Loading...
HomeMy WebLinkAbout10C - Feasibility Report for 1999 Improvement Projects CITY COUNCIL AGENDA REPORT DATE: AGENDA #: PREPARED BY: AGENDA ITEM: JUNE 1, 1998 10C SUE MCDERMOTT, ASSISTANT CITY ENGINEER CONSIDER APPROVAL OF RESOLUTION 98-XX ORDERING PREPARATION OF FEASIBILITY REPORT FOR 1999 IMPROVEMENT PROJECTS DISCUSSION: HISTORY The City uses the Five Year Capital Improvement Program to plan its infrastructure improvements and the financing therefore. The proposed 1999 street program includes seven road improvements and one utility improvement project. The purpose of this Agenda item is to initiate the process for local improvements set forth in the 1999 portion of the 1999-2003 Capital Improvement Program in accordance with Minnesota Statutes (M.S.), Chapter 429. This process applies to all projects that will be financed in whole or part through special assessments or bond proceeds. The first step in the process is for the Council to order preparation of a Feasibility Report on the improvement projects. The Feasibility Report will address: the upgrading of Candy Cove Trail, Manor Road, Hill Circle, Lemley Circle, and Woodlawn Circle; the upgrading of Centennial Street; reconstruction of CSAH 42 from McKenna Avenue to the western City limits; and sanitary sewer and water construction in North Shore Oaks First Addition (see attached location map). CURRENT CIRCUMSTANCES Each of these projects is in the 1999 Capital Improvement Program. Attached are pages from the C.I.P. which provide additional information on these projects. All of the projects require special assessments or are to be financed through 16200~Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER FISCAL IMPACT: ALTERNATIVES: RECOMMENDED MOTION: 99CIPFEA.DOC bond proceeds and therefore require the City to follow the requirements of MS Chapter 429. ISSUES The City is required to assess a minimum of 20% of the cost of a public improvement project completed through the Chapter 429 process and financed through G.O. bonds. The City will meet the minimum assessment requirement. The Feasibility Report will determine the costs of the improvements and methods of financing. The preparation of the feasibility report is only the first step in the public improvement process. Following receipt of the feasibility report the council can determine which projects to move forward with by scheduling a public improvement hearing. If the council approves the hearing, it is still not committed to proceed with actual construction until bids are' solicited following approval to prepare plans and specifications. Passage of Resolution 98-XX at this time does not fiscally impact the City beyond the Engineering staff time required to prepare the Feasibility Report. There are three alternatives for the City Council to consider: 1. Approve Resolution 98-XX which orders preparation of a Feasibility Report for: the upgrading of Candy Cove Trail, Manor Road, Hill Circle, Lemley Circle, and Woodlawn Circle; the upgrading of Centennial Street; reconstruction of CSAH 42 from McKenna Avenue to the western City limits; and sanitary sewer and water construction in North Shore Oaks First Addition. 2. Deny this item for a specific reason and provide staff with direction. 3. Table this item until some date in the future. A motion and second to Approve Resolution 98-XX which orders preparation of a Feasibility Report for: the upgrading of Candy Cove Trail, Manor Road, Hill Circle, Lemley Circle, and Woodlawn Circle; the upgrading of Centennial Street; :. reconstruction of CSAH 42 from McKenna Avenue to the western City limits; .and sanitary sewer and water construction in North Shore Oaks First Addition. REVIEWED BY: ~vl 99CIPFEA.DOC ( RESOLUTION 98-XX ORDERING PREPARATION OF FEASIBILITY REPORT FOR 1999 IMPROVEMENT PROJECTS MOTION BY: SECOND BY: WHEREAS, it is proposed to construct improvements within the following generally described project area: 1. Candy Cove Trail, Manor Road, Hill Circle, Lemley Circle, Woodlawn Circle and Centennial Street by the construction of storm sewer, grading, aggregate base, concrete curb and gutter, bituminous surfacing, and appurtenant work; and 2. CSAH 42 from McKenna Avenue to the west City limits by the construction of storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, sidewalk, and appurtenant work; and 3. North Shore Oaks First Addition utilities by the construction of sanitary sewer, watermain and appurtenant work. WHEREAS, it is proposed to assess the benefited property for all or a portion of the cost of the improvements, pursuant to Minnesota Statutes, Chapter 429, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that the proposed improvements be referred to the City Engineer for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvements are feasible and as to whether they should best be made as proposed or in connection with other improvements, and the estimated costs for the improvements as recommended. 162<mI!aw~CreekAve. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER Passed and adopted this 1st day of June, 1998. YES Mader Kedrowski Petersen Schenck Wuellner {Seal} Frank Boyles City Manager City of Prior Lake 99CIPFEA.DOC Mader Kedrowski Petersen Schenck Wuellner NO ~ -='-7"'--- ------~. AREA. # 1 CANDY & CENTENNIAL S .COVE RECONSTRUCTIOTN 1999 CAPITAL BUDGET and 1999 - 2003 CAPITAL IMPROVEMENTS I I I I I. Description and Location: Construction of sanitary sewer and watermain in North Shore Oaks First Addition. I II. Purpose: I To provide sanitary sewer and water at the request of owners to replace failing septic systems and existing wells. ' Project Financing: Project Levy Property Tax Special Assessments Federal State County City MSA Funds Capital Park Fund Fund Balance Equipment Certificates I Grant/Contributions I Other/(Specify) I Total 1999 2000 60,000 60,000 Project Expenditures: Construction (New) Renovation/Repairs Land Acquisition Buildings and Plant Equipment Vehicles Other 1999 2000 60,000 Total 60,000 Department: Project Title: I Project Number: Project Useful Life: Public Works North Shore Oaks First Sanitary Sewer and Water Construction 30 Years I III. Needs Assessment: H Priority Rating 1 IV. ICostlBenefit Impact Statement: Septic systems are failing and in order to comply with City ordinances must be replaced with public utility. 2001 2002 2003 2001 2002 2003 CIP9 1999 CAPITAL BUDGET and 1999 - 2003 CAPITAL IMPROVEMENTS I I I I I. Description and Location: Street reconstruction project on Candy Cove Trail, Manor Road, Hill Circle, Lemley Circle, and Woodlawn Circle. Street reconstruction of Centennial Street. II. Purpose: To rehabilitate or restore streets to a 7 ton design standard. I I Project Financing: Property Tax Project Levy Special Assessments Federal State County City MSA Funds Capital Park Fund Fund Balance Equipment Certificates Grant/Contributions Other/(Specify) Total 1999 2000 486,000 414,000 Project Expenditures: Construction (New) I RenovationlRepairs Land Acquisition Buildings and Plant Equipment Vehicles Other 1999 2000 900,000 900,0001 Total Department: Project Title: I Project Number: I Project Useful Life: III. INeeds Assessment: I Priority Rating I IV. I Cost/Benefit Impact Statement: Improved streets will reduce maintenance for the streets. I I I I Note: Centennial is 100% assessed, Candy Cove area 60/40%. 2001 2002 2001 2002 Public Works Street Reconstruction 20 Years H 1 CIP 13 1999 CAPITAL BUDGET and 1999 - 2003 CAPITAL IMPROVEMENTS I I I I J I. Description and Location: I Reconstruction of CSAH 42 from McKenna Avenue to the western City limits. II. Purpose: Widen existing two-lane road to a four-lane rural roadway, and provide a bituminous trail. Includes twelve inch trunk water line extension. Department: Public Works Project Title: CSAH 42 Reconstruction I Project Number: Project Useful Life: 120 Years III. Needs Assessment: H Priority Rating 3 IV. I Cost/Benefit Impact Statement: This county highway improvement project will provide an extra two lanes to facilitate the increased traffic. Project Financing: 1999 2000 2001 2002 2003 Property Tax Project Levy 200,000 Special Assessments Federal State County 2,000,000 City MSA Funds Capital Park Fund Fund Balance Equipment Certificates Grant/Contributions Other/(Trunk Reserve) I 185,000 Total 2,385,000 Project Expenditures: 1999 2000 2001 2002 2003 Construction (New) 2,385,000 RenovationlRepairs Land Acquisition Buildings and Plant Equipment Vehicles Other Total 2,385,0001 CIP 16