DISCUSSION:
HISTORY
At the April 7, 1997 Council meeting, the Council authorized
Bonestroo, Rosene, Anderlik, & Associates to provide the
required professional engineering services for the
completion of well #6, reconstruction of well house #3, and
the associated water system improvements, which included
SCADA (Supervisory Control And Data Acquisition)
upgrading.
At the October 6, 1997 City Council meeting the Council
approved going forward with the upgrading of the SCADA
system in conjunction with the reconstruction of Wellhouse
#3, prior to beginning construction of well #6.
At the June 15, 1998 City Council Meeting the Council
approved the plans and specifications and authorized the
advertisement for bids for the replacement of the SCADA
system for the City's water distribution system. A copy of
the agenda report for that meeting is included with this
report.
CURRENT CIRCUMSTANCES
Bids for the replacement of the SCADA system were opened
on Monday, July 27,1998, and are tabulated as follows:
162()9\~@reek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
FINANCIAL IMPACT:
ALTERNATIVES:
RECOMMENDED
MOTION:
REVIEWED BY:
SCADAAWD.DOC
Contractor
Automatic Systems Co.
Dynamic Systems, Inc.
I Instrument Control Systems, Inc.
I System Control Services, Inc.
Total Bid
$182,000.00
$215,800.00
$198,159.00
$161,995.00
The Engineer's estimate for this project was $162,000.
ISSUES
Equipment procurement lead time required that this contract
be let and awarded now in order to be installed upon
completion of the reconstruction of Wellhouse #3 and be
ready for the 1999 peak demand season.
CONCLUSION
Based on the bids received it is the Staff and our Consulting
Engineer's recommendation (letter attached) to award the
bid to System Control Services, Inc. of St. Paul, Minnesota
in the amount of $161 ,995.00.
This project is being funded through the Trunk Reserve
fund. The Trunk Reserve Fund had a balance of
$1,904,325.23 on, June 1, 1998.
There are three alternatives for the City Council to consider:
1. Approve Resolution 98-XX awarding the bid for a
replacement of the Supervisory Control And Data
Acquisition system for the City's water distribution system
in the amount of $161,995.00 to System Control
Services, Inc. of St. Paul, Minnesota.
2. Deny this item for a specific reason and provide staff with
direction.
3. Table this item until some date in the future.
A motion and second as part of the Consent Agenda to
approve Resolution 98-XX awarding the bid for a
replacement Supervisory Control and Data Acquisition
system for the City's water distribution system.
~u~
r'
RESOLUTION 98-XX
RESOLUTION AWARDING THE BID FOR A REPLACEMENT SUPERVISORY
CONTROL AND DATA ACQUISITION SYSTEM FOR THE CITY'S WATER
DISTRIBUTION SYSTEM.
MOTION BY:
SECOND BY:
WHEREAS, The replacement of the Supervisory Control And Data Acquisition system for the
City's water distribution system is in the Capital Improvement Program, and
WHEREAS, plans and specifications have been prepared and approved for this project, and
WHEREAS, this project has been authorized for advertisement for bid, and
WHEREAS, pursuant to a call for bids for the replacement of the Supervisory Control And Data
Acquisition system for the City's water distribution system the following bids were.
received:
Contractor
Automatic Systems Co.
Dynamic Systems, Inc.
Instrument Control Systems, Inc.
System Control Services, Inc.
Total Bid
$182,000.00
$215,800.00
$198,159.00
$161,995.00
WHEREAS, upon analysis of the bids the apparent low responsible bidder is System Contol
Services, Inc., in the amount of $ 161,995.00.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, that System Control Services, Inc. of St. Paul, Minnesota be awarded the bid for
a replacement Supervisory Control and Data Acquisition system for the City's water distribution
system in the amount of $161,995.00.
Passed and adopted this 3rd day of August, 1998.
YES
NO
Mader
Kedrowski
Petersen
Schenck
Wuellner
Mader
Kedrowski
Petersen
Schenck
Wuellner
{Seal}
Frank Boyles
City Manager
City of Prior Lake
SCADAAWD.DOC
~(~ Bonestroo
~ Rosene
i-, Anderlil< &
1 \. 1 Associates
Engineers & Architects
Bonestroo, Rosene, Anderlik and Associates, Inc. is an Affirmative Action/Equal Opportunity Employer
Principals: Otto G. Bonestroo. PE. . Joseph C. Anderlik. P.E. . Marvin L. Sorvala. PE. .
Richard E. Turner, PE. . Glenn R. Cook, P,E. . Robert G. Schunicht P,E. . Jerry A. Bourdon, P.E. .
Robert W. Rosene, P.E. and Susan M. Eberlin, C.PA., Senior Consultants
Associate Principals: Howard A. Sanford. P.E. . Keith A. Gordon. PE. . Robert R. Pfefferle. P.E. .
Richard W. Foster. P.E. . David O. Loskota. P.E. . Robert C. Russek. A.I.A. . Mark A. Hanson. P.E. .
Michael T. Rautmann. P.E. . Ted K.Field. P.E. . Kenneth P Anderson. P.E. . Mark R. Rolfs. PE. .
Sid~y P Williamson. P.E.. L.S. . Robert F. Kotsmith . Agnes M. Ring. Michael f' Rau. P.E. .
Allan Rick Schmidt. PE.
Offices: St. Paul. Rochester. Willmar and St. Cloud. MN . Milwaukee. WI
Website: www.bonestroo.com
July 28, 1998
f\~05lvrJt.
JUl 2 9 1998
Mr. Greg Ilkka, P.E.
DPW /City Engineer
City Hall
16200 Eagle Creek Ave. SE
Prior Lake, MN 55372
Re: SCADA System; City Project No. 98-05
(BRAA File No. 56601B)
Dear Mr. Ilkka:
Bids were opened for the above referenced project on July 27, 1998 at 10:00 a.m. Four (4) bids
were received as follows:
System Control Services:
Automatic Systems:
Instrument Control System:
Dynamic Systems:
$161,995
$182,000
$198,159
$215,800
The engineer's estimate prepared by Bonestroo and Associates was $162,000. The engineer's
estimate was not given out during bidding in accordance with City policy.
System Control Services has completed SCADA system projects designed by Bonestroo and
Associates for the cities of Ramsey, Apple Valley, and Cottage Grove. These projects were
successfully completed.
I contacted Ron Smith of System Control Services this morning regarding their ability to
complete the project by the specified completion date of April 30, 1999. Mr. Smith assured me
that they will complete the project on schedule.
In summary, Bonestroo and Associates recommends that the City of Prior Lake award the
SCADA System project to System Control Services on the basis that they are capable of
completing the project and low bidder.
If you have any questions regarding this submittal, please feel free to call.
Sincerely,
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
~~~~
Thomas A. Roushar
2335 West Highway 36 · St. Paul, MN 55113 · 612-636-4600 · Fax: 612-636-1311
CITY COUNCIL AGENDA REPORT
MEETING DATE:
AGENDA #:
PREPARED BY:
JUNE 15, 1998
5L
GREG ILKKA, DIRECTOR OF PUBLIC WORKSICITY
ENGiNEER
CONSIDER APPROVAL OF RESOLUTION 98-XX
APPROVING PLANS AND SPECIFICATIONS AND
AUTHORIZING ADVERTISEMENT FOR BIDS FOR A
REPLACEMENT SUPERVISORY CONTROL AND DATA
ACQUISITION SYSTEM FOR THE CITY'S WATER
DISTRIBUTION SYSTEM.
AGENDA ITEM:
DISCUSSION:
HISTORY
At the April 7, 1997 Council meeting, the Council authorized
Bonestroo, Rosene, Anderlik, & Associates to provide the
required professional engineering services for the
completion of well #6, which is ongoing, the reconstruction
of well house #3 and the associated water system
improvements which included replacing the SCADA
(Supervisory Control And Data Acquisition) system.
At the October 6, 1997 City Council meeting the Council
approved going forward with the reconstruction of wellhouse
#3 and replacing the SCADA system prior to beginning
construction of well #6.
At the March 2, 1998 City Council Meeting the Council
approved the plans and specifications and authorized the
advertisement for bids for the reconstruction of wellhouse
#3.
At the April 6, 1998 City Council meeting the Council
awarded the reconstruction of wellhouse #3 to EnComm
Midwest, LLC. in the amount of $307,083.00. This was
$123,000 below the engineer's estimate.
CURRENT CIRCUMSTANCES
i
162~ Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNI1Y EMPLOYER
FISCAL IMPACT:
SCADA.DOC
Based on the Council action at the October 6, 1997 meeting
plans and specifications for the water SCADA system have
been prepared. Plans are available through the City's
consultant engineer (Bonestroo). Councilmembers
interested in reviewing these plans should contact the City
Engineer to arrange a review.
The new SCADA system will monitor the operation of, and
connect all of the City's key water distribution facilities via
radio to a main computer control center at the maintenance
center. These facilities include 3 wellhouses, two water
towers, and the Wilds booster station. Th'e current system is
dependent upon the phone system which is subject to
interuption. The current main control center is located within
wellhouse #3 which requires personnel to go to this location
to check and monitor th.e water system. The current controls
have been corroded by' the chemical environment in the .
wellhouse and have been rendered unreliable.
ISSUES
Equipment lead time requires this contract be let now and
awarded as soon as possible in order to be installed upon
the completion of wellhouse#3.
A sanitary sewer SCADA system is currently programmed in
the 1999 C.I.P. (Capital Improvement Program). Both
SCADA systems will be monitored and controlled from the
same main computer at the maintenance center. The main
computer will be acquired now with the water system
SCADA system.
CONCLUSION
The current SCADA system is unreliable and requires
replacement in conjunction with the reconstruction of
wellhouse #3. Replacement of the water distribution system
SCADA system was approved at the October 6, 1997
Council meeting. Plans and specifications have been
prepared and authorization for advertising for bids is
recommended.
The current estimate for the SCADA system is $162,000 and
is proposed to be funded through the Trunk Reserve Fund.
ALTERNATIVES:
RECOMMENDED
MOTION:
REVIEWED BY:
SCADA.DOC
There will be no fiscal impact by this action. The impact will
be at time of contract award. .
The alternatives for the Council to consider are:
1. Approve Resolution 98-XX approving plans and
specifications and authorizing advertisement for bids for
a replacement Supervisory Control And Data Acquisition
system for the Citys water distribution system.
2. Deny this item and provide staff with direction.
.
3. Table this item and provide staff with direction.
A motion and second to approve Resoluiton 98-XX
approving plans and specifications and authorizing.
advertisement for bids for a replacement Supervisory
Control And Data Acquisition system for the city's water
distribution system.
~
RESOLUTION 98-XX
RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING
ADVERTISEMENT FOR BIDS FOR A REPLACEMENT SUPERVISORY CONTROL AND
DATA ACQUISITION SYSTEM FOR THE CITY'S WATER DISTRIBUTION SYSTEM
MOTION BY:
SECOND BY:
WHEREAS, it is proposed to replace the current water distribution SCADA system, and
WHEREAS, plans and specifications have been prepared for this project, and
WHEREAS, the City Public Works Department has reviewed the plans and specifications for
the replacement of the current water distribution SCADA system and recommends
approval.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCil OF PRIOR LAKE,
MINNESOTA, plans and specifications for the replacement of the water distribution SCADA
system are hereby approved and advertisement for bids is hereby authorized.
Passed and adopted this 15th day of June, 1998.
YES
NO
Mader
Kedrowski
Petersen
Schenck
Wuellner
Mader
Kedrowski
Petersen
Schenck
Wuellner
{Seal}
Frank Boyles
City Manager
City of Prior lake
162<16^'r:a~ Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER