STAFF AGENDA REPORT
DATE:
5J
GREG ILKKA, DIRECTOR OF PUBLIC WORKS/CITY
ENGINEER
CONSIDER APPROVAL OF CHANGE ORDER NO. 1 TO
THE CONTRACT FOR CONSTRUCTION OF PIKE LAKE
TRAIL TO ELIMINATE A RETAINING WALL.
MARCH 16, 1998
AGENDA #:
PREPARED BY:
SUBJECT:
BACKGROUND:
The improvement of Pike Lake Trail was in the 1997 C.I.P.
(Capital Improvement Program). Plans and specifications
were prepared and bids were opened on August 4, 1997.
As part of the design a retaining wall was required on the
west side of Pike Lake Trail.
After construction began Herb Wensmann. owner of both
parcels on the west side of Pike Lake Trail. approached the
City with draft plans to develop one site on the southerly
most part of the property and requested an access directly
to Pike Lake Trail for this site. The engineering staff met with
Wensmann and his engineer to discuss this concept. He can
pursue building on this site with a building permit. Further
development of the parcel would require platting. Pike Lake
Trail is a Minor Collector, and the request for an access at
the proposed location is consistent with a Minor Collector.
Due to the topography of the site an access at the requested
location required significant fill. Wensmann offered the use
of material from his parcel. With placement of the fill the
need for a retaining wall as contemplated in the approved
project plans to support Pike Lake Trail was eliminated. The
need for a guard rail was eliminated as well.
By the time Wensmann brought his request to the City the
retaining wall sub-contractor had incurred costs of
engineering, mobilization, and freight. Additionally, he
incurred a re-stocking charge to return the blocks. The utility
sub-contractor incurred a re-mobilization cost to return to the
" 0
16200CE~ Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
FISCAL IMPACT:
ALTERNATIVES:
RECOMMENDATION:
ACTION REQUIRED:
PLTCOI.DOC
....
I
project and make required watermain modifications to
accomodate the slope vs. retaining wall. This project was
assessed to abutting properties and Wensmann was
assessed $187,612 for street costs.
Included with this change order is the cost for the utility sub-
contractor to provide a water service stub to one of the
parcels in the Maple Hill Plat. This water service was not
originally contemplated in this contract but the homeowner
requested it during construction. The property was
assessed for water, thus recovering this cost for the City.
The change in contract cost is summarized on the attached
sheet and totals a deduction of $72,632.
There are two alternatives for the City Council to consider:
1. Approve Change Order NO.1 to Pike Lake Trail to
eliminate a retaining wall.
2. Deny this item and provide staff with direction.
On October 13, 1997, the City Council reviewed and
concurred with this change at a work session with the formal
change order to be presented at a later date once final
costs/deductions were determined. The contractor has
finalized his costs and a formal change order is attached for
Council approval.
Alternative No. 1
Motion and second to pprove recommended alternative.
~J
REVIEWED
MAR-10-S8 TUE 14:28
03/10/96 09:4$
TO:
FOR:
OWNER:
~4X 612 447 4245
MCNAMARA CONTRACTING INC
Cln' PRIOR LAKE
FAX NO, 6123225944
~GE ~,...,._
CITY OIl rlUOR LAKE
19z00 JU,GLE CRUX A" &'- UE SE
PRIOR LAKE. MN SS37J
M<;Namapa C...~;....,.ating. lc.c.
SOOll60th Stn)etWcst
RosemouDt, MN 55068-1304
, ,
p, 02
~002
!JIANGE ORDlm,NO. 1
DAlE:
~t:oJ~t No. 97-~ 7. Pike Lak~ Tmil
~g, Stqnn SC'WflI:, and ~treetL.....k'.u..~CIl1S
City ofPriot Lako
March 9, 1998
You a1;e Mxe~ dir~d ,to m~ the folloWing ~haage to your contl'iWt dated Awrust 18. 1997'1.
U16 c;cl~6 'and the WQtk affi:!c:ted tbereby is. SUbjec;t to aU con1nu;t stipulAtions and GQnnants.
This Ch~ge' O.i-der WnJ 'deC;:J~ ~ ~f1trJ.ct ~ by:
,Seventy-Tw9~A,o~q;-S~~~ 'QPrtv- Two a,pd Noll 00 t>aUars (t:D.632.DO)
Declllct 'the fol1V'W~~lg;
Item-'
I.'
2.
I! - " ..
BI.lIo1. ..1....0 ".....OJ!
~, \ """'"
. .Rct:~ning Wall
'. C51>>rr4lw1
Add the f()l1owil1g:
IWii'
r.
2,.
3.
4.
5.
6.
7.
8.
. ~.
DelulDti()~
CwhplQ~ E~aVition
Silt :Fe:t'1~, ' ,', ' ,
. ClelUlng - .
Qi4bl)w.g .
Ret'ajxlj:ng W~
~airt~ JnQ1,.~.. . .l(wlI!:I S~)
, ovq~~~o:'~~
~ ~~~ le-M,Qb "
W~ Mo.4ift~
C!!I.\"!\QI1'.<;1'AII!i?;)I'PllumO\()r,>I !l'~C
11 nit
'S.l.
L.?
IIDm .
C.Y.
L.P.
I\ere
A~
S.P- ~
L.S.
L.S.
L,S.
L.S.
Op~)J.lity Unit Pri~
6.000 -. $14.30
510 ~ S13.00
Total Decluctio~
01lGutity
1.000
600
0.13
0.23
130
1
1
1
1
Unit Pric~ -
53.S0
, $Z.7S
52,SOD.DO
$l~SO.OO
$23.00
$4.250,00
55,S10.00
SSOO.OO
Sl.31 $.00
Total Additions
Amount
585)800-00
S7 .410.00
'93,210.00
Am01lDt
S 3.500.00-
$ 1.650.00
S S15.00
S 288.00
S 2.990.00
S 4.2S0.00
S St510.00
S 500.00
S 1~lS.00
$20,578-00
" t.
SUMMARY OF CONTRACT CHANGES
Change Order No. 1
Pike Lake Trail
Deductions:
6,000 S.F. Retaining Wall @$14.30/S.F. = $85,800
570 L.F. Guardrail @ $13.00 IL.F. = $ 7.410
Total Deductions = $93,210
Additions:
Retaining Wall Sub-Contractor
Costs Incurred (Engineering, Mob, Freight, Re-Stock):
New Unit Price for Remaining Wall 130 S.F. @ $23/S.F.
= $ 4,250
= $ 2,990
= $ 5,510
Prime Contractor Overhead Allocated to wall
Utility Sub-Contractor
Re-mobilization
Watermain modifications
Additional service stub
= $ 500
= $ 610
= $ 705
Additional Work at Contract Prices
Common Excavation:
Silt Fence:
Clearing:
Grubbing:
1,000 C.Y. @ $3.50 ICY. = $ 3,500
600 L.F. @ $2.75/L.F. = $ 1,650
0.23 acre @ $2,500 lacre = $ 575
0.23 acre @ $1,250 lacre = $ 288
Total Additions = $20,578
NET CHANGE IN CONTRACT COST = - $72,632
PLTCOl.DOC
MAR-10-98 TUE 14:28
MCNAMARA CONTRACTING INC
FAX NO. 6123225944
P. 03
IfIl003
03/10/96 09;48
FAX 81~ ~47 l2~6
~In!' PIUOR LAKE
i
DATE:
Maret). 9, 1998
M~N~Co~. mo.
~O\ll l~Oth S~t Wed
R,OSe!nount, MN 55068.1304
CHANGE ORDER. NO.1
TO:
FOR:
Frc.)j(1)t:1 No. 97~171o Pike Lake Trail
G,adins. ~ wuu. Scwet and Street Improvements
OWNER;
City ofPner L~
Amuuot (If Qrlg.huil Contract
$ 9S'Ui41.8S
Change Order No. 1 ~
~ ~7.W2-00>
S 88.1.009.61-
Rt:vis~d Contrill;t Amount
1he Contrac'.1ipllt ~or bituminous b=sc coursc e;ompletion for Pike Lake Trail is heteby extended
to JunQ J 0,' 1 ~9,8:, $.l;lb~~aJ ~o~etion and. ~ wear COI1TSC QOrnp1etioD mr Pike Luke Trail is
hereby ~n~ ~ ]~ly IS. ~998. ~ tiIf1c for Mushtown Rd. and Fish Point Rd. aze AOt
affected by this -.;;~cmge.
ApprOV~ a..~ to Fol;lb.:
qTY AlTORNBY
ArP~QYAtfu
Approved:
Cit~Prior La'P:
"owne,'" '
Approved: lvf.cNIlJI:Wi! CQ.gtmcting.1,.n..c,
By
Mayor
natf;l
B~Q 1'11 Uo-fB
./ Pate
By _'~_'. _"
. City M~a4;~' '
Date
TIt1eMIW,1 ~eluy
o:lI.'lI.Oll''.': [~l~'9i\l1N~e.'$O\(.()\J;IQC