FAX NO, 6123225944 ~GE ~,...,._ CITY OIl rlUOR LAKE 19z00 JU,GLE CRUX A" &'- UE SE PRIOR LAKE. MN SS37J M<;Namapa C...~;....,.ating. lc.c. SOOll60th Stn)etWcst RosemouDt, MN 55068-1304 , , p, 02 ~002 !JIANGE ORDlm,NO. 1 DAlE: ~t:oJ~t No. 97-~ 7. Pike Lak~ Tmil ~g, Stqnn SC'WflI:, and ~treetL.....k'.u..~CIl1S City ofPriot Lako March 9, 1998 You a1;e Mxe~ dir~d ,to m~ the folloWing ~haage to your contl'iWt dated Awrust 18. 1997'1. U16 c;cl~6 'and the WQtk affi:!c:ted tbereby is. SUbjec;t to aU con1nu;t stipulAtions and GQnnants. This Ch~ge' O.i-der WnJ 'deC;:J~ ~ ~f1trJ.ct ~ by: ,Seventy-Tw9~A,o~q;-S~~~ 'QPrtv- Two a,pd Noll 00 t>aUars (t:D.632.DO) Declllct 'the fol1V'W~~lg; Item-' I.' 2. I! - " .. BI.lIo1. ..1....0 ".....OJ! ~, \ """'" . .Rct:~ning Wall '. C51>>rr4lw1 Add the f()l1owil1g: IWii' r. 2,. 3. 4. 5. 6. 7. 8. . ~. DelulDti()~ CwhplQ~ E~aVition Silt :Fe:t'1~, ' ,', ' , . ClelUlng - . Qi4bl)w.g . Ret'ajxlj:ng W~ ~airt~ JnQ1,.~.. . .l(wlI!:I S~) , ovq~~~o:'~~ ~ ~~~ le-M,Qb " W~ Mo.4ift~ C!!I.\"!\QI1'.<;1'AII!i?;)I'PllumO\()r,>I !l'~C 11 nit 'S.l. L.? IIDm . C.Y. L.P. I\ere A~ S.P- ~ L.S. L.S. L,S. L.S. Op~)J.lity Unit Pri~ 6.000 -. $14.30 510 ~ S13.00 Total Decluctio~ 01lGutity 1.000 600 0.13 0.23 130 1 1 1 1 Unit Pric~ - 53.S0 , $Z.7S 52,SOD.DO $l~SO.OO $23.00 $4.250,00 55,S10.00 SSOO.OO Sl.31 $.00 Total Additions Amount 585)800-00 S7 .410.00 '93,210.00 Am01lDt S 3.500.00- $ 1.650.00 S S15.00 S 288.00 S 2.990.00 S 4.2S0.00 S St510.00 S 500.00 S 1~lS.00 $20,578-00 " t. SUMMARY OF CONTRACT CHANGES Change Order No. 1 Pike Lake Trail Deductions: 6,000 S.F. Retaining Wall @$14.30/S.F. = $85,800 570 L.F. Guardrail @ $13.00 IL.F. = $ 7.410 Total Deductions = $93,210 Additions: Retaining Wall Sub-Contractor Costs Incurred (Engineering, Mob, Freight, Re-Stock): New Unit Price for Remaining Wall 130 S.F. @ $23/S.F. = $ 4,250 = $ 2,990 = $ 5,510 Prime Contractor Overhead Allocated to wall Utility Sub-Contractor Re-mobilization Watermain modifications Additional service stub = $ 500 = $ 610 = $ 705 Additional Work at Contract Prices Common Excavation: Silt Fence: Clearing: Grubbing: 1,000 C.Y. @ $3.50 ICY. = $ 3,500 600 L.F. @ $2.75/L.F. = $ 1,650 0.23 acre @ $2,500 lacre = $ 575 0.23 acre @ $1,250 lacre = $ 288 Total Additions = $20,578 NET CHANGE IN CONTRACT COST = - $72,632 PLTCOl.DOC MAR-10-98 TUE 14:28 MCNAMARA CONTRACTING INC FAX NO. 6123225944 P. 03 IfIl003 03/10/96 09;48 FAX 81~ ~47 l2~6 ~In!' PIUOR LAKE i DATE: Maret). 9, 1998 M~N~Co~. mo. ~O\ll l~Oth S~t Wed R,OSe!nount, MN 55068.1304 CHANGE ORDER. NO.1 TO: FOR: Frc.)j(1)t:1 No. 97~171o Pike Lake Trail G,adins. ~ wuu. Scwet and Street Improvements OWNER; City ofPner L~ Amuuot (If Qrlg.huil Contract $ 9S'Ui41.8S Change Order No. 1 ~ ~ ~7.W2-00> S 88.1.009.61- Rt:vis~d Contrill;t Amount 1he Contrac'.1ipllt ~or bituminous b=sc coursc e;ompletion for Pike Lake Trail is heteby extended to JunQ J 0,' 1 ~9,8:, $.l;lb~~aJ ~o~etion and. ~ wear COI1TSC QOrnp1etioD mr Pike Luke Trail is hereby ~n~ ~ ]~ly IS. ~998. ~ tiIf1c for Mushtown Rd. and Fish Point Rd. aze AOt affected by this -.;;~cmge. ApprOV~ a..~ to Fol;lb.: qTY AlTORNBY ArP~QYAtfu Approved: Cit~Prior La'P: "owne,'" ' Approved: lvf.cNIlJI:Wi! CQ.gtmcting.1,.n..c, By Mayor natf;l B~Q 1'11 Uo-fB ./ Pate By _'~_'. _" . City M~a4;~' ' Date TIt1eMIW,1 ~eluy o:lI.'lI.Oll''.': [~l~'9i\l1N~e.'$O\(.()\J;IQC